a <br />PLUMBING SPECIFICATIONS: <br />MR-., lo I <br />SCOPE OF WORK <br />WORK SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING: <br />PROVIDE ALL LABOR, MATERIALS, SERVICES, EQUIPMENT AND <br />APPLIANCES REQUIRED FOR THE FABRICATION AND INSTALLATION OF <br />THE PLUMBING SYSTEM, AS INDICATED ON THE DESIGN DRAWINGS <br />AND AS OUTLINED IN THESE SPECIFICATIONS. <br />RELATED WORK SPECIFIED ELSEWHERE <br />REFER TO ELECTRICAL SPECIFICATION (DIV. 16) FOR ELECTRICAL <br />WORK TO BE DONE IN CONJUNCTION WITH THE PLUMBING WORK. <br />THIS CONTRACTOR IS RESPONSIBLE FOR ALL CONDUIT, WIRING, <br />JUNCTION BOXES, ETC. <br />SUBSTITUTIONS <br />EQUIPMENT AND DESIGN OF SYSTEMS INDICATED ON THE DESIGN <br />DRAWINGS AND WITHIN THESE SPECIFICATIONS SHALL BE <br />CONSIDERED AS "SPECIFIED STANDARD" OF QUALITY. NO <br />SUBSTITUTIONS SHALL BE MADE WITHOUT PRIOR WRITTEN <br />APPROVAL OF THE ENGINEER. <br />CODES AND STANDARDS <br />ALL PLUMBING WORK SHALL BE IN STRICT COMPLIANCE WITH THE <br />2014 FLORIDA BUILDING PLUMBING CODE (5TH EDITION) AND <br />FLORIDA ACCESSIBILITY CODE FOR BUILDING CONSTRUCTION <br />CHAPTER 11. <br />THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS, <br />INSPECTIONS AND PAY ALL FEES. <br />�di771I� <br />ALL EQUIPMENT, ETC., SHALL BE NEW UNLESS OTHERWISE NOTED, <br />AND AS SPECIFIED FREE OF DEFECTS AS SHOWN ON THE DRAWINGS <br />AND AS INDICATED IN THESE SPECIFICATIONS. ALL ELECTRICAL <br />POWERED EQUIPMENT SHALL BE U.L. OR E.T,L, LISTED. <br />WORKMANSHIP <br />ALL MATERIALS SHALL BE FABRICATED AND INSTALLED IN A NEAT <br />AND PROFESSIONAL MANNER WITH THE COORDINATION OF ALL <br />INVOLVED TRADES TO AVOID INTERFERENCES AND DELAY DUE TO <br />LACK OF COORDINATION. NO ALLOWANCES WILL BE MADE FOR <br />REWORK DUE TO COORDINATION DIFFICULTIES OR INTERFERENCES <br />BETWEEN INVOLVED TRADES. <br />SHOP DRAWINGS AND SUBMITTALS <br />SUBMIT FOR ENGINEER'S APPROVAL, SHOP DRAWINGS, AND <br />MANUFACTURER'S DATA FOR ALL NEW EQUIPMENT AND FIXTURES <br />PRIOR TO PURCHASE AND OR FABRICATION, SHOP DRAWINGS FOR <br />EQUIPMENT REQUIRING ELECTRIC POWER OR CONTROL WIRING <br />CONNECTIONS SHALL INCLUDE COMPLETE WIRING DIAGRAMS <br />AS-BUILTS CONTRACTOR SHALL PROVIDE THE ENGINEER TWO (2) <br />SETS OF COMPLETE PLUMBING AS -BUILT DRAWINGS AT THE TIME OF <br />SUBSTANTIAL COMPLETION. AS BUILTS SHALL BE PROVIDED ON <br />REPRODUCIBLE VELLUM AND AUTOCAD DRAWING FILES [RELEASE <br />2007 OR LATER]. AS -BUILT DRAWINGS SHALL CONSIST OF AN <br />ACCURATE "AS -BUILT" RECORD OF THE INSTALLED WORK. PROJECT <br />WILL NOT BE COMPLETE UNTIL ACCURATE AS-BUILTS ARE <br />DELIVERED, <br />ACCESS PANELS <br />CONTRACTOR SHALL PROVIDE HINGED ACCESS DOORS (MIN. <br />12"X12") FOR VALVES, ETC. WHERE FLOORS, WALLS, AND <br />CEILINGS MUST BE <br />PENETRATED TO ACCESS MECHANICAL SYSTEMS. FINISH SHALL BE <br />COORDINATED THROUGH ARCHITECT TO MATCH SURROUNDING <br />FINISHES. <br />0xilIDI671 <br />ALL LOCATIONS OF EQUIPMENT, PIPING, ETC., INDICATED ON THE <br />DRAWINGS IS DIAGRAMMATIC AND SHALL BE FOLLOWED AS CLOSELY <br />AS POSSIBLE TO THE PLANS SUBJECT TO BUILDING CONSTRUCTION <br />AND INTERFERENCES WITH OTHER TRADES. ALL WORK SHALL BE <br />INSTALLED TO INSURE MAXIMUM HEADROOM, BALANCED OPERATION <br />AND SUITABLE AESTHETIC APPEARANCE. CONTRACTOR IS <br />RESPONSIBLE FOR ANY FIELD MEASUREMENTS REQUIRED TO PROVIDE <br />AN APPROVED AND FUNCTIONAL INSTALLATION. <br />NOT ALL COMPONENTS REQUIRED FOR A COMPLETE INSTALLATION ARE <br />SHOWN ON THESE DRAWINGS. REFER TO EQUIPMENT INSTALLATION <br />INSTRUCTION, SCHEDULES AND APPLICABLE CODES FOR ADDITIONAL <br />INFORMATION, INCLUDING REQUIRED CONNECTION LOCATIONS, TYPES <br />AND SIZES, <br />PROVIDE ISOLATION VALVES AND UNIONS AT ALL EQUIPMENT AND AS <br />INDICATED ON DRAWINGS. <br />CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND <br />INSTALLING ADEQUATE AND PROPER INSULATION AND MOISTURE -SEAL <br />IN A MANNER THAT WILL PERMANENTLY PREVENT THE ACCUMULATION <br />OF ANY OBJECTIONABLE MOISTURE ON THE EXTERIOR OF CONDENSATE <br />DRAIN PIPING, OR OTHER PARTS OF THE SYSTEM. HE SHALL <br />CORRECT THE CAUSE OF ANY CONDENSATION AND FULLY REPAIR, <br />WITHOUT COST TO THE OWNER, ANY DAMAGES TO BUILDING <br />SURFACES, FURNISHINGS OR EQUIPMENT CAUSED BY CONDENSATION <br />FROM THIS SYSTEM, FOR THE FULL PERIOD OF THE GUARANTEE. <br />PERFORM ALL WORK NECESSARY TO PREPARE THE STRUCTURE FOR <br />THE INSTALLATION OF THE WORK. <br />ALL HOLES, OPENINGS AND DAMAGED MATERIALS CREATED DURING <br />CONSTRUCTION SHALL BE REPAIRED AND FINISHED BY EXPERIENCED <br />WORKMEN. PROVIDE ALL ROOF, WALL AND FLOOR PENETRATIONS <br />REQUIRED TO COMPLETE INSTALLATION OF WORK (MAINTAIN FIRE <br />RATING OF EXISTING STRUCTURE), ALL PENETRATIONS SHALL BE <br />PATCHED AND FINISHED TO MATCH SURROUNDING SURFACES AND <br />FINISHES. ALL EQUIPMENT OR PIPE PENETRATIONS THROUGH <br />WALL, ROOF AND FLOORS SHALL BE SLEEVED AND SEALED SO AS TO <br />BE WATER AND AIR TIGHT. <br />ALL ROOF CUTS AND REPAIRS SHALL BE PERFORMED BY AN APPROVED <br />ROOFING CONTRACTOR IN ORDER TO MAINTAIN ROOF WARRANTY. <br />CLEANING, TESTING AND ADJUSTING: <br />THE CONTRACTOR, AT HIS EXPENSE, SHALL CLEAN, REPAIR, <br />ADJUST, CHECK, BALANCE, AND PLACE IN SERVICE THE VARIOUS <br />SYSTEMS <br />HEREIN SPECIFIED WITH THEIR RESPECTIVE EQUIPMENT, <br />ACCESSORIES AND PIPING. HE SHALL FURNISH ALL LABOR, <br />MATERIALS, EQUIPMENT, AND TOOLS REQUIRED TO PERFORM TESTS <br />REQUIRED BY THESE SPECIFICATIONS AND BY THE GOVERNING <br />AUTHORITIES. <br />NO WORK SHALL BE COVERED OR CONCEALED UNTIL PROPERLY <br />INSPECTED AND TESTED. <br />IEXCAVATION AND BACKFILL <br />PROVIDE ALL EXCAVATION AND TRENCHING TO THE CORRECT <br />ELEVATIONS, FOR THE INSTALLATION OF ALL PIPING. PROVIDE <br />ALL BACKFILL IN STRICT ACCORDANCE WITH THE EXCAVATION AND <br />BACKFILL SECTION OF DIVISION 1 SPECIFICATIONS. <br />TESTING: <br />ALL DOMESTIC WATER PIPING SYSTEMS SHALL BE TESTED FOR <br />ABSOLUTE TIGHTNESS BY SUBJECTING THE SYSTEM TO A <br />HYDROSTATIC PRESSURE OF 150 PSI GAUGE OR 50 PSI OVER WORKING <br />PRESSURE, WHICHEVER IS GREATER FOR A PERIOD OF NOT LESS <br />THAN EIGHT (8) HOURS. ALL LEAKS SHALL BE REPAIRED AND THE <br />HYDROSTATIC TEST REAPPLIED UNTIL, FOR AN EIGHT (8) HOUR <br />PERIOD, NO LEAKS CAN BE FOUND WHILE THE SYSTEM IS SUBJECT TO <br />THE TEST PRESSURE. <br />SOIL PIPE AND CONDENSATE DRAINS SHALL BE TESTED BY <br />TEMPORARILY PLUGGING ALL OUTLETS AND FILLING THE SYSTEM WITH <br />WATER TO THE LEVEL OF THE HIGHEST VENT STACK. THE SYSTEM <br />MUST BE INSPECTED AND ALL LEAKS REPAIRED AND THE TEST <br />REPEATED UNTIL THE WATER LEVEL DOES NOT DECREASE FOR A <br />PERIOD OF 24 HOURS. <br />MAINTENANCE MANUALS <br />PROVIDE COMPLETE MAINTENANCE MANUALS (3 REQUIRED) ON ALL NEW <br />EQUIPMENT, ORGANIZE OPERATING AND MAINTENANCE DATA INTO <br />SUITABLE SETS OF MANAGEABLE SIZE. BIND PROPERLY INDEXED <br />DATA IN INDIVIDUAL, HEAVY-DUTY, 2-INCH, 3-RING VINYL -COVERED <br />BINDERS WITH POCKET FOLDERS FOR FOLDED SHEET INFORMATION, <br />MARK APPROPRIATE IDENTIFICATION ON FRONT AND SPINE OF EACH <br />BINDER. INCLUDE THE FOLLOWING TYPE OF INFORMATION. THE <br />INFORMATION WILL BE TURNED OVER TO THE OWNER AT TIME OF <br />SUBSTANTIAL COMPLETION: <br />OPERATING AND MAINTENANCE INSTRUCTIONS <br />SPARE PARTS LIST <br />COPIES OF WARRANTIES <br />WIRING DIAGRAMS <br />INSPECTION REPORTS & APPROVALS <br />SHOP DRAWINGS AND PRODUCT DATA <br />TRAINING SERVICES <br />THOROUGHLY INSTRUCT THE OWNER'S REPRESENTATIVE IN THE <br />OPERATION OF ALL EQUIPMENT FURNISHED AND LOCATION OF ALL <br />VALVES AND CONTROL DEVICES. <br />TRAIN BUILDING OWNER'S PERSONNEL DURING NORMAL WORKING HOURS <br />ON START-UP AND SHUT -DOWN PROCEDURES, TROUBLESHOOTING <br />PROCEDURES, SERVICING AND PREVENTATIVE MAINTENANCE <br />SCHEDULE AND PROCEDURES, <br />REVIEW WITH THE OWNER'S PERSONNEL, THE DATA CONTAINED IN THE <br />OPERATING AND MAINTENANCE MANUALS. SCHEDULE TRAINING WITH <br />OWNER, PROVIDE AT LEAST 7-DAYS PRIOR NOTICE TO <br />ARCHITECT/ENGINEER. <br />SYSTEM IDENTIFICATION <br />PROVIDE IDENTIFICATION LABELS ON OR NEAR EACH PIECE OF MAJOR <br />EQUIPMENT AND EACH OPERATIONAL DEVICE AND DISCONNECT, THE <br />LABELS SHALL BE CONSTRUCTED OF ENGRAVED PLASTIC LAMINATE <br />SIGN OR PLASTIC EQUIPMENT MARKER PERMANENTLY SECURED TO <br />EQUIPMENT. THE LETTERING SHALL BE A MINIMUM OF 1/2 INCH HIGH <br />FOR EQUIPMENT NAME AND 3/8 INCH FOR EQUIPMENT INFORMATION. <br />HANGERS AND SUPPORTS <br />PROVIDE ALL NECESSARY, PIPE SUPPORTS, HANGER, RODS, CLAMPS <br />AND ATTACHMENTS TO PROPERLY INSTALL AND SUPPORT PIPING AND <br />EQUIPMENT FROM THE BUILDING STRUCTURE. <br />PROVIDE ANY ANGLE IRON OR UNISTRUT AND SUSPENSION RODS <br />REQUIRED TO INSTALL EQUIPMENT, PIPING AND DUCTWORK. <br />ALL SUPPORTS EXPOSED TO OUTDOORS SHALL BE CLEANED, PRIMED <br />AND PAINTED TO PREVENT RUSTING. FINISH COLOR AS SELECTED BY <br />OWNER. <br />THE USE OF BALING WIRE OR PERFORATED METAL STRAPPING IS <br />NOT ACCEPTABLE FOR SUPPORTS. <br />WARRANTY/GUARANTEE; <br />THE CONTRACTOR SHALL WARRANTY/GUARANTEE AND MAINTAIN THE <br />STABILITY OF WORK AND MATERIALS AND KEEP SAME IN PERFECT <br />REPAIR AND CONDITION OF THE PERIOD OF ONE (1) YEAR. DEFECTS <br />OF ANY KIND DUE TO FAULTY WORK OR MATERIALS APPEARING DURING <br />THE ABOVE MENTIONED PERIOD MUST BE IMMEDIATELY MADE GOOD <br />BY THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE <br />SATISFACTION OF THE OWNER AND ARCHITECT AND ENGINEER. SUCH <br />RECONSTRUCTION AND REPAIRS SHALL INCLUDE ALL DAMAGE TO THE <br />FINISH OR FURNISHING OF THE BUILDING RESULTING FROM THE <br />ORIGINAL DEFECT OR REPAIRS THERETO. <br />WATER SUPPLY SYSTEM: <br />EXTEND WATER SERVICE AS INDICATED ON DESIGN DRAWINGS. <br />PROVIDE SHOCK ABSORBERS AND VACUUM BREAKERS WHERE <br />REQUIRED. <br />PIPE AND FITTINGS ABOVE GROUND - TYPE L HARD COPPER AND <br />WROUGHT COPPER FITTINGS. <br />PIPE AND FITTINGS BELOW GROUND - TYPE "K" SOFT COPPER. <br />VALVES - BALL VALVES - ALL BRONZE, LEAD FREE*, RISING STEM, <br />DOUBLE WEDGE TAPER SEAT, 125 PSI STEAM PRESSURE. <br />CHLORINATION - BEFORE BEING PLACED IN SERVICE ALL WATER <br />DISTRIBUTION <br />SYSTEMS SHALL BE STERILIZED WITH CHLORINE IN ACCORDANCE WITH <br />AWWA C-601-54 STANDARD PROCEDURE FOR DISINFECTING WATER <br />MAINS, <br />INSULATE HOT WATER LINES WITH V RUBATEX INSULATION OR EQUAL. <br />INSULATION TO BE FIRE RATED FOR USE IN RETURN AIR PLENUM. <br />CONNECTIONS TO MISCELLANEOUS EQUIPMENT: <br />ROUGH -IN AND CONNECT WATER, WASTE, AND VENT TO COMPLETE THE <br />INSTALLATION OF EQUIPMENT LISTED ON THE DRAWINGS. <br />PLUMBING FIXTURES SHALL BE PROVIDED COMPLETE AS SHOWN ON THE <br />DRAWINGS WITH ALL REQUIRED SUPPLY, WASTE, SOIL, AND VENT <br />CONNECTIONS, TOGETHER WITH ALL FITTINGS, SUPPORTS, FASTENING <br />DEVICES, COCKS, VALVES, AND TRAPS. <br />ALL FIXTURES SHALL HAVE STOP VALVES (LEAD FREE*) ON ALL WATER <br />CONNECTIONS. <br />ALL EXPOSED METAL TRIM ON ALL FIXTURES SHALL BE POLISHED <br />CHROMIUM PLATED. ALL EXPOSED PIPES EXTENDING FROM WALL SHALL <br />HAVE CHROMIUM PLATED BRASS ESCUTCHEON MOUNTED AGAINST <br />WALL. EXPOSED PVC PIPING AND P-TRAPS ARE UNACCEPTABLE. <br />*LEAD FREE REFERS TO THE WETTED SURFACE OF PIPE, FITTINGS, <br />AND FIXTURES IN POTABLE WATER SYSTEMS THAT HAVE A WEIGHTED <br />AVERAGE LEAD CONTENT LESS THAN 0.25% PER THE SAFE DRINKING <br />WATER ACT AND OTHER EQUIVALENT STATE REGULATIONS. <br />THE PLUMBING FIXTURES SHALL BE ROUGHED -IN ACCORDANCE WITH <br />MANUFACTURER'S "ROUGH -IN INFORMATION", PROVISIONS FOR MOUNTING WALL <br />FIXTURES SHALL BE MADE WHILE THE WALL IS BEING BUILT. <br />DRAINAGE SYSTEM: <br />EXTEND PIPING AS INDICATED ON THE DRAWINGS, <br />PIPE SLOPE <br />2-1/2 INCH DIAMETER AND LESS SHALL BE INSTALLED WITH A FALL OF NOT LESS THAN <br />1/4 INCH PER FOOT. <br />3 INCH DIAMETER OR LARGER SHALL BE INSTALLED WITH A FALL NOT LESS THAN 1/8 <br />INCH PER FOOT. <br />PIPE AND FITTINGS: <br />SERVICE -WEIGHT CAST IRON WITH NO/HUB OR BELL AND SPIGOT FITTINGS. <br />NO/HUB COUPLING SHALL CONFORM TO CISPI STANDARD 310 (LATEST EDITION) AND <br />SHALL BE LISTED BY NSF INTERNATIONAL. <br />DRAIN, WASTE AND VENT PIPING LOCATED IN FIRE RATED WALL <br />ASSEMBLIES AND RETURN AIR PLENUMS SHALL BE SERVICE -WEIGHT CAST IRON WITH <br />NO/HUB OR BELL AND SPIGOT FITTINGS. <br />ALL CAST IRON SOIL PIPE AND FITTINGS SHALL BE MARKED WITH THE COLLECTIVE <br />TRADEMARK OF THE CAST IRON SOIL PIPE INSTITUTE (CISPI) AND BE LISTED BY NSF <br />INTERNATIONAL. <br />CONDENSATE DRAIN PIPING LOCATED ON THE EXTERIOR SHALL BE TYPE L HARD <br />COPPER AND WROUGHT COPPER FITTINGS, WITH SOLDERED JOINTS (USE ONLY <br />"LEAD FREE"). <br />PROVIDE CLEANOUTS EVERY 75 FEET, AT CHANGES IN DIRECTION, AT BASE OF <br />DOWNSPOUTS AND AT BASE OF SOIL AND WASTE STACKS. <br />SHOCK ARRESTOR: SIOUX CHIEF PER DRAWINGS <br />WALL CLEANOUT: ZURN, JONESPEC, JOSAM OR EQUAL. <br />FLOOR CLEANOUT: ZURN, JONESPEC, JOSAM OR EQUAL, <br />PLUMBING GENERAL NOTES <br />1 ALL PLUMBING INSTALLATIONS AND MATERIALS SHALL BE IN STRICT ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL CODES, LAWS, <br />ORDINANCES AND REGULATIONS OF ALL AUTHORITIES HAVING JURISDICTION OVER THIS PROJECT. <br />2, PIPE ROUTING SHOWN ON THESE DRAWINGS IS SCHEMATIC AND IS NOT INTENDED TO INDICATE EXACT ROUTING. PLUMBING CONTRACTOR SHALL <br />PROVIDE ANY ADDITIONAL OFFSETS AND FITTINGS REQUIRED FOR PROPER INSTALLATION AND TO MAINTAIN PROPER CLEARANCES <br />3. COORDINATE ALL PIPE ROUTING WITH ALL OTHER TRADES PRIOR TO INSTALLATION. ROUTE ALL PIPING TO AVOID DUCTWORK, PIPING AND <br />BUILDING STRUCTURE. <br />4, SEE ARCHITECTURAL DRAWINGS FOR EXACT PLUMBING FIXTURE LOCATIONS AND MOUNTING HEIGHTS FOR COMPLIANCE WITH FLORIDA BUILDIN <br />CODE ACCESSIBILITY REQUIREMENTS. SINKS REQUIRED TO BE ACCESSIBLE SHALL BE MOUNTED WITH COUNTER RIM NO HIGHER THAN 34 INCHES <br />ABOVE FINISH FLOOR. CONTROLS FOR FLUSH VALVES SHALL BE MOUNTED ON THE WIDE SIDE OF THE TOILET AREAS NO MORE THAN 44 INCHES <br />ABOVE THE FLOOR. FOR ALL OTHER FIXTURE MOUNTING HEIGHTS SEE PLUMBING FIXTURE SCHEDULE. <br />5, ROUTE ALL PIPING CONCEALED ABOVE CEILING, WITHIN CHASES OR ABOVE NON -ACCESSIBLE CEILINGS, REFER TO ARCHITECTURAL DRAWINGS <br />FOR CEILING TYPES. <br />6, ALL VALVES, WATER HAMMER ARRESTORS, CONTROLS AND CLEANOUTS CONCEALED WITHIN CHASES OR ABOVE NON -ACCESSIBLE CEILINGS <br />SHALL HAVE 24 in. X 24 in. METAL ACCESS PANELS UNLESS INDICATED OTHERWISE ON DRAWINGS. PROVIDE UL 1 1/2 HOUR LABEL ACCESS PANEL <br />IN 1 AND 2 HOUR CONSTRUCTION, <br />7. INSTALL SHUTOFF VALVES ON ALL WATER LINES IN THE FOLLOWING LOCATIONS: ALL MAJOR BRANCH RUNS SUCH AS BRANCHES SERVING A <br />FLOOR, WING, OR A MAJOR SECTION OF BUILDING, ALL EQUIPMENT CONNECTIONS, AND OTHER LOCATIONS AS MAY BE INDICATED ON DRAWINGS. <br />8. INSTALL BALANCING VALVES AS INDICATED ON THE DRAWINGS AND AS REQUIRED FOR PROPER BALANCING OF THE VARIOUS SYSTEM. <br />9, PLUMBING CONTRACTOR SHALL PROVIDE VALVE DIRECTORY WITH A TAG SCHEDULE SHOWING LOCATION OF EACH VALVE, TYPE, NUMBER, <br />MANUFACTURER, FUNCTION AND ALL OPERATING POSITIONS. <br />10. PLUMBING CONTRACTOR SHALL SUPPLY AND INSTALL A MEANS OF BACKFLOW PROTECTION OF THE POTABLE WATER SYSTEM AS INDICATED ON <br />DRAWINGS AND AS REQUIRED PER 2014 FLORIDA BUILDING CODE (5th EDITION)- PLUMBING: SECTION 608. <br />11. AT ALL PUBLIC HAND WASHING FACILITIES PLUMBING CONTRACTOR SHALL SUPPLY AND INSTALL A APPROVED WATER TEMPERATURE LIMITING <br />DEVICE. EITHER A THERMOSTATIC OR MECHANICAL MIXING VALVE THAT CONFORMS TO ASSE 1070 OR CSA B125.3. REFER TO 2014 FLORIDA <br />BUILDING CODE (5th EDITION) - PLUMBING: SECTION 416(5). <br />12. PLUMBING CONTRACTOR SHALL PROVIDE SLEEVES FOR ALL PIPES PASSING THROUGH FLOORS, WALLS AND CEILINGS. EXTEND SLEEVES 2" in. <br />ABOVE FLOORS, MAKE ALL SLEEVES FLUSH WITH WALLS AND CEILINGS. CONTRACTOR SHALL FIRE STOP ALL PENETRATIONS OF RATED WALLS, <br />CEILINGS, ETC., INCLUDING ROOF, FLASH AND COUNTER FLASH ALL ROOF PENETRATIONS. <br />13. PLUMBING CONTRACTOR SHALL PROVIDE CHROME PLATED HINGED ESCUTCHEON WITH SET SCREWS AT EACH EXPOSED PIPE PASSING THROUG <br />A WALL, FLOOR OR CEILING IN FINISHED PORTIONS OF THE BUILDINGS, <br />14. PLUMBING CONTRACTOR SHALL PROVIDE BELLOW TYPE WATER HAMMER ARRESTORS ON ALL HOT AND COLD WATER LINES. INSTALL IN UPRIGHT <br />POSITION AT ALL QUICK CLOSING VALVES, SOLENOIDS, ISOLATED PLUMBING FIXTURES AND SUPPLY HEADERS AT PLUMBING FIXTURE GROUPS. <br />LOCATE AND SIZE AS SPECIFIED OR AS SHOWN ON THE DRAWINGS AND WHERE NOT SHOWN, LOCATE IN ACCORDANCE WITH THE <br />MANUFACTURER'S RECOMMENDATIONS AND COMPLY WITH THE PLUMBING AND DRAINAGE INSTITUTE STANDARDS WH 2O1, <br />15. AT ADA FIXTURES WHERE SHOWN ON THE DRAWINGS, OR WHERE REQUIRED BY GOVERNMENTAL AGENCIES HAVING JURISDICTIONS, PROVIDE <br />PER -MANUFACTURED INSULATION KITS ON THE SUPPLIES, TRAP AND DRAIN AT LAVATORIES AND SINKS FOR HANDICAPPED PERSONS. <br />16. ALL VENTS THRU ROOF SHALL BE A MINIMUM OF TEN FEET (1Y-0") FROM ANY AIR INTAKE. <br />17. PLUMBING CONTRACTOR SHALL INSTALL DIELECTRIC UNIONS AT ALL CONNECTIONS OF DISSIMILAR METALS. <br />18, ALL HOT WATER AND HOT WATER RETURN LINES SHALL BE INSULATED WITH V WALL THICKNESS, PRE -SLIT, FLEXIBLE UNICELLULAR POLYOLEFIN <br />FOAM PLENUM RATED ARMAFLEX INSULATION. <br />19, PLUMBING CONTRACTOR SHALL THOROUGHLY INVESTIGATE THE SITE, CAREFULLY STUDY THE PLUMBING DRAWINGS, AND BECOME THOROUGHL <br />FAMILIAR WITH THE EXISTING CONDITIONS BEFORE BIDDING, NO CHANGES WILL BE ALLOWED IN CONTRACT PRICE FOR EXTRA WORK CLAIMS <br />BECAUSE CONTRACTOR FAILED TO FOLLOW THESE DIRECTIONS. <br />20. EXISTING CONDITIONS AS SHOWN ON THESE DRAWINGS ARE TAKEN FROM ORIGINAL AND AS-BUILTS DRAWINGS OF THE BUILDING. THESE <br />DRAWINGS IN PART ARE UNVERIFIED AND FIELD CONDITIONS SHALL GOVERN. FIELD VERIFY EXISTING INSTALLATIONS OF ALL DESCRIPTION AND <br />MODIFY EXISTING PLUMBING SYSTEMS WHICH ARE TO REMAIN ACTIVE, TO FACILITATE RECONNECTION AND EXTENSION UNDER NEW WORK. <br />PROVIDE SHUT-OFF VALVES ON ALL PIPES AT THE POINT OF TIE-IN TO EXISTING SYSTEM. <br />21, INTERRUPTION OF EXISTING SERVICES SHALL BE MINIMALAND SHALL BE FULLY COORDINATED WITH OWNER IN ADVANCE. PLUMBING <br />CONTRACTOR SHALL SUBMIT TIME THAT SERVICE WILL BE DOWN, AREA OF PIPING AND ANY EQUIPMENT THAT WILL BE AFFECTED. SCHEDULE AN <br />INTERRUPTION DURING NON -CRITICAL HOURS OR NOTIFY OWNER AT LEAST TWENTY-FOUR (24) HOURS PRIOR TO INTERRUPTION. PUT <br />INTERRUPTED SERVICES BACK INTO OPERATION AS SOON AS IS PRACTICAL. NO SHUT DOWN CAN BE DONE WITHOUT THE OWNER'S APPROVAL, <br />22. DURING THE PROGRESS OF WORK THE PLUMBING CONTRACTOR SHALL MAINTAIN AN ACCURATE RECORD OF ALL CHANGES MADE TO THE <br />PLUMBING SYSTEM. THE RECORD DRAWINGS SHALL SHOW, CHANGES, DIMENSIONS AND LOCATIONS OF ALL PIPING. CHANGES SHALL BE DONE IN <br />AUTOCAD RELEASE 14 OR ABOVE AND SUBMITTED TO THE OWNER AND GENERAL CONTRACTOR AT FINAL COMPLETION, <br />PLUMBING FIXTURE SCHEDULE <br />PLAN MARK DESCRIPTION MANUFACTURER/MODEL NUMBER <br />WC-1 WATER CLOSET: (PHYSICALLY HAND ICAPPED)(PRESSURE ASSISTED)(BEDPAN LUGS) <br />1, PRESSURE ASSISTED, VITREOUS CHINA, FLOOR MOUNTED ELONGATED BOWL, CLOSE AMERICAN STANDARD 2168.175 <br />COUPLED TANK, 1.6 G.P.F., 18" HIGH FROM FINISH FLOOR. INTEGRAL BEDPAN LUGS. <br />2. PRESSURE ASSIST: FLUSHOMETER TANK SYSTEM. SLOAN-FLUSHMATE <br />3. SEAT: WHITE EXTRA HEAVY DUTY PLASTIC FOR ELONGATED BOWL, OPEN FRONT LESS BEMIS 1655-SSC <br />COVER WITH CONCEALED CHECK AND STAINLESS STEEL HINGE POST. <br />4, BEDPAN WASHER: WALL MOUNTED EXPOSED FOR COLD WATER ONLY WITH HOSE SPRAYCHICAGO FAUCET 809 <br />HOLDER AND VACUUM BREAKER. (MOUNTING HEIGHT PER MANUFACTURES <br />RECOMMENDATIONS) <br />5. SUPPLY: 3/8" ANGLE SUPPLY WITH ANNEALED VERTICAL TUBE, WHEEL HANDLE STOPS AWCGUIRE <br />ESCUTCHEON. <br />PLUMBING LEGEND <br />SYMBOL <br />ABBREVIATION <br />DESCRIPTION <br />SAN <br />SAN <br />SANITARY WASTE <br />GL <br />GL <br />GREASE LINE <br />SD <br />SD <br />STORM DRAIN <br />CD <br />CD <br />CONDENSATE DRAIN <br />- <br />CW <br />COLD WATER <br />- - <br />HW <br />HOT WATER <br />- - - - - <br />HWR <br />HOT WATER RETURN <br />DIRECTION OF FLOW <br />V <br />V <br />VENT LINE <br />JIL <br />VTR <br />VENT THRU ROOF <br />oc <br />P-TRAP <br />FD <br />FLOOR DRAIN <br />Oc <br />HD <br />HUB DRAIN <br />ECO <br />EXTERIOR CLEAN OUT <br />7k0 <br />WCO <br />WALL CLEAN OUT <br />I1--_ <br />Co <br />CLEAN OUT <br />FCO <br />FLOOR CLEAN OUT <br />GV <br />GATE VALVE <br />CV <br />CHECK VALVE <br />-f�i-- <br />BALL VALVE (FULL PORT) <br />n <br />T <br />WATER HAMMER ARRESTOR <br />4_0 <br />HB <br />HOSE BIBB <br />C <br />CAPPED PIPE <br />C i <br />RISER DOWN (ELBOW) <br />Q+-- <br />RISER UP (ELBOW) <br />+ <br />BRANCH - TOP CONNECTION <br />BRANCH - BOTTOM CONNECTION <br />BRANCH - SIDE CONNECTION <br />O <br />RD <br />ROOF DRAIN <br />O <br />SRD <br />SECONDARY ROOF DRAIN <br />POC <br />POINT OF CONNECTION <br />Q <br />LOR <br />POINT OF DISCONNECT / LIMIT OF REMOVAL <br />REDUCER FITTING <br />California I Florida I Nevada <br />Peninsula Engineering, INC. <br />MEP&FP <br />PENINSULA <br />ENGINEERING <br />INC. <br />2016 ALDEN ROAD <br />ORLANDO, FL 32803 <br />CA 3089 <br />VOICE: (407) 246.1688 <br />FAX: (407) 246.1664 <br />http.,Iiwww.peina.com <br />Email to: pei@peffla.com <br />JOB #: 15384 <br />Copyright - All ideas, designs, <br />methods and plans indicated or <br />represented by this drawing are <br />owned by and the property of <br />Peninsula Engineering, Inc. and <br />were created, evolved and <br />developed for use on and in <br />connection with the specified <br />project. None of the ideas, <br />designs, arrangements, methods <br />or plans shall be used by or <br />disclosed to any person, firm or <br />corporation for any purpose <br />whatsoever without the written <br />permission of Peninsula <br />Engineering, Inc. <br />©opyright <br />2015 <br />ARCHISPEC, INC <br />ARCHITECTURAL SPECIFICATIONS <br />653 Mallory Hill Drive Lady Lake, FL 32162 <br />P: 352.430.0987 <br />REVISIONS: <br />1 1 <br />07/29/16 <br />JAHCA COMMENTS <br />2 <br />11/23/16 <br />REVISION #1 <br />L_l <br />SH-1 <br />LAVATORY (PHYSICALLY HANDICAPPED) <br />1. VITREOUS CHINA, WALL HUNG, 20-112" X 18-1/4" PUNCHED FOR COMBINATION FITTINGS. <br />2, FITTING: 8" WIDESPREAD COMBINATION, CHROME PLATED 4" WRIST BLADE HANDLES, <br />GOOSENECK SPOUT, 0.5 G.P.M. FLOW LIMITER, 1-1/4" GRID STRAINER AND TAILPIECE. <br />3, TRAP: CAST BODY ADJUSTABLE "P" TRAP WITH CLEAN OUT. <br />4. SUPPLY: 3/8" ANGLE BALL STOP, 114 TURN, WITH ANNEALED VERTICAL TUBE AND <br />ESCUTCHEON. <br />5, CARRIER: RECTANGULAR STEEL UPRIGHTS WITH CONCEALED ARMS AND SLEEVES. <br />SHOWER: (PHYSICALLY HANDICAPPED) <br />AMERICAN STANDARD 0356.015 <br />CHICAGO FAUCET 785-GN28-317 <br />McGUIRE <br />BRASSCRAFT <br />ZURN Z-1231 <br />SYMMONS S 96 300 B30 L V <br />ENGINEER OF RECPRD: <br />1. ANTI -SCALED PRESSURE BALANCE SHOWER VALVE, SUPPLY ELL AND WALL FLANGE, <br />04'� <br />HEAVY DUTY CHROME PLATED BRASS HOSE WITH RUBBER HOSE SWIVEL CONNECTOR,; <br />SLIDE BAR, AERATED HAND HELD WITH RUBBER LINER, SHOWER. <br />J� R ,.•••°°°•..,. ` <br />i <br />a <br />No.37313 (P <br />SHOWER/FLOOR DRAIN; <br />1. SHOWER DRAIN: CAST IRON BODY WITH BOTTOM OUTLET COMBINATION INVERTIBLE <br />ZURN ZN-145-56 <br />STATE OF <br />`�� <br />OR�� •6=";: <br />MEMBRANE CLAP AND ADJUSTABLE TYPE NICKEL BRONZE STRAINER. <br />e <br />�*, BO�Ae,.•' �� <br />2. TRAP: DEEP SEAL, DU RA COATED CAST IRON WITH BOTTOM BRONZE CLEANOUT. <br />ZURN Z1000®���7•. <br />A sQez <br />L_2 <br />HANDWASHING SINK - PATIENT ROOM (WALL MOUNTED) <br />Jose. A. Marques, PE, <br />1. VITREOUS CHINA, WALL -HUNG CORNER SINK, FRONT OVERFLOW, 16 3/4" X 11 1/4" X <br />AMERICAN STANDARD 0451.001 <br />FL Reg. No. 37313 <br />51/4" DEEP, SINK RATED FOR 250 LBS. LOAD PER MANUFACTURER'S LITERATURE. <br />PROJECT TITLE: <br />PROVIDE DOCUMENTATION AT TIME OF AHCA INSPECTION. <br />2. FITTING: SINGLE HOLE MOUNTING WITH OPTIONAL ESCUTCHEON PLATE. ADA- <br />AMERICAN STANDARD 7420.101 <br />COMPLIANT METAL LEVER HANDLE, SPOUT, 0.5 G.P.M. FLOW LIMITER, <br />ADVENTIST CARE CENTERS <br />1-11/4" GRID STRAINER AND TAILPIECE. <br />3, TRAP: CAST BODY ADJUSTABLE "P" TRAP WITH CLEAN OUT. <br />McGUIRE <br />McGUIRE <br />ZEPHYRHILLS HEALTH &REHAB <br />4. SUPPLY: 3/8" ANGLE BALL STOP, 1/4 TURN, WITH ANNEALED VERTICAL TUBE AND <br />ESCUTCHEON, <br />CENTER -10 BED SKILLED <br />2 <br />NURSING BED CONVERSION <br />Al <br />PLUMBING DRAWING INDEX <br />Sheet Number <br />Sheet Name <br />Current Revision <br />P001 <br />SPECIFICATIONS AND LEGEND - PLUMBING <br />2 <br />P201 <br />FIRST FLOOR DEMOLITION PLAN - SANITARY/VENT <br />P202 <br />FIRST FLOOR DEMOLITION PLAN - DOMESTIC WATER <br />P203 <br />FIRST FLOOR DEMOLITION PLAN - MEDICAL GAS <br />1 <br />P301 <br />FIRST FLOOR RENOVATION PLAN - SANITARY/VENT <br />2 <br />P302 <br />FIRST FLOOR RENOVATION PLAN - DOMESTIC WATER <br />2 <br />P801 <br />RISER DIAGRAM - PLUMBING <br />2 <br />PROJECT ADDRESS: <br />7350 DAIRY ROAD, ZEPHYRHILLS FL. 33504 <br />C PROJECT NUMBER: <br />FLTSP15008 <br />SHEET TITLE: <br />SPECIFICATIONS AND LEGEND - <br />PLUMBING <br />PROJECT NORTH TRUE NORTH <br />Pool <br />© 2015 Studio+ <br />C \l1-,Pr.S\kinnP\nnriimPnts\15384 7FPHYRHII I S HFAI TH R RFHAR (FNTFR KInnP rvt <br />