Laserfiche WebLink
STOP FL <br />CHUT <br />MIN. <br />INTERIOF <br />FROMMELT RAINGUARD RG-3000 WATER <br />DIVERSION HEADER SEAL <br />-- FROMMELT TP-903 DOCK SEAL, C--PAD STYI.E, <br />WITH BLACK SUF)ERFLEX HC/AP FABRIC, AND <br />ROSS LOCO DOCK SIGN, FROM ARBON EQUIP., <br />NO SUBSTITUTION. SEE AO.O FOR CONTACT <br />NFORMAIION <br />SECTIONAL DOOR, SEE DOOR SCHEDULE A6.0 <br />FROMMELT CODE U4 COMBINED BOTTOM PAD <br />AND BUMPER <br />MINIMUM 4" DOCK OFFSET @ RECESSED OR <br />DECLINED DOCK APPROACH - VARIES TO BE <br />PARALLEL 10 TRUCK, MORE IF APPROPRIATE <br />FOR SITE CONDITIONS. TRUCK DOCK MUST BE <br />DESIGNED FOR SITE SPECIFIC CONDITION <br />0 4" MIN. OFFSET <br />" (VARIES) <br />TRENCI DRAIN Wf111 SUMP PUMP <br />SECT ON AT DOCK DOOR <br />SCALE: 1 /4" = 1'-0" <br />\ICI E\/A_[I(' fNI AT nnCK IR <br />SCALE: 1 /4" = 1'-0" <br />SEC - ON Q) CHUTE <br />SCALE: 1 /4" = 1 `-0" <br />DOCK DETAIL <br />SCALE: N.T.S. <br />_ ._.... <br />MINIMUM 5 <br />MANEUVERING <br />SPACG,_RFQU�RED �. �.• �� � <br />( S YARD, BIN i <br />�I <br />1 <br />W <br />RIBBED METAL CANOPY ABOVE @ + 02" a- C <br />A.F.F., FACTORY FINISHED TO MATCH ADJ, 26 vi <br />WALL SURFACE IC - <br />- <br />SUMP PUMP CONTROL BOX w <br />SIGN (INCLUDED WITH WITH OUTSIDE ALARMS AND LOCKING <br />BY G.C. WEATHERPROOF COVER i 4'-0" ANOPY <br />i <br />iAINGUARD RG-3000 <br />RSION HEADER SEAL <br />)OOR <br />5 <br />A4.1 a <br />6" DIA. PIPE BOLLARD (TYP <br />) a <br />OFFSET CONCRETE 4" a8" CMU <br />BOTTOM PAD AND BUMPER <br />DOCK RAMP TO BE DESIGNED BY AR <br />TFOR 1:26 MAXIMUM TRAILER BED SATO PREVENT CONTACT AND IMPACT <br />BUILDING AND TRAILER, EXISTING DOCK RAMPS <br />MUST BE CHECKED FOR SUFFICIENT DOCK <br />OFFSET AT THE SITE AND MODIFIED WHERE <br />APPROPRIATE <br />WEATHER TIGHT 0 <br />WALL <br />;OMPACTOR WITH <br />TU TE COMPLETE <br />ASSEMBLY <br />E COMPACTOR PAD, <br />MINIMUM 3000 PSI, STEEL <br />REINFORCED <br />- ---- --- 1:26 MAXIMUM TRAILER BED SLOPE <br />DOCK RAMP TO BE DFSIGNED BY ARCIITECT FOR 1:26 MAXIMUM TRAILER <br />BED SLOPE AND TO PREVENT CONTACT AND IMPACT DAMAGE TO BUILDING I <br />AND TRAILER. EXISTING DOCK RAMPS MUST BE CIJECKFD FOR SUFFICIENT <br />DOCK OFFSET AT THE SITE AND MODIFIED WHERE APPROPRIATE. <br />1 <br />A4.1 OPP. <br />I <br />I <br />4" DOCK OFFSET <br />IJ 0 d- <br />SLOPE OF DOCK MUST BE COORDINATED W11H DOCK EQUIPMENT <br />RAMP SLOPE TO DRAIN <br />LANDLORD IS TO PROVIDE A DEDICATED AREA <br />FOR ONE TENANT 8-YARD RECYCLE BIN WITH <br />AN ASSOCIATED 50'-0" TRUCK ACCESS/ <br />MANEUVERING SPACE ADJACENT AND <br />CONVENIENT TO THE ROSS PROCESSING ROOM <br />MAN DOOR FOR ROSS SOLE USE. LANDLORD <br />IS RESPONSIBLE FOR ANY SCREENING OR <br />ENCLOSURE REQUIRED BY LOCAL AUTHORITY. <br />SURFACE MAY BE CONCRETE OR ASPHALT, <br />LOCATION MUST BE PROTECTED BY TRAFFIC <br />BOLLARDS <br />CODE COMPLIANT DOCK & COMPACTOR ANGLE <br />GALVANIZED STEEL MAY BE MODIFIED TO AVOID <br />GUARDRAIL OBSTRUCTIONS, SEE AFT PLAN <br />DOCK RAMP TO BE DESIGNED BY ARCHITECT <br />FOR 1:26 MAXIMUM TRAILER BED SLOPE AND <br />LANDLORD IS TO CONFIRM THAT BOTH DOCK <br />TO PREVENT CONTACT AND IMPACT DAMAGE TO <br />SITE ACCESS AND CIRCULATION ARE SUITABLE <br />BUILDING AND TRAILER. EXISTING DOCK RAMPS <br />FOR USE BY A 65 FOOT SEMI -TRACTOR <br />MUST BE CHECKED FOR SUFFICIENT DOCK <br />TRAIIFR TRUCK AND TO MAKE SUCH <br />OFESFT AT THE SITE AND MODIFIED WHERE <br />MODIFICATIONS AS MAY BE NECESSARY TO <br />APPROPRIATE. <br />MAKE IT SO <br />YX <br />CONCRETE TO BE DOMED FOR <br />PROPER WATER RIJN OFF <br />CO STEEL PIPE FILLED W <br />CONC. & EMBEDDED IN C <br />BASE PAINT: OSHA YELL( <br />BITUMINOUS JOINT AROUNI <br />TOP OF SLAB OR ASPHAL <br />CONCRETE BASE <br />PER MFG RECOMMENDATIO <br />12" <br />16 �1211�,- 12 <br />ROOF HATCH, LADDER & SAFETY POLE, <br />SEE DETAIL 4/A1.1. MUST BE LOCATED <br />IN ELECTRICAL ROOM, ARCHITECT OF <br />RECORD MUST MODIFY STRUCTURE TO <br />ACCOMMODATE IF REQUIRED <br />ANCHORED BOLLARDS REQUIRED Al <br />RISER & UTILITY POINT OF ENTRY <br />c� <br />J J <br />C �L_I <br />FDC 0 <br />FIRE RISER & UTILITY AREA <br />ALLOWANCE a <br />J 9 <br />w <br />= nzr� <br />-= w <br />Z U <br />cn <br />N <br />6" DIA. PIPE BOLLARD (IYP) <br />TYP. BOLLARD DETAIL (TRAGIC <br />SCALE. 1 /2" = 1'-0" <br />1 <br />A4.1 <br />PROCESSING ROOM <br />102 <br />TRENCH DRAIN WITH <br />AUTOMATIC SUMP <br />PUMP. ENGINEER TO <br />SIZE SUMP PUMP FOR <br />20 YEAR RAIN -FALL <br />FROMMEL- CODE U4 <br />COMBINED 10" BOTTOM <br />PAD AND BUMPER <br />FROMMELT TP-903 DOCK <br />SEAL, C-PAD STYLE, WITH <br />BLACK SUPERFLEX HC / AP <br />FABRIC, AND ROSS LOGO <br />DOCK SIGN. FROM ARBON <br />EQUIPMENT (SEE AO.O FOR <br />CONTACT INFORMATION) <br />FROMMEIT RAINGUARD <br />RC-3000 WATER <br />DIVERSION HEADER SEAL <br />LEGEND <br />8" ALLOWANCE <br />BASE BUILDING SHELL = 8" ALLOWANCE <br />in <br />8" ALLOWANCE <br />METAL STUD FURRING WITH 5/8" GWB - 5" STANDARD ALLOWANCE <br />jEgE <br />I <br />ALLOWANCE - NON STRUCTURAL WALL TO ALLOW FOR FUTURE EXPANSION <br />AREA SHOWN (LAYER: A -PAT I--NONBEARING) <br />-_- <br />METAL STUD PARTITION WITH 5/8" GWB EACH SIDE. 3-5/8" STUD ® 5" <br />STAND. ALLOWANCE (6" ALLOWANCE IF PLYWD BACKING BLILIND GWB); 6 <br />LIJu' <br />STUD = 7" STAND. ALLOWANCE <br />1/2" APA CDX PLYWOOD BACKING BFITIND GWB INDICATED BY A 2" <br />POLY -LINE (LAYER: A-WALL-FINISH-01) <br />— <br />5/8" A-C, 0-1, EXT-APA PLYWOOD IN LIEU OF GWB INDICATED BY A 2" <br />PO1 Y--HNF (0) RFSTROOM & JANITORIAL CI-OSEI WALLS ONLY <br />(LAYER: A -WALL- FINISH --02) <br />FUH HEIGHT METAL STUD WALL WITH GWB BOTH SIDES <br />(LAYER: A-PATT-FULL HEIGHT) <br />TULL HEIGHI ACOUSIICALLY INSULATED AND SEALED METAL STUD FULL <br />HEIGHT WALL (LAYER: A-PATT-FULL HEIGHT AND SOUND) <br />AREA LINE (LAYER: A -AREA) <br />a� <br />�d ¢ �U rY0 C-5 <br />� c z=� I - a- z n U w <br />Y r <br />~ww�,LC) nrnnI U) -1 �a>�7 <br />(/)C] wc.a-" W Cr Cn W z W'—�C)rY <br />2'Ld <br />(D G�I—w�(�-} n W mLL,nf _^ll ICJ �'�'� L� V) <br />`K[ W �, I ,. V'1 U CC .2- 4 �q <br />fCD CD W .� `�" (J) .`�' W G n. J =7 = w C l (/� H J <br />C) W �U) =D � � V) CJ I Uz i- U C3 1— " �' J — U - <br />`� � � C7 �V) Cr -=r' m C7 O CD C? d W � � W � � C? W <br />�C1 SU-�1—..�<z:Uce cY v��tr-�wr�-=z cnvCY)�Jcci cry <br />COMPACTOR CONTROLS W/ PRESSURE <br />GAUGE @ +54" ADJACENT TO LATCH SIDE <br />OF HATCH <br />SII I IS TO BE PLACED <br />@ +40" A.F.F. <br />17 <br />CONTAINER / 3 <br />A4.1 <br />4'-D" VIGIL x 3/4" PLYWOOD WAINSCOT, SEE RA--1 AISLE PLAN, V.L. <br />(LAYER: A-LL INS IALLED-WAINSCOT) <br />8'H x 3/4" APA A PLYWOOD BACKBOARD HORIZ. (FULL HEIGHT AT LADDER) <br />(LAYER: A-LL INSTALLED- PLYWOOD MOUNTING BOARD) <br />3 ROWS 2x6 ANCHOR BOARDS MOUNTED Q 9", 48", AND 87" A.F.F. <br />(LAYER: A-LL INSTALLED -ANCHOR BOARD) <br />3 ROWS OF 10 WOOD NAILERS MOUNTED a 9", 48", AND 87" A.F.F. <br />(LAYER: A -II INSTALLED -NAILER) <br />KOROGARD WALL PANEL MOUNTED 10 +6'-0" A.F.F„ SEE ROOM FINISH <br />SCHEDULE AND NOTE '#15 ON A6.0 FOR LOCATIONS <br />-------- <br />KOROGARD WALL PANEL MOUNTED TO +4'-0" A.F.F., SEE ROOM FINISH <br />"- <br />SCHEDULE AND NOTE #15 ON A6.0 FOR LOCATIONS <br />6'-0" "SNOW" EXTRUDED CORNER GUARD U.N.O. <br />I IOORING TRANSITION, THRESHOLD, SADDLE, ETC, <br />FINISH <br />FLOOR FINISH MATERIAL - SEE SHELT A6.0 AND A5.0 FOR ADDITIONAL <br />INFORMATION <br />DOOR SYMB01- - SEE SHEET A6.0 <br />a O o <br />I <br />EQUAL 6" REINF CONC. COMPACTOR <br />EQUAL <br />MAX.) PAD, SLOPE TO DRAIN MIN, <br />1/4" PER FOOT; MAX. 1:30 <br />CA ENLARCLD PROCE_),�:)NG 8c ELECTR CAL_ DOOM PLAN <br />SCALE: 1 /4" = 1)-0" <br />NOTES: <br />1, TRASH COMPACTOR "RAMJET" TCT2201 STANDARD, COLOR 07-0004 <br />BEIGE U.O.N. TRASH CONTAINER "RAMJE " RJ-40-OC, COLOR 07-0004 <br />BEIGF U.O.N. BY MARATIION EQUIPMENT CO. PURCHASED DIRECTLY FROM <br />MARATHON'S ROSS ACCOUNT MANAGER ONLY (SEE SHT AO.0 FOR CONTACT <br />INFORMATION), NO EXCEPTIONS, INSTAI LED BY G.C. AND FULLY <br />OPERATIONAL PRIOR TO TURNOVER, NO EXCEI'11ON. <br />2. REQUIRED TRASH COMPACTOR ELECTRICAL SERVICE AND FUSED <br />DISCONNECT SWITCH ARE TO BE SIZED IN ACCORDANCE WITH MARATHON <br />EQUIPMFNT CO, SPECIFICATIONS (AS MUCH AS A 100 AMP SERVICE <br />DISCONNECT MAY BE REQUIRED DEPENDING ON PHASE AND VOLTAGE) AND <br />PROVIDED BY C.C. CONNECT COMPACTOR TO BUILDING POWER IN <br />ACCORDANCE WITH MARATHON AND CODE REQUIREMENTS (SPECIFIED <br />COMPACTOR IS TO BE SUPPLIED WITH A 10HP MOTOR AND PRESSURE <br />GAUGE). <br />3. IF THE COMPACTOR IS LOCATED AT A DISTANCE FROM THE ELECRICAL <br />ROOM TI-IEN INSURE THAT WIRING IS ADEQUATELY SIZED FOR THE VOLTAGE <br />DROP. <br />4. REQUIRED WELLMAN OIL HEATER TO BE INSTAI I ED BY MARATI ION AT <br />TRASH COMPACTOR ON ANY STORE WHERE THE TEMPERATURE DROPS <br />BELOW 30' FAHRENHEIT AT TIIF SOLE DISCRETION OF THE ROSS <br />CONSTRUCTION REPRESENTATIVE. <br />5. CONFIRM PROCESSING ROOM SHELF LAYOUT WITH ROSS CONSTRUCTION <br />RFPRFSFNTATIVF; ACTUAL LAYOUT WILL BE SHOWN ON RA-1 'ROSS AISLE <br />PLAN' PROVIDED BY THE ROSS CONSTRUCTION REPRESENTATIVE. <br />6. THE LOCATION OF ALL DEVICES AND OBJECTS (RISERS, LEADERS, PIPING, <br />CONDUITS, FTC.) IN THE PROCESSING ROOM MUST BE COORDINATED WITH <br />AND APPROVED BY THE ROSS CONSTRUCTION REPRESENTATIVE SO AS NOT <br />TO INTERFERE WITH FIXTURES AND PROCESSING ROOM OPERATIONS. <br />7. PROVIDE 1-1/2" STEEL ANGLE CORNER GUARDS AT ALL EXPOSED <br />OUTSIDE CORNERS OF PROCESSING ROOM TO 8'-0" A.F.F. OR LOP OF <br />DOOR FRAME. <br />Proj. Mgr. <br />JU <br />Job. Capt. <br />SG <br />Drawn by <br />JT <br />RON BARR, A,I.A. <br />Rev'd by <br />STATE OF FLORIDA <br />RIB <br />AR 0016160 <br />JUL 17 A13 <br />U W <br />F <br />O W d H W W <br />Iw�- F=- <br />U <br />p: Fw- S O w 0 <br />� <br />O <br />`'[ <br />' <br />O p F© W O~ <br />W <br />Q z <br />0�� <br />rn <br />U tq U I_ F o Y <br />co <br />o <br />0 <br />W o o 2 z W z <br />w w w <br />LL D z <br />r <br />coo <br />w U a >- z~ z O F <br />T: z z a-, s <br />ro a <br />x <br />u�l <br />q <br />o� <br />W J <br />0 0) z�� 2r <br />z z � ,z S <br />0 p 0 <br />O <br />ui <br />g 0 U O <br />SF <br />¢ <br />W w <br />W O <br />W <br />U W z p Y u_ RUCC Ci <br />OF ~ MC) <br />O <br />O cn z 5= <br />U <br />U <br />W O O p (1 W U� a <br />i0i. W <br />caWU <br />Fi <br />W0z�aza <br />2 3¢ <br />coo <br />d' U' V F- Yj U <br />O S o f Oz ? <br />uWi <br />r3 <br />O <br />COPYRIGHT <br />2012 <br />BARR ARCHITECTURAL STUDIO <br />Revisions: <br />CADFILE No. <br />J <br />sr <br />A <br />. <br />$d' <br />W <br />�r_ <br />N <br />L <br />.� 0 <br />N 4) <br />C7 0 0 <br />M 0) <br />_0 N 0 LL <br />(V Q <br />w, (0 Lo <br />(' /1 a I) a) <br />p E <br />`~ a <br />C C: <br />0 <br />L (� 0 <br />0 <br />f 4 <br />W C <br />ca 4-5r U <br />.,r <br />0L <br />T <br />0 U <br />LO <br />a <br />L <br />Sheet Title <br />ENLARGED PLAN <br />AND DETAILS <br />Scale: <br />Date: Sheet No. <br />01-31-2013 <br />Project Na <br />A4.1 <br />12-027 <br />