<br />SECTION VI ELECTRICAL WORK
<br />PART 1 - GENERAL
<br />1.1 SCOPE: THIS SECTION COVERS THE FURNISHING OF ALL LABOR, MATERIALS, SERVICES, EQUIPMENT AND APPLIANCES
<br />REQUIRED IN CONJUNCTION WITH OR PROPERLY INCIDENTAL TO THE FURNISHING AND INSTALLATION OF COMPLETE
<br />ELECTRICAL WORK INCLUDING:
<br />1.1.1 ELECTRICAL SERVICE AND DISTRIBUTION SYSTEM, INCLUDING CONDUITS, PANEL BOARD OUTLET
<br />BOXES, WIRING, SWITCHES, OUTLETS, ETC.
<br />1.1.2 CONDUIT AND WIRING SYSTEM FOR INTERCOM.
<br />1.1.3 WIRING SYSTEM TO SERVE ALL ELECTRIC -USING DEVICES, LIGHTING FIXTURES, PUMPS, CONTROL
<br />EQUIPMENT, DISPENSERS, DEVICES AND OTHER CURRENT CONSUMING EQUIPMENT.
<br />1.1.4 POWER AND CONTROL WIRING WITH FINAL CONNECTIONS TO ALL EQUIPMENT.
<br />1.1.5 ALL CONDUITS, CONNECTIONS, WIRE AND STUB -OUTS FOR FASCIA SIGN(S) (WHEN SHOWN), CANOPY
<br />LIGHTS, PRICE SIGN(S) AND CANOPY MOUNTED FLOOD LIGHTS.
<br />1.1.6 CONDUITS AS MAY BE SHOWN FOR "FUTURE EQUIPMENT' ON DRAWINGS.
<br />1.1.7 ALL TRENCHING, EXCAVATIONS AND BACK FILL AS REQUIRED IN CONJUNCTION WITH ELECTRICAL
<br />WORK.
<br />1.1.8 INCIDENTAL ITEMS NOT INDICATED ON THE DRAWINGS OR MENTIONED IN THE SPECIFICATIONS, BUT
<br />WHICH ARE REQUIRED TO PROVIDE COMPLETE ELECTRICAL SYSTEMS IN CONFORMANCE WITH
<br />REQUIREMENTS OF LOCAL CODES AND ORDINANCES AND THE NATIONAL ELECTRIC CODE.
<br />1.2 CODES AND REGULATIONS: COMPLY WITH LATEST REQUIREMENTS OF LOCAL UTILITY COMPANY, LOCAL, STATE, OSHA,
<br />NATIONAL ELECTRIC CODES, NATIONAL FIRE PROTECTIVE ASSOCIATION AND LOCAL ELECTRICAL INSPECTION AUTHORITY.
<br />REPORT TO OWNER IMMEDIATELY ANY DISCREPANCIES BETWEEN DRAWINGS AND CODES. PROVIDE INSTALLATION
<br />SUPERIOR TO CODE WHERE SO INDICATED ON DRAWINGS AND SPECIFIED HEREIN.
<br />1.3 PERMITS, FEES, TAXES: ARRANGE AND PAY FOR ALL NECESSARY PERMITS, FEES, AND TAXES.
<br />1.4 PROGRESS OF WORK: SCHEDULE WORK WITH THAT OF OTHER TRADES AND IN RELATION TO ENTIRE INSTALLATION SO
<br />THAT THE ENTIRE PROJECT CAN BE COMPLETED PER CONSTRUCTION SCHEDULE.
<br />1.5 CUTTING AND REPAIRING: PROVIDE ALL CUTTING, CHANNELING, PATCHING, ETC. AS NECESSARY FOR ELECTRICAL WORK
<br />UNDER DIRECTION OF GENERAL CONTRACTOR. WORK FOUND TO BE DEFECTIVE OR INCORRECTLY INSTALLED IS TO BE
<br />CORRECTED AT THE DIRECTION OF THE OWNER AT NO ADDITIONAL COST TO THE OWNER. MAKE REPAIR WORK TO BE
<br />DONE BY SKILLED CRAFTSMEN IN TRADES INVOLVED, BUT PAID FOR THE ELECTRICAL SUBCONTRACTOR.
<br />PART 2 - PRODUCTS
<br />2.1 IDENTIFICATION OF EQUIPMENT AND WIRING: PROVIDE IDENTIFICATION WITH DYMO TAPE OR EQUAL FOR ALL SERVICE
<br />ENTRANCE AND DISTRIBUTION EQUIPMENT INCLUDING MAIN SWITCH GEAR, PANELS, DISCONNECT SWITCHES, CONDUITS,
<br />ETC., AND FOR MOTOR FEEDERS INCLUDING SWITCHES, STARTERS AND MOTORS.
<br />2.2 LIGHT FIXTURES: TO BE PROVIDED BY OWNER.
<br />2.3 CONDUITS: PROVIDE THE FOLLOWING TYPES OF RACEWAYS IN ACCORDANCE WITH THE SPECIFIC APPLICATION OF
<br />LOCATION INDICATED.
<br />2.3.1 RIGID NONMETALLIC CONDUIT (RNC) IS ALLOWED FOR UNDERGROUND RUNS IF CONDUIT IS BURIED
<br />AT A MINIMUM OF 2' WITH THE EXCEPTION OF THE LAST 2' OF THE UNDERGROUND RUN WHERE AHJ
<br />ALLOWS. LAST 2' WILL BE PVC COATED GALVANIZED STEEL.
<br />PVC COATED GALVANIZED STEEL FOR WIRING RUNS EXPOSED TO THE WEATHER; FOR ENCLOSING
<br />MAIN GROUNDING CONDUCTOR: WHERE REQUIRED FOR MECHANICAL PROTECTION OR WHERE
<br />SPECIFICALLY INDICATED.
<br />USE ONLY ROB ROY CONDUIT TYPES "PERMA-COAT', "PLASTI-BOND" OR "KORKAP" ELECTRICAL
<br />CONDUITS AT FIBERGLASS TANK SUMPS OR WHERE BRAVO F-17-RR OR F-10-RR ENTRY FITTINGS
<br />ARE CALLED OUT.
<br />STP POWER CONDUITS MUST BE RUN IN SEPARATE RACEWAY. ENTIRE WIRING RUN MUST BE
<br />IN RIGID PVC COATED GALVANIZED STEEL CONDUIT (NO PVC OR RNC CONDUIT ALLOWED).
<br />2.3.2 SEAL -OFFS: WHERE CONDUITS EXIT FLOOR OR CONCRETE AT DISPENSERS, AUTO GAUGING AND
<br />SUBMERSIBLE PUMPS.
<br />2.3.3 N.E.C. APPROVED WEATHER PROOF WIRE PULL BOX.
<br />SECTION VII ELECTRICAL WORK- CONTINUED
<br />PART 3 - EXECUTION
<br />3.1 GENERAL: COORDINATE TIME SCHEDULES, INSTALLATION, HOOKUPS AND MISCELLANEOUS PROCEDURES WITH ALL OTHER
<br />TRADES THAT WILL BE INVOLVED TO EXPEDITE THE COMPLETION OF THE CONTRACT. THE ELECTRICAL SUBCONTRACTOR
<br />SHALL BE SOLELY RESPONSIBLE FOR THE PROPER INSTALLATION OF THE ELECTRICAL WORK.
<br />3.2 CONDUITS: FURNISH AND INSTALL A COMPLETE OVERALL CONDUIT RACEWAY SYSTEM FOR ALL WIRING AND CONDUCTORS.
<br />PROVIDE SIZES AND RACEWAYS AS INDICATED ON DRAWINGS OR AS REQUIRED BY NATIONAL ELECTRICAL CODE FOR
<br />CONDUCTORS TO BE CONTAINED. ALL RACEWAYS SHALL CONFORM TO THE FOLLOW REQUIREMENTS:
<br />3.2.1 CONCEAL ALL CONDUIT RUNS EXCEPT WHERE EXPOSED RUNS ARE AUTHORIZED BY OWNER'S
<br />CONSTRUCTION MANAGER IN WRITING.
<br />3.2.2 ACTUAL CONDUIT RUNS ARE NOT GENERALLY INDICATED; CONDUITS AT TANKS SHALL NOT CROSS
<br />OVER TANKS. PLACE CONDUIT THROUGH EACH END OF TANK EXCAVATION AND PLACE FIELDS
<br />PARALLEL WITH AXIS OF TANKS.
<br />3.2.3 CLEAN AND DRY ALL RACEWAYS THOROUGHLY BEFORE CONDUCTORS ARE PULLED IN.
<br />3.2.4 FLASH AND COUNTER FLASH CONDUITS WHICH PENETRATE THE CANOPY DECKING.
<br />3.2.5 PROVIDE SEAL -OFF FITTINGS WHERE CONDUIT RUNS ENTER OR LEAVE HAZARDOUS AREAS OF
<br />DISSIMILAR CONDITIONS SUCH AS TEMPERATURE, HUMIDITY, ETC.
<br />3.2.6 FURNISH AND INSTALL COMPLETE RACEWAY SYSTEM, INCLUDING CONDUITS AND OUTLETS, AS
<br />INDICATED AND AS REQUIRED FOR INTERCOM SYSTEM, GAS PRICE SIGNS, SECURITY LIGHTING AND
<br />CANOPY LIGHTING SYSTEM, AND LIGHTED FASCIA SYSTEM WHERE APPLICABLE. CONDUIT AMOUNTS
<br />AND SIZES SHALL BE AS SHOWN ON GASOLINE DRAWINGS. ADDITIONAL CONDUITS AND CIRCUITS
<br />WILL BE REQUIRED FOR LIGHTED FASCIA SYSTEMS. PROVIDE AS REQUIRED.
<br />3.3 LIGHTING: INSTALL ALL LIGHTING FIXTURES AND LAMPS AS INDICATED ON DRAWINGS. SECURELY MOUNT ALL FIXTURES;
<br />PROVIDE ALL ADDITIONAL HANGERS AND SUPPORTS AS NECESSARY TO SECURELY FASTEN AND SUPPORT FIXTURES.
<br />CLEAN ALL FIXTURES AND LAMPS UPON COMPLETION OF THE PROJECT. CONTRACTOR SHALL VERIFY AMOUNT AND TYPE
<br />OF ISLAND/CANOPY LIGHTING SYSTEMS. SHOULD ADDITIONAL CONDUITS/CIRCUITS BE REQUIRED, VERIFY THROUGH LOCAL
<br />CONSTRUCTION OFFICE AND PROVIDE AS REQUIRED.
<br />3.4 SIGNS AND LIGHTED FASCIA: VERIFY FINAL LOCATIONS AND TYPE WITH OWNER. FURNISH AND INSTALL ALL CONDUITS AND
<br />WIRES WITH STUB -OUTS AS DIRECTED. MAKE FINAL CONNECTIONS AS REQUIRED.
<br />3.5 OUTLETS: COORDINATE LOCATION OF ALL ELECTRICAL EQUIPMENT, INCLUDING INTERCOM OUTLETS, SWITCHES,
<br />RECEPTACLES, CONTROLLERS, PANEL BOARDS, SWITCH GEAR, ETC., TO AVOID INTERFERENCE AND OBSTRUCTIONS WITH
<br />EQUIPMENT OF OTHER CRAFTS AND TRADES SO THAT ELECTRICAL EQUIPMENT WILL NOT BE BLOCKED OR MADE
<br />INACCESSIBLE OR IMPERMEABLE. PROVIDE WEATHERPROOF OUTLETS WHERE EXPOSED TO THE WEATHER OR TO
<br />MOISTURE.
<br />3.6 ISOLATED GROUND: IT IS MANDATORY THAT GASOLINE EQUIPMENT REQUIRING ISOLATED GROUND SHALL BE PROVIDED
<br />WITH SAME. MINIMUM CIRCUITS REQUIRED, BUT NOT LIMITED TO, SHALL BE: INTERCOM, GAS CONSOLE AND GASOLINE
<br />TANK MONITORING SYSTEM.
<br />3.7 EXCAVATION AND BACK FILLING: ALL EXCAVATION AND BACK FILLING NECESSARY FOR THE INSTALLATION OF ELECTRICAL
<br />WORK SHALL BE INCLUDED IN THIS SECTION AND COMPLY WITH SECTION III, EARTHWORK.
<br />3.8 OPERATING AND ACCEPTANCE TESTS:
<br />3.8.1 CONDUCT OPERATING TEST ON ENTIRE ELECTRICAL INSTALLATION; ALL SYSTEMS MUST BE
<br />COMPLETE AND IN GOOD OPERATING ORDER. REFER TO STARTUP AND FINAL CHECK-OUT OF
<br />SYSTEM COVERED ELSEWHERE. DO NOT START OR OPERATE EQUIPMENT WITHOUT SPECIFIC
<br />DIRECTIVES OF OWNER'S SPECIFIED REPRESENTATIVE. ANY DAMAGE TO OWNER'S EQUIPMENT DUE
<br />TO DEFECTIVE INSTALLATION AND/OR OPERATION WILL BE THE RESPONSIBILITY OF THAT
<br />SUBCONTRACTOR FOR CORRECTION, REPLACEMENT AND/OR MONETARY COMPENSATION AS
<br />REQUIRED.
<br />3.8.2 MAKE INSULATION TESTS ON MAIN SERVICE EQUIPMENT AND ALL FEEDERS AND PANELBOARDS.
<br />3.8.3 TEST GROUND: RESISTANCE TO GROUND SHALL NOT EXCEED 25 OHMS.
<br />3.8.4 INSPECT ALL PANELBOARDS. ALL CONNECTIONS MUST BE TIGHT AND SECURE.
<br />3.9 "AS -BUILT' DRAWINGS: FURNISH OWNER'S CONSTRUCTION MANAGER WITH ONE SET OF MARKED -UP PRINTS (HARDCOPY)
<br />AND ALSO IN AUTO CAD 2004 COMPATIBLE DRAWING FILE FORMAT (.DWG) SHOWING "AS -BUILT' INSTALLATION.
<br />3.10 FINAL ACCEPTANCE: UPON COMPLETION OF WORK, PRESENT CERTIFICATE OF APPROVAL OF LOCATION OR GOVERNING
<br />INSPECTION AUTHORITY.
<br />3.11 CLEANUP: CLEAN UP ALL DEBRIS CAUSED BY WORK OF THIS SECTION, KEEPING THE PREMISES CLEAN AND NEAT AT ALL
<br />TIMES.
<br />SECTION VIII CONTINUED
<br />PART 2 - PRODUCTS
<br />2.1 PAINT MANUFACTURERS AND PRODUCTS: PAINTING SYSTEM AS SPECIFIED HEREIN IS BASED ON PRODUCTS OF THE
<br />GLIDDEN COATING & RESINS COMPANY, A DIVISION OF SCM CORPORATION. HOWEVER, EQUAL PAINTING SYSTEMS OF
<br />PRATT & LAMBERT, PPG INDUSTRIES AND BENJAMIN MOORE WILL BE CONSIDERED.
<br />2.2 PAINTING COATS AND PRODUCTS: SUPPLIED BY CONTRACTOR
<br />2.2.1 PAINT ALL MANHOLES COVERS AND 4" SURROUNDING CONCRETE, INSIDE AND OUT, IN ACCORDANCE
<br />WITH STANDARD INDUSTRY COLOR CODE AS SHOWN:
<br />API COLOR CODES:
<br />OBSERVATION WELL AND ALL OTHERS
<br />UNLEADED REGULAR
<br />UNLEADED PREMIUM
<br />UNLEADED REGULAR W/EXTENDER
<br />UNLEADED PREMIUM W/EXTENDER
<br />DIESEL
<br />VAPOR RECOVERY
<br />KEROSENE
<br />2.2.2 PAINT FASCIA SIGN FRAMES.
<br />BLACK
<br />WHITE W/BLACK CROSS
<br />RED W/WHITE CROSS
<br />WHITE W/BLACK CROSS & BLACK BAND
<br />RED WfWHITE CROSS & WHITE BAND
<br />SOLID YELLOW
<br />SOLID ORANGE
<br />SOLID BROWN
<br />PAINT GLOSSY WHITE - 2 COATS.
<br />PART 3 - EXECUTION
<br />3.1 PROTECTION: COVER ENTIRE CONCRETE SURFACES. NO PAINT OR SOLVENT SHALL BE ALLOWED TO COME IN CONTACT
<br />WITH CONCRETE SURFACES. WHERE IT BECOMES NECESSARY, IN ORDER TO EXECUTE HIS OWN WORK, FOR PAINTER TO
<br />REMOVE COVERINGS, PLATES, ETC., PLACED BY OTHER CONTRACTORS IN ANY BRANCH OF THE WORK, HE SHALL REPLACE
<br />SAME IN PROPER MANNER. IN SITUATIONS WHERE SAID COVERINGS, PLATES, ETC., CANNOT BE READILY REMOVED,
<br />PAINTER SHALL PROTECT THE WORK IN SOME OTHER SATISFACTORY MANNER. OILY RAGS AND WASTE MUST BE REMOVED
<br />EVERY NIGHT. UNDER NO CIRCUMSTANCES SHALL THEY BE ALLOWED TO ACCUMULATE. PAINTING SUBCONTRACTOR
<br />SHALL BE RESPONSIBLE FOR ANY DAMAGE DONE TO THE WORK OF OTHER SUBCONTRACTORS AND SHALL REPAIR OR
<br />REPLACE AS NECESSARY TO THE SATISFACTION OF THE OWNER.
<br />3.2 PREPARATION OF SURFACES: INSPECT ALL SURFACES TO BE PAINTED. REPORT ANY DISCREPANCIES TO THE
<br />CONTRACTOR PRIOR TO START OF WORK. STARTING OF PAINT APPLICATION SHALL CONSTITUTE ACCEPTANCE OF
<br />SURFACES AS SUITABLE FOR THE RECEPTION OF PAINT APPLICATION. ALL SURFACES SHALL BE CLEAN AND DRY,
<br />BETWEEN 50 AND 90 DEGREES FAHRENHEIT AT TIME OF PAINT APPLICATION. CLEAN METAL OF MILL SCALE, RUST, OIL,
<br />GREASE AND FOREIGN MATTER. CLEAN GALVANIZED METAL ACCORDING TO SSPC-SP 1-63 SOLVENT CLEANING. PROTECT
<br />ADJACENT AND FINISHED WORK FROM PAINT.
<br />3.3 APPLICATION OF PAINT: DO NOT THIN, ADULTERATE OR CHANGE MATERIALS EXCEPT AS RECOMMENDED BY
<br />MANUFACTURER. EMPLOY ONLY SKILLED MECHANICS FOR WORK. ALL PAINTING SHALL BE BRUSHED, SPRAYED OR
<br />ROLLED EVENLY FOR THOROUGH COATS WITHOUT RUNS, SAGS OR OTHER BLEMISHES. ALLOW EACH COAT TO DRY
<br />BEFORE APPLYING SUBSEQUENT COATS. ALL SURFACES TO RECEIVE A MINIMUM OF 2 COATS AS NECESSARY TO ACHIEVE
<br />AN APPROVED FINISH. APPLICATION OF PAINT, ETC., SHALL BE IN STRICT COMPLIANCE WITH MANUFACTURER'S
<br />DIRECTIONS.
<br />3.4 CLEANUP: CLEANUP ALL DEBRIS CAUSED BY THE WORK OF THIS SECTION, KEEPING THE PREMISES CLEAN AND NEAT AT
<br />ALL TIMES.
<br />SECTION IX CANOPIES
<br />PART 1 - GENERAL
<br />1.1 SCOPE: THIS SECTION COVERS THE FURNISHING AND INSTALLATION OF ALL ITEMS FOR THE INSTALLATION OF A COMPLETE
<br />GASOLINE CANOPY INCLUDING:
<br />1.1.1 COMPLETE FABRICATION DRAWINGS INCLUDING FOOTINGS DESIGN.
<br />1.1.2 COMPLETE ABOVE GROUND STRUCTURAL SUPPORT SYSTEM.
<br />1.1.3 STEEL ROOF DECK AND GUTTER, 20 GA WHITE EMBOSSED.
<br />1.1.4 ROOF BRACING.
<br />1.1.5 CAP FLASHING.
<br />2.4 CONDUCTORS:
<br />1.1.6
<br />DOWN SPOUTS - INTERNAL INSIDE COLUMNS.
<br />2.4.1 FURNISH AND INSTALL COLOR CODED COPPER CONDUCTORS, 600 VOLT, OF SIZES INDICATED.
<br />SECTION VIII PAINTING
<br />1.1.7
<br />PERMITS AND INSPECTIONS DONE BY OTHERS.
<br />MINIMUM SIZE #12 EXCEPT FOR SIGNAL AND CONTROL CIRCUITS AND WHERE OTHERWISE NOTED.
<br />TYPE TW (60 DEGREES CENTIGRADE) FOR GENERAL BRANCH CIRCUIT WIRING; TYPE THN OR THWN-2
<br />1.1.8
<br />INSTALLATION AND FRAMING FOR OWNER SUPPLIED FASCIA SIGNS (ELECTRICAL BY OTHERS).
<br />(90 DEGREES CENTIGRADE) FOR SUPPLY CONNECTIONS TO LIGHT FIXTURES. INSTALL PER COLOR
<br />CODE OF NEC.
<br />PART 1 GENERAL
<br />1.1.9
<br />INSTALLATION AND FRAMING FOR FASCIA MATERIAL AS PER OWNER SPECIFICATIONS.
<br />2.4.2 SHIELDED CABLES: PROVIDE SHIELDED CABLE FOR INTERCOM AS PER MANUFACTURER'S
<br />SPECIFICATIONS AND AS REQUIRED ON DRAWINGS.
<br />1.1 SCOPE: THIS SECTION COVERS THE FURNISHING OF ALL LABOR, MATERIALS, SERVICES, EQUIPMENT AND APPLIANCES IN
<br />CONJUNCTION WITH OR PROPERLY INCIDENTAL TO THE COMPLETION OF ALL PAINTING OF SURFACES COMPLETE,
<br />PART 2 -PRODUCTS
<br />VARIABLE SPEED PUMP CABLE:
<br />INCLUDING PAINTING OF THE FOLLOWING SURFACES:
<br />- THWN-2 "12 AWG 4 CONDUCTOR 600V SHIELDED, GAS/OIL RESISTANT".
<br />1.1.1 MISCELLANEOUS METAL, DOWNSPOUTS, COLUMNS, POSTS, ISLAND FORMS, VENT RISERS,
<br />2.1 EMBOSSED ROOF STEEL DECK: ROOF STEEL DECK SHALL BE 2 1/4" MINIMUM DEEP, 20 GAUGE HIGH REFLECTIVE WHITE
<br />DATA COMMUNICATION CABLE:
<br />MANHOLE COVERS AND ELECTRICAL CONDUITS.
<br />STEEL WITH MINIMUM
<br />SECTION MODULES OF 0.25 IN 1/4 3 MOMENT OF INERTIA OF 0.030 IN 14/4 4. IN CERTAIN AREAS, ROOF
<br />- SHIELDED WIRE MUST NOT BE USED:
<br />DECK WILL BE ALUMINUM.
<br />VERIFY WITH LOCAL CONSTRUCTION MANAGER.
<br />- 2 WIRE TWISTED PAIR (UTP) W/ 10-12 TWISTS PER FOOT.
<br />1.2 PAINTING DOES NOT INCLUDE:
<br />- WIRING IS STRANDED ANNEALED COPPER TINNED WITH 18 AWG MINIMUM REQUIRED FOR RUNS UP
<br />2.2 STRUCTURAL STEEL:
<br />TO 1000 FEET OR 14 AWG FOR RUNS UP TO 2600 FEET. DO NOT DAISY CHAIN COMMUNICATION
<br />1.2.1 PAINTING CANOPY SOFFITS.
<br />WIRING.
<br />2.2.1
<br />ALL STRUCTURAL STEEL TO BE A.S.T.M. A-36 AND SHALL COMPLY WITH THE STANDARD
<br />- INSULATION SPEC IS 300V, PVC INSULATION, TYPE TFFN OR MTW, UL APPROVED GASOLINE AND OIL
<br />1.2.2 PAINTING LIGHT FIXTURES.
<br />SPECIFICATIONS FOR STRUCTURAL STEEL FOR BUILDINGS OF A.I.S.C. AND WITH THE A.I.S.C. CODE
<br />RESISTANT.
<br />OF STANDARD PRACTICE (LATEST EDITION).
<br />1.2.3 PAINTING GASOLINE EQUIPMENT.
<br />2.5 SPLICES AND CONNECTIONS: PROVIDE SPLICES ONLY IN READILY ACCESSIBLE OUTLET BOXES. PROVIDE INSULATED
<br />2.2.2
<br />STRUCTURAL BOLTS SHALL CONFORM TO THE STANDARD SPECIFICATION A.S.T.M. A-307 AND SHALL
<br />PRESSURE CONNECTORS OR "CRIMP -ON" SLEEVES WITH OVERALL NYLON INSULATORS FOR CONDUCTORS. CONNECTORS
<br />1.3 COLOR SCHEDULE: COLOR OF PAINTS SHALL BE AS LISTED IN COLOR SCHEDULE.
<br />BE PROVIDED WITH WASHERS UNDER THE NUTS.
<br />SHALL BE 3M "SCOTCHLOK", BUCHANNAN SPLICE CAPS WITH INSULATED WRAP, OR IDEAL "CRIMP -SLEEVES" WITH SCAP
<br />CAP INSULATOR OR EQUAL.
<br />2.2.3
<br />ALL OTHER BOLTS SHALL BE A-307 AND SHALL CONFORM TO A.S.T.M. STANDARDS, WITH WASHER
<br />REQUIRED.
<br />2.6 PANEL BOARDS:
<br />2.2.4
<br />ALL HIGH STRENGTH BOLTS SHALL BE TORQUED TO PROVIDE A MINIMUM TENSION IN BOLT OF 90%
<br />2.6.1 BRANCH CIRCUIT PANEL BOARDS: PROVIDE FLUSH -MOUNT CIRCUIT BREAKER TYPE PANEL BOARDS
<br />OF MINIMUM PROOF LOAD OF THE BOLT.
<br />WITH THERMAL MAGNETIC, MOLDED CASE, "SQUARE D" TYPE NLAB OR APPROVED EQUAL, WITH
<br />PLUG-IN CIRCUIT BREAKERS, "SQUARE D" TYPE NLQT. PROVIDE GROUNDING TERMINAL BLOCK IN
<br />2.2.5
<br />TUBE COLUMNS SHALL COMPLY WITH A-500, GRADE B.
<br />EACH PANELBOARD. SEE INDIVIDUAL PANEL SCHEDULE ON DRAWINGS.
<br />2.2.6
<br />ALL TUBE COLUMNS SHALL BE 46 KSI STEEL. 2.2.7 ALL WELDING SHALL BE WITH E70XX ELECTRODES
<br />2.6.2 SUBSTITUTES: DISTRIBUTION EQUIPMENT EQUIVALENT IN TYPE, CLASSIFICATION AND QUALITY IN
<br />AND BE ACCOMPLISHED BY CERTIFIED WELDERS.
<br />ACCORDANCE WITH NEMA STANDARDS AS MANUFACTURED BY G.E., CUTLER -HAMMER, FEDERAL
<br />PACIFIC, ITE, SQUARE D AND WESTINGHOUSE ARE ACCEPTABLE AS SUBSTITUTES ONLY WHEN
<br />APPROVED IN WRITING.
<br />c
<br />0
<br />�L
<br />U
<br />a�
<br />Proto 2nd Qtr 04-03-15
<br />ch
<br />t0
<br />0
<br />LO
<br />ti
<br />QW
<br />X
<br />U�
<br />LO
<br />Z
<br />Z
<br />�QM
<br />cn
<br />"
<br />J LL
<br />W\
<br />�
<br />`Fi- m
<br />/
<br />0
<br />J
<br />�J=
<br />J
<br />r 0 _
<br />w
<br />W
<br />�v�
<br />p.
<br />Y
<br />'` N
<br />U
<br />2
<br />0
<br />0
<br />N
<br />M
<br />W
<br />Z
<br />O
<br />Q
<br />LL
<br />W
<br />IL
<br />Z
<br />J
<br />Z)
<br />LL
<br />EMMONS
<br />LLI °
<br />oC
<br />m
<br />W kin
<br />� o
<br />� o
<br />'2-_c.
<br />cri
<br />O N
<br />r- O L Q
<br />�OfH
<br />co p co
<br />N 00 U
<br />o
<br />00 0 Z o
<br />cM
<br />co Q m
<br />w m N
<br />C U
<br />0 M L
<br />�
<br />04)MM om0mc-Bf°
<br />UNc�a�,��wcoau8E
<br />.. U
<br />�� °� of a� a o N voi
<br />caiEc-03ca wL�o
<br />o�L N c 7�C
<br />- 3Sc vi o o.wt'3-
<br />v��,o`�a�Q"oa30oY>jy
<br />�Vr w DL Q.2N N� 2 o
<br />E fp U N (DnU) 0 �.L.'�� V
<br />m o !� c
<br />0coca���,a
<br />�U) c o a3 O x) 0 m c;g
<br />0w.r- u�U��-co
<br />P�CEIMS•
<br />No 68170
<br />� pt
<br />� n, STAVE OF W
<br />Alp
<br />SHEET:
<br />G16
<br />FUELING - USA
<br />
|