Laserfiche WebLink
6 <br />5 <br />MECHANICAL SPECIFICATIONS <br />2 I 1 <br />0 <br />%D <br />N <br />f'f'1 <br />t0 <br />O <br />N <br />O <br />fn <br />I <br />fn <br />K <br />C <br />0 <br />U <br />f6 <br />ra <br />v <br />Q <br />f71 <br />0 <br />n <br />fr <br />0 <br />Cr <br />I B�o <br />a <br />I <br />Iu <br />I <br />ai <br />to <br />c_ <br />t7 <br />co <br />M <br />C7 <br />CJ <br />J <br />LL <br />tri <br />i <br />L <br />a <br />L <br />Q <br />ai <br />N <br />00 <br />0 <br />/ <br />all <br />.1 <br />0 <br />L <br />a" 1 <br />0 <br />N <br />E <br />f0 <br />�A <br />u'► <br />c <br />L <br />O <br />x <br />O <br />.0 <br />Iz <br />0 <br />0 <br />c <br />fli <br />Y <br />L <br />ai <br />/ <br />U <br />1. GENERAL <br />1.1 GENERAL REQUIREMENTS: <br />1.1.1 REQUIREMENTS UNDER DIVISION ONE AND THE GENERAL AND SUPPLEMENTARY CONDITIONS <br />OF THESE SPECIFICATIONS SHALL BE A PART OF THIS SECTION. EACH CONTRACTOR SHALL BECOME <br />THOROUGHLY ACQUAINTED WITH ITS CONTENTS AS TO REQUIREMENTS THAT AFFECT THIS DIVISION OR <br />SECTION. THE WORK REQUIRED UNDER THIS SECTION INCLUDES MATERIAL, EQUIPMENT, APPLIANCES, <br />TRANSPORTATION, SERVICES, AND LABOR REQUIRED TO COMPLETE THE ENTIRE SYSTEM AS REQUIRED BY <br />THE DRAWINGS AND SPECIFICATIONS. HEREAFTER IN THIS SPECIFICATION, THE WORD "MECHANICAL <br />CONTRACTOR" SHALL REFER TO THE INSTALLING MECHANICAL CONTRACTOR AND "OWNER" SHALL REFER <br />TO 7-ELEVEN. <br />1.1.2 THE SPECIFICATIONS AND DRAWINGS FOR THE PROJECT ARE COMPLEMENTARY, AND <br />PORTIONS OF THE WORK DESCRIBED IN ONE, SHALL BE PROVIDED AS IF DESCRIBED IN BOTH. IN THE <br />EVENT OF DISCREPANCIES, NOTIFY THE ENGINEER AND/OR OWNER AND REQUEST CLARIFICATION PRIOR <br />TO PROCEEDING WITH THE WORK INVOLVED. <br />1.2 INSPECTION OF SITE: <br />1.2.1 PRIOR TO SUBMITTING BID, VISIT THE SITE OF THE PROPOSED WORK AND BECOME FULLY <br />INFORMED AS TO THE CONDITIONS UNDER WHICH THE WORK IS TO BE DONE. FAILURE TO DO SO WILL NOT <br />BE CONSIDERED SUFFICIENT JUSTIFICATION TO REQUEST OR OBTAIN EXTRA COMPENSATION OVER AND <br />ABOVE THE CONTRACT PRICE. <br />1.3 MATERIAL AND WORKMANSHIP: <br />1.3.1 PROVIDE NEW MATERIAL, EQUIPMENT, AND APPARATUS UNDER THIS CONTRACT UNLESS <br />OTHERWISE STATED HEREIN, OF BEST QUALITY NORMALLY USED FOR THE PURPOSE IN GOOD <br />COMMERCIAL PRACTICE, AND FREE FROM ANY DEFECTS. MODEL NUMBERS LISTED IN THE SPECIFICATIONS <br />OR SHOWN ON THE DRAWINGS ARE NOT NECESSARILY INTENDED TO DESIGNATE THE REQUIRED TRIM, <br />WRITTEN DESCRIPTIONS OF THE TRIM GOVERN MODEL NUMBERS. <br />1.3.2 WORK PERFORMED UNDER THIS CONTRACT SHALL PROVIDE A NEAT AND "WORKMANLIKE" <br />APPEARANCE WHEN COMPLETED, TO THE SATISFACTION OF THE ARCHITECT AND ENGINEER. <br />WORKMANSHIP SHALL BE THE FINEST POSSIBLE BY EXPERIENCED MECHANICS. INSTALLATIONS SHALL <br />COMPLY WITH APPLICABLE CODES AND LAWS. <br />1.3.3 THE COMPLETE INSTALLATION SHALL FUNCTION AS DESIGNED AND INTENDED WITH RESPECT <br />TO EFFICIENCY, CAPACITY, NOISE LEVEL, ETC. ABNORMAL NOISE CAUSED BY RATTLING EQUIPMENT, <br />PIPING, DUCTS, AIR DEVICES, AND SQUEAKS IN ROTATING COMPONENTS WILL NOT BE ACCEPTABLE. IN <br />GENERAL, MATERIALS AND EQUIPMENT SHALL BE OF COMMERCIAL SPECIFICATION GRADE IN QUALITY. <br />LIGHT DUTY AND RESIDENTIAL TYPE EQUIPMENT WILL NOT BE ACCEPTED. <br />1.3.4 REMOVE FROM THE PREMISES WASTE MATERIAL PRESENT AS A RESULT OF WORK, INCLUDING <br />CARTONS, CRATING, PAPER, STICKERS, AND/OR EXCAVATION MATERIAL NOT USED IN BACKFILLING, ETC. <br />CLEAN EQUIPMENT INSTALLED UNDER THIS CONTRACT TO PRESENT A NEAT AND CLEAN INSTALLATION AT <br />THE TERMINATION OF THE WORK. <br />1.3.5 REPAIR OR REPLACE PUBLIC AND PRIVATE PROPERTY DAMAGED AS A RESULT OF WORK <br />PERFORMED UNDER THIS CONTRACT TO THE SATISFACTION OF AUTHORITIES AND REGULATIONS HAVING <br />JURISDICTION. <br />1.4 COORDINATION: <br />1.4.1 COORDINATE WORK WITH THAT OF OTHER TRADES SO THAT THE VARIOUS COMPONENTS OF <br />THE SYSTEMS THAT ARE BEING INSTALLED AND/OR EXISTING SYSTEMS WILL BE INSTALLED AT THE PROPER <br />TIME, WILL FIT THE AVAILABLE SPACE, AND WILL ALLOW PROPER SERVICE ACCESS TO THOSE ITEMS <br />REQUIRING MAINTENANCE. COMPONENTS WHICH ARE INSTALLED WITHOUT REGARD TO THE ABOVE SHALL <br />BE RELOCATED AT NO ADDITIONAL COST TO THE OWNER. <br />1.4.2 UNLESS OTHERWISE INDICATED, THE GENERAL CONTRACTOR WILL PROVIDE CHASES AND <br />OPENINGS IN BUILDING CONSTRUCTION REQUIRED FOR INSTALLATION OF THE SYSTEMS SPECIFIED HEREIN. <br />MECHANICAL CONTRACTOR SHALL FURNISH THE GENERAL CONTRACTOR WITH INFORMATION WHERE <br />CHASES AND OPENINGS ARE REQUIRED, KEEP INFORMED AS TO THE WORK OF OTHER TRADES ENGAGED <br />IN THE CONSTRUCTION OF THE PROJECT, AND EXECUTE WORK IN A MANNER AS TO NOT INTERFERE WITH <br />OR DELAY THE WORK OF OTHER TRADES. <br />1.4.3 FIGURED DIMENSIONS SHALL BE TAKEN IN PREFERENCE TO SCALE DIMENSIONS. MECHANICAL <br />CONTRACTOR SHALL TAKE HIS OWN MEASUREMENTS AT THE BUILDING, AS VARIATIONS MAY OCCUR. <br />MECHANICAL CONTRACTOR WILL BE HELD RESPONSIBLE FOR ERRORS THAT COULD HAVE BEEN AVOIDED <br />BY PROPER CHECKING AND INSPECTION. <br />1.4.4 PROVIDE MATERIALS WITH TRIM THAT WILL PROPERLY FIT THE TYPES OF CEILING, WALL, OR <br />FLOOR FINISHES ACTUALLY INSTALLED. MODEL NUMBERS LISTED IN THE SPECIFICATIONS OR SHOWN ON <br />THE DRAWINGS ARE NOT INTENDED TO DESIGNATE THE REQUIRED TRIM. <br />1.4.5 MECHANICAL CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR DUCTWORK LAYOUT TO THE <br />CONSTRUCTION PROJECT MANAGER FOR OWNER APPROVAL PRIOR TO INSTALLATION. <br />1.5 ORDINANCES AND CODES: <br />1.5.1 WORK PERFORMED UNDER THIS CONTRACT SHALL, AT A MINIMUM, BE IN CONFORMANCE WITH <br />APPLICABLE NATIONAL, STATE AND LOCAL CODES HAVING JURISDICTION. EQUIPMENT FURNISHED AND <br />ASSOCIATED INSTALLATION WORK PERFORMED UNDER THIS CONTRACT SHALL BE IN STRICT COMPLIANCE <br />WITH CURRENT APPLICABLE CODES ADOPTED BY THE LOCAL AHJ INCLUDING ANY AMENDMENTS AND <br />STANDARDS AS SET FORTH BY THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), UNDERWRITERS <br />LABORATORIES (UL), OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA), AMERICAN SOCIETY OF <br />MECHANICAL ENGINEERS (ASME), AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR <br />CONDITIONING ENGINEERS (ASHRAE), AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), AMERICAN <br />SOCIETY OF TESTING MATERIALS (ASTM) AND OTHER NATIONAL STANDARDS AND CODES WHERE <br />APPLICABLE. WHERE THE CONTRACT DOCUMENTS EXCEED THE REQUIREMENTS OF THEIR REFERENCED <br />CODES, STANDARDS, ETC., THE CONTRACT DOCUMENTS SHALL TAKE PRECEDENCE. <br />1.5.2 PROCURE AND PAY FOR PERMITS AND LICENSES REQUIRED FOR THE ACCOMPLISHMENT OF <br />THE WORK HEREIN DESCRIBED. WHERE REQUIRED, OBTAIN, PAY FOR AND FURNISH CERTIFICATES OF <br />INSPECTION TO OWNER. MECHANICAL CONTRACTOR WILL BE HELD RESPONSIBLE FOR VIOLATIONS OF THE <br />LAW. <br />1.6 PROTECTION OF EQUIPMENT AND MATERIALS: <br />1.6.1 STORE AND PROTECT FROM DAMAGE EQUIPMENT AND MATERIALS DELIVERED TO JOB SITE. <br />COVER WITH WATERPROOF, TEAR -RESISTANT, HEAVY TARP OR POLYETHYLENE PLASTIC AS REQUIRED TO <br />PROTECT FROM PLASTER, DIRT, PAINT, WATER, OR PHYSICAL DAMAGE. EQUIPMENT AND MATERIAL THAT <br />HAS BEEN DAMAGED BY CONSTRUCTION ACTIVITIES WILL BE REJECTED, AND MECHANICAL CONTRACTOR <br />IS OBLIGATED TO FURNISH NEW EQUIPMENT AND MATERIAL OF A LIKE KIND AS APPROVED BY OWNER. <br />1.6.2 KEEP PREMISES ROOM CLEAN FROM FOREIGN MATERIAL CREATED DURING WORK <br />PERFORMED UNDER THIS CONTRACT. PIPING, EQUIPMENT, ETC., SHALL HAVE A NEAT AND CLEAN <br />APPEARANCE AT THE TERMINATION OF THE WORK. <br />1.6.3 PLUG OR CAP OPEN ENDS OF DUCTWORK AND PIPING SYSTEMS WHILE STORED OR INSTALLED <br />DURING CONSTRUCTION WHEN NOT IN USE TO PREVENT THE ENTRANCE OF DEBRIS INTO THE SYSTEMS. <br />1.6.4 KEEP THE MANUFACTURER PROVIDED PROTECTIVE COVERINGS ON FLOOR DRAINS, FLOOR <br />SINKS, AND TRENCH DRAINS DURING CONSTRUCTION. REMOVE COVERINGS AT THE TERMINATION OF THE <br />WORK AND POLISH EXPOSED SURFACES. <br />1.7 OPERATION AND MAINTENANCE INSTRUCTIONS: <br />1.7.1 COLLECT AND COMPILE A COMPLETE BROCHURE OF FIXTURES, MATERIALS, AND EQUIPMENT <br />FURNISHED AND INSTALLED ON THIS PROJECT. INCLUDE OPERATIONAL AND MAINTENANCE INSTRUCTIONS, <br />MANUFACTURER'S CATALOG SHEETS, WIRING DIAGRAMS, PARTS LISTS, APPROVED SHOP DRAWINGS, AND <br />DESCRIPTIVE LITERATURE FURNISHED BY THE MANUFACTURER. INCLUDE AN INSIDE COVER SHEET THAT <br />LISTS THE PROJECT NAME, DATE, OWNER, ARCHITECT, ENGINEER, GENERAL CONTRACTOR, <br />SUBCONTRACTOR, AND AN INDEX OF CONTENTS. <br />1.7.2 SUBMIT COPIES OF LITERATURE BOUND IN APPROVED BINDERS TO THE ARCHITECT AND <br />OWNER AT THE TERMINATION OF THE WORK. PAPER CLIPS, STAPLES, RUBBER BANDS, AND MAILING <br />ENVELOPES ARE NOT CONSIDERED APPROVED BINDERS. FINAL APPROVAL OF MECHANICAL AND <br />PLUMBING SYSTEMS WILL BE WITHHELD UNTIL THIS EQUIPMENT BROCHURE IS DEEMED COMPLETE BY THE <br />ARCHITECT, ENGINEER, AND OWNER. <br />1.8 WARRANTIES: <br />1.8.1 WARRANT EACH SYSTEM AND EACH ELEMENT THEREOF AGAINST ALL DEFECTS DUE TO <br />FAULTY WORKMANSHIP, DESIGN OR MATERIAL FOR A PERIOD OF 12 MONTHS FROM DATE OF <br />SUBSTANTIAL COMPLETION, UNLESS SPECIFIC ITEMS ARE NOTED TO CARRY A LONGER WARRANTY IN <br />THE CONSTRUCTION DOCUMENTS OR MANUFACTURER'S STANDARD WARRANTY EXCEEDS 12 <br />MONTHS. REMEDY ALL DEFECTS, OCCURRING WITHIN THE WARRANTY PERIOD(S), AS STATED IN THE <br />GENERAL CONDITIONS AND DIVISION 1. <br />1.8.2 WARRANTIES SHALL INCLUDE LABOR AND MATERIAL. MAKE REPAIRS OR REPLACEMENTS <br />WITHOUT ANY ADDITIONAL COSTS TO THE OWNER. <br />1.8.3 PERFORM THE REMEDIAL WORK PROMPTLY, UPON WRITTEN NOTICE FROM THE ENGINEER <br />OR OWNER. <br />1.8.4 AT THE TIME OF SUBSTANTIAL COMPLETION, DELIVER TO THE OWNER ALL WARRANTIES, IN <br />WRITING AND PROPERLY EXECUTED, INCLUDING TERM LIMITS FOR WARRANTIES EXTENDING BEYOND <br />THE ONE YEAR PERIOD, EACH WARRANTY INSTRUMENT BEING ADDRESSED TO THE OWNER AND <br />STATING THE COMMENCEMENT DATE AND TERM. <br />1.9 CUTTING AND PATCHING: <br />1.9.1 PERFORM CUTTING OF WALLS, FLOORS, CEILINGS, ETC. AS REQUIRED TO INSTALL WORK <br />UNDER THIS SECTION. OBTAIN PERMISSION FROM THE ARCHITECT PRIOR TO CUTTING. DO NOT CUT <br />OR DISTURB STRUCTURAL MEMBERS WITHOUT PRIOR APPROVAL FROM THE ARCHITECT. CUT HOLES <br />AS SMALL AS POSSIBLE. GENERAL CONTRACTOR SHALL PATCH WALLS, FLOORS, ETC. AS REQUIRED <br />BY WORK UNDER THIS SECTION. PATCHING SHALL MATCH THE ORIGINAL MATERIAL AND <br />CONSTRUCTION. REPAIR AND REFINISH AREAS DISTURBED BY WORK TO THE CONDITION OF <br />ADJOINING SURFACES IN A MANNER SATISFACTORY TO THE ARCHITECT. <br />1.10 ROUGH -IN: <br />1.10.1 COORDINATE WITHOUT DELAY ROUGHING -IN WITH GENERAL CONSTRUCTION. CONCEAL <br />PIPING AND CONDUIT ROUGH -IN EXCEPT IN UNFINISHED AREAS AND WHERE OTHERWISE SHOWN. <br />1.11 STRUCTURAL STEEL: <br />1.11.1 STRUCTURAL STEEL USED FOR PIPE SUPPORTS, EQUIPMENT SUPPORTS, ETC., SHALL BE <br />NEW, CLEAN, AND CONFORM TO ASTM DESIGNATION A-36. <br />1.11.2 SUPPORT PLUMBING AND MECHANICAL EQUIPMENT AND PIPING FROM THE BUILDING <br />STRUCTURE. DO NOT SUPPORT PLUMBING EQUIPMENT FROM CEILINGS, OTHER MECHANICAL OR <br />ELECTRICAL COMPONENTS, AND OTHER NON-STRUCTURAL ELEMENTS. <br />1.12 ACCESS DOORS: <br />1.12.1 PROVIDE ACCESS DOORS IN CEILINGS AND WALLS WHERE INDICATED OR REQUIRED FOR <br />ACCESS TO CONCEALED VALVES AND EQUIPMENT INSTALLED UNDER THIS SECTION. PROVIDE <br />CONCEALED HINGES, SCREWDRIVER -TYPE LOCK, ANCHOR STRAPS; MANUFACTURED BY MILCOR, <br />ZURN, TITUS, OR EQUAL. OBTAIN ARCHITECT'S APPROVAL OF TYPE, SIZE, LOCATION, AND COLOR <br />BEFORE ORDERING. <br />1.13 PENETRATIONS: <br />1.13.1 SEAL FLOOR, EXTERIOR WALL AND ROOF PENETRATIONS WATER AND WEATHER TIGHT <br />WITH APPROPRIATE NON -SHRINK, NON -HARDENING COMMERCIAL CONSTRUCTION SEALANT. SEAL <br />ROOF PENETRATIONS WITH 4 POUND PER SQUARE FOOT LEAD FLASHING. PROVIDE A SLEEVE, AND <br />SEAL NON -FIRE -RATED FLOOR AND WALL PENETRATIONS WITH FIBERGLASS PACKING AND SILICONE <br />CAULK (FOR ACOUSTICAL INSULATION). <br />1.13.2 COORDINATE FIRE RATING REQUIREMENTS AND LOCATIONS WITH THE ARCHITECT. SEAL <br />PENETRATIONS OF FIRE -RATED ASSEMBLIES WITH 3M # CP-25 FIRE BARRIER CAULK (PROVIDE <br />THICKNESS AND METHOD AS REQUIRED AND RECOMMENDED BY MANUFACTURER) TO MAINTAIN THE <br />FIRE RESISTANCE RATING OF FIRE -RATED ASSEMBLIES. <br />1.13.3 SEAL EXTERIOR WALL PENETRATIONS BELOW GRADE WITH CAST IRON WALL PIPES AND <br />MODULAR MECHANICAL SLEEVE SEALS, MANUFACTURED BY THUNDERLINE/LINK SEAL, CALPICO, INC <br />AND METRAFLEX. <br />1.13.4 PROVIDE SLEEVES FOR HORIZONTAL PIPE PASSING THROUGH OR UNDER FOUNDATION. <br />SLEEVES SHALL BE CAST IRON SOIL PIPE TWO NOMINAL PIPE SIZES LARGER THAN THE PIPE SERVED. <br />1.13.5 PROVIDE SLEEVES FOR VERTICAL PIPE PASSING THROUGH SLAB ON GRADE. SLEEVES <br />SHALL BE SCHEDULE 40 PVC PIPE, TWO NOMINAL PIPE SIZES LARGER THAN THE PIPE SERVED. SEAL <br />WATER -TIGHT WITH SILICONE CAULK. <br />2. HEATING, VENTILATION, AND AIR CONDITIONING <br />2.1 DUCTWORK: <br />2.1.1 MECHANICAL CONTRACTOR SHALL PROVIDE ANY DUCTWORK NECESSARY FOR A <br />COMPLETE INSTALLATION OF HVAC SYSTEMS (INCLUDING EXHAUST SYSTEMS). ALL DUCTWORK <br />IDENTIFICATION AND INSTALLATION TO ADHERE TO SMACNA STANDARDS AND ALL GOVERNING <br />CODES. <br />2.1.2 ROUND PIPE DUCT RUNS SHALL BE CONSTRUCTED OF METAL PIPE WITH EXTERNAL <br />SLEEVE INSULATION. <br />2.1.3 DUCTWORK CONNECTIONS TO AIR DEVICES MUST BE MADE WITH HARDPIPE ELBOWS, <br />COVERED WITH SLEEVE INSULATION. FLEX DUCT MUST NOT BE UTILIZED FOR A 90 DEGREE <br />CONNECTION TO AN AIR DEVICE. <br />2.1.4 BALANCING DAMPERS WITH DOUBLE LOCKING QUADS SHALL BE PROVIDED IN ALL ROUND <br />PIPE TAKE -OFFS FROM THE MAIN TRUNKS, UNLESS OTHERWISE NOTED ON PLANS. <br />2.1.5 A MAXIMUM OF 6' OF FLEX DUCT MAY BE USED FOR FINAL CONNECTION OF SIDE WALL <br />DIFFUSERS. <br />2.1.6 FLEX DUCT MUST BE PROPERLY SUPPORTED WITH ONE INCH STRAPS AND CUT TO <br />PROPER LENGTH TO PREVENT SAGGING. <br />2.1.7 FLEX DUCT SHALL BE OWENS-CORNING FOIL -BACK HIGH QUALITY U/L APPROVED. PLASTIC <br />WRAPPED FLEX DUCT IS NOT ACCEPTABLE. <br />2.1.8 RIGID ROUND DUCT SHALL BE USED FOR HOT FOODS EXHAUST. <br />2.2 INSULATION: <br />2.2.1 SUPPLY AND RETURN DUCTWORK INSIDE THE BUILDING SHALL BE INSULATED WITH 1.5" <br />THICK ACOUSTICAL LINING WITH A MINIMUM R-VALUE OF 6.0 OR EXTERNALLY WRAPPED WITH 2" THICK <br />GLASS FIBER DUCT WRAP. <br />2.2.2 SUPPLY AND RETURN DUCTWORK OUTSIDE THE BUILDING SHALL BE INSULATED WITH 2" <br />LINER WITH A MINIMUM R-VALUE OF 8.0 AND SEAL SEAMS WEATHER TIGHT. <br />2.2.3 DEDICATED OUTSIDE AIR SUPPLY AND RELIEF DUCTWORK INSIDE THE BUILDING SHALL BE <br />INSULATED WITH 2" THICK DUCT WRAP WITH A MINIMUM R-VALUE OF 6.0. <br />2.3 FINAL TESTING AND ADJUSTMENTS: <br />2.3.1 AIR BALANCE SHALL BE PERFORMED AT THE COMPLETION OF THE PROJECT. BALANCE <br />EACH SUPPLY, RETURN, OUTSIDE AIR DEVICE WITHIN 5% OF REQUIREMENTS AND FURNISH A REPORT <br />TO THE CONSTRUCTION PROJECT MANAGER. THE ENTIRE HVAC SYSTEM MUST BE FULLY OPERABLE, <br />BALANCED, AND APPROVED BY OWNER'S REPRESENTATIVE ON THE DAY TENANT OPENS FOR <br />BUSINESS. <br />2.3.2 ADJUST THERMOSTATS AND CONTROL DEVICES TO OPERATE AS INTENDED. ADJUST <br />PUMPS, FANS, ETC. FOR PROPER AND EFFICIENT OPERATION. CERTIFY TO ARCHITECT THAT <br />ADJUSTMENTS HAVE BEEN MADE AND THAT SYSTEM IS OPERATING SATISFACTORILY. CALIBRATE, <br />SET AND ADJUST AUTOMATIC TEMPERATURE CONTROLS. CHECK PROPER SEQUENCING OF <br />INTERLOCK SYSTEMS, AND OPERATION OF SAFETY CONTROLS. <br />2.3.3 VERIFY ECONOMIZER OPERATION PER MANUFACTURER PROCEDURE. <br />2.4 DIFFUSERS AND GRILLES (OWNER PROVIDED): <br />2.4.1 ALL SUPPLY AND RETURN AIR DEVICES SHALL INSTALLED BY THE MECHANICAL CONTRACTOR. <br />2.4.2 ALL AIR TERMINAL DEVICES SHALL BE INSTALLED AS SHOWN ON THE PLANS IN ORDER TO <br />HANDLE THE DESIGNED AIR FLOW CAPACITIES WITH A MINIMUM AMOUNT OF NOISE AND STATIC <br />PRESSURE. <br />2.5 CONDENSATE DRAINS: <br />2.5.1 THE MECHANICAL CONTRACTOR SHALL PROVIDE AND INSTALL AS A MINIMUM A 4" DEEP P-TRAP <br />ON CONDENSATE DRAIN OUTLETS WHERE THE CONDENSATE WATER WILL EXIT THE P-TRAP AT A POINT 1" <br />LOWER THAN THE DRAIN CONNECTION AT THE UNIT. THE MECHANICAL CONTRACTOR SHALL PROVIDE <br />AND INSTALL CONDENSATE LINES AS REQUIRED TO MEET LOCAL CODES AND AS SHOWN ON THE <br />MECHANICAL PLANS. THESE LINES SHALL BE SLOPED AWAY FROM THE UNITS, SUPPORTED AS REQUIRED <br />TO ASSURE PROPER FLOW, AND AT THE MECHANICAL CONTRACTOR'S OPTION, CONDENSATE DRAIN LINES <br />MAY BE SCHEDULE 40 PVC OR COPPER. ALL JOINTS SHALL BE SECURELY GLUED OR SOLDERED AS <br />REQUIRED. INSULATE WITH 3/4" THICK PIPE INSULATION WHERE REQUIRED. <br />2.6 CONTROLS: <br />2.6.1 RTU CONTROLS PROVIDED BY OWNER. COORDINATE LOCATIONS FOR THERMOSTAT AND <br />SENSORS FOR ROUGH -IN. <br />2.6.2 SMOKE DETECTORS AND SAMPLING TUBES PROVIDED AND INSTALLED TO THE UNITS AND IN <br />THE DUCTWORK BY CARRIER. THE SMOKE DETECTORS SHALL DISABLE HVAC UNIT OPERATION UPON <br />ACTIVATION. <br />2.7 ELECTRICAL: <br />2.7.1 LOW VOLTAGE WIRING - ALL PROVISIONS FOR LOW VOLTAGE WIRING SHALL BE PERFORMED <br />BY THE MECHANICAL CONTRACTOR UNLESS CODES OR LABOR SITUATIONS DO NOT PERMIT. IF THE <br />MECHANICAL CONTRACTOR CAN NOT PERFORM LOW VOLTAGE WIRING, THE MECHANICAL CONTRACTOR <br />SHALL INFORM THE GENERAL CONTRACTOR, AS PART OF THE HVAC BID DOCUMENT, TO HAVE THE <br />ELECTRICAL SUBCONTRACTOR INCLUDE THIS WORK IN THEIR BID. <br />2.7.2 POWER WIRING - ALL ELECTRICAL POWER WIRING TO INCLUDE FINAL CONNECTIONS SHALL BE <br />PROVIDED BY THE GENERAL CONTRACTOR'S ELECTRICAL SUBCONTRACTOR. <br />2.8 GAS PIPING: <br />2.8.1 SCHEDULE 40 BLACK CARBON STEEL WITH MALLEABLE IRON THREADED FITTINGS. PROVIDE <br />SHUT-OFF VALVE, DIRT LEG, AND UNION AT EACH ROOFTOP UNIT. PAINT ALL GAS PIPING EXPOSED TO <br />WEATHER WITH ONE COAT OF PRIMER, AND TWO COATS OF RUST -PROOF PAINT. COLOR SHALL MATCH <br />BUILDING COLORS. COORDINATE WITH OWNER'S CONSTRUCTION MANAGER. <br />2.8.2 TREATED WOOD BLOCKING 6X6X12, 8'-0" OC MAX WITH GALVANIZED PIPE STRAP, 1 1/4" ZINC <br />COATED LAG SCREWS, AND RUBBER WALKPAD ADHERED TO ROOF. <br />2.9 REFRIGERATION LINES: <br />2.9.1 REFRIGERATION LINE SETS FOR HVAC UNITS ARE TO BE PROVIDED AND INSTALLED BY THE <br />MECHANICAL CONTRACTOR. <br />2.10 MECHANICAL CONTRACTOR RESPONSIBILITIES: <br />2.10.1 AFTER COMPLETION OF THE WORK DESCRIBED IN THIS SPECIFICATION AND SHOWN ON THE <br />DRAWINGS, THE MECHANICAL CONTRACTOR SHALL THOROUGHLY CLEAN ALL EXPOSED EQUIPMENT, <br />REMOVING ALL LABELS AND STICKERS NOT CONTAINING OPERATION INSTRUCTION. MECHANICAL <br />CONTRACTOR SHALL REMOVE CRATING DEBRIS, LEAVING THE INSTALLATION FINISHED AND READY FOR <br />OPERATION, TO INCLUDING CLEAN FILTERS IN AIR HANDLING UNITS. <br />rev 04/10/13 <br />Date; <br />106 N 37TH STREET, SUITE C <br />ROGERS, ARKANSAS 72756 <br />W W W.BATESARCH ITECTS.COM <br />TEL: 479.633.816E <br />Copyright 2016 Bates & Associates, Architects <br />E Drawings and Specifications as instruments of service are and shall remain <br />the property of the Architect. They are not to be used on other projects or <br />extensions to this project except by agreement in writing and with <br />appropriate compensation to the Architect. <br />Contractor is responsible for confirming and correlating dimensions at job <br />site; the Architect will not be responsible for construction means, methods, <br />techniques, sequences or procedures, or for safety precautions and <br />programs in connection with the project. <br />SITE/STORE #: <br />1037728 <br />CONSTRUCTION MANAGER <br />CREIGHTON CONST. & MGMT <br />900 SW PINE ISLAND ROAD, SUITE 202, <br />CAPE CORAL, FL 33991 <br />DEVELOPER CONTACT <br />TENANT <br />7-ELEVEN INC. <br />1722 ROUTH ST. SUITE 1000 DALLAS, TX 75201 <br />DANIELTUBB <br />STRUCTURAL CONSULTANT <br />ARCH CONSULTING ENGINEERS <br />510 S CONGRESS SUITE B-100 AUSTIN, TX 78704 <br />JUSTIN BILLODEAU <br />MEP CONSULTANT <br />WALTER J. FITZGERALD, P.E. 24636 <br />2566 NEBRASKA AVE. APT 443 <br />PALM HARBOR, FL 34684 PH (813) 785-7526 <br />D <br />c� N <br />c N <br />V W <br />W o 06 U) CY) <br />OO M M <br />0- M Q CV) <br />~ U)� � w <br />Z aC <br />Z w � O o Q <br />C > � � z � O <br />J T O - W <br />W M a z a- <br />>- N = U <br />W cn <br />T_ CDU C)) <br />r <br />M <br />03/3117oi& <br />Architect Name - RYAN M FAUST <br />Architect Number - AR97905 <br />THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TO WHICH <br />THEY ARE AFFIXED AND WE EXPRESSLY DISCLAIM ANY RESPONSIBILITY FOR <br />ALL OTHER PLANS, SPECIFICATIONS, ESTIMATES, REPORTS OR OTHER <br />DOCUMENTS OR INSTRUMENTS RELATING TO OR INTENDED TO BE USED <br />FOR ANY PART OR PARTS OF THE PROJECT. <br />REVISIONS <br />NO. DATE I DESCRIPTION <br />PROJECT NUMBER: 16-021 <br />RELEASE DATE: 03/31/2016 <br />MECHANICAL <br />SPECIFICATIONS <br />1 <br />