<br />PLUMBING SPECIFICATIONS:
<br />MR-., lo I
<br />SCOPE OF WORK
<br />WORK SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING:
<br />PROVIDE ALL LABOR, MATERIALS, SERVICES, EQUIPMENT AND
<br />APPLIANCES REQUIRED FOR THE FABRICATION AND INSTALLATION OF
<br />THE PLUMBING SYSTEM, AS INDICATED ON THE DESIGN DRAWINGS
<br />AND AS OUTLINED IN THESE SPECIFICATIONS.
<br />RELATED WORK SPECIFIED ELSEWHERE
<br />REFER TO ELECTRICAL SPECIFICATION (DIV. 16) FOR ELECTRICAL
<br />WORK TO BE DONE IN CONJUNCTION WITH THE PLUMBING WORK.
<br />THIS CONTRACTOR IS RESPONSIBLE FOR ALL CONDUIT, WIRING,
<br />JUNCTION BOXES, ETC.
<br />SUBSTITUTIONS
<br />EQUIPMENT AND DESIGN OF SYSTEMS INDICATED ON THE DESIGN
<br />DRAWINGS AND WITHIN THESE SPECIFICATIONS SHALL BE
<br />CONSIDERED AS "SPECIFIED STANDARD" OF QUALITY. NO
<br />SUBSTITUTIONS SHALL BE MADE WITHOUT PRIOR WRITTEN
<br />APPROVAL OF THE ENGINEER.
<br />CODES AND STANDARDS
<br />ALL PLUMBING WORK SHALL BE IN STRICT COMPLIANCE WITH THE
<br />2014 FLORIDA BUILDING PLUMBING CODE (5TH EDITION) AND
<br />FLORIDA ACCESSIBILITY CODE FOR BUILDING CONSTRUCTION
<br />CHAPTER 11.
<br />THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS,
<br />INSPECTIONS AND PAY ALL FEES.
<br />�di771I�
<br />ALL EQUIPMENT, ETC., SHALL BE NEW UNLESS OTHERWISE NOTED,
<br />AND AS SPECIFIED FREE OF DEFECTS AS SHOWN ON THE DRAWINGS
<br />AND AS INDICATED IN THESE SPECIFICATIONS. ALL ELECTRICAL
<br />POWERED EQUIPMENT SHALL BE U.L. OR E.T,L, LISTED.
<br />WORKMANSHIP
<br />ALL MATERIALS SHALL BE FABRICATED AND INSTALLED IN A NEAT
<br />AND PROFESSIONAL MANNER WITH THE COORDINATION OF ALL
<br />INVOLVED TRADES TO AVOID INTERFERENCES AND DELAY DUE TO
<br />LACK OF COORDINATION. NO ALLOWANCES WILL BE MADE FOR
<br />REWORK DUE TO COORDINATION DIFFICULTIES OR INTERFERENCES
<br />BETWEEN INVOLVED TRADES.
<br />SHOP DRAWINGS AND SUBMITTALS
<br />SUBMIT FOR ENGINEER'S APPROVAL, SHOP DRAWINGS, AND
<br />MANUFACTURER'S DATA FOR ALL NEW EQUIPMENT AND FIXTURES
<br />PRIOR TO PURCHASE AND OR FABRICATION, SHOP DRAWINGS FOR
<br />EQUIPMENT REQUIRING ELECTRIC POWER OR CONTROL WIRING
<br />CONNECTIONS SHALL INCLUDE COMPLETE WIRING DIAGRAMS
<br />AS-BUILTS CONTRACTOR SHALL PROVIDE THE ENGINEER TWO (2)
<br />SETS OF COMPLETE PLUMBING AS -BUILT DRAWINGS AT THE TIME OF
<br />SUBSTANTIAL COMPLETION. AS BUILTS SHALL BE PROVIDED ON
<br />REPRODUCIBLE VELLUM AND AUTOCAD DRAWING FILES [RELEASE
<br />2007 OR LATER]. AS -BUILT DRAWINGS SHALL CONSIST OF AN
<br />ACCURATE "AS -BUILT" RECORD OF THE INSTALLED WORK. PROJECT
<br />WILL NOT BE COMPLETE UNTIL ACCURATE AS-BUILTS ARE
<br />DELIVERED,
<br />ACCESS PANELS
<br />CONTRACTOR SHALL PROVIDE HINGED ACCESS DOORS (MIN.
<br />12"X12") FOR VALVES, ETC. WHERE FLOORS, WALLS, AND
<br />CEILINGS MUST BE
<br />PENETRATED TO ACCESS MECHANICAL SYSTEMS. FINISH SHALL BE
<br />COORDINATED THROUGH ARCHITECT TO MATCH SURROUNDING
<br />FINISHES.
<br />0xilIDI671
<br />ALL LOCATIONS OF EQUIPMENT, PIPING, ETC., INDICATED ON THE
<br />DRAWINGS IS DIAGRAMMATIC AND SHALL BE FOLLOWED AS CLOSELY
<br />AS POSSIBLE TO THE PLANS SUBJECT TO BUILDING CONSTRUCTION
<br />AND INTERFERENCES WITH OTHER TRADES. ALL WORK SHALL BE
<br />INSTALLED TO INSURE MAXIMUM HEADROOM, BALANCED OPERATION
<br />AND SUITABLE AESTHETIC APPEARANCE. CONTRACTOR IS
<br />RESPONSIBLE FOR ANY FIELD MEASUREMENTS REQUIRED TO PROVIDE
<br />AN APPROVED AND FUNCTIONAL INSTALLATION.
<br />NOT ALL COMPONENTS REQUIRED FOR A COMPLETE INSTALLATION ARE
<br />SHOWN ON THESE DRAWINGS. REFER TO EQUIPMENT INSTALLATION
<br />INSTRUCTION, SCHEDULES AND APPLICABLE CODES FOR ADDITIONAL
<br />INFORMATION, INCLUDING REQUIRED CONNECTION LOCATIONS, TYPES
<br />AND SIZES,
<br />PROVIDE ISOLATION VALVES AND UNIONS AT ALL EQUIPMENT AND AS
<br />INDICATED ON DRAWINGS.
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND
<br />INSTALLING ADEQUATE AND PROPER INSULATION AND MOISTURE -SEAL
<br />IN A MANNER THAT WILL PERMANENTLY PREVENT THE ACCUMULATION
<br />OF ANY OBJECTIONABLE MOISTURE ON THE EXTERIOR OF CONDENSATE
<br />DRAIN PIPING, OR OTHER PARTS OF THE SYSTEM. HE SHALL
<br />CORRECT THE CAUSE OF ANY CONDENSATION AND FULLY REPAIR,
<br />WITHOUT COST TO THE OWNER, ANY DAMAGES TO BUILDING
<br />SURFACES, FURNISHINGS OR EQUIPMENT CAUSED BY CONDENSATION
<br />FROM THIS SYSTEM, FOR THE FULL PERIOD OF THE GUARANTEE.
<br />PERFORM ALL WORK NECESSARY TO PREPARE THE STRUCTURE FOR
<br />THE INSTALLATION OF THE WORK.
<br />ALL HOLES, OPENINGS AND DAMAGED MATERIALS CREATED DURING
<br />CONSTRUCTION SHALL BE REPAIRED AND FINISHED BY EXPERIENCED
<br />WORKMEN. PROVIDE ALL ROOF, WALL AND FLOOR PENETRATIONS
<br />REQUIRED TO COMPLETE INSTALLATION OF WORK (MAINTAIN FIRE
<br />RATING OF EXISTING STRUCTURE), ALL PENETRATIONS SHALL BE
<br />PATCHED AND FINISHED TO MATCH SURROUNDING SURFACES AND
<br />FINISHES. ALL EQUIPMENT OR PIPE PENETRATIONS THROUGH
<br />WALL, ROOF AND FLOORS SHALL BE SLEEVED AND SEALED SO AS TO
<br />BE WATER AND AIR TIGHT.
<br />ALL ROOF CUTS AND REPAIRS SHALL BE PERFORMED BY AN APPROVED
<br />ROOFING CONTRACTOR IN ORDER TO MAINTAIN ROOF WARRANTY.
<br />CLEANING, TESTING AND ADJUSTING:
<br />THE CONTRACTOR, AT HIS EXPENSE, SHALL CLEAN, REPAIR,
<br />ADJUST, CHECK, BALANCE, AND PLACE IN SERVICE THE VARIOUS
<br />SYSTEMS
<br />HEREIN SPECIFIED WITH THEIR RESPECTIVE EQUIPMENT,
<br />ACCESSORIES AND PIPING. HE SHALL FURNISH ALL LABOR,
<br />MATERIALS, EQUIPMENT, AND TOOLS REQUIRED TO PERFORM TESTS
<br />REQUIRED BY THESE SPECIFICATIONS AND BY THE GOVERNING
<br />AUTHORITIES.
<br />NO WORK SHALL BE COVERED OR CONCEALED UNTIL PROPERLY
<br />INSPECTED AND TESTED.
<br />IEXCAVATION AND BACKFILL
<br />PROVIDE ALL EXCAVATION AND TRENCHING TO THE CORRECT
<br />ELEVATIONS, FOR THE INSTALLATION OF ALL PIPING. PROVIDE
<br />ALL BACKFILL IN STRICT ACCORDANCE WITH THE EXCAVATION AND
<br />BACKFILL SECTION OF DIVISION 1 SPECIFICATIONS.
<br />TESTING:
<br />ALL DOMESTIC WATER PIPING SYSTEMS SHALL BE TESTED FOR
<br />ABSOLUTE TIGHTNESS BY SUBJECTING THE SYSTEM TO A
<br />HYDROSTATIC PRESSURE OF 150 PSI GAUGE OR 50 PSI OVER WORKING
<br />PRESSURE, WHICHEVER IS GREATER FOR A PERIOD OF NOT LESS
<br />THAN EIGHT (8) HOURS. ALL LEAKS SHALL BE REPAIRED AND THE
<br />HYDROSTATIC TEST REAPPLIED UNTIL, FOR AN EIGHT (8) HOUR
<br />PERIOD, NO LEAKS CAN BE FOUND WHILE THE SYSTEM IS SUBJECT TO
<br />THE TEST PRESSURE.
<br />SOIL PIPE AND CONDENSATE DRAINS SHALL BE TESTED BY
<br />TEMPORARILY PLUGGING ALL OUTLETS AND FILLING THE SYSTEM WITH
<br />WATER TO THE LEVEL OF THE HIGHEST VENT STACK. THE SYSTEM
<br />MUST BE INSPECTED AND ALL LEAKS REPAIRED AND THE TEST
<br />REPEATED UNTIL THE WATER LEVEL DOES NOT DECREASE FOR A
<br />PERIOD OF 24 HOURS.
<br />MAINTENANCE MANUALS
<br />PROVIDE COMPLETE MAINTENANCE MANUALS (3 REQUIRED) ON ALL NEW
<br />EQUIPMENT, ORGANIZE OPERATING AND MAINTENANCE DATA INTO
<br />SUITABLE SETS OF MANAGEABLE SIZE. BIND PROPERLY INDEXED
<br />DATA IN INDIVIDUAL, HEAVY-DUTY, 2-INCH, 3-RING VINYL -COVERED
<br />BINDERS WITH POCKET FOLDERS FOR FOLDED SHEET INFORMATION,
<br />MARK APPROPRIATE IDENTIFICATION ON FRONT AND SPINE OF EACH
<br />BINDER. INCLUDE THE FOLLOWING TYPE OF INFORMATION. THE
<br />INFORMATION WILL BE TURNED OVER TO THE OWNER AT TIME OF
<br />SUBSTANTIAL COMPLETION:
<br />OPERATING AND MAINTENANCE INSTRUCTIONS
<br />SPARE PARTS LIST
<br />COPIES OF WARRANTIES
<br />WIRING DIAGRAMS
<br />INSPECTION REPORTS & APPROVALS
<br />SHOP DRAWINGS AND PRODUCT DATA
<br />TRAINING SERVICES
<br />THOROUGHLY INSTRUCT THE OWNER'S REPRESENTATIVE IN THE
<br />OPERATION OF ALL EQUIPMENT FURNISHED AND LOCATION OF ALL
<br />VALVES AND CONTROL DEVICES.
<br />TRAIN BUILDING OWNER'S PERSONNEL DURING NORMAL WORKING HOURS
<br />ON START-UP AND SHUT -DOWN PROCEDURES, TROUBLESHOOTING
<br />PROCEDURES, SERVICING AND PREVENTATIVE MAINTENANCE
<br />SCHEDULE AND PROCEDURES,
<br />REVIEW WITH THE OWNER'S PERSONNEL, THE DATA CONTAINED IN THE
<br />OPERATING AND MAINTENANCE MANUALS. SCHEDULE TRAINING WITH
<br />OWNER, PROVIDE AT LEAST 7-DAYS PRIOR NOTICE TO
<br />ARCHITECT/ENGINEER.
<br />SYSTEM IDENTIFICATION
<br />PROVIDE IDENTIFICATION LABELS ON OR NEAR EACH PIECE OF MAJOR
<br />EQUIPMENT AND EACH OPERATIONAL DEVICE AND DISCONNECT, THE
<br />LABELS SHALL BE CONSTRUCTED OF ENGRAVED PLASTIC LAMINATE
<br />SIGN OR PLASTIC EQUIPMENT MARKER PERMANENTLY SECURED TO
<br />EQUIPMENT. THE LETTERING SHALL BE A MINIMUM OF 1/2 INCH HIGH
<br />FOR EQUIPMENT NAME AND 3/8 INCH FOR EQUIPMENT INFORMATION.
<br />HANGERS AND SUPPORTS
<br />PROVIDE ALL NECESSARY, PIPE SUPPORTS, HANGER, RODS, CLAMPS
<br />AND ATTACHMENTS TO PROPERLY INSTALL AND SUPPORT PIPING AND
<br />EQUIPMENT FROM THE BUILDING STRUCTURE.
<br />PROVIDE ANY ANGLE IRON OR UNISTRUT AND SUSPENSION RODS
<br />REQUIRED TO INSTALL EQUIPMENT, PIPING AND DUCTWORK.
<br />ALL SUPPORTS EXPOSED TO OUTDOORS SHALL BE CLEANED, PRIMED
<br />AND PAINTED TO PREVENT RUSTING. FINISH COLOR AS SELECTED BY
<br />OWNER.
<br />THE USE OF BALING WIRE OR PERFORATED METAL STRAPPING IS
<br />NOT ACCEPTABLE FOR SUPPORTS.
<br />WARRANTY/GUARANTEE;
<br />THE CONTRACTOR SHALL WARRANTY/GUARANTEE AND MAINTAIN THE
<br />STABILITY OF WORK AND MATERIALS AND KEEP SAME IN PERFECT
<br />REPAIR AND CONDITION OF THE PERIOD OF ONE (1) YEAR. DEFECTS
<br />OF ANY KIND DUE TO FAULTY WORK OR MATERIALS APPEARING DURING
<br />THE ABOVE MENTIONED PERIOD MUST BE IMMEDIATELY MADE GOOD
<br />BY THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE
<br />SATISFACTION OF THE OWNER AND ARCHITECT AND ENGINEER. SUCH
<br />RECONSTRUCTION AND REPAIRS SHALL INCLUDE ALL DAMAGE TO THE
<br />FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE
<br />ORIGINAL DEFECT OR REPAIRS THERETO.
<br />WATER SUPPLY SYSTEM:
<br />EXTEND WATER SERVICE AS INDICATED ON DESIGN DRAWINGS.
<br />PROVIDE SHOCK ABSORBERS AND VACUUM BREAKERS WHERE
<br />REQUIRED.
<br />PIPE AND FITTINGS ABOVE GROUND - TYPE L HARD COPPER AND
<br />WROUGHT COPPER FITTINGS.
<br />PIPE AND FITTINGS BELOW GROUND - TYPE "K" SOFT COPPER.
<br />VALVES - BALL VALVES - ALL BRONZE, LEAD FREE*, RISING STEM,
<br />DOUBLE WEDGE TAPER SEAT, 125 PSI STEAM PRESSURE.
<br />CHLORINATION - BEFORE BEING PLACED IN SERVICE ALL WATER
<br />DISTRIBUTION
<br />SYSTEMS SHALL BE STERILIZED WITH CHLORINE IN ACCORDANCE WITH
<br />AWWA C-601-54 STANDARD PROCEDURE FOR DISINFECTING WATER
<br />MAINS,
<br />INSULATE HOT WATER LINES WITH V RUBATEX INSULATION OR EQUAL.
<br />INSULATION TO BE FIRE RATED FOR USE IN RETURN AIR PLENUM.
<br />CONNECTIONS TO MISCELLANEOUS EQUIPMENT:
<br />ROUGH -IN AND CONNECT WATER, WASTE, AND VENT TO COMPLETE THE
<br />INSTALLATION OF EQUIPMENT LISTED ON THE DRAWINGS.
<br />PLUMBING FIXTURES SHALL BE PROVIDED COMPLETE AS SHOWN ON THE
<br />DRAWINGS WITH ALL REQUIRED SUPPLY, WASTE, SOIL, AND VENT
<br />CONNECTIONS, TOGETHER WITH ALL FITTINGS, SUPPORTS, FASTENING
<br />DEVICES, COCKS, VALVES, AND TRAPS.
<br />ALL FIXTURES SHALL HAVE STOP VALVES (LEAD FREE*) ON ALL WATER
<br />CONNECTIONS.
<br />ALL EXPOSED METAL TRIM ON ALL FIXTURES SHALL BE POLISHED
<br />CHROMIUM PLATED. ALL EXPOSED PIPES EXTENDING FROM WALL SHALL
<br />HAVE CHROMIUM PLATED BRASS ESCUTCHEON MOUNTED AGAINST
<br />WALL. EXPOSED PVC PIPING AND P-TRAPS ARE UNACCEPTABLE.
<br />*LEAD FREE REFERS TO THE WETTED SURFACE OF PIPE, FITTINGS,
<br />AND FIXTURES IN POTABLE WATER SYSTEMS THAT HAVE A WEIGHTED
<br />AVERAGE LEAD CONTENT LESS THAN 0.25% PER THE SAFE DRINKING
<br />WATER ACT AND OTHER EQUIVALENT STATE REGULATIONS.
<br />THE PLUMBING FIXTURES SHALL BE ROUGHED -IN ACCORDANCE WITH
<br />MANUFACTURER'S "ROUGH -IN INFORMATION", PROVISIONS FOR MOUNTING WALL
<br />FIXTURES SHALL BE MADE WHILE THE WALL IS BEING BUILT.
<br />DRAINAGE SYSTEM:
<br />EXTEND PIPING AS INDICATED ON THE DRAWINGS,
<br />PIPE SLOPE
<br />2-1/2 INCH DIAMETER AND LESS SHALL BE INSTALLED WITH A FALL OF NOT LESS THAN
<br />1/4 INCH PER FOOT.
<br />3 INCH DIAMETER OR LARGER SHALL BE INSTALLED WITH A FALL NOT LESS THAN 1/8
<br />INCH PER FOOT.
<br />PIPE AND FITTINGS:
<br />SERVICE -WEIGHT CAST IRON WITH NO/HUB OR BELL AND SPIGOT FITTINGS.
<br />NO/HUB COUPLING SHALL CONFORM TO CISPI STANDARD 310 (LATEST EDITION) AND
<br />SHALL BE LISTED BY NSF INTERNATIONAL.
<br />DRAIN, WASTE AND VENT PIPING LOCATED IN FIRE RATED WALL
<br />ASSEMBLIES AND RETURN AIR PLENUMS SHALL BE SERVICE -WEIGHT CAST IRON WITH
<br />NO/HUB OR BELL AND SPIGOT FITTINGS.
<br />ALL CAST IRON SOIL PIPE AND FITTINGS SHALL BE MARKED WITH THE COLLECTIVE
<br />TRADEMARK OF THE CAST IRON SOIL PIPE INSTITUTE (CISPI) AND BE LISTED BY NSF
<br />INTERNATIONAL.
<br />CONDENSATE DRAIN PIPING LOCATED ON THE EXTERIOR SHALL BE TYPE L HARD
<br />COPPER AND WROUGHT COPPER FITTINGS, WITH SOLDERED JOINTS (USE ONLY
<br />"LEAD FREE").
<br />PROVIDE CLEANOUTS EVERY 75 FEET, AT CHANGES IN DIRECTION, AT BASE OF
<br />DOWNSPOUTS AND AT BASE OF SOIL AND WASTE STACKS.
<br />SHOCK ARRESTOR: SIOUX CHIEF PER DRAWINGS
<br />WALL CLEANOUT: ZURN, JONESPEC, JOSAM OR EQUAL.
<br />FLOOR CLEANOUT: ZURN, JONESPEC, JOSAM OR EQUAL,
<br />PLUMBING GENERAL NOTES
<br />1 ALL PLUMBING INSTALLATIONS AND MATERIALS SHALL BE IN STRICT ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL CODES, LAWS,
<br />ORDINANCES AND REGULATIONS OF ALL AUTHORITIES HAVING JURISDICTION OVER THIS PROJECT.
<br />2, PIPE ROUTING SHOWN ON THESE DRAWINGS IS SCHEMATIC AND IS NOT INTENDED TO INDICATE EXACT ROUTING. PLUMBING CONTRACTOR SHALL
<br />PROVIDE ANY ADDITIONAL OFFSETS AND FITTINGS REQUIRED FOR PROPER INSTALLATION AND TO MAINTAIN PROPER CLEARANCES
<br />3. COORDINATE ALL PIPE ROUTING WITH ALL OTHER TRADES PRIOR TO INSTALLATION. ROUTE ALL PIPING TO AVOID DUCTWORK, PIPING AND
<br />BUILDING STRUCTURE.
<br />4, SEE ARCHITECTURAL DRAWINGS FOR EXACT PLUMBING FIXTURE LOCATIONS AND MOUNTING HEIGHTS FOR COMPLIANCE WITH FLORIDA BUILDIN
<br />CODE ACCESSIBILITY REQUIREMENTS. SINKS REQUIRED TO BE ACCESSIBLE SHALL BE MOUNTED WITH COUNTER RIM NO HIGHER THAN 34 INCHES
<br />ABOVE FINISH FLOOR. CONTROLS FOR FLUSH VALVES SHALL BE MOUNTED ON THE WIDE SIDE OF THE TOILET AREAS NO MORE THAN 44 INCHES
<br />ABOVE THE FLOOR. FOR ALL OTHER FIXTURE MOUNTING HEIGHTS SEE PLUMBING FIXTURE SCHEDULE.
<br />5, ROUTE ALL PIPING CONCEALED ABOVE CEILING, WITHIN CHASES OR ABOVE NON -ACCESSIBLE CEILINGS, REFER TO ARCHITECTURAL DRAWINGS
<br />FOR CEILING TYPES.
<br />6, ALL VALVES, WATER HAMMER ARRESTORS, CONTROLS AND CLEANOUTS CONCEALED WITHIN CHASES OR ABOVE NON -ACCESSIBLE CEILINGS
<br />SHALL HAVE 24 in. X 24 in. METAL ACCESS PANELS UNLESS INDICATED OTHERWISE ON DRAWINGS. PROVIDE UL 1 1/2 HOUR LABEL ACCESS PANEL
<br />IN 1 AND 2 HOUR CONSTRUCTION,
<br />7. INSTALL SHUTOFF VALVES ON ALL WATER LINES IN THE FOLLOWING LOCATIONS: ALL MAJOR BRANCH RUNS SUCH AS BRANCHES SERVING A
<br />FLOOR, WING, OR A MAJOR SECTION OF BUILDING, ALL EQUIPMENT CONNECTIONS, AND OTHER LOCATIONS AS MAY BE INDICATED ON DRAWINGS.
<br />8. INSTALL BALANCING VALVES AS INDICATED ON THE DRAWINGS AND AS REQUIRED FOR PROPER BALANCING OF THE VARIOUS SYSTEM.
<br />9, PLUMBING CONTRACTOR SHALL PROVIDE VALVE DIRECTORY WITH A TAG SCHEDULE SHOWING LOCATION OF EACH VALVE, TYPE, NUMBER,
<br />MANUFACTURER, FUNCTION AND ALL OPERATING POSITIONS.
<br />10. PLUMBING CONTRACTOR SHALL SUPPLY AND INSTALL A MEANS OF BACKFLOW PROTECTION OF THE POTABLE WATER SYSTEM AS INDICATED ON
<br />DRAWINGS AND AS REQUIRED PER 2014 FLORIDA BUILDING CODE (5th EDITION)- PLUMBING: SECTION 608.
<br />11. AT ALL PUBLIC HAND WASHING FACILITIES PLUMBING CONTRACTOR SHALL SUPPLY AND INSTALL A APPROVED WATER TEMPERATURE LIMITING
<br />DEVICE. EITHER A THERMOSTATIC OR MECHANICAL MIXING VALVE THAT CONFORMS TO ASSE 1070 OR CSA B125.3. REFER TO 2014 FLORIDA
<br />BUILDING CODE (5th EDITION) - PLUMBING: SECTION 416(5).
<br />12. PLUMBING CONTRACTOR SHALL PROVIDE SLEEVES FOR ALL PIPES PASSING THROUGH FLOORS, WALLS AND CEILINGS. EXTEND SLEEVES 2" in.
<br />ABOVE FLOORS, MAKE ALL SLEEVES FLUSH WITH WALLS AND CEILINGS. CONTRACTOR SHALL FIRE STOP ALL PENETRATIONS OF RATED WALLS,
<br />CEILINGS, ETC., INCLUDING ROOF, FLASH AND COUNTER FLASH ALL ROOF PENETRATIONS.
<br />13. PLUMBING CONTRACTOR SHALL PROVIDE CHROME PLATED HINGED ESCUTCHEON WITH SET SCREWS AT EACH EXPOSED PIPE PASSING THROUG
<br />A WALL, FLOOR OR CEILING IN FINISHED PORTIONS OF THE BUILDINGS,
<br />14. PLUMBING CONTRACTOR SHALL PROVIDE BELLOW TYPE WATER HAMMER ARRESTORS ON ALL HOT AND COLD WATER LINES. INSTALL IN UPRIGHT
<br />POSITION AT ALL QUICK CLOSING VALVES, SOLENOIDS, ISOLATED PLUMBING FIXTURES AND SUPPLY HEADERS AT PLUMBING FIXTURE GROUPS.
<br />LOCATE AND SIZE AS SPECIFIED OR AS SHOWN ON THE DRAWINGS AND WHERE NOT SHOWN, LOCATE IN ACCORDANCE WITH THE
<br />MANUFACTURER'S RECOMMENDATIONS AND COMPLY WITH THE PLUMBING AND DRAINAGE INSTITUTE STANDARDS WH 2O1,
<br />15. AT ADA FIXTURES WHERE SHOWN ON THE DRAWINGS, OR WHERE REQUIRED BY GOVERNMENTAL AGENCIES HAVING JURISDICTIONS, PROVIDE
<br />PER -MANUFACTURED INSULATION KITS ON THE SUPPLIES, TRAP AND DRAIN AT LAVATORIES AND SINKS FOR HANDICAPPED PERSONS.
<br />16. ALL VENTS THRU ROOF SHALL BE A MINIMUM OF TEN FEET (1Y-0") FROM ANY AIR INTAKE.
<br />17. PLUMBING CONTRACTOR SHALL INSTALL DIELECTRIC UNIONS AT ALL CONNECTIONS OF DISSIMILAR METALS.
<br />18, ALL HOT WATER AND HOT WATER RETURN LINES SHALL BE INSULATED WITH V WALL THICKNESS, PRE -SLIT, FLEXIBLE UNICELLULAR POLYOLEFIN
<br />FOAM PLENUM RATED ARMAFLEX INSULATION.
<br />19, PLUMBING CONTRACTOR SHALL THOROUGHLY INVESTIGATE THE SITE, CAREFULLY STUDY THE PLUMBING DRAWINGS, AND BECOME THOROUGHL
<br />FAMILIAR WITH THE EXISTING CONDITIONS BEFORE BIDDING, NO CHANGES WILL BE ALLOWED IN CONTRACT PRICE FOR EXTRA WORK CLAIMS
<br />BECAUSE CONTRACTOR FAILED TO FOLLOW THESE DIRECTIONS.
<br />20. EXISTING CONDITIONS AS SHOWN ON THESE DRAWINGS ARE TAKEN FROM ORIGINAL AND AS-BUILTS DRAWINGS OF THE BUILDING. THESE
<br />DRAWINGS IN PART ARE UNVERIFIED AND FIELD CONDITIONS SHALL GOVERN. FIELD VERIFY EXISTING INSTALLATIONS OF ALL DESCRIPTION AND
<br />MODIFY EXISTING PLUMBING SYSTEMS WHICH ARE TO REMAIN ACTIVE, TO FACILITATE RECONNECTION AND EXTENSION UNDER NEW WORK.
<br />PROVIDE SHUT-OFF VALVES ON ALL PIPES AT THE POINT OF TIE-IN TO EXISTING SYSTEM.
<br />21, INTERRUPTION OF EXISTING SERVICES SHALL BE MINIMALAND SHALL BE FULLY COORDINATED WITH OWNER IN ADVANCE. PLUMBING
<br />CONTRACTOR SHALL SUBMIT TIME THAT SERVICE WILL BE DOWN, AREA OF PIPING AND ANY EQUIPMENT THAT WILL BE AFFECTED. SCHEDULE AN
<br />INTERRUPTION DURING NON -CRITICAL HOURS OR NOTIFY OWNER AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO INTERRUPTION. PUT
<br />INTERRUPTED SERVICES BACK INTO OPERATION AS SOON AS IS PRACTICAL. NO SHUT DOWN CAN BE DONE WITHOUT THE OWNER'S APPROVAL,
<br />22. DURING THE PROGRESS OF WORK THE PLUMBING CONTRACTOR SHALL MAINTAIN AN ACCURATE RECORD OF ALL CHANGES MADE TO THE
<br />PLUMBING SYSTEM. THE RECORD DRAWINGS SHALL SHOW, CHANGES, DIMENSIONS AND LOCATIONS OF ALL PIPING. CHANGES SHALL BE DONE IN
<br />AUTOCAD RELEASE 14 OR ABOVE AND SUBMITTED TO THE OWNER AND GENERAL CONTRACTOR AT FINAL COMPLETION,
<br />PLUMBING FIXTURE SCHEDULE
<br />PLAN MARK DESCRIPTION MANUFACTURER/MODEL NUMBER
<br />WC-1 WATER CLOSET: (PHYSICALLY HAND ICAPPED)(PRESSURE ASSISTED)(BEDPAN LUGS)
<br />1, PRESSURE ASSISTED, VITREOUS CHINA, FLOOR MOUNTED ELONGATED BOWL, CLOSE AMERICAN STANDARD 2168.175
<br />COUPLED TANK, 1.6 G.P.F., 18" HIGH FROM FINISH FLOOR. INTEGRAL BEDPAN LUGS.
<br />2. PRESSURE ASSIST: FLUSHOMETER TANK SYSTEM. SLOAN-FLUSHMATE
<br />3. SEAT: WHITE EXTRA HEAVY DUTY PLASTIC FOR ELONGATED BOWL, OPEN FRONT LESS BEMIS 1655-SSC
<br />COVER WITH CONCEALED CHECK AND STAINLESS STEEL HINGE POST.
<br />4, BEDPAN WASHER: WALL MOUNTED EXPOSED FOR COLD WATER ONLY WITH HOSE SPRAYCHICAGO FAUCET 809
<br />HOLDER AND VACUUM BREAKER. (MOUNTING HEIGHT PER MANUFACTURES
<br />RECOMMENDATIONS)
<br />5. SUPPLY: 3/8" ANGLE SUPPLY WITH ANNEALED VERTICAL TUBE, WHEEL HANDLE STOPS AWCGUIRE
<br />ESCUTCHEON.
<br />PLUMBING LEGEND
<br />SYMBOL
<br />ABBREVIATION
<br />DESCRIPTION
<br />SAN
<br />SAN
<br />SANITARY WASTE
<br />GL
<br />GL
<br />GREASE LINE
<br />SD
<br />SD
<br />STORM DRAIN
<br />CD
<br />CD
<br />CONDENSATE DRAIN
<br />-
<br />CW
<br />COLD WATER
<br />- -
<br />HW
<br />HOT WATER
<br />- - - - -
<br />HWR
<br />HOT WATER RETURN
<br />DIRECTION OF FLOW
<br />V
<br />V
<br />VENT LINE
<br />JIL
<br />VTR
<br />VENT THRU ROOF
<br />oc
<br />P-TRAP
<br />FD
<br />FLOOR DRAIN
<br />Oc
<br />HD
<br />HUB DRAIN
<br />ECO
<br />EXTERIOR CLEAN OUT
<br />7k0
<br />WCO
<br />WALL CLEAN OUT
<br />I1--_
<br />Co
<br />CLEAN OUT
<br />FCO
<br />FLOOR CLEAN OUT
<br />GV
<br />GATE VALVE
<br />CV
<br />CHECK VALVE
<br />-f�i--
<br />BALL VALVE (FULL PORT)
<br />n
<br />T
<br />WATER HAMMER ARRESTOR
<br />4_0
<br />HB
<br />HOSE BIBB
<br />C
<br />CAPPED PIPE
<br />C i
<br />RISER DOWN (ELBOW)
<br />Q+--
<br />RISER UP (ELBOW)
<br />+
<br />BRANCH - TOP CONNECTION
<br />BRANCH - BOTTOM CONNECTION
<br />BRANCH - SIDE CONNECTION
<br />O
<br />RD
<br />ROOF DRAIN
<br />O
<br />SRD
<br />SECONDARY ROOF DRAIN
<br />POC
<br />POINT OF CONNECTION
<br />Q
<br />LOR
<br />POINT OF DISCONNECT / LIMIT OF REMOVAL
<br />REDUCER FITTING
<br />California I Florida I Nevada
<br />Peninsula Engineering, INC.
<br />MEP&FP
<br />PENINSULA
<br />ENGINEERING
<br />INC.
<br />2016 ALDEN ROAD
<br />ORLANDO, FL 32803
<br />CA 3089
<br />VOICE: (407) 246.1688
<br />FAX: (407) 246.1664
<br />http.,Iiwww.peina.com
<br />Email to: pei@peffla.com
<br />JOB #: 15384
<br />Copyright - All ideas, designs,
<br />methods and plans indicated or
<br />represented by this drawing are
<br />owned by and the property of
<br />Peninsula Engineering, Inc. and
<br />were created, evolved and
<br />developed for use on and in
<br />connection with the specified
<br />project. None of the ideas,
<br />designs, arrangements, methods
<br />or plans shall be used by or
<br />disclosed to any person, firm or
<br />corporation for any purpose
<br />whatsoever without the written
<br />permission of Peninsula
<br />Engineering, Inc.
<br />©opyright
<br />2015
<br />ARCHISPEC, INC
<br />ARCHITECTURAL SPECIFICATIONS
<br />653 Mallory Hill Drive Lady Lake, FL 32162
<br />P: 352.430.0987
<br />REVISIONS:
<br />1 1
<br />07/29/16
<br />JAHCA COMMENTS
<br />2
<br />11/23/16
<br />REVISION #1
<br />L_l
<br />SH-1
<br />LAVATORY (PHYSICALLY HANDICAPPED)
<br />1. VITREOUS CHINA, WALL HUNG, 20-112" X 18-1/4" PUNCHED FOR COMBINATION FITTINGS.
<br />2, FITTING: 8" WIDESPREAD COMBINATION, CHROME PLATED 4" WRIST BLADE HANDLES,
<br />GOOSENECK SPOUT, 0.5 G.P.M. FLOW LIMITER, 1-1/4" GRID STRAINER AND TAILPIECE.
<br />3, TRAP: CAST BODY ADJUSTABLE "P" TRAP WITH CLEAN OUT.
<br />4. SUPPLY: 3/8" ANGLE BALL STOP, 114 TURN, WITH ANNEALED VERTICAL TUBE AND
<br />ESCUTCHEON.
<br />5, CARRIER: RECTANGULAR STEEL UPRIGHTS WITH CONCEALED ARMS AND SLEEVES.
<br />SHOWER: (PHYSICALLY HANDICAPPED)
<br />AMERICAN STANDARD 0356.015
<br />CHICAGO FAUCET 785-GN28-317
<br />McGUIRE
<br />BRASSCRAFT
<br />ZURN Z-1231
<br />SYMMONS S 96 300 B30 L V
<br />ENGINEER OF RECPRD:
<br />1. ANTI -SCALED PRESSURE BALANCE SHOWER VALVE, SUPPLY ELL AND WALL FLANGE,
<br />04'�
<br />HEAVY DUTY CHROME PLATED BRASS HOSE WITH RUBBER HOSE SWIVEL CONNECTOR,;
<br />SLIDE BAR, AERATED HAND HELD WITH RUBBER LINER, SHOWER.
<br />J� R ,.•••°°°•..,. `
<br />i
<br />a
<br />No.37313 (P
<br />SHOWER/FLOOR DRAIN;
<br />1. SHOWER DRAIN: CAST IRON BODY WITH BOTTOM OUTLET COMBINATION INVERTIBLE
<br />ZURN ZN-145-56
<br />STATE OF
<br />`��
<br />OR�� •6=";:
<br />MEMBRANE CLAP AND ADJUSTABLE TYPE NICKEL BRONZE STRAINER.
<br />e
<br />�*, BO�Ae,.•' ��
<br />2. TRAP: DEEP SEAL, DU RA COATED CAST IRON WITH BOTTOM BRONZE CLEANOUT.
<br />ZURN Z1000®���7•.
<br />A sQez
<br />L_2
<br />HANDWASHING SINK - PATIENT ROOM (WALL MOUNTED)
<br />Jose. A. Marques, PE,
<br />1. VITREOUS CHINA, WALL -HUNG CORNER SINK, FRONT OVERFLOW, 16 3/4" X 11 1/4" X
<br />AMERICAN STANDARD 0451.001
<br />FL Reg. No. 37313
<br />51/4" DEEP, SINK RATED FOR 250 LBS. LOAD PER MANUFACTURER'S LITERATURE.
<br />PROJECT TITLE:
<br />PROVIDE DOCUMENTATION AT TIME OF AHCA INSPECTION.
<br />2. FITTING: SINGLE HOLE MOUNTING WITH OPTIONAL ESCUTCHEON PLATE. ADA-
<br />AMERICAN STANDARD 7420.101
<br />COMPLIANT METAL LEVER HANDLE, SPOUT, 0.5 G.P.M. FLOW LIMITER,
<br />ADVENTIST CARE CENTERS
<br />1-11/4" GRID STRAINER AND TAILPIECE.
<br />3, TRAP: CAST BODY ADJUSTABLE "P" TRAP WITH CLEAN OUT.
<br />McGUIRE
<br />McGUIRE
<br />ZEPHYRHILLS HEALTH &REHAB
<br />4. SUPPLY: 3/8" ANGLE BALL STOP, 1/4 TURN, WITH ANNEALED VERTICAL TUBE AND
<br />ESCUTCHEON,
<br />CENTER -10 BED SKILLED
<br />2
<br />NURSING BED CONVERSION
<br />Al
<br />PLUMBING DRAWING INDEX
<br />Sheet Number
<br />Sheet Name
<br />Current Revision
<br />P001
<br />SPECIFICATIONS AND LEGEND - PLUMBING
<br />2
<br />P201
<br />FIRST FLOOR DEMOLITION PLAN - SANITARY/VENT
<br />P202
<br />FIRST FLOOR DEMOLITION PLAN - DOMESTIC WATER
<br />P203
<br />FIRST FLOOR DEMOLITION PLAN - MEDICAL GAS
<br />1
<br />P301
<br />FIRST FLOOR RENOVATION PLAN - SANITARY/VENT
<br />2
<br />P302
<br />FIRST FLOOR RENOVATION PLAN - DOMESTIC WATER
<br />2
<br />P801
<br />RISER DIAGRAM - PLUMBING
<br />2
<br />PROJECT ADDRESS:
<br />7350 DAIRY ROAD, ZEPHYRHILLS FL. 33504
<br />C PROJECT NUMBER:
<br />FLTSP15008
<br />SHEET TITLE:
<br />SPECIFICATIONS AND LEGEND -