FLORIDA HOSPITAL = ZEPHYRHILLS, FL <br />CHILLER NO. 2 REPLACEMENT <br />100% <br />MECHANICAL SPECIFICATIONS <br />I ELECTRICAL SPECIFICATIONS <br />DRAWING LIST <br />1. ALL SYSTEMS AND MATERIALS SHALL BE CONSTRUCTED IN STRICT ACCORDANCE WITH THE CURRENT EDITION OF ASHRAE FUNDAMENTALS, <br />1. GENERAL: PROVIDE MATERIALS, EQUIPMENT, ACCESSORIES, INCIDENTALS, ARTICLES, ITEMS OPERATIONS, <br />NATIONAL ELECTRICAL CODE, NATIONAL FIRE PROTECTION ASSOCIATION, THE FLORIDA BUILDING CODE, MECHANICAL, PLUMBING, AND ENERGY <br />INCLUDING LABOR, NECESSARY FOR COMPLETION OF WORK CALLED FOR ON THESE DRAWINGS. <br />CONSERVATION, LATEST ADOPTED EDITIONS, AND ALL CITY, COUNTY, STATE, AND FEDERAL CODES AND STANDARDS AS APPLICABLE FOR AND ALL <br />ME-1 COVER SHEET <br />AUTHORITIES HAVING JURISDICTION OVER THIS PROJECT. <br />2. REGULATORY REQUIREMENTS: ALL WORK SHALL CONFORM TO THE LATEST EDITION, ADOPTED BY THE <br />AUTHORITY HAVING JURISDICTION, OF THE FLORIDA BUILDING CODE, THE NATIONAL ELECTRICAL CODE AND <br />2. IF MECHANICAL EQUIPMENT OTHER THAN AS SPECIFIED IS UTILIZED WITH DIFFERENT ELECTRICAL, MECHANICAL, PLUMBING, OR DIMENSIONAL <br />THE NFPA. WORK SHALL COMPLY WITH THE REQUIREMENTS OF OSHA AND THE LOCAL BUILDING <br />M-1 MECHANICAL PLAN - CHILLER ROOM - DEMOLITION <br />CHARACTERISTICS, THAN THE CONTRACTOR SHALL COORDINATE WITH OTHERS AND PROVIDE THE NECESSARY CHANGES WITHOUT ADDITIONAL COST <br />DEPARTMENT PLANS REVIEWERS AND FIELD INSPECTORS. MATERIALS SHALL BE UNDERWRITERS <br />TO THE OWNER. <br />LABORATORIES APPROVED. <br />M-2 MECHANICAL PLAN - CHILLER ROOM - RENOVATION <br />3. SUBMIT SHOP DRAWINGS OF ALL EQUIPMENT AND MATERIALS FOR REVIEW BY THE ENGINEER. PROVIDE ADEQUATE COPIES FOR OWNER, <br />3, COORDINATION: INSTALLATION OF ALL WORK SHALL BE COORDINATED WITH EXISTING CONDITIONS IN THE <br />ENGINEER, CONTRACTOR, VENDOR RECORDS. PROVIDE WRITTEN INSTALLATION INSTRUCTIONS AND RECOMMENDATIONS FROM EACH <br />MANUFACTURER FOR ALL EQUIPMENT. SUBMIT DRAWINGS AND CATALOG CUT SHEETS FOR ALL EQUIPMENT AND MATERIALS SPECIFIED. <br />BUILDING. THE ELECTRICAL CONTRACTOR SHOULD VISIT THE SITE PRIOR TO SUBMITTING A FEE <br />PROPOSAL FOR THE WORK. THE ELECTRICAL CONTRACTOR SHALL COORDINATE THE INSTALLATION OF <br />M-3 MECHANICAL - DETAILS - SCHEDULES <br />4. SYSTEM CONTROLS SHALL BE PROVIDED BY TRANE CONTROLS. COORDINATE WITH AND REFER TO TRANE CONTROL DOCUMENTS FOR SEQUENCE <br />ELECTRICAL SERVICE TO EQUIPMENT FURNISHED BY OTHER TRADES. ELECTRICAL WORK SHALL BE <br />OF OPERATION AND METHODS OF CONTROL FOR ALL EQUIPMENT. THE CONTRACTOR SHALL COORDINATE ELECTRICAL REQUIREMENTS TO <br />PHASED AS REQUIRED BY THE WORK OF OTHER TRADES. <br />PROVIDE POWER TO LOCATIONS REQUIRED FOR OPERATION OF SYSTEMS AND ASSOCIATED CONTROLS. <br />E-1 ELECTRICAL - PARTIAL PLAN - RENOVATION <br />4. GUARANTEES: THE CONTRACTOR SHALL PROVIDE AONE-YEAR WRITTEN GUARANTEE FOR ALL MATERIALS <br />5. PROVIDE ALL NECESSARY VALVES, FITTINGS, AND ACCESSORIES IN THE CHILLED & CONDENSER WATER PIPING SYSTEMS AS REQUIRED FOR <br />AND LABOR FROM THE DATE OF SUBSTANTIAL COMPLETION. GUARANTEE SHALL COVER ALL LABOR AND <br />REMOVAL AND RENOVATION OF SYSTEMS AS INDICATED. COORDINATE WITH THE TRANE CO. TO DETERMINE ANY SPECIAL REQUIREMENTS OR <br />MATERIALS TO REPLACE DEFECTIVE MATERIALS AND TO ENSURE PROPER OPERATION OF ALL SYSTEMS. <br />ACCESSORIES REQUIRED FOR THE CONTROLS AND PROVIDE THESE ACCESSORIES IN THE PIPE SYSTEMS. <br />E-2 ELECTRICAL - PARTIAL PLAN - DEMOLITION <br />5. SHOP DRAWINGS: SUBMIT SHOP DRAWINGS AND PRODUCT INFORMATION FOR ALL ELECTRICAL EQUIPMENT <br />6. ALL ABOVE GRADE CHILLED AND CONDENSER WATER PIPING SHALL BE SCHEDULE 40 BLACK STEEL WITH WITH THREADED JOINTS FOR SIZES <br />AND DEVICES. <br />UP THROUGH 0/2". CONTRACTOR MAY USE SWEAT COPPER, TYPE L, FOR SMALL SIZES. PIPING LARGER THAN 2Y" SHALL BE WELDED OR <br />FLANGED JOINTS. PROVIDE DIELECTRIC COUPLING BETWEEN DISSIMILAR METALS. FLANGE GASKETING MATERIALS FOR FLANGED CONNECTIONS <br />6. CONDUIT: MINIMUM SIZE SHALL BE 3 / 4 INCH. GALVANIZED RIGID STEEL CONDUIT WITH LIQUIDTIGHT <br />SHALL BE SUITABLE FOR THE CHEMICAL AND THERMAL CONDITIONS OF THE PIPING SYSTEM CONTENTS, ASME B16.21, NONMETALLIC, FLAT, <br />FLEXIBLE CONNECTIONS SHALL BE PROVIDED AT OUTDOOR LOCATIONS. ELECTRICAL METALLIC TUBING <br />ASBESTOS FREE, 1/8" MAXIMUM THICKNESS. FLANGES SHALL BE FULL FLAT FACE, CLASS 125 CAST IRON, ASME B16.20. FLANGE BOLTS AND <br />WITH COMPRESSION FITTINGS SHALL BE PROVIDED AT INDOOR/DRY LOCATIONS. <br />NUTS SHALL BE ASME B18.2.1, CARBON STEEL. REFER TO PLANS FOR THERMOMETERS, GAGES, AND OTHER ACCESSORIES AND COMPONENTS <br />TO BE PROVIDED ON PIPING SYSTEMS AT CHILLER. PROVIDE WELDOLETS, AS REQUIRED, FOR CONTROL DEVICES ON EXISTING AND NEW <br />7. BUILDING WIRE AND CABLE: CONDUCTORS SHALL BE COPPER RATED FOR 600 VOLTS, WITH THHN/THWN <br />PIPING. <br />INSULATION. CONDUCTOR SIZES NO. 10 AWG AND SMALLER SHALL BE SOLID. CONDUCTOR SIZES NO. <br />8 AND LARGER SHALL BE STRANDED. COLOR CODING SHALL MATCH EXISTING. <br />7. ALL VALVES IN CHILLED AND CONDENSER WATER PIPING SHALL BE BRONZE OR CAST IRON BODY WITH BRONZE FITTED TRIM. DRAIN VALVES, <br />SPANISH TRAILS BLVD. <br />WHERE REQUIRED, SHALL BE 1 /4 TURN, TWO-PIECE, BRONZE BALL VALVES WITH TEFLON OR PTFE SEATS AND CHROME PLATED BRASS BALL, <br />8. ELECTRICAL IDENTIFICATION: PROVIDE ENGRAVED NAMEPLATE LABELS, INDICATING LOAD OR EQUIPMENT <br />THREADED OR SOLDER CONNECTION. GLOBE VALVES 2Y" AND SMALLER SHALL BE CLASS 125, FNPT CONNECTION, BRONZE BODY, TOP <br />SERVED, FOR DISCONNECTS AND CONTROL EQUIPMENT. LETTERS/NUMBERS SHALL BE MINIMUM 5/8" <br />WORK AREA <br />MALLEABLE IRON HAND WHEEL, RISING BRONZE STEM, UNION STYLE BONNET,BRONZE WEDGE, STD. MSS-SP-80. WAFER BUTTERFLY WAFER <br />HIGH ETCHED INTO BLACK LAMACOID AND ATTACHED WITH STAINLESS -STEEL SCREWS. PROVIDE NEW <br />FLORIDA HOSPRAL7050 <br />LUG -STYLE SHUTOFF VALVES TO FIT BETWEEN FLANGES SHALL BE CAST IRON BODY, 200 PSI PRESSURE RATING, EPDM MOLDED -IN SEAL <br />TYPEWRITTEN DIRECTORY, FOR PANELS AFFECTED BY THIS WORK, WITH EXISTING/REMAINING CIRCUITS <br />GeV A� <br />CENTRAL PLANT <br />ZEPHAHtiLS, FL o CENTRAL <br />LINER, ALUMINUM BRONZE DISC, STAINLESS STEEL STEM WITH COPPER BUSHINGS, GEOMETRIC DRIVE, EXTENDED NECK, WITH MANUAL GEAR <br />TRACED AND IDENTIFIED, NEW CIRCUITS IDENTIFIED AND SPARES AND/OR SPACES IDENTIFIED IN PENCIL. <br />OPERATOR OPERATING MECHANISM; LEAD FREE, MEETING MSS SP-87 AND MSS SP-25 SPECIFICATIONS, NIBCO MODEL WC-2000 OR EQUAL.ry <br />CONTRACTOR HAS OPTION TO USE BRONZE VALVES IN LIEU OF IRON BODY. <br />9. GROUNDING: BOND NON -CURRENT -CARRYING METAL PARTS OF EQUIPMENT ENCLOSURES, METAL <br />o <br />RACEWAY SYSTEMS, GROUNDING CONDUCTOR IN RACEWAYS AND CABLES AND RECEPTACLE GROUND <br />8. ALL NEW AND EXISTING PIPING SHALL BE SUPPORTED WITH RE -USED EXISTING OR NEW CLEVIS TYPE HANGERS AND/OR UNISTRUT SYSTEMS <br />CONNECTORS. PROVIDE INSULATED GROUND CONDUCTOR IN ALL RACEWAYS. INSPECT GROUNDING AND <br />ATTACHED TO THE EXISTING BUILDING OR STEEL SUPPORT STRUCTURE. SIZE HANGERS TO ACCOMMODATE PIPING INSULATION THICKNESS AND <br />BONDING SYSTEM CONDUCTORS AND CONNECTIONS FOR TIGHTNESS AND PROPER INSTALLATION. <br />PROVIDE HANGER SPACING PER CODE. PROVIDE INSULATION SADDLES AT ALL HANGER LOCATIONS. PROVIDE A SHEET METAL PROTECTIVE <br />COVERING OVER INSULATION AT ALL HANGERS OR SUPPORT POINTS WITH MINIMUM 6" LONG GALV. SHEET METAL PIPING PROTECTION SADDLE <br />10. INSTALLATION: ALL EQUIPMENT AND MATERIAL SHALL BE INSTALLED IN ACCORDANCE WITH THE <br />DAUGHTERY RD. <br />SHIELDS. LOCATE AT THE BOTTOM OF EACH PIPE TO FIT BETWEEN THE HANGER OR SUPPORT AND THE BOTTOM OF PIPING INSULATION. <br />RESPECTIVE MANUFACTURER'S WRITTEN INSTRUCTIONS/REQUIREMENTS. PROVIDE ADEQUATE CLEARANCE <br />FOR ALL EQUIPMENT. ANY RE -USED WIRING SHALL BE DE -ENERGIZED AND INSULATION RESISTANCE <br />SITE PLAN <br />SHALL BE TESTED USING A "MEGGER". TEST EACH CONDUCTOR IN A RACEWAY INDIVIDUALLY TO EACH <br />9. ALL DRAIN PIPING, WHERE REQUIRED, SHALL BE SWEAT COPPER DWV PIPING AND FITTINGS, AS SELECTED BY CONTRACTOR. SLOPE PIPING AT <br />MIN. Y4" PER FT. <br />OTHER AND TO GROUND. <br />NOT TO SCALE <br />GENERAL DRAWINGS AND COORDINATION NOTES' <br />10, REMOVE EXISTING CONDENSER WATER PIPING, CHILLED WATER PIPING, ALL FITTINGS, HANGERS, ETC., AND REMOVE ALL CHILLED WATER PIPING <br />11. CONTROL SYSTEM: CONTROL SYSTEM RACEWAYS, CONDUCTORS AND CONNECTIONS WILL BE PROVIDED BY <br />OTHERS. <br />INSULATION ON PIPING AND FITTINGS, AS REQUIRED TO PERFORM RENOVATION WORK. REPAIR AND REPLACE INSULATION ON EXISTING CHILLED <br />WATER PIPING AND FITTINGS AS REQUIRED AND PROVIDE NEW INSULATION ON ALL NEW CHILLED WATER PIPING, FITTINGS, VALVES, AND OTHER <br />ACCESSORY COMPONENTS IN THE PIPING SYSTEM. <br />THE NOTES SHOWN ON THIS SHEET APPLY TO GENERAL CONDITIONS OF ALL WORK FOR HEATING, VENTILATING, AIR CONDITIONING, <br />ELECTRICAL, AND PLUMBING REQUIRED FOR THIS PROJECT. REFER TO SPECIFICATIONS AND SCHEDULES THAT ARE SHOWN OR <br />11. NEW AND REPLACED OR REPAIRED CHILLED PIPING INSULATION SHALL BE PITTSBURGH CORNING "FOAMGLASS" RIGID CELLULAR FOAM <br />NOTED ON THESE DRAWINGS FOR ALL WORK AND MATERIALS REQUIRED FOR THIS PROJECT. <br />INSULATION, 2" THICK ON ALL CHILLED WATER SUPPLY AND RETURN PIPING TO MATCH EXISTING. INSULATION SHALL BE APPLIED TO PIPING <br />WITH ALL JOINTS SEALED FULL DEPTH WITH JOINT SEALANT. ALL JOINTS SHALL BE TIGHTLY FILLED WITH NO VOIDS. JOINT SEALER SHALL NOT <br />THE CONTRACTOR AND SUB -CONTRACTORS ARE RESPONSIBLE FOR COORDINATION WITH ALL WORK OF OTHER TRADES AND <br />BE USED TO FILL VOIDS OR CRACKS. JOINTS LESS THAN OR EQUAL TO 1/8 IN ARE DESIRABLE. INSULATION SHALL BE SECURED WITH <br />SPECIALTIES. THE CONTRACTOR SHALL LOCATE AND INSTALL ALL PRODUCTS AND SYSTEMS IN ACCORDANCE WITH AND IN <br />CONJUNCTION WITH THE PLANS AND SPECIFICATIONS OF WORK SHOWN ON ALL ARCHITECTURAL, STRUCTURAL, ELECTRICAL, AND <br />REINFORCED TAPE WHEN JACKETING IS APPLIED SEPARATELY, TWO STRIPS OF TAPE PER SECTION OF INSULATION. THE TAPE SHALL OVERLAP <br />OTHER TRADE DRAWINGS TO INSURE PROPER LOCATIONS, SERVICE ACCESS, AND COORDINATION FOR ALL EQUIPMENT AND DEVICES. <br />BY 50%. FITTINGS SHALL BE INSULATED IN A MANNER SIMILAR TO THAT FOR PIPING. APPLY MASTIC AND HARD CAST FINAL FINISH TO ALL <br />INSULATED PIPING AND PAINT TO MATCH EXISTING PIPING. PROVIDE FLOW AND PIPING LABELS OVER FINAL INSULATE PIPE TO MATCH EXISTING. <br />TO THE BEST OF THE ENGINEER'S KNOWLEDGE, THESE PLANS AND SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM BUILDING <br />CODES AND THE APPLICABLE FIRE PREVENTION CODE AND STANDARDS AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE <br />WITH CHAPTER 1 OF THE FLORIDA BUILDING CODE AND FLORIDA STATUTE 633. <br />12, PROVIDE NEW INSULATED CUSTOM COVERS FABRICATED AROUND THE BODY OF EACH CHILLED WATER PUMP, AND AROUND ALL GLOBE, GATE, <br />BALL, BUTTERFLY WAFER VALVES, SPECIAL FITTINGS, FLEXIBLE CONNECTORS, FLANGES, ETC. USING INDUSTRY STANDARD COVERS FOR THESE <br />DEVICES. MAKE COVERS REMOVABLE WHERE REQUIRED FOR SERVICE ACCESS. PROVIDE COVERS MADE FROM PITTSBURGH-CORNING <br />CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF INSTALLATION AND DEMOLITION WORK WITH OTHER TRADES TO AVOID <br />"FOAMGLAS ONE" 2" THICK INSULATION PRE -FORMED BLOCKS. SEAL, COVER, AND FINISH TO MATCH PIPING WITH SAME MATERIALS USED ON <br />CONFLICTS. ALL EQUIPMENT SCHEDULED FOR DEMOLITION SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED OF AT <br />PIPING INSULATION. <br />APPROVED FACILITIES. CONTRACTOR SHALL COORDINATE EXACT LOCATIONS OF NEW MECHANICAL EQUIPMENT WITH STRUCTURAL <br />SUPPORTS AND OTHER EXISTING ROOFTOP EQUIPMENT THAT REMAINS. <br />13. TEST AND BALANCE ALL SYSTEMS TO PROVIDE SPECIFIED WATER FLOWS TO WITHIN PLUS OR MINUS 10%. SEE PLANS OR SCHEDULES FOR <br />EXISTING EQUIPMENT LOCATIONS AND DATA ARE BASED ON FIELD MEASUREMENTS AND EXISTING DRAWING DATA. CONTRACTOR SHALL <br />WATER FLOW VALUES. PROVIDE TEMPERATURE, PRESSURE, AND FLOW READINGS FOR WATER FOR CHILLED AND CONDENSER WATER FLOWS <br />FIELD VERIFY EXACT LOCATIONS OF ALL ITEMS. <br />THRU CHILLER. COORD AND REPORT ALL FLOW, TEMPERATURE AND PRESSURE READINGS FOR ALL DEVICES AND COMPONENTS IN A <br />TABULATED REPORT FORMAT TO THE ENGINEER FOR REVIEW. ALL TEST AND BALANCE WORK AND REPORTING PROCEDURES SHALL BE IN <br />ANY ROOF OR WALL PENETRATIONS LEFT AS A CONSEQUENCE OF DEMOLITION OR NEW WORK SHALL BE REPAIRED TO MATCH <br />ACCORDANCE WITH NEBB OR OTHER RECOGNIZED STANDARDS. <br />EXISTING CONSTRUCTION AND FINISHES. <br />14. CONTRACTOR SHALL COMPILE ALL WRITTEN MANUFACTURER'S WARRANTIES AND OPERATION/MAINTENANCE INSTRUCTIONS AND SUBMIT TO THE <br />OWNER. <br />or ZEPMYRHILLS <br />CIT`� <br />PLANS <br />'/ � <br />SKALL COMPLY <br />WICH ALL �� V <br />ALLWORK CODES, CODE OD <br />pREVA11 ELECTIRIC ANCES <br />CODE 1w10NAL ILLS ORI� <br />CITY OF ZEPHYRtt <br />Tampa Bay Trane <br />® �d <br />•��N •CNN M •�N •�• <br />• 00NN90IMI*968 00 <br />z <br />W <br />0 <br />W <br />J <br />Revisions: <br />No. <br />Description <br />Date <br />1 <br />INITIAL ISSUE <br />1/11/15 <br />z <br />O <br />LZLI <br />�U <br />f <br />� <br />Z J <br />JLua. <br />M <br />U. <br />6 <br />Cl)Q N <br />O 0 <br />-d J <br />E <br />J <br />_ a- z <br />J <br />m <br />z <br />WW <br />= <br />c0� <br />v <br />.i <br />0_= <br />0. <br />a <br />LL U 0 <br />pW <br />ti N <br />Cn <br />W <br />O <br />z <br />Cl) <br />\ <br />J <br />z <br />O W <br />Q J <br />z <br />—vv <br />o <br />E <br />z <br />z <br />M <br />z <br />Q <br />.. <br />— LL W <br />J <br />VWW <br />Q <br />i <br />W J <br />a v <br />o <br />W <br />Cn Cn <br />Project <br />Engineer: <br />G. BARBARI <br />Project <br />Manager: <br />S. HELMER <br />Sales <br />Engineer: <br />R. GERUN <br />Date: <br />11 /11 /15 <br />Job #: CROH5298715 <br />File Name: <br />Sheet #: ME-1of 1 <br />C� <br />