Laserfiche WebLink
4 <br />3 <br />2 1 <br />oo <br />7t <br />00 <br />cn <br />1-i <br />10 <br />14 <br />0 <br />N <br />R* <br />E <br />�I <br />CI <br />116 <br />0 <br />0 <br />"I <br />_J <br />a <br />Z <br />LLI <br />UI <br />an <br />06 <br />C7 <br />Vf <br />t <br />�A <br />a� <br />N <br />00 <br />c <br />v <br />U <br />0 <br />U <br />WATER HEATER <br />REF PLUMBING <br />EXPANSION <br />TANK <br />2X6 SP #2 <br />OR SPF #2 <br />EXPANSION TANK <br />LU <br />OR BETTER <br />FOR WATER <br />(TYP) <br />HEATER <br />o <br />DRIP PAN <br />LU <br />SHELF PLAN (2) 16D <br />v <br />IN CAI <br />VIEW COMMON TO <br />3/4" PLWD. <br />= <br />EACH STUD <br />SHELF ON 2 x 6 <br />FRAMING WITH El <br />M <br />WALL COVERING <br />g <br />0 <br />SEE P SHEETS <br />FOR FILTER AND <br />0 <br />LL <br />LU <br />PUMP PLUMBING <br />DETAILS <br />LOCATE MOP HANGER <br />(FIAT 899-CC) ON <br />WALL SERVICE <br />ADJACENT WALL OVER <br />FAUCET <br />i� <br />MOP SINK @ 50" AFF <br />MOP SINK <br />30" HOSE AND <br />BASE AS <br />CKET <br />SCHEDULE `� <br />(FLAT 39-CC) <br />5 WATER HEATER ELEVATION (SIM) <br />.0 3/8if= 1�-0" <br />J-MOLD WITH <br />SILICONE CAULK JOINT <br />REF FINISH SCHEDULE <br />1/2" GYP. BOARD <br />MIN R-19 <br />INSULATION <br />3 5/8" METAL STUDS <br />@ 24" O.C. <br />i <br />Lm,wl <br />CMU WALL; REF <br />STRUCTURAL <br />DRAWINGS <br />FINISH AS SCHEDULED <br />COLUMN DETAIL @ STOREFRONT <br />3" = 1'-0" <br />I <br />3" — 1'-0" <br />STEEL COLUMN <br />REFERECE STRUCTURAL <br />SHEETS FOR DETAILS. <br />PREFINISHED BREAKMETAL <br />6" DEEP LEG CAPTURE <br />WRAP TO MATCH STOREFRONT <br />TRACK DO NOT <br />STRUCTURE <br />ABOVE <br />ALUMINUM STOREFRONT <br />ATTACH TO STUDS <br />X.X <br />SHIM AS REQUIRED <br />1" <br />CONTINUOUS <br />20 GA. BENT PLATE <br />1/2" GYP <br />BACKER ROD & SEALANT, <br />BOTH SIDES OF <br />BOARD <br />BOTH SIDES <br />WALL DO NOT <br />EASILY <br />ATTACH TO WALL <br />COMPRESSIBLE <br />1" THK. <br />SOFT FOAM FILLERINSULATED GLASS <br />METAL STUD <br />FRAMING <br />WOOD BLOCKING <br />9 STUD SLIP JOINT <br />STOREFRONT @ CENTER POST <br />A7.o ; <br />11/2 - 1-0 19 <br />WALL COVERING AS <br />SCHEDULED <br />1/2" GYP. BOARD <br />MIN R-19 INSULATION <br />W.R. GRACE PERM -A <br />BARRIER MEMBRANE <br />TOOLED MORTAR JOINT <br />REINFORCED BOND BEAM <br />PER STRUCTURAL <br />3/4" PLYWOOD <br />CORNER TRIM <br />WRAP WALL FINISH AS <br />SCHEDULED <br />STOREFRONT <br />I f 5 I DETAIL - STOREFRONT HEAD <br />11/2" =1'-0" <br />X.X <br />I <br />I <br />WALL FINISH AS <br />STAINLESS STEEL <br />SCREW AT T O.C. <br />3" <br />AND COUNTER SUNK <br />16 GA STAINLESS STEEL <br />2"X3" CONTINUOUS <br />ANGLE WITH BACKER <br />N ROD AND SEALANT, TYP. <br />MIN R-19 INSULATION <br />3 5/8" METAL STUDS <br />@ 24" O.C. <br />W.R. GRACE PERM -A <br />BARRIER MEMBRANE <br />1/2" GYP. BOARD <br />WALL COVERING <br />AS SCHEDULED <br />3/4" PLYWOOD <br />METAL FRAME <br />PAINTED <br />THRESHOLD BEYOND <br />STEEL COLUMN REFERECE <br />STRUCTURAL SHEETS FOR DETAILS. <br />PREFINISHED BREAKMETAL <br />WRAP TO MATCH STOREFRONT <br />ALUMINUM STOREFRONT <br />SHIM AS REQUIRED <br />zfCONTINUOUS BACKER ROD <br />& SEALANT, BOTH SIDES <br />1" THK. <br />INSULATED GLASS <br />INTERIOR NON -LOAD BEARING PARTITION HEADER SCHEDULE <br />HEADER <br />LENGTH <br />HEADER <br />MEMBERS <br />MINIMUM EFFECTIVE <br />PROPERTIES PER STUD <br />2'_TO_6' <br />6'_TO_8' <br />8'_TO_10' <br />10'_TO 12'__(2) <br />-12' _TO 14' <br />14'_TO_16' <br />16'_TO_18' <br />18' TO 26' <br />(2)_6"_x18 GAUGE <br />(2) 6"_x16 GAUGE <br />(2)_6"_x14 GAUGE <br />8" X18 GAUGE <br />(2) 8"_x 16 GAUGE <br />(2) 8"_x14 GAUGE <br />(2)10" x14 GAUGE <br />2 12" x 16 GAUGE <br />Ix = 2.042 Sx = 0.670 <br />Ix = 2.518 Sx = 0.839 <br />Ix = 3.094 Sx = 1.031 <br />Ix = 4.134 Sx = 1.033 <br />Ix = 5.110 Sx = 1.277 <br />Ix = 6.303 Sx = 1.576 <br />Ix = 12.325 Sx = 2.456 <br />Ix = 15.730 Sx = 2.334 <br />METAL STUD <br />DOUBLE MTL STUD <br />AT JAMBS <br />BOX BEAM BOTTOM TRACK <br />TOP TRACK <br />2 STUD <br />HEADERS <br />FINISH AS <br />INDICATED <br />BATT <br />INSULATION <br />BOTTOM TRACK <br />PC 18 GA TRACK <br />VARIES <br />SECTION B lei <br />SECTION A <br />17 DETAIL - HEADER <br />A7.0 1 1/211 = 11 011 <br />NOTE: SHEET METAL HOOD; COORDINATE <br />1. DETAIL ELIMINATES PITCH POCKETS FOR PIPING WITH MECH SHEETS FOR REQ'D <br />PENETRATIONS THROUGH THE ROOF. PITCH POCKET NUMBER OF LINES SETS AND SIZE OF <br />INSTALLATIONS ARE PROHIBITED. OPENING REQ'D. <br />2. ATTACHED TREATED WOOD NAILER TO DECK WITH SHEET METAL OR FLEX TUBE <br />SUITABLE FASTNER AS REQ'D PER LOCAL AHJ. COLLAR. PROVIDE CONT. <br />BEAD OF SEALANT AT COLLAR <br />3. PROVIDE MIN 2" BETWEEN PIPES AND 4" MIN <br />CLEARANCE FROM PIPE TO TOP OF CURB. INSULATE VOID AS REQ'D TO <br />0 <br />COOLER WALL <br />= _ <br />PER MANUFACTURER <br />inU <br />w <br />EXTEND FINISH <br />12" MIN. TYP. <br />REQUIRED GAP PER <br />MANUFACTURER <br />— — - <br />SECTION @ PIPE PORTAL <br />1 1/2" =1'-0" <br />CMU BLOCK WALL; REF <br />STRUCTURAL DRAWINGS <br />BUILDING FINISH AS <br />SCHEDULED <br />PREVENT CONDENSATION <br />SHEET MTL FLASHING RECEIVER WITH <br />GASKETED FASTENERS @ MIN 18" O.C. <br />AROUND PERIMETER OF PIPE PORTAL; <br />Z PROVIDE PROPER FASTENING <br />SCHEDULE AS REQ'D PER LOCAL AHJ. <br />REMOVABLE COUNTER FLASHING <br />OVER FASTNERS @ 8" O.C. <br />ROOFING MEMBRANE TO EXTEND <br />MIN OF 2" ABOVE CANT <br />SINGLE PLY ROOFING MEMBRANE <br />OVER LAP FLASHING AS REQ'D PER <br />ROOFING MEMBRANE SPECIFICATIONS <br />WOOD CANT AS REQ'D TO BRACE CURB <br />INTERIOR <br />WALL COVERING <br />AS SCHEDULED <br />MIN R-19 INSULATION <br />3 5/8" METAL STUDS <br />@ 24" O.C. <br />A <br />A7.0 <br />METAL STUD HEADER <br />PC 18 GA TRACK WITH (3) #10 TEK <br />SCREWS EACH SIDE TO HEADER AND <br />(6) #10 TEK SCREWS TO JAMB <br />METAL STUD JAMB <br />NOTE: _ 0 <br />WHEN THE THRESHOLD CREATES A TRANSITION g n <br />BETWEEN TWO FLOOR SURFACE MATERIALS, THE TWO �! <br />MATERIALS SHOULD NOT VARY IN THICKNESS OR DROP <br />MORE THAN 1/4" BELOW TOP OF THRESHOLD VERTICALLY Q <br />WHEN A 1:2 SLOPE IS NOT IN EXISTENCE. <br />THRESHOLD DETAIL <br />6" = 1'-0" <br />EXTERIOR <br />REINFORCE AND GROUT EACH <br />SIDE OF JAMB PER STRUCTURAL. <br />CMU BLOCK WALL; REF <br />STRUCTURAL DRAWINGS <br />MIN 1/2" STUCCO FINISH <br />WALL TYPE RE <br />TYPES SHEET, <br />METAL STUD B <br />BEAM HEADER <br />CONTINUOUS <br />SEALANT, <br />EACH SIDE <br />METAL FRAME <br />DOORFRAME. <br />ANCHORS, MIN <br />JAMB <br />DOOR AS SCHI <br />REFERENCE SI <br />DOOR HEAD / JAMB DETAIL <br />3" = 1'-0" <br />TILE FLOOR <br />AS <br />SCHEDULED <br />SWEEP <br />TRANSITION <br />STRIP <br />}, ° <br />a d •, <br />°d - _ _ -4 ° <br />11 COOLER VAULT TRANSITION STRIP <br />A7.0 3" = 1'-0" <br />TRANSITION STRIP, <br />DOOR <br />REF A3.0 <br />HOLLOW METAL <br />DOORFRAME <br />NEW VCT, <br />(BEYOND) <br />REFERENCE <br />TILE; REF FINISH <br />FINISH <br />SCHEDULE <br />SCHEDULE A3.0 <br />CONT SEALANT AT <br />DOOR FRAME CONCRETE FLOORING <br />10 TILE / VCT TRANSITION STRIP <br />W.R. GRACE PERM -A- <br />f l ' <br />TOOLED MORTAR JOINT <br />WALL FINISH, AS SCHEDULED; <br />,_ <br />(4) 5" x 1/4" DIA MASONRY <br />BARRIER MEMBRANE <br />I I <br />REFERENCE ROOM FINISH <br />�.a°• <br />o <br />ANCHORS PER JAMB <br />I <br />SCHEDULE, SHEET A3.0 <br />I <br />°.� <br />1/2" GYP. BOARD <br />I <br />REINFORCED BOND <br />d <br />BEAM PER STRUCTURAL <br />METAL J TRIM TO MATCH <br />HORIZONTAL REINFORCING; <br />EXTERIOR DOOR/FRAME <br />3/4" PLYWOOD <br />REF STRUCTURAL <br />20 GA. SS SILL FLASHING WITH <br />CORNER TRIM <br />HEMMED EDGE AND END <br />GYP BOARD <br />SEALANT EACH SIDE <br />WRAP WALL FINISH AS - <br />DAMS TO MATCH DOOR. <br />SCHEDULED <br />MIN R-19 INSULATION <br />H.M. DOOR AND FRAME <br />AS SCHEDULED <br />H.M. DOOR AND <br />CONTINUOUS BACKER ROD <br />FRAME AS SCHEDULED <br />& SEALANT, BOTH SIDES <br />3 5/8" MTL STUDS @ 24" O.C. <br />-" <br />I <br />i •ly <br />CMU BLOCK WALL; REF <br />STRUCTURAL DRAWINGS I I <br />EXTERIOR - HM DOORJAMB 6 DETAIL - HM DOOR HEAD <br />..... <br />11/2" = 1'-0" <br />STOREFRONT <br />REINFORCE AND <br />WRAP WALL FINISH AS <br />GROUT EACH SIDE <br />SCHEDULED <br />OF <br />CORNER TRIM <br />W.R. GRACE PERM -A - <br />BARRIER MEMBRANE <br />CMU BLOCK WALL; <br />REF STRUCTURAL <br />3-5/8" METAL STUDS <br />DRAWINGS <br />@ 24" O.C. <br />=1 I <br />INVERTED BOND BEAM <br />MIN. 1/2" <br />REF STRUCTURAL <br />STUCCO FINISH <br />° <br />TOOLED MORTAR JOINT <br />a <br />CONTINUOUS BACKER <br />MIN R-19 <br />-, <br />ROD & SEALANT, <br />INSULATION <br />I <br />_ <br />BOTH SIDES <br />1/2" GYP. BOARD <br />20 GA. SS SILL FLASHING <br />a. <br />° <br />WITH HEMMED EDGE <br />WALL COVERING AS <br />_"•. <br />AND END DAMS TO <br />SCHEDULED <br />MATCH STOREFRONT. <br />DETAIL - STOREFRONT SILL <br />A7.o 11/2" = 1'-0" <br />a.o <br />_ <br />1 1/2n -1,-0„ <br />TOOLED MORTAR JOINT <br />'I <br />7:..� . .. <br />STUD WALL WHERE <br />;.= <br />1. �..:::; <br />OCCURS OR WALK IN <br />PERM -A -BARRIER <br />•�: <br />I 1 <br />COOLER WALL, REF WALL <br />BY W.R. GRACE <br />:T <br />TYPE SCHEDULE. <br />BASE, AS SCHEDULED; <br />20 GA. SS SILL FLASHING <br />BASE, SEE FINISH <br />REFERENCE ROOM FINISH <br />j. <br />WITH HEMMED EDGE <br />SCHEDULE <br />SCHEDULE, SHEET A3.0 <br />AND END DAMS TO <br />METAL RUNNER WITH 1 <br />MATCH STOREFRONT. <br />1/2" X 0.145 SHOT PIN AT <br />FINISH FLOOR AS <br />'- <br />16" O.C. TO CONCRETE <br />SCHEDULED <br />CONTINUOUS BACKER <br />SLAB WITH MIN. 1 1/8". <br />STOREFRONT <br />ROD &SEALANT, <br />USE HILTI XU SERIES <br />SILICONE CAULK <br />BOTH SIDES <br />ESR-2269 PINS LARR # <br />JOINT <br />a m'_ •. . < " = - a_ <br />° °d <br />d25675 CONCRETE SLAB; <br />BLOCK WALL; REF <br />FLOOR AS <br />SEALANT <br />REF STRUCTURAL d <br />DRAWINGS <br />, <br />, <br />�CMU <br />d. <br />`�STRUCTURAL <br />,p <br />FINISH SCHEDULE <br />REFERENCE A3.0 <br />20 GA. SS SILL FLASHING <br />�°, <br />° d.d, <br />CONCRETE EXPANSION JOINT 4° . - a ; ° <br />°.. <br />MIN 1/2" STUCCO FINISH <br />` ' 9 <br />d,• - °=4 <br />WITH HEMMED EDGE <br />4 $ d ; <br />REINFORCE AND GROUT <br />_8 4_ - < _ <br />° <br />AND END DAMS TO <br />_ d <br />`" <br />EACH SIDE OF JAMB <br /><� " <br />" <br />° <br />_ . <br />Q " <br />EXISTING CONCRETE <br />° <br />. d <br />CONCRETE - a <br />MATCH STOREFRONT. <br />° <br />°' a ° ' <br />PER STRUCTURAL. <br />a• <br />SLAB <br />a <br />SLAB ON '" <br />9• . ° <br />-: ``� _Ia <br />GRADE p <br />° _ d� <br />iv <br />a <br />WALL CONNECTION DETAIL (TYP) <br />STOREFRONT SILL <br />1 <br />DETAIL - BASE <br />= <br />—V <br />A7.o 1 1/2" = V-0" <br />° °4. <br />A7.o -... 3" =1'-0" <br />I <br />MIN. 1/2" STUCCO <br />FINISH <br />BLOCKFLASH PAN W/ <br />INTEGRAL <br />CONCAVED WEEP <br />SPOUT & <br />INSECT GUARDS AS <br />RECOMMENDED PER <br />MFG.SPECS <br />iv PAVFn SURFACF <br />w <br />FINISH GRADE Q <br />> <br />1P <br />106 N 37TH STREET, SUITE C <br />ROGERS, ARKANSAS 72756 <br />W W W. BATESARCH ITECTS.CO M <br />TEL: 479.633.8165 <br />Copyright 2016 Bates & Associates, Architects <br />E Drawings and Specifications as instruments of service are and shall remain <br />the property of the Architect. They are not to be used on other projects or <br />extensions to this project except by agreement in writing and with <br />appropriate compensation to the Architect. <br />Contractor is responsible for confirming and correlating dimensions at job <br />site; the Architect will not be responsible for construction means, methods, <br />techniques, sequences or procedures, or for safety precautions and <br />programs in connection with the project. <br />SITE/STORE #: <br />37745 <br />CONSTRUCTION MANAGER <br />CREIGHTON COMMERCIAL DEVELOPMENT <br />900 SW PINE ISLAND ROAD, SUITE 202 <br />CAPE CORAL, FL 33991 <br />TENANT <br />7-ELEVEN INC. <br />1722 ROUTH ST. SUITE 1000 DALLAS, TX 75201 <br />CONTACT: DANIELTUBB <br />STRUCTURAL CONSULTANT <br />SELECT STRUCTURAL <br />12573 NEW BRITTANY BLVD FORT MYERS, FL 33907 <br />CONTACT: SHAWN ANDERSON <br />MEP CONSULTANT <br />WALTER J. FITZGERALD, P.E. <br />2566 NEBRASKA AVE., PALM HARBOR, FL 34684 <br />CONTACT: (813) 785-7526 <br />L� O <br />N <br />�z <br />N <br />oUJ <br />L 1_ o a' <br />a _J <br />z �UW <br />�` LL Z W <br />g O <br />C C LU z Q <br />O <br />o U� <br />rh Z 0 <br />0 <br />O °' <br />U <br />B s, <br />AR97905 16� <br />Architect Name - RYAN M FAUST <br />Architect Number - AR97905 <br />THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TO WHICH <br />THEY ARE AFFIXED AND WE EXPRESSLY DISCLAIM ANY RESPONSIBILITY FOR <br />ALL OTHER PLANS, SPECIFICATIONS, ESTIMATES, REPORTS OR OTHER <br />DOCUMENTS OR INSTRUMENTS RELATING TO OR INTENDED TO BE USED <br />FOR ANY PART OR PARTS OF THE PROJECT. <br />REVISIONS <br />NO. DATE DESCRIPTION <br />A PROJECT NUMBER: <br />RELEASE DATE: <br />DETAILS <br />0 <br />16018 <br />03/31/2016 <br />6 5 4 3 2 1 <br />