Laserfiche WebLink
N <br />ro- <br />N <br />Q <br />F ORIDA 110SPITA Z PHYRHI <br />S BABY <br />P AC <br />]Florida Ilospital <br />ephyrhills <br />7050 Ciall 13oixle-vard <br />e h rhills IF <br />33541 <br />Clierit Code/ File <br />Number: 23/100046 <br />-- <br />1 12-1 Permit Set <br />PROJECT TEAM DIRECTORY <br />SYMBOLS AND <br />MATERIALS <br />GENERAL NOTES <br />INDEX OF DRAWINGS <br />A0.0 <br />Cover Sheet <br />OWNERIndustry <br />A.l COLUMN REFERENCE <br />j� <br />EARTH <br />standards (I.e. ASTM, ANSI, etc.) SHALL HAVE THE SAME FORCE AND EFFECT <br />on performance of work as if copies were directly Inserted into the Contract Documents or bound and <br />ARCHITECTURAL <br />� -- <br />published therewith. Comply with standards In effect as of the dote of the Contract Documents, <br />Florida Hospital Zephyrhills <br />�A WINDOW TYPE <br />COMPACTED SUBGRADE <br />unless otherwise note or required by authorities having Jurisdiction. <br />A1.O <br />Life Safety Flan -First Floor <br />_ _ _ _ _ _ _ _ CENTERLINE OR FLOOR LINE <br />A1.1 <br />Life Safety Plan - Second Floor <br />7050 Gall Boulevard <br />$ ELEVATION BENCHMARK <br />® <br />METAL <br />CODES - All work shall conform to the following codes and ordinances: <br />AI.2 <br />ICRA Plan - First Floor <br />Zephyrhills, Florida 33541 <br />A1.3 <br />ICRA Plan - Second Floor <br />Phone: (813) 788-0411 <br />REVISION & NUMBER <br />FINISH WOOD <br />- 2010 Florida Building Cade <br />-2010 Florida Plumbing Code <br />AIA <br />Demolition Plan <br />C.J.P CONTROL JOINT <br />EIFS/OFFS OR GYPSUM BOARD <br />- 2010 Florida Fuel Gas Code <br />2010 Florida Mechanical Code <br />-2010 Florida Accessibility Code <br />A2.0 <br />A2.1 <br />Second Floor Plan <br />Second Floor Plan Ceiling Plan <br />ARCHITECT <br />E.J.► EXPANSION JOINT <br />INSULATION BOARD - SECTION <br />- 2010 Florida Energy Conservation Code <br />- 2010 Florida Existing Building Code <br />-2010 Florida Fire Prevention Code - Effective December 31,2011 <br />A2.2 <br />Interior Elevations <br />- Local Codes and Ordinances and flood damage prevention ordinances where applicable <br />A3.1 <br />Interior Seconds <br />Inc.Burt Hill / Pollock Krieg Architects, I <br />NEW DOOR & FRAME <br />` > : ' . <br />CONCRETE OR GRAVEL <br />- 2009 NFPA 101 - Life Safety Code <br />- 2005 NFPA 99 - Health Core Facilities <br />A5.0 <br />Finishes and Door Schedule <br />-2010 Guidelines for Design and Construction of Health Care Facilities <br />A6.0 <br />Floor Finishes Plan <br />13099 South Cleveland Avenues Suite 500 <br />NEW METAL STUD WALL <br />CONCRETE MASONRY UNIT (CMU) <br />BUILDING CODE INFORMATION : <br />A6.1 <br />Wall Finishes Plan <br />Fort Myers, Florida 33907 <br />y <br />NEW MASONRY WALL <br />OCCUPANCY GROUP :1-2 <br />Phone: 239 482-4761 <br />( ) <br />=______= <br />WALL TO BE DEMOLISHED <br />® <br />PLYWOOD <br />TYPE OF CONSTRUCTION :TYPE 1B - FBC <br />PLUMBING <br />Fax: (2 3 9) 4 8 2 - 0 2 6 5 <br />CORRIDOR <br />197 ROOM NAME &NUMBER <br />� <br />ACOUSTIC CEILING TILE <br />TYPE 1 0,30 FULLY SPRI NKLERED NFPA <br />P0.1 <br />Plumbing Legends and General Notes <br />SQUARE FOOTAGE OF REMODELING. 8,695 SOFT <br />PLO <br />Plumbing Demolition Plan <br />(ID�D DOOR NUMBER <br />® <br />BATT OR SEMI -RIGID INSULATION <br />P1.1 <br />Plumbing Renovation Plan <br />MECHANICAL/ELECTRICAL ENGINEERS <br />SECTION OR DETAIL <br />RIGID INSULATION <br />I. Contractor to oversee cleaning and insure that the premises are maintained free of rubbish during construction. Final cleanup is the <br />responsibility of the Contractor. Contractor to provide Permitting Authority with Debris Affidavit of time of submittal. <br />MECHANICAL <br />A <br />Architecture <br />TLCEngineering for chitec}l Uri' <br />� <br />ELEVATION <br />ROUGH WOOD FRAMING OR BLOCKING <br />2. At the termination of work, submit to Building Agent/Tenant maintenance manuals presenting full details for care and maintenance of all <br />surfaces and equipment of every nature. Contents shall include manufacturer's and installer's names, addresses, and phone numbers, and <br />MO.1 <br />M0.2 <br />Mechanical Legend & General Notes <br />Infection Control Risk Assesment <br />500 N. Westshore Boulvard, Suite 435 <br />ua <br />instructions for Installation, start-up, operation, maintenance parts list, and data sheets. <br />INTERIOR ELEVATION <br />® <br />CONCRETE ROOF TILE <br />3. Contractor Is responsible for compliance with all Codes, Ordinances and Regulations applicable at project location. Contractor Is responsible <br />M1,0 <br />Mechanical Demolition Plan <br />Tampa, FL 33609 <br />for filing and securing all necessary permits, approvals, etc. for all trades. <br />MIA <br />Mechanical Renovation Plan <br />Phone: 813-637-011 Q <br />NORTH <br />METAL ROOFING <br />4. When 'or equal', "alternate', or other qualifying terms are used, those Items shall be approved by Building Agent/Tenant and/or Architect. <br />M2.0 <br />Mechanical Details <br />Fax: 813-637-0013 <br />PLAN NORTH <br />BRICK PAVERS <br />5. Existing materials or items scheduled to remain that are damaged by construction shall be repaired, patched, and refinished to the nearest <br />intersection, restoring surface to It's orlginol condltlon. <br />FIRE PROTECTION <br />SUPPLY DIFFUSER�`K.� <br />--�� <br />STRIP FLOURESCENT FIXTURE <br />6. Contractor shall protect all existing walls, doors, frames, surfaces, fixtures, finishes, etc. from damage during demolition and construction. Existing <br />materials to be removed shall be coordinated with Owner to verify if Owner wishes to salvage some. Relocation of salvaged materials, once <br />removed, to be by the Building Agent/Tenant's forces <br />FP0.1 <br />FP1.0 <br />Fire Protection Legend and General Notes <br />Fire Protection Renovation Plan <br />® RETURN GRILLE <br />PARABOLIC LIGHT FIXTURE <br />AAad��F �I101e <br />FLOURESCENT LiGHT FIXTURE <br />7. Contractor shall verify and be responsible for all dimensions and Job site conditions related to this work. Any discrepancy in dimensions or <br />special modifications required due to field conditions shall be reported to the Architect for clarification <br />ELECTRICAL <br />Q CEILING FAN <br />-�} <br />RECESSED LIGHT FIXTURE <br />8. The Architect does not have control or charge of, and shall not be held responsible for construction means, methods, techniques, sequence or for <br />safety precautions and programs in connection with work, for the acts or omissions of the contractor, subcontractors or any other persons <br />E0.1 <br />Electrical Legend and General Notes <br />performing any of the work, or for the failure of any of them to carry out the work in accordance with the Documents. <br />E1.0 <br />Electrical Demolition Plan <br />9. All pipes, ducts, conduit, etc., which penetrate the final slab or walls shall be Installed so as to maintain the fire resistive and structural Integrity <br />E1.1 <br />Electrical Lighting Plan4 <br />of the building construction. <br />E1.2 <br />Enlarged Electrical Plan <br />1� <br />G-A <br />l0. Demolition of existing construction necessary to Install new construction and equipment is to be performed by the contractor who is to <br />supply and Install the new construction and equipment. Install l)ntels where required with prior written approval. <br />ll. Contractor to repair floor slabs, f1/1 gaps, cracks and voids. Grind smooth any high spots or ridges. Floors to be as required to <br />prepared <br />receive floor finishes so that previous substrate defects cannot be detected. <br />N� <br />VICINITY MAP <br />NORTH <br />KEY PLAN <br />12, GENERAL CONDITIONS OF THE CONTRACT, AIA Document A201, latest edition, shall apply. <br />0 <br />��� Yt <br />\ <br />13. All gypsum board in partitions around 'wet use areas' ( i.e.: Toilet Room(s), Laundry Room(s), Shower Room(s), etc.) shall be of moisture -resistantr- <br />type, and these partltlons are to be sound -rated. <br />14. All studs, furring and miscellaneous metal accessories in walls having moisture -resistant gypsum board are to be of galvanized metal. <br />.._ <br />15. All fire rated partitions are to extend to deck above, and have all voids packed between the deck and top of wall with fire safeing insulation. <br />Floor track is to be set in a bed of sealant. Joints in gypsum board partitions are to be taped over the full height of the partition. <br />1 Y <br />16. Fire extinguisher cabinets mounting height to be 2'-6' from floor to bottom of receptacle. Top of extinguisher to be 4'-0' AFF, max. <br />t <br />17All non flre-rafed partitions are to extend 4' above suspended ceHing grid. All such partitions are t0 be braced back to the structural <br />s with suitable sub -framing at 48 o max. Provide additional framing, racl g and blocking for all required cabine y <br />decking or Joist - n .c„ m n, b n ntr <br />•' <br />Project L t ion <br />and equipment. <br />�. +F <br />oca <br />18. Not all listed GENERAL NOTES may apply, nor are they all-inclusive for every work situation. <br />z a xr,ta <br />` s Pra�ect <br />19. Each new FIRE WALL, FIRE BARRIER, FIRE PARTITION, SMOKE BARRIER, SMOKE PARTITION, or an other new wall <br />Y <br />decorative celling and protectedh Sg y <br />in concealed spaces ewithmthe words,'FIRE AND t SMOKE BARRIER I n PROTECTED ALL OPENINGS', <br />orgsimilar language. Sign or stencilinto in �ude UL Design number of partition. Such signs or stencll)ngg shall be in 4-Inch <br />; <br />high letters, % Inch stroke, and not more than 15 feet on center. Per Florida Fire Protection Code 101:8.3.2.4. Penetrations <br />¢ <br />- <br />through fire walls to be Identified In the some manor. <br />s <br />b <br />20. Contractor to repair any damaged spray fireproof. Patch shall be completed to maintain the require fire resistant rating. <br />' <br />M <br />ICI <br />U <br />bh <br />tV <br />N <br />Ob <br />U <br />CT <br />o <br />� � o <br />4 b <br />rz,C <br />y <br />ti <br />Project No. 13051.00 <br />iI'% r\ <br />512812014 3:49:32 PM ...\cd\A0-0 Cover Sheet.dgn <br />