l
<br />5 I 4
<br />3
<br />2
<br />Ln
<br />lD
<br />O
<br />N
<br />M
<br />M
<br />�I
<br />C.
<br />L
<br />aU
<br />E
<br />t
<br />v
<br />,I
<br />l0
<br />I
<br />a
<br />w
<br />�I
<br />06
<br />v
<br />tin
<br />c
<br />C7
<br />is
<br />(D
<br />@J
<br />LL
<br />tri
<br />=A
<br />a
<br />t
<br />a
<br />v
<br />N
<br />10
<br />0
<br />N
<br />U
<br />v
<br />a
<br />LD
<br />0
<br />N
<br />PLUMBING SPECIFICATIONS
<br />1. INTRODUCTION
<br />1.1 THE CONTRACTING FOR INSTALLATION OF PLUMBING SYSTEMS WILL BE ACCOMPLISHED IN THE FIELD AT
<br />THE DIVISION LEVEL (IN CASE OF A CONFLICT BETWEEN THIS SPECIFICATION AND THE CONTRACT DOCUMENTS
<br />AND/OR WRITTEN OR VERBAL INSTRUCTIONS PROVIDED BY THE CONSTRUCTION MANAGER, THE DIVISION'S
<br />INSTRUCTIONS SHALL PREVAIL). HEREAFTER IN THIS SPECIFICATION, THE WORD "PLUMBING CONTRACTOR"
<br />SHALL REFER TO THE INSTALLING PLUMBING CONTRACTOR AND "OWNER" SHALL REFER TO 7-ELEVEN.
<br />1.2 SCOPE OF WORK
<br />1.2.1 PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL PLUMBING FIXTURES, ACCESSORIES, AND
<br />ATTENDANT PIPING AS STATED HEREIN. REFER TO THE PLUMBING PLANS AND THE "MATERIALS" PORTION OF
<br />THIS SPECIFICATION FOR EQUIPMENT TO BE FURNISHED. EXACT LOCATION OF ALL EQUIPMENT SHALL BE
<br />DETERMINED BY REFERENCE TO THE PLANS AND MEASUREMENTS AT THE BUILDING SITE AND IN COOPERATION
<br />WITH OTHER CONTRACTORS AND IN ALL CASES SHALL BE SUBJECT TO THE OWNERS APPROVAL.
<br />1.3 GENERAL
<br />1.3.1 ALL SAFETY PRECAUTIONS SHALL BE TAKEN TO PROTECT PERSON, PROPERTY, AND EQUIPMENT.
<br />1.3.2 NO COMPENSATION FOR WORK PERFORMED OVER AND ABOVE PROJECTS SUM SHALL BE
<br />ALLOWED DUE TO CONDITIONS WITH WHICH THE PLUMBING CONTRACTOR SHOULD HAVE BEEN FAMILIAR.
<br />1.3.3 ANY DEVIATION BY PLUMBING CONTRACTOR FROM THE PLANS AND SPECIFICATIONS, OR ANY
<br />SUBSTITUTION OF EQUIPMENT FROM THAT SPECIFIED, SHALL FIRST RECEIVE OWNER'S APPROVAL.
<br />1.4 OPERATIONS AND INSTALLATION
<br />1.4.1 ALL DELIVERIES TO COINCIDE WITH CONSTRUCTION SCHEDULE. MATERIALS SHALL BE STORED
<br />WHERE AND/OR AS DIRECTED BY THE GENERAL CONTRACTOR. STORAGE MUST BE IN SUCH A PLACE AS TO
<br />AVOID ACCIDENTAL MUTILATION BY EQUIPMENT BY ANY CONTRACTOR WHILE PERFORMING THEIR WORK,
<br />WHETHER ON SITE OR OFF.
<br />1.4.2 ALL UNDER FLOOR PIPING SHALL BE INSTALLED IN CONJUNCTION WITH THE GENERAL
<br />CONTRACTOR'S WORK SCHEDULE. NO UNDERGROUND WORK SHALL BE COVERED OR ENCLOSED UNTIL IT HAS
<br />BEEN INSPECTED AND TESTED.
<br />1.4.3 PLUMBING CONTRACTOR SHALL DO THE NECESSARY TRENCHING, SHORING AND BACKFILLING
<br />REQUIRED TO FULFILL HIS CONTRACT. BOTTOMS OF TRENCHES SHALL BE CUT TO GRADE.
<br />1.4.4 ALL OPENINGS AND STUB -UP FOR PLUMBING PIPING AND FIXTURES SHALL BE CAREFULLY LOCATED
<br />AND COORDINATED, OTHERWISE, PLUMBING CONTRACTOR SHALL CUT NEW OPENINGS AT HIS OWN EXPENSE,
<br />AND REIMBURSE OTHER SUBCONTRACTORS FOR ANY DAMAGE DONE TO THEIR WORK.
<br />1.5 CODE AND PERMIT REQUIREMENTS
<br />1.5.1 ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE LOCAL LAWS, REGULATIONS,
<br />ORDINANCES, STATUTES, AND CODES, WHICH SHALL BE DELINEATED, AND ALL MODIFICATIONS REQUIRED BY
<br />THE INSPECTION AUTHORITIES SHALL BE MADE BY PLUMBING CONTRACTOR WITHOUT ADDITIONAL COST TO
<br />OWNER.
<br />1.5.2 PLUMBING CONTRACTOR SHALL OBTAIN, PAY FOR AND FURNISH ALL PERMITS REQUIRED BY LOCAL
<br />OR STATE ORDINANCES OR CODES, AND THESE COSTS SHALL BE STATED SEPARATELY ON THE PLUMBING
<br />CONTRACTOR'S INVOICES.
<br />2. MATERIALS
<br />2.1 DOMESTIC WATER PIPING:
<br />2.1.1 ABOVE AND BELOW GRADE WATER PIPING SHALL BE PEX TUBING CONFORMING TO ASTM F877
<br />CROSS -LINKED POLYETHYLENE TUBING HOT AND COLD WATER DISTRIBUTION SYSTEMS, ASTM F876 CROSS -
<br />LINKED POLYETHYLENE TUBE, ASTM F1807 FITTING AND ASTM F2159 FITTINGS, COMPLY WITH NSF STANDARD
<br />14 AND 61. PEX TUBING SHALL BE WATTS WATERPEX CROSS -LINKED POLYETHYLENE OR EQUAL. ALL PEX
<br />TUBING BELOW GRADE SHALL BE SLEEVED WITH PVC PIPE.
<br />2.1.1.1 FITTINGS: FITTINGS SHALL BE MECHANICAL CRIMP FITTINGS IN COMPLIANCE WITH ASTM F1807
<br />AND F2159. PEX FITTINGS SHALL BE WATTS BRASS CRIMPRING FITTINGS USING EITHER WATTS COPPER
<br />CRIMPRING OR STAINLESS STEEL CINCHCLAMP OR EQUAL. INSTALLED IN ACCORDANCE WITH MANUFACTURER'S
<br />RECOMMENDATIONS.
<br />2.2 FILTERED WATER PIPING:
<br />2.2.1 ABOVE AND BELOW GRADE FILTERED WATER PIPING SHALL BE CPVC TUBING CONFORMING TO
<br />ASTM D2846 AND CSA B137 CHLORINATED POLY (VINYL CHLORIDE) PLASTIC HOT AND COLD WATER
<br />DISTRIBUTION SYSTEMS, ASTM D1784 RIGID AND CHLORINATED PVC COMPOUNDS, ASTM F493 SOLVENT
<br />CEMENTS, COMPLY WITH NSF STANDARD 14 AND 61. CPVC TUBING SHALL BE FLOWGUARD GOLD CPVC CTS OR
<br />EQUAL.
<br />2.2.1.1 FITTINGS: FITTINGS SHALL BE SOCKET TYPE JOINTS IN COMPLIANCE WITH ASTM D2846 AND
<br />CSA B137. CPVC FITTINGS SHALL BE FLOWGUARD GOLD CPVC CTS FITTINGS OR EQUAL. JOINING MATERIAL
<br />SHALL BE ASTM F493 SOLVENT CEMENT. INSTALLED IN ACCORDANCE WITH MANUFACTURER'S
<br />RECOMMENDATIONS.
<br />2.3 SOIL, WASTE AND VENT PIPES:
<br />2.3.1 ABOVE AND BELOW GRADE SOIL, WASTE AND VENT PIPING SHALL BE PVC PLASTIC, SCHEDULE 40
<br />DWV PIPE CONFORMING TO ASTM D2665 WITH PLAIN ENDS. CELLULAR (FOAM) CORE PVC NOT ALLOWED.
<br />INSTALL PER ASTM D2665 AND ASTM D2321.
<br />2.3.1.1 FITTINGS SHALL BE PVC SOCKET -TYPE DWV PIPE FITTINGS; ASTM D2665 MADE TO ASTM D3311
<br />DRAIN, WASTE AND VENT PATTERNS.
<br />2.4 FLASHING:
<br />SHEET LEAD. 4 POUNDS PER SQUARE FOOT, MINIMUM.
<br />rev 02/01 /13
<br />CONTI
<br />MODU
<br />TI
<br />LAVSHROUD
<br />N.T.S.
<br />2.5 INSULATION:
<br />2.5.1 DOMESTIC COLD WATER (WITHIN BUILDING):
<br />COPPER PIPE: NOT USED.
<br />PEX TUBING: NO INSULATION REQUIRED.
<br />EXCEPTION: FOR NON -RECIRCULATING HOT WATER SYSTEM, PROVIDE 1/2" WALL
<br />ONE-PIECE FIBERGLASS COVERING HAVING A CONDUCTIVITY NOT EXCEEDING 0.27 WITH FIRE
<br />RESISTANTJACKET WITH SELF-SEALING LAP TO PROVIDE A CONTINUOUS VAPOR BARRIER BY
<br />CERTAINTEED, OWENS-CORNING OR ARMSTRONG ON THE FIRST 8 FEET OF INLET PIPING AT
<br />WATER HEATER.
<br />CPVC TUBING: NO INSULATION REQUIRED.
<br />2.5.2 DOMESTIC HOT WATER:
<br />COPPER PIPE: NOT USED.
<br />PEX TUBING: 1/2" WALL ONE-PIECE FIBERGLASS COVERING HAVING A
<br />CONDUCTIVITY NOT EXCEEDING 0.27 WITH FIRE RESISTANT JACKET WITH SELF-SEALING LAP
<br />TO PROVIDE A CONTINUOUS VAPOR BARRIER BY CERTAINTEED, OWENS-CORNING OR
<br />ARMSTRONG. (SEE BELOW FOR PLUMBING FITTING INSULATION REQUIREMENTS)
<br />FOR HOT WATER PIPING BEING SERVED BY SYSTEM WITH RECIRCULATING PUMP,
<br />PROVIDE 1" WALL ONE-PIECE FIBERGLASS COVERING HAVING A CONDUCTIVITY NOT
<br />EXCEEDING 0.27 WITH FIRE RESISTANT JACKET WITH SELF-SEALING LAP TO PROVIDE A
<br />CONTINUOUS VAPOR BARRIER BY CERTAINTEED, OWENS-CORNING OR ARMSTRONG. (SEE
<br />BELOW FOR PLUMBING FITTING INSULATION REQUIREMENTS)
<br />2.5.3 INDIRECT AND CONDENSATE DRAIN PIPING (WITHIN BUILDING):
<br />COPPER PIPE: PROVIDE 1" FLEXIBLE UNICELLULAR INSULATION BY ARMACELL.
<br />PVC PIPING: NO INSULATION REQUIRED.
<br />FOR PIPING AT HANGERS, PROVIDE 8" LONG SECTIONS OF HIGH DENSITY, HIGH TEMPERATURE
<br />CALCIUM SILICATE BY JOHNS-MANVILLE, FIBERGLASS BY KNAUF, OR 8" LONG STYROFOAM
<br />BILLETS BY DOW. INSULATION SHALL BE CONTINUOUS ALONG THE PIPE SURFACE, EXCEPT
<br />AT VALVES, UNIONS, AND WHERE PIPING IS EXPOSED AT FIXTURES.
<br />FOR HOT AND COLD WATER PIPING EXPOSED, CONCEALED IN WALLS, AND/OR INSTALLED
<br />INSIDE MASONRY UNITS OF WALLS, COVER FITTINGS WITH ZESTON, KNAUF, OR EQUAL ONE-
<br />PIECE PVC PREMOLDED INSULATING COVERS. FITTING COVERS, JACKETS AND ADHESIVES
<br />SHALL NOT EXCEED FLAME SPREAD RATING OF 25 AND SMOKE DEVELOPMENT RATING OF
<br />50 PER ASTM E84. AT ALL ELBOWS AND TEES, FILL VOIDS BETWEEN COVERS AND PIPING
<br />WITH FIBERGLASS INSULATION AND TAPE JOINTS. INSTALL PIPE INSULATION IN COMPLIANCE
<br />WITH MANUFACTURER'S RECOMMENDATIONS. WHERE PREMOLDED INSULATING FITTINGS
<br />ARE NOT APPROVED BY LOCAL AUTHORITIES, MITER INSULATION AT FITTINGS.
<br />2.6 INDIRECT AND CONDENSATE DRAIN LINES:
<br />PROVIDE HARD DRAWN, TYPE "M" OR "L" COPPER PIPE FOR ALL CONDENSATE DRAIN PIPING
<br />FROM COOLER AND FREEZER EVAPORATORS. PROVIDE HEAT TRACE FOR ALL CONDENSATE
<br />DRAIN PIPING LOCATED IN FREEZERS, AND ROUTE TO FLOOR DRAIN IN BUILDING.
<br />PROVIDE PVC PIPE FOR ALL OTHER INDIRECT AND CONDENSATE DRAIN PIPING FROM HVAC,
<br />PLUMBING, AND BEVERAGE EQUIPMENT, AND ROUTE TO FLOOR DRAIN IN BUILDING.
<br />3. TESTING AND INSPECTION:
<br />3.1 THE ENTIRE PLUMBING SYSTEM SHALL BE TESTED BEFORE COVERING OR ENCLOSING.
<br />3.2 INSPECTION:
<br />WORK SHALL BE INSPECTED FOR COMPLIANCE WITH CODES, ORDINANCES, REGULATIONS
<br />AND ADHERENCE TO CONTRACT DOCUMENTS. PLUMBING CONTRACTOR SHALL SUPPLY
<br />OWNER WITH SIGNED FORMS OR PROOF OF ACCEPTANCE BY THE LOCAL AUTHORITY
<br />BEFORE CONTINUING FROM ONE STAGE TO ANOTHER. FINAL APPROVAL SHALL BE OBTAINED
<br />BEFORE FINAL PAYMENT IS MADE ON THE CONTRACT.
<br />3.3 PERFORMANCE REQUIRED:
<br />3.3.1 PLUMBING CONTRACTOR SHALL INSTALL ALL PLUMBING SYSTEMS LEAK FREE
<br />AND AS PER PLANS AND SPECIFICATIONS.
<br />3.3.2 ALL EXPOSED EQUIPMENT SHALL BE INSTALLED IN A WORKMANLIKE MANNER
<br />AND WILL BE SUBJECT TO ARCHITECTURAL INSPECTION FOR AESTHETIC APPEARANCE.
<br />4. CUTTING AND CLEANING:
<br />4.1 PLUMBING CONTRACTOR SHALL CLEAN ENTIRE SITE OF DEBRIS, TOOLS AND
<br />EQUIPMENT RELATED TO THIS WORK.
<br />4.2 PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING
<br />OF HIS WORK WHICH MAY BE REQUIRED TO RELIEVE THE WORK OF OTHER CONTRACTORS.
<br />5. GUARANTEES:
<br />5.1 PLUMBING CONTRACTOR SHALL GUARANTEE ALL OF THE WORK AND THE COMPLETE
<br />OPERATION WILL BE FREE FROM DEFECTS IN WORKMANSHIP AND MATERIALS. PLUMBING
<br />CONTRACTOR AGREES TO REPLACE, WITHOUT EXPENSE TO THE OWNER, ANY PART OF HIS
<br />WORK ON THIS INSTALLATION WHICH PROVES TO BE DEFECTIVE WITHIN ONE (1) YEAR AFTER
<br />ACCEPTANCE OF THE WORK.
<br />HEAT TRAP -
<br />DOWN TO MID
<br />POINT OF
<br />HEATER TANK,
<br />TYP. OF 2.
<br />SET DISCHARGE
<br />TEMPERATURE
<br />TO 120 DEG. F
<br />SHELF TO SUPPORT
<br />WEIGHT OF 650 LBS.
<br />I r
<br />1 0
<br />LO
<br />I I I
<br />I
<br />I 1 I
<br />I I
<br />I I 1
<br />I I I
<br />1 1
<br />I I 1
<br />I 1 WATER I
<br />1 1 1 1
<br />1 HEATER
<br />I
<br />I
<br />I
<br />WATER H EAT E R
<br />N.T.S.
<br />FINISH FLOOR
<br />S3
<br />CO
<br />FS
<br />3-COMPARTMENT SINK WITH FLOOR SIN
<br />N.T.S.
<br />HW SUPPLY TO SYSTEM
<br />RE: PLAN.
<br />BALL VALVE, TYP.
<br />CW SUPPLY TO WATER
<br />HEATER. RE: PLAN
<br />SECONDARY BY-PASS TO BE -
<br />INSTALLED ONLY WHEN
<br />BOOSTER PUMP IS INSTALLED
<br />OPTIONAL BOOSTER PUMP, -
<br />REF NOTE #8 BELOW
<br />ASSE 1013 COMPLIANT
<br />CASH ACME RP500 LEAD
<br />FREE RPZ BACKFLOW
<br />PREVENTER, DO NOT
<br />MOUNT HIGHER THAN 5'4"
<br />3/4" SUPPLY
<br />3/4" Y-STRAINER
<br />ROUTE DISCHARGE
<br />TO AN APPROVED
<br />RECEPTOR
<br />3/4" FLEXIBLE
<br />TUBING 10 FT
<br />REQUIRED
<br />3/4" BALL VALVE
<br />SET SURGE
<br />TANK ON
<br />SHELF
<br />3/4"
<br />BY-PASS
<br />NOTE:
<br />CORD FROM
<br />BOOSTER PUMP
<br />TO PLUG.
<br />COARSE
<br />FILTER
<br />DRAIN 3-COMP SINK
<br />INDIRECTLY TO FLOOR
<br />SINK WITH AIR GAP 1.5X
<br />DIAMETER OF DRAIN
<br />PIPE
<br />3/4"
<br />PLUG
<br />XC2I IXCzI IXCzI IXC2
<br />o Z
<br />co
<br />TAG
<br />POST
<br />MIX
<br />TAG ICE
<br />MAKER
<br />SS -IMF
<br />PRESSURE ❑
<br />REDUCING
<br />VALVE, SS -IMF
<br />REF NOTE
<br />#8 BELOW
<br />SPRING -LOADED
<br />CHECK VALVE
<br />REF. 1/P1.1
<br />FOR ROUTING
<br />DIAGRAM
<br />ROUTE OVER FLOW TO AN
<br />APPROVED RECEPTOR
<br />CPVC BEVERAGE TUBING
<br />3/4" REINFORCED PLASTIC LINE TO
<br />SLURPEE ABOVE CEILING. PROVIDE
<br />WILKINS 740 BACKFLOW PREVENTER
<br />CONFORMING TO ASSE 1022.
<br />TAG SLURPEE
<br />3/4" REINFORCED PLASTIC LINE TO
<br />POST MIX ABOVE CEILING. PROVIDE
<br />WILKINS 740 BACKFLOW PREVENTER
<br />CONFORMING TO ASSE 1022.
<br />U aie;
<br />106 N 37TH STREET, SUITE C
<br />ROGERS, ARKANSAS 72756
<br />W W W. BATESARCH ITECTS.COM
<br />TEL: 479.633.8165
<br />Copyright 2016 Bates & Associates, Architects
<br />E Drawings and Specifications as instruments of service are and shall remain
<br />the property of the Architect. They are not to be used on other projects or
<br />extensions to this project except by agreement in writing and with
<br />appropriate compensation to the Architect.
<br />Contractor is responsible for confirming and correlating dimensions at job
<br />site; the Architect will not be responsible for construction means, methods,
<br />techniques, sequences or procedures, or for safety precautions and
<br />programs in connection with the project.
<br />SITE/STORE #:
<br />1037728
<br />CONSTRUCTION MANAGER
<br />CREIGHTON CONST. & MGMT
<br />900 SW PINE ISLAND ROAD, SUITE 202,
<br />CAPE CORAL, FL 33991
<br />DEVELOPER CONTACT
<br />TENANT
<br />7-ELEVEN INC.
<br />1722 ROUTH ST. SUITE 1000 DALLAS, TX 75201
<br />DANIELTUBB
<br />STRUCTURAL CONSULTANT
<br />ARCH CONSULTING ENGINEERS
<br />510 S CONGRESS SUITE B-100 AUSTIN, TX 78704
<br />JUSTIN BILLODEAU
<br />MEP CONSULTANT
<br />WALTER J. FITZGERALD, P.E. 24636
<br />2566 NEBRASKA AVE. APT 443
<br />PALM HARBOR, FL 34684 PH (813) 785-7526
<br />■ I�
<br />C
<br />1/2" LINE TO ICE MAKER ABOVE CEILING.
<br />PROVIDE WILKINS 740 BACKFLOW
<br />PREVENTER CONFORMING TO ASSE 1022
<br />-REGULATOR @ ICE MAKER
<br />TO < 60 PSI -
<br />TAG COFFEE
<br />** 3/4" LINE TO COFFEE BREWER(S), TEA
<br />BREWER, AND CAPPUCCINO MACHINE:.
<br />PROVIDE WILKINS 740 BACKFLOW
<br />PREVENTER CONFORMING TO ASSE 1022.
<br />SHUT OFF VALVE (TYP.)
<br />3/4" LINE SPLITS INTO 1/2" LINES WITH
<br />SHUT OFF VALVES AT EACH COFFEE
<br />BREWER, TEA BREWER, AND CAPPUCCINO
<br />MACHINE.
<br />EVERPURE FILTER SYSTEM MODEL
<br />EXPANSION TANK. RE:
<br />WATER HEATER SCHEDULE.
<br />FLEXIBLE CONNECTOR TYP
<br />1. WATER SUPPLY MUST BE 3/4" INCH.
<br />2. WATER SHUT-OFF VALVE SHALL BE "BALL LOCK" TYPE. POSITIVE ON -OFF.
<br />3. DRAIN MUST BE PROVIDED TO PERMIT FLUSHING OF NEW FILTERS.
<br />T & P RELIEF
<br />4. WATER FOR ICE MAKERS, COFFEE MAKERS, AND CAPPUCCINO MACHINES SHALL BE ROUTED THROUGH THE SS -IMF UNITS.
<br />5. WATER FOR FSD AND FCB EQUIPMENT SHOULD NOT BE ROUTED THROUGH THE SS -IMF UNITS (WILL REDUCE CARBONATION).
<br />6. XC2(CARBON) FILTERS MUST BE REPLACED IN SETS.
<br />GALVANIZED SHEET METAL
<br />DRAIN PAN 4" DEEP
<br />7. COARSE FILTER AND SS -IMF UNITS MAY BE CHANGED INDIVIDUALLY.
<br />8. MINIMUM SUPPLY WATER PRESSURE TO THE FILTER SYSTEM IS 40 PSI. BELOW 40 PSI REQUIRES A PRESSURE BOOSTER PUMP.
<br />IF REQUIRED, CONTRACTOR TO PROVIDE SHURFLO WATER BOOSTER MODEL 24VDC WB PUMP, K NEMA 5-15US (PART # 94-189-000) WITH
<br />1/2" MALE CONNECTIONS. ALSO HONEYWELL PRESSURE REDUCING VALVE MODEL DSO5C1030 (SET AT 55 PSI) INSTALLED AFTER TEE TO
<br />SURGE TANK AND BEFORE FIRST TEE TO BEVERAGE EQUIPMENT.
<br />PIPE FULL SIZE
<br />WITH AIR GAP
<br />EVERPU RE WATER PURIFICATION SYSTEM
<br />1
<br />N.T.S.
<br />N
<br />C�
<br />G
<br />N
<br />0
<br />V
<br />ui
<br />W
<br />p
<br />06
<br />U)
<br />M
<br />O
<br />O
<br />CM
<br />M
<br />-
<br />o
<br />M
<br />CO
<br />LL
<br />z
<br />O
<br />�
<br />Li_
<br />z
<br />I-
<br />W
<br />(J)
<br />J
<br />O
<br />J
<br />Q
<br />W
<br />LU
<br />�
<br />=
<br />U
<br />z
<br />Q
<br />o0
<br />W
<br />=
<br />z
<br />O
<br />Cn
<br />v
<br />J
<br />W
<br />o
<br />cn
<br />I-
<br />W
<br />z
<br />w
<br />Q
<br />I`
<br />N
<br />=
<br />101-
<br />U
<br />W
<br />Cn
<br />U
<br />O
<br />`\\%111111111//7/�/
<br />B�IFIC,9�
<br />. VA nl0%A':,
<br />?mTSTATE Wff lz;z
<br />sloe Va.
<br />sees
<br />03 �31 �ZrJi (�
<br />Architect Name - RYAN M FAUST
<br />Architect Number - AR97905
<br />THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TO WHICH
<br />THEY ARE AFFIXED AND WE EXPRESSLY DISCLAIM ANY RESPONSIBIUTY FOR
<br />ALL OTHER PLANS, SPECIFICATIONS, ESTIMATES, REPORTS OR OTHER
<br />DOCUMENTS OR INSTRUMENTS RELATING TO OR INTENDED TO BE USED
<br />FOR ANY PART OR PARTS OF THE PROJECT.
<br />REVISIONS
<br />NO. DATE DESCRIPTION
<br />A PROJECT NUMBER:
<br />16-021
<br />RELEASE DATE: 03/31/2016
<br />PLUMBING DETAILS &
<br />SPECIFICATIONS
<br />u
<br />6 5 4 3 2 1
<br />
|