Laserfiche WebLink
FIRST FLOOR RENOVATION PLAN - DOMESTIC WATER <br />1 /4" =1'-0" <br />KEY NOTES: <br />F1 PLUMBING CONTRACTOR SHALL TIE NEW 1/2" DOMESTIC COLD AND HOT WATER <br />LINES FROM NEW LAVATORY (L_1) INTO EXISTING 1/2" DOMESTIC COLD AND HOT <br />WATER LINES. <br />SHOWER TO BE RE -TILED. PLUMBING CONTRACTOR SHALL TIE NEW 1/2" DOMESTIC <br />COLD AND HOT WATER LINES FROM NEW SHOWER VALVE AND HEAD <br />ASSEMBLY(SH-1) INTO EXISTING 1/2" DOMESTIC COLD AND HOT WATER LINES. <br />PLUMBING CONTRACTOR SHALL TIE NEW 1/2" DOMESTIC COLD WATER LINE FROM <br />NEW WATER CLOSET (WC-1) INTO EXISTING 1/2" DOMESTIC COLD WATER LINE. <br />® PLUMBING CONTRACTOR SHALL TIE NEW 1/2" DOMESTIC COLD AND HOT WATER <br />LINES FROM NEW SHOWER VALVE AND HEAD ASSEMBLY(SH-1) INTO EXISTING 1/2" <br />DOMESTIC COLD AND HOT WATER LINES. <br />PROVIDE 1/2" TRAP PRIMER FROM NEW LAVATORY TO NEWIEXISTING FLOOR <br />DRAIN, <br />© PLUMBING CONTRACTOR SHALL TIE NEW 1/2" DOMESTIC COLD AND HOT WATER <br />LINES FROM NEW LAVATORY (L-2) INTO EXISTING DOMESTIC COLD AND HOT <br />WATER LINES. <br />7❑ PLUMBING CONTRACTOR SHALL TIE NEW 1/2" DOMESTIC COLD AND HOT WATER <br />LINES FROM NEW LAVATORY (LH), IN NURSE STATION AREA, INTO EXISTING <br />DOMESTIC COLD AND HOT WATER LINES ABOVE CORRIDOR. <br />1/4"m <br />NURSE STATION LAVATORY - DOMESTIC WATER <br />1/4" =1'-0" <br />AREA OF WORK <br />NURSE STATION LAVATORY LOCATION <br />L3 0 <br />1 <br />KEY PLAN <br />1" = 80'-0" <br />PROJECT NORTH <br />TRUE NORTH <br />Californiatumlo+ <br />- .•. <br />Peninsula Engineering, INC. <br />MEP&FP <br />PENINSULA <br />ENGINEERING <br />INC. <br />2016 ALDEN ROAD <br />ORLANDO, FL 32803 <br />CA 3089 <br />VOICE. (407) 246.1688 <br />FAX. (407) 246.1664 <br />http.liwww.peifia.com <br />Email to: pei@peifia.com <br />JOB #. 15384 <br />Copyright - All ideas, designs, <br />methods and plans indicated or <br />represented by this drawing are <br />owned by and the property of <br />Peninsula Engineering, Inc. and <br />were created, evolved and <br />developed for use on and in <br />connection with the specified <br />project. None of the ideas, <br />designs, arrangements, methods <br />or plans shall be used by or <br />disclosed to any person, firm or <br />corporation for any purpose <br />whatsoever without the written <br />permission of Peninsula <br />Engineering, Inc. <br />©opyright <br />2015 <br />ARCHISPEC, INC <br />ARCHITECTURAL SPECIFICATIONS <br />653 Mallory Hill Drive Lady Lake, FL 32162 <br />P: 352.430.0987 <br />REVISIONS: <br />1 <br />1 07/29/16 <br />JAHICA COMMENTS <br />2 <br />1 11/23/16 <br />1 REVISION #1 <br />ENGINEER OF RECORD: <br />��� INTO <br />° s <br />No. 3313 UP r <br />STATE OF <br />Jose. A. Marques, PE, <br />FL Reg. No. 37313 <br />PROJECT TITLE: <br />G <br />ADVENTIST CARE CENTERS <br />ZEPHYRHILLS HEALTH & REHAB <br />CENTER -10 BED SKILLED <br />NURSING BED CONVERSION <br />PROJECT ADDRESS: <br />7350 DAIRY ROAD, ZEPHYRHILLS FL. 33504 <br />.� 4- <br />FLTSP15008 <br />SHEET TITLE: <br />FIRST FLOOR RENOVATION PLAN <br />- DOMESTIC WATER <br />C: 111�Pr.�\kinn¢\I�nrumPnts\153R4 7FPHYRHII 1 .1; HFAI TH R RFHAR C:FNTFR KlnnP rvt <br />P302 <br />© 2015 Studio+ <br />