Laserfiche WebLink
HANGER STRAPS: <br />SUPPORTED FROM <br />1"x 22 GAUGE, <br />STRUCTURE ABOVE, <br />ROUND <br />METAL <br />'SNAPLOCK" SHEET <br />FOR RUN -OUTS <br />FLEXIBLE DUCT: <br />MAXIMUM 8 FEET, <br />_-_------ , <br />� - _ � (3) SHEET METAL SCREWS BELOW GREATER. THAN 8 G OR KINK <br />/ II I����� II (AN APPROVED EQUAL <br />y / II I i� II �( IS SPIRO-PIPE ) <br />I I WRAP INSULATION : OVER <br />- I1 LAP 4" MINIMUM, GLASS FABRIC <br />AND MASTIC SEAL <br />ROOFTOP UNIT I F - �I II I I I FIBERGLASS TAPE <br />II II II 1 II TO PREVENT SAGS <br />II - II I I I AND KINKS IN FLEX <br />L lL 1L--1--- <br />- - - - _-A CONTROL CONDUIT: <br />OUTSIDE AIR HOOD ROUTE UP INSIDE ES SH I BAND CLAMP AND <br />CURB. A F E/ I THREE SHEET METAL <br />CONDENSATE DRAIN: SCREWS THROUGH <br />SEE DETAIL HELIX OF FLEXIBLE <br />..--:..:...::-._...�..._...-..-.-:.._.-..;, DUCT LINER <br />:` .............................. .... ....::: SECURE INSULATION WITH 'MINIMUM RADIUS EQUAL TO (TYPICAL) <br />DISCONNECT SWITCH: " THE FLEX DUCT DIAMETER <br />BY ELECTRICAL SUBCON- STICK -PINS AT 18 O.C. <br />FACTORY CURB: TRACTOR, DO NOT MOUNT AND ADHESIVE ON BOTTOM, <br />SEE DETAIL OVER NAME PLATE. FOR DUCTS 24" AND <br />LARGER 24" MAX VERTICAL DUCT RUN <br />-IN FITTING: <br />ROOF SPIN <br />WITH SCOOP AND <br />SUPPLY AIR DUCT DAMPER, EXCEPT IN WRAP INSULATION ABOVE CEILING DIFFUSER: SET <br />RETURN AIR DUCT GYP. BOARD CEILINGS, THE CEILING DIFFUSERS THROW AS SHOWN ON PLANS <br />4 DAMPER IN NECK SHEET METAL DUCT DETAIL <br />1 SHEET METAL DUCTS SHALL BE FABRICATED & INSTALLED PER THE LATEST EDITION OF SMACNA, <br />ROOFTOP UNIT DETAIL AND THE 2007 FLORIDA ENERGY CODE (WITH 2O09 AMENDMENTS) WITH THE FOLLOWING CRITERIA <br />BASED ON 4 FOOT DUCT SECTIONS. <br />DESIGNATION RTU-1 DUCT SIZE DUCT MATERIAL HANGERS REINFORCEMENT <br />AREA SERVED SEE PLAN 0 - 12" 26 GA FLAT 8' O.C. NONE <br />13 - 30" 24 GA BEADED 8' O.C. 13-18" NONE. 19-30" STANDING <br />TRANE MODEL NUMBER THC060E3 31 - 54" 22 GA BEADED 6' O.C. 31-48" STANDING 1" S.-49-54" STANDING 2" S,20 GA. <br />WEIGHT - LBS 800 55 - 84" 20 GA CROSS 5' O.C. 55-80" STANDING 2" S. 84"+ STANDING SEAM, 20 GA. <br />BREAK <br />NOMINAL TONS 5 2. ALTERNATE INTERPRETATIONS OF SMACNA DUCT MATERIAL, HANGERS AND REINFORCEMENTS ARE <br />CAPACITY - TOTAL MBH 62.0 SUBJECT TO ENGINEER APPROVAL, AND REQUIRE SEPARATE SUBMITTAL OF THE ALTERNATES. <br />CAPACITY SENSIBLE MBH 43.5 3. FLEXIBLE DUCT CONNECTORS SHALL BE PROVIDED AT CONNECTIONS TO ALL EQUIPMENT <br />AMBIENT TEMPERATURE - F' 95 4. SUPPLY AIR DROPS FROM ROOFTOP UNITS SHALL TRANSITION FROM THE UNIT OPENING SIZE TO <br />SQUARE NECK ELBOWS, WITH SIZES AS SHOWN ON THE PLAN. IF TWO SUPPLY AIR DUCT RUNS <br />HEATING - KW -9.0 ARE AT THE UNIT, THEN TWO SEPERATE DROPS AND ELBOWS SHALL BE PROVIDED. <br />ELECTRICAL VOLTAGE 208/3 5. RETURN AIR DROPS FROM THE ROOFTOP UNITS SHALL BE FULL SIZEOFTHE UNIT OPENING. <br />6. ELBOWS SHALL BE SQUARE NECK (SAME IN OUT DIMENSION) WITH 2 DOUBLE THICKNESS <br />FAN HORSEPOWER 1 TURNING VANES. <br />OUTSIDE 2000 200 7. OFFSETS SHALL NOT REDUCE THE FREE AREA, AND SHALL NOT EXCEED 30'. A RADIUS HEEL <br />CFM - SUPPLY <br />/ / SHALL BE PROVIDED ON 30' OFFSETS. SMALLER OFFSETS MAY BE MITERED AT BOTH THE <br />EXTERNAL STATIC PRESSURE HEEL AND THROAT <br />8, TRANSITIONS SHALL NOT EXCEED 1:3 RATIO (4" TRANSITION PER FOOT SINGLE SIDED <br />ELECTRICAL.VOLTAGE 208/3 TRANSITION, AND 8" PER FOOT DOUBLE SIDED TRANSITION). <br />--COMPRESSOR RLA 1 EA 17.6 9. INSULATION SHALL BE NFPA 90 APPROVED, WITH MINIMUM 5.2 R VALUE. WRAP INSULATION SHALL <br />CONDENSER FAN FLA �1� EA 2.5 BE 2" THICK WITH ALUMINUM FOIL FACING. LINER SHALL BE 1-1/2" THICK, 6.0 R VALUE. <br />EVAPORATOR FAN FLA 1 EA 5.0 10. RECTANGULAR BRANCH CONNECTIONS SHALL BE 45' ENTRY TYPE PER SMACNA FIGURE 2-10. <br />MINIMUM CIRCUIT AMPS 40.8 11. ROUND DUCT CONNECTIONS SHALL BE WITH "METAL MANUFACTURING COMPANY" MSI-6 SPIN -IN <br />MAXIMUM FUSE AMPS 45 FITTINGS, WITH 90' SCOOP, DAMPER AND HANDLE. SPRAY PAINT LOCATIONS OF HANDLES. <br />12. FLEXIBLE DUCT SHALL INCLUDE AN INNER ALUMINUM LINER, 1-1/2" R6 INSULATION, A <br />SYSTEM SEER: 15.0 POLYETHYLENE OUTER VAPOR BARRIER, AND BE UL-181 APPROVED, THERMOFIN OR METALFLEX. <br />13. ALL TAPE SHALL BE FASSON 0810 (NO SUBSTITUTIONS), SMACNA APPROVED. <br />14. COMPLETELY SEAL ALL SUPPLY, RETURN AND OUTSIDE AIR DUCTS WITH MASTIC. <br />1. PROVIDE WITH HOT GAS REHEAT COIL. <br />ROOFTOP UNIT <br />GASKET AND SILICONE GASKET & WEATHER -SEAL: BY <br />SEALING <br />MECHANICAL SUBCONTRACTOR <br />PRESSURE -TREATED COUNTER FLASHING STRIP REMOVEABLE CAP: FOR CLEAN - <br />WOOD NAILER STRIP OUT OF THE TRAP & DRAIN LINE <br />1" RIGID INSULATION <br />® TIE -DOWN STRAPS: TWO PER SIDE, 3" CANT STRIP TEE CONNECTION <br />16 GAGE, BOLTED TO CURB AND REMOVEABLE CAP: WITH 1/4" HOLE <br />TO UNIT, 1/2" BOLT SETS. ROOFING DRILLED IN CAP FOR CLEAN -OUT, <br />„ VENT OF DRAIN PIPING, AND OVER - <br />CURB HEIGHT 14 - F . <br />- °;` R00 INSULATION <br />FLOW OF DRAIN <br />FACTORY CURB: NRCA APPROVED, _ METAL DECKING DRAIN PAN <br />18 GAGE, SQUARE WITHIN 1/8" TEE CONNECTION <br />ON DIAGONAL MEASUREMENT, WITH BOLT SETS: 1/2", PER SIDE, <br />A MINIMUM OF 8" ABOVE TOP OF THRU BASE OF CURB(2) AND FRAME DRAIN PIPING AND SUPPORT BLOCKING: <br />ROOF STRUCTURAL SUPPORT FRAME DUCT �- SEE DETAIL BELOW <br />CURB SET DIRECTLY ON STEEL FOR UNIT & DECKING AT FULL <br />PERIMETER OF FACTORY CURB ROOF CONSTRUCTION <br />FACTOR <br />CURB COUNTER -FLASHING STRIP <br />BY MECHANICAL SUBCONTRACTOR <br />CURB DETAIL: ROOFTOP UNIT <br />DRAIN AND COUNTER -FLASHING DETAIL <br />1. MECHANICAL SUBCONTRACTOR SHALL FURNISH ROOF OPENING SIZES & LOCATIONS, <br />FOR STRUCTURAL SUPPORT FRAMING BY GENERAL CONTRACTOR. <br />2. THIS CURB DETAIL WILL ALLOW THE UNIT TO SLOPE WITH THE SLOPE OF THE <br />ROOF PITCH. THIS DETAIL CAN ONLY BE USED (A) IF THE CONDENSATE DRAIN <br />PAN OUTLET IS ON THE LOW SIDE OF THE UNIT, OR (B) IF THE CONDENSATE <br />DRAIN PAN IS NOT AFFECTED BY SLOPE. THIS DETAIL CAN NOT BE USED IF <br />THE CONDENSATE DRAIN CONNECTION IS ON THE HIGH SIDE OF THE UNIT. <br />10 FOOT MAXIMUM & AT <br />ALL JOINTS/FITTINGS <br />PIPE CLAMP: NON- <br />45' CLEAN -OUT WITH METALLIC, FACTORY <br />REMOVABLE CAP I FABRICATED <br />n <br />GALVANIZED WOOD SCREWS <br />SCHEDULE 40 PVC � <br />(TYPICAL) \ - - - - - SLOPE WITH ROOF <br />SUPPORT BLOCK: 4x4x8" <br />MEMBRANE CEMENT: BELOW PRESSURE TREATED WOOD <br />SUPPORT BLOCK & THE <br />EXTRA LAYER <br />EXTRA LAYER OF SINGLE SINGLE MEMBRANE <br />MEMBRANE (PLY) ROOFING (PLY) ROOFING <br />CONDENSATE DRAIN DETAIL <br />NOTE: SIZE OF DRAIN PIPING SHALL BE: <br />1" FOR 5 TONS & UNDER <br />1-1/4" FOR 6 TO 30 TONS <br />HVAC GENERAL NOTES <br />1. ALL WORK SHALL COMPLY WITH APPLICABLE NATIONAL, STATE AND LOCAL CODES. THIS INCLUDES <br />THE 2007 FLORIDA BUILDING CODE AND THE 2007 FLORIDA MECHANICAL CODE, WITH 2O09 <br />AMENDMENTS, THE APPLICABLE NFPA CODES AND THE FLORIDA ENERGY CODE. <br />2. ALL ELECTRICAL EQUIPMENT SHALL BE UL CLASSIFIED OR LISTED. <br />3. DEFINITIONS: "FURNISH" SHALL MEAN TO PURCHASE AND LOCATE AN ITEM ON THE JOBSITE. <br />"INSTALL" SHALL MEAN TO PHYSICALLY INSTALL AN ITEM AND CONNECT IT TO ALL REQUIRED <br />SERVICES TO MAKE THE ITEM FULLY FUNCTIONAL. "PROVIDE" SHALL MEAN TO BOTH FURNISH AND <br />INSTALL THE ITEM. <br />4. TEST AND BALANCE SHALL BE PERFORMED BY THE MECHANICAL CONTRACTOR ON APPROVED FORMS <br />USED BY AABC OR NEBB. THE MECHANICAL CONTRACTOR SHALL HAVE ALL SYSTEMS FULLY <br />INSTALLED AND OPERATIONAL WITH CLEAN FILTERS INSTALLED PRIOR TO TEST AND BALANCE. <br />AIR CONDITIONING EQUIPMENT <br />1. THE AIR CONDITIONING EQUIPMENT SHALL BE STRAIGHT COOL, WITH ELECTRIC HEAT. <br />2. ALL EQUIPMENT SHALL MEET THE MINIMUM EER REQUIREMENTS OF THE FLORIDA ENERGY CODE. <br />3. CARRIER IS THE BASIS OF DESIGN WITH TRANE AND YORK AS APPROVED ALTERNATES. IF AN <br />ALTERNATE IS SUBMITTED, THE CONTRACTOR SHALL MAKE ALL NECESSARY CHANGES TO THE <br />ELECTRICAL, STRUCTURAL AND DUCTWORK TO ACCOMMODATE THE SUBSTITUTION. <br />4. SUBMITTALS SHALL BE REVIEWED BY THE ELECTRICAL SUBCONTRACTOR FOR IMPACT TO THE <br />ELECTRICAL SYSTEMS, PRIOR TO ORDERING THE EQUIPMENT. <br />5. ALL AIR CONDITIONING EQUIPMENT SHALL INCLUDE A MINIMUM 1 YEAR UNIT WARRANTY AND AN <br />EXTENDED 4 YEAR COMPRESSOR WARRANTY. <br />6. PROVIDE CONDENSATE PIPING AS SHOWN ON THE PLAN AND DETAIL. THE CONTRACTOR SHALL <br />EXTEND THE CONDENSATE PIPING TO THE REAR DOWNSPOUT TO SPILL TO SITE STORM RETENTION. <br />7. THE AIR CONDITIONING UNITS SHALL BE OPERATED DURING CONSTRUCTION WITH THROW AWAY <br />FILTERS. FILTERS SHALL BE CHANGED DURING CONSTRUCTION IF THEY BECOME RESTRICTIVE OF <br />AIR FLOW FOR NORMAL OPERATION. PROVIDE NEW FILTERS JUST PRIOR TO TEST AND BALANCE. <br />8. UNITS SHALL BE CLEANED AND ALL SCRATCHES PAINTED OVER WITH FACTORY PAINT TO MATCH <br />UNIT. ALL CONDENSER COILS SHALL BE CODED OUT AND ALL PANELS AND SCREWS SHALL BE <br />INSTALLED AT THE COMPLETION OF THE PROJECT. <br />DUCTWORK <br />1. SUPPLY AND RETURN DUCT SHALL BE EXTERNALLY INSULATED SHEET METAL, INSTALLED IN <br />ACCORDANCE WITH SMACNA. SEE DETAIL FOR INSTALLATION AND HANGING INSTRUCTIONS. <br />2. OUTSIDE AIR AND EXHAUST DUCT WORK SHALL BE GALVANIZED SHEET METAL WITH ALL JOINTS <br />SEALED WITH MASTIC. ROUND DUCT WORK SHALL BE "THERMOFIN" OR SINGLE WALL SHEET METAL. <br />DUCTS DO NOT NEED TO BE INSULATED UNLESS REQUIRED BY LOCAL JURISDICTION. ALL DUCT <br />SHALL BE CONSTRUCTED AND INSTALLED PER SMACNA. <br />3. ALL DUCT SIZES DEPICTED ARE CLEAR INSIDE DIMENSIONS. <br />4. SUPPLY AIR DUCT SHALL BE SIZED AT 0.10"/100 FT. EQUAL FRICTION AND RETURN DUCT SHALL <br />BE SIZED AT 0.06"/100 FT. EQUAL FRICTION. <br />5. HOLD THE BOTTOM OF THE SUPPLY AIR DUCT A MAXIMUM OF 24" ABOVE LAY -IN CEILINGS TO ALLOW <br />FOR ACCESS TO BALANCING DEVICES. <br />6. PROVIDE A FLEXIBLE CONNECTION FROM EACH AIR HANDLER AND FAN TO THE DUCT SYSTEM. <br />7. FLEXIBLE RUNOUTS TO THE DIFFUSERS ARE LIMITED TO A MAXIMUM OF 8 FEET. <br />8. PROVIDE ACCESS PANELS IN DUCTS FOR ACCESS TO VOLUME DAMPERS, FIRE DAMPERS, FIRE/SMOKE <br />DAMPERS, DUCT MOUNTED SMOKE DETECTORS AND WHERE REQUIRED TO MAINTAIN EQUIPMENT. <br />9. ALL FLEXIBLE BRANCH CONNECTIONS SHALL HAVE A MANUAL VOLUME DAMPER INSTALLED AT THE <br />MAIN TRUNK FOR BALANCING PURPOSES. <br />CONTROLS <br />1. ALL TEMPERATURE CONTROLS SHALL BE BY TENANT VENDOR. CONTRACTOR SHALL COORDINATE WITH <br />SAVE -A -LOT REPRESENTATIVE FOR CONTROL SYSTEM REQUIREMENTS. <br />2. LOW VOLTAGE CONTROL WIRING SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR.THE <br />ELECTRICAL CONTRACTOR SHALL PROVIDE CONDUIT FOR ALL CONTROL WIRING AS COORDINATED WITH <br />THE MECHANICAL CONTRACTOR. <br />3. LINE VOLTAGE (110 VOLT OR HIGHER) POWER AND CONDUIT SHALL BE PROVIDED BY THE <br />ELECTRICAL CONTRACTOR. <br />4. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL DISCONNECT SWITCHES. DO NOT MOUNT <br />DISCONNECT SWITCHES OVER NAMEPLATES OR SERVICE PANELS. <br />5. TEST AND BALANCE SHALL VERIFY THE OPERATION OF ALL CONTROLS AT THE COMPLETION OF THE <br />PROJECT. <br />6. WHERE SMOKE DETECTORS ARE PROVIDED AND INSTALLED BY THE MECHANICAL CONTRACTOR (NO FIRE <br />ALARM SYSTEM), EACH SMOKE DETECTOR SHALL BE EQUIPPED WITH A REMOTE TEST STATION <br />EQUIPPED WITH A VISUAL AND AUDIBLE ALARM TO BE LOCATED ADJACENT TO THE UNIT THERMOSTAT <br />IN ACCORDANCE WITH NFPA 90. COORDINATE WITH EMS VENDOR FOR FINAL LOCATION. <br />AIR DISTRIBUTION SCHEDULE <br />DESIGNATION <br />DESCRIPTION <br />LEGEND <br />SPECIFICATIONS <br />EXAMPLE <br />CD1-10-300 <br />CEILING DIFFUSER <br />CD1 <br />PRICE SCD SERIES, STEEL, <br />NECK SIZE NOTED <br />10" <br />MODULAR CORE, LAY -IN MOUNTED, <br />CFM NOTED <br />300 <br />OFF-WHITE COLOR. <br />CD2-9x9-300 <br />CEILING DIFFUSER <br />CD2 <br />PRICE SCVD SERIES, STEEL, <br />NECK SIZE NOTED <br />90" <br />MODULAR CORE, SURFACE MOUNTED, <br />CFM NOTED <br />300 <br />OFF-WHITE COLOR. <br />RG1-1202-100 <br />RETURN GRILLE <br />RG1 <br />PRICE 530D, STEEL <br />FACE SIZE NOTED <br />1202" <br />LOUVERED CORE, LAY -IN OR SURFACE, <br />CFM NOTED <br />100 <br />OFF WHITE COLOR. <br />ER1-120 2-100 <br />EXHAUST REGISTER <br />ER1 <br />PRICE 530D, STEEL <br />FACE SIZE NOTED <br />1202" <br />LOUVERED CORE, LAY -IN OR SURFACE, <br />CFM NOTED <br />100 <br />OFF WHITE COLOR. <br />SR1-12x12-150 <br />SIDEWALL REGISTER <br />SR1 <br />PRICE 520D, STEEL <br />FACE SIZE NOTED <br />1202" <br />LOUVERED CORE, SURFACE MOUNTED, <br />CFM NOTED <br />150 <br />OFF WHITE COLOR. <br />NOTES: <br />1. SIZES AND <br />CFM SHOWN ON THE LEGEND ABOVE ARE <br />FOR EXAMPLE ONLY. SEE PLAN <br />FOR ACTUAL <br />SIZES AND CFM VALUES <br />USED ON THIS <br />PROJECT. <br />2. LOCATE ALL <br />AIR DISTRIBUTION PER <br />THE ARCHITECTURAL <br />REFLECTED CEILING PLAN. <br />3. APPROVED MANUFACTURERS: PRICE, <br />METALAIRE, <br />KRUEGER, TITUS <br />OUTSIDE <br />AIR CALCULATION <br />SCHEDULE <br />SPACE <br />NET OCCUPIABLE AREA <br />REQUIRED OA <br />PROVIDED OA <br />SALES <br />6615 SQUARE FEET <br />993 <br />1000 <br />NOTE: 1. OUTSIDE AIR VOLUMES ARE BASED UPON FLORIDA MECHANICAL CODE <br />SECTION 403.3, RETAIL SPACE 0 0.30 CFM PER SQUARE FOOT WITH <br />ASHRAE 3-HOUR RULE. <br />2. RETAIL SPACE WITHIN CENTER HAS OUTSIDE AIR BASED UPON 707o <br />NET OCCUPIABLE SPACE OF SALES FLOOR. <br />BUILDING AIR BALANCE <br />OUTSIDE AIR <br />INTO BUILDING <br />EXHAUST AIR OUT OF <br />BUILDING <br />SOURCE <br />CFM <br />SOURCE <br />CFM <br />AC-1 <br />RTU-1 <br />1100 <br />200 <br />TEF-1 <br />EXFILTRATION <br />100 <br />1100 <br />TOTAL OUTSIDE <br />AIR IN = 1300 <br />TOTAL EXHAUST .AIR OUT = 1200 <br />BUILDING PRESSURIZATION = <br />+100 <br />11 <br />n <br />z <br />0 <br />�--- _ <br />W <br />[� I <br />w <br />z <br />c� <br />z. <br />w <br />w <br />Z <br />I..LI <br />U <br />0U)a <br />_z J <br />O <br />_I J O <br />' Q � LL <br />U Z <br />W Z <br />LJJ � O <br />> s <br />Q U <br />O <br />QU) W Q <br />W � N <br />w_ <br />Z <br />0 <br />SAVE -A -LOT <br />TENANT BUILD -OUT <br />RENOVATION <br />PROJECT ADDRESS: <br />TOWNVIEW SQUARE SHOPPING CENTER <br />7320 GALL BLVD. <br />ZEPHYRHILLS, FLORIDA 33541 <br />PASCO COUNTY <br />SUPERVALU <br />COMPANY <br />CLIENT ADDRESS: <br />100 CORPORATE OFFICE DR. <br />EARTH CITY, MISSOURI <br />DATE DESCRIPTION <br />09-02-10 OWNER REVIEW <br />09-08-10 PERMIT DRAWINGS <br />MECHANICAL <br />DETAILS <br />SEEDS Engineering, Inc. ASH <br />PROJECT #: 710-009 <br />27730 Santa Anita Blvd. p: (813) 902-2515 <br />Wesley Chapel, FL 33544 f: (813) 902-2516 <br />IPA, jmakar@seedseng.com <br />Florida Certificate of Authorization No. 28278 09-09-10 <br />