Laserfiche WebLink
r- <br />t <br />F <br />M <br />a <br />e6 <br />G E N E R A L N 0 T E S <br />1.1 GENERAL: <br />1.1.1 SCOPE: THE FOLLOWING GENERAL AND SPECIFIC NOTES SHALL APPLY EQUALLY TO ALL <br />CONTRACTORS AND SUPPLIERS ENGAGED IN EXECUTION OF THE WORK SHOWN ON THE CONTRACT <br />DOCUMENTS. THESE NOTES SUPPLEMENT AND ARE MADE A PART OF THE PLANS AND <br />SPECIFICATIONS. <br />1.1.2 REFERENCES: ALL CONSTRUCTION SHALL BE EXECUTED IN CONFORMANCE WITH THE FOLLOWING: <br />PLANS AND SPECIFICATIONS <br />GOVERNING LOCAL AND MUNICIPAL CODES <br />2014 FLORIDA BUILDING CODE (FBC) <br />ASTM INTERNATIONAL (ASTM) <br />OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) <br />CONCRETE CONSTRUCTION: <br />AMERICAN CONCRETE INSTITUTE (ACI) <br />CONCRETE REINFORCING STEEL INSTITUTE (CRSI) <br />CONTRACTOR SHALL ENSURE FAMILIARITY OF THE ABOVE ITEMS. INSPECTIONS AND <br />OBSERVATIONS WILL BE IN CONFORMANCE WITH THE ABOVE. <br />1.1.3 DESIGN DATA: <br />OCCUPANCY CATEGORY . . . . . . . . . . . . . . . . . . . . . . . . CATEGORY II <br />FLOOR LIVE LOADS (L): <br />STORAGE <br />LIGHT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 125 PSF <br />1.1.4 DESIGN CRITERIA: <br />CONCRETE (NORMAL WEIGHT UNO): <br />INTERIOR SLAB ON GRADE . . . . . . . . . . . . . . . . . . . f' c = 3500 PSI <br />REINFORCMENT STEEL: <br />#3 BARS & LARGER, ASTM A615 GRADE 60 . . . . . . . . . . . . Fy = 60000 PSI <br />1.1.5 EXECUTION: CONTRACTOR TO CROSS CHECK DIMENSIONS, ELEVATIONS, SECTIONS AND <br />DETAILS BETWEEN ARCHITECTURAL, MECHANICAL AND STRUCTURAL PLANS. AMBROSE <br />ENGINEERING IS TO BE NOTIFIED OF ANY VARIANCE THAT WILL AFFECT THE STRUCTURAL <br />FRAMING BEFORE CONTRACTOR BEGINS WORK. ALL EQUIPMENT SUPPORTS AND ANCHORAGES TO <br />BE CROSS CHECKED WITH MANUFACTURER'S DRAWINGS. CONTRACTORS SHALL VERIFY ALL <br />PROFILES, HEIGHTS AND DIMENSIONS AT PROJECT SITE PRIOR TO FABRICATION OF ANY <br />MATERIAL AND INFORM THE ENGINEER OF ANY DISCREPANCIES OR FRAMING INTERFERECCS. <br />1.1.6 PROJECT CONDITIONS: ALL EXISTING BUILDING DIMENSIONS AND CONDITIONS MUST BE <br />FIELD VERIFIED PRIOR TO FABRICATION. AMBROSE ENGINEERING SHALL NOT BE <br />RESPONSIBLE FOR ANY EXISTING INFORMATION SUPPLIED BY THE OWNER/ARCHITECT NOR BE <br />LIABLE FOR THOSE EXISTING CONDITIONS THAT VARY FROM THE PREVIOUSLY GIVEN <br />INFORMATION. <br />1.1.7 SHOP DRAWINGS/SUBMITTALS: SHALL BE SUBMITTED BY THE GENERAL CONTRACTOR TO THE <br />ARCHITECT/ENGINEER FOR APPROVAL BEFORE FABRICATION MAY PROCEED. <br />SHOP DRAWINGS/SUBMITTALS SHALL BE PROVIDED FOR THE FOLLOWING COMPONENTS: <br />CONCRETE DESIGN MIXES. <br />1.1.10 CONSTRUCTION LOADS: PLACEMENT OF CONSTRUCTION EQUIPMENT, MATERIALS, AND PERSONNEL <br />SHALL NOT EXCEED THE DESIGN LIVE LOAD OF THE STRUCTURE. CONCRETE SHALL CURE A <br />MINIMUM OF 7 DAYS BEFORE THE APPLICATION OF CONSTRUCTION LOADS. IN ADDITION, <br />EQUIPMENT PLACED ON FLOORS SHALL ALSO COMPLY WITH THE FOLLOWING: <br />FORKLIFT SPACING BETWEEN WHEELS ON AXLE IS NOT LESS THAN 38' c/c OR <br />SCISSOR LIFT SPACING BETWEEN WHEELS ON AXLE IS NOT LESS THAN 25' c/c. <br />SLAB -ON -GRADE: ALLOWABLE EQUIPMENT AXLE LOADS <br />SLAB DEPTH FORKLIFT SCISSOR/PLATFORM LIFTS <br />4" NONE 5,400 LBS <br />WHEN AXLE LOADS EXCEED THE VALUES LISTED ABOVE, OR WHEN WHEEL SPACING IS <br />LESS THAN c/c SPACING, CONTACT ENGINEER PRIOR TO OPERATING UNAUTHORIZED <br />EQUIPMENT. <br />1.1.11 FIELD MODIFICATIONS: MODIFICATIONS OF NEW OR EXISTING STRUCTURAL MEMBERS DUE <br />TO MISLOCATION, MISFIT, MECHANICAL INTERFERENCE, OR ANY OTHER CONSTRUCTION <br />ISSUE SHALL NOT BE MADE WITHOUT THE PRIOR APPROVAL OF ENGINEER. NO OPENING <br />SHALL BE PLACED IN ANY STRUCTURAL MEMBER UNLESS SHOWN ON THE CONTRACT STRUCTURAL <br />DRAWINGS° <br />1.1.12 PERMENANT EQUIPMENT: SHALL BE LOCATED ONLY ON THE STRUCTURAL MEMBERS INTENDED <br />TO SUPPORT THIS EQUIPMENT AS SHOWN ON THE CONTRACT DRAWINGS OR THE APPROVED <br />SHOP DRAWINGS. IF STRUCTURAL SUPPORT IS NOT CLEAR, OR A QUESTION ARISES, <br />CONTACT ENGINEER PRIOR TO EQUIPMENT INSTALLATION. <br />2.1 EARTHWORK: <br />2.1.1 GEOTECHNICAL INSPECTION: GEOTECHNICAL ENGINEER SHALL INSPECT AND VERIFY DESIGN <br />CRITERIA FOR SITE CONDITIONS, SUITABLE BEARING MATERIALS, STRUCTURAL FILL, BACKFILL <br />MATERIALS, COMPACTION REQUIREMENTS AND PROJECT SPECIFICATIONS FOR EARTHWORK NOT <br />SPECIFIED HEREIN. <br />2.1.3 SITE PREPARATION: ALL UNSUITABLE EXISTING FILL AND TOPSOIL SHALL BE EXCAVATED <br />WITHIN THE NEW SLAB AND REPLACED TO FINISHED PAD ELEVATION IN <br />ACCORDANCE WITH THE GEOTECHNICAL RECOMMENDATIONS. PROVIDE COMPACTED <br />AGGREGATE SUB -BASE AND VAPOR RETARDER BELOW SLAB PER DRAWINGS. <br />3.1 CONCRETE: <br />3.1.1 REFERENCES: CONCRETE CONSTRUCTION SHALL COMPLY WITH THE FOLLOWING STANDARDS AND <br />AS MODIFIED HEREIN: <br />ACI 117 'SPECIFICATIONS FOR TOLERANCES FOR CONCRETE CONSTRUCTION AND <br />MATERIALS" <br />ACI 301 "SPECIFICATIONS FOR STRUCTURAL CONCRETE" <br />ACI SP-66 'ACI DETAILING MANUAL" <br />ACI 318 "BUILDING CODE REQUIREMENTS FOR STUCTURAL CONCRETE" <br />ACI 347 "GUIDE TO FORMWORK FOR CONCRETE" <br />ACI 360 'GUIDE TO DESIGN OF SLABS -ON -GROUND" <br />CRSI "MANUAL OF STANDARD PRACTICE" <br />CRSI "PLACING REINFORCING BARS" <br />3.1.2 MATERIALS: PROPORTION CONCRETE MATERIALS TO ATTAIN 28 DAY CONCRETE MIX DESIGN <br />STRENGTHS INDICATED IN THE DESIGN CRITERIA. <br />3.1.3 SHOP DRAWINGS/SUBMITTALS: SUBMIT CONCRETE MIX DESIGNS, COMPRESSIVE STRENGTH <br />TEST HISTORY, CEMENT, FLY ASH, AGGEGATE TEST REPORTS, ADMIXTURES, FIBER <br />REINFORCING, REBAR PLACEMENT AND FABRICATION PLANS, LAP LENGTHS, REBAR BENDING <br />DIAGRAMS, AND ALL DETAILS AS REQUIRED TO COMPLETE INSTALLATION. <br />3.1.4 ACCESSORIES: ALL CONCRETE ACCESSORIES SUCH AS CHAIRS, TIES, ETC., THAT COME IN <br />CONTACT WITH FORMWORK ON EXPOSED CONCRETE SHALL BE GALVANIZED OR PLASTIC <br />COATED. CONCRETE BLOCK OR CLAY MASONRY SHALL NOT BE USED AS CHAIRS FOR SUPPORT <br />OF SLAB -ON -GRADE REINFORCMENT. <br />3.1.6 SYNTHETIC FIBER REINFORCMENT: MICRO SYNTHETIC FIBER REINFORCING SHALL BE <br />FIBERMESH 300, PROPEX CONCRETE SYSTEMS, OR EQUAL, COLLATED FIBRILLATED FIBERS <br />SHALL CONFORM TO ASTM C1116, AND SHALL BE THE MINIMUM DOSAGE INDICATED ON PLAN. <br />3.1.7 BAR REINFORCEMENT: PROVIDE BAR REINFORCMENT IN ACCORDANCE WITH THE DESIGN <br />CRITERIA. WHEN BAR REINFORCEMENT IS CALLED FOR IN A CERTAIN PORTION OF THE <br />BUILDING, IT SHALL BE DUPLICATED IN SIMILAR PORTIONS OF THE BUILDING, UNO. <br />3.1.8 MINIMUM COVER: INSTALL BAR REINFORCEMENT WITH THE FOLLOWING MINIMUM COVER UNLESS <br />A GREATER COVER IS REQUIRED DUE TO FIRE PROTECTION: <br />CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH . . . . . . . . . . 3" <br />CONCRETE EXPOSED TO EARTH AND WEATHER: <br />#5 BAR AND SMALLER . . . . . . . . . . . . . . . . . . . . . . . . 1 1/2" <br />#6 BAR AND LARGER . . . . . . . . . . . . . . . . . . . . . . . . . . . 2' <br />CONCRETE NOT EXPOSED TO EARTH AND WEATHER OR IN CONTACT WITH GROUND: <br />SLABS, MALLS: <br />#11 BAR AND SMALLER . . . . . . . . . . . . . . . . . . . . . . . . . 3/4' <br />3.1.10 HOT WEATHER CONCRETING: FOLLOW ACI 305 'HOT WEATHER CONCRETING' WHEN MAXIMUM <br />DAILY TEMPERATURE EXCEEDS 85"F, OR RAPID DRYING CONDITIONS EXIST; EVAPORATION <br />RATE > .15 LB/SF/HR PER FIGURE 2.1.5. <br />3.1.12 SLABS: MAY BE POURED AS A CONTINUOUS SCREEDED POUR WITH SAW CUT CONTROL JOINTS <br />IN BOTH DIRECTIONS. SAW CUTS TO BE MADE WITHIN 8 HOURS OF POUR AND SPACED AS <br />INDICATED IN THE DRAWINGS. <br />3.1.14 OPENINGS: CONTRACTOR TO PROVIDE AND COORDINATE WITH ALL OTHER TRADES FOR SIZE <br />AND LOCATIONS OF ANY AND ALL OPENINGS, SLEEVES, ETC. OCCURRING IN WALLS, <br />FOOTINGS, AND FLOORS. SLEEVE LAYOUTS SHALL BE SUBMITTED FOR APPROVAL PRIOR TO <br />CONSTRUCTION. <br />3.1.15 BOND BREAKER: PROVIDE BOND BREAKER MATERIAL WHERE SLABS ABUT WALLS, COLUMNS AND <br />OTHER VERTICAL SURFACES. <br />66'-4" <br />SLAB REPLACEMENT PLAN <br />SCALE: 3/16" = V-0" <br />NOTES: 1. * FIELD VERIFY AND MATCH EXISTING SLAB THICKNESS. <br />a <br />O <br />c0 <br />It <br />m <br />U <br />c <br />P <br />o W <br />Z <br />O <br />z �, <br />0 <br />o <br />w <br />Q <br />oD <br />N C <br />U <br />U <br />ai <br />w <br />W m j <br />Z <br />�' <br />O <br />~ <br />W <br />Y v m <br />W <br />Z <br />`c <br />c <br />U <br />� Q <br />00 <br />lz <br />,c <br />21 <br />W <br />015-373 <br />AMBROSE <br />ENCy1l%MI;RfNG <br />INCORPORATED <br />N56 N215 COMMERCE CT., CEDARBURG, W 53012 <br />PH. [2621377-7602. FAX 1262137748% <br />aftengUambeng.= <br />STIPULATION FOR REUSE <br />THIS DRAWING WAS SPECIFICALLY <br />PREPARED POP USE IN REGARDS TO THE <br />PERMITTING AND CONSTRUCTION OF <br />THIS <br />PROJECT AND IS NOT SUITABLE FOR USE <br />POP ANY OTHER PROJECT. USE OF THIS <br />DRAWING FOR REFERENCE OR EXAMPLE <br />ON ANOTHER PROJECT REQUIRES THE <br />SERVICES OF PROPERLY LICENSED <br />ARCHITECTS AND ENGINEERS. <br />REPRODUCTION Of THIS DRAWING FOR <br />REUSE ON ANOTHER PROJECT IS NOT <br />AUTHORIZED AND MAY BE CONTRARY TO <br />THE LAW, <br />Q 1ri <br />o N �75 <br />� � N <br />o,n <br />�a In " o <br />Ln <br />Z °v <br />` <br />* No.0052544 * Lo <br />> + 3 <br />a� <br />STAT Ftu <br />FS,'• LOR10•'U\�� �� p <br />�S�0NAL,EN�\\�\ o of <br />EXIST SLAB <br />REPLACE HIGHER <br />EXIST SLAB REPLACE HIGHER <br />FLOOR SLAB <br />SAWCUT 1/8"x1/4 <br />TO REMAIN <br />EXISTING SLAB <br />TO REMAIN EXISTING SLAB <br />SLAB THICKNESS <br />VAPOR BARRIER <br />NEW <br />/ <br />NEW <br />NEW <br />COOLER <br />#4x1'-0" EPDXY DOWEL <br />COOLER <br />COOLER <br />7. <br />BOND BREAKER <br />REMOVE EXI T SLAB <br />@ 24" OC (6" EMBED MIN) <br />REMOVE EXIST SLAB <br />SEE PLA <br />#4x1'-O" EPDXY DOWEL <br />24" OC 6" EMBEDMIN <br />°� ( <br />REMOVE EXIST SLAB <br />) SEE PLAN <br />S PLAN <br />EXIST CONIC LAB <br />FV THIC NESS <br />NEW COf- <br />EXIST CON <br />SLAB <br />NEW CO C SLAB <br />' <br />SLAB <br />FV THICKNESS <br />NEW CO C SLAB <br />STONE SUB -BASE <br />.0 <br />TO SLAB _ ... __ <br />i <br />TO SLAB <br />0,-2" ::: <br />_ _ .. _.TO SLAB <br />TO SLAB <br />- <br />01-011 <br />'y-+f"4;�, <br />TYPICAL CONTROL JOINT <br />"` g <br />EXIST CMU <br />WALL & FTG <br />4 <br />TYP SLAB ON <br />GRADE CONTROL JNT <br />3 <br />NEW SLAB SECTION <br />2 <br />EXISTINGINEW <br />SLAB SECTION <br />1 <br />EXISTING/NEW <br />SLAB SECTION <br />S1 <br />S1 <br />S1 <br />S1 <br />SCALE: 1/2" = V-0" <br />SCALE: 1/2" = V-0" <br />SCALE: 1/2" = V-0" <br />SCALE: <br />1/2" = V-0" <br />STOREOG656 <br />BLDG N0. <br />VERSION OR 751 193-01 <br />PROJECT ID <br />SLAB REPLACEMENT <br />PLAN AND DETAILS <br />DESIGN TEAM DATE <br />DGNR. <br />P.MGR, CESO K24.2015 <br />RVWR. RMS - <br />DRWG. NO, <br />1 <br />