Laserfiche WebLink
l <br />5 I 4 <br />3 <br />2 <br />Ln <br />lD <br />O <br />N <br />M <br />M <br />�I <br />C. <br />L <br />aU <br />E <br />t <br />v <br />,I <br />l0 <br />I <br />a <br />w <br />�I <br />06 <br />v <br />tin <br />c <br />C7 <br />is <br />(D <br />@J <br />LL <br />tri <br />=A <br />a <br />t <br />a <br />v <br />N <br />10 <br />0 <br />N <br />U <br />v <br />a <br />LD <br />0 <br />N <br />PLUMBING SPECIFICATIONS <br />1. INTRODUCTION <br />1.1 THE CONTRACTING FOR INSTALLATION OF PLUMBING SYSTEMS WILL BE ACCOMPLISHED IN THE FIELD AT <br />THE DIVISION LEVEL (IN CASE OF A CONFLICT BETWEEN THIS SPECIFICATION AND THE CONTRACT DOCUMENTS <br />AND/OR WRITTEN OR VERBAL INSTRUCTIONS PROVIDED BY THE CONSTRUCTION MANAGER, THE DIVISION'S <br />INSTRUCTIONS SHALL PREVAIL). HEREAFTER IN THIS SPECIFICATION, THE WORD "PLUMBING CONTRACTOR" <br />SHALL REFER TO THE INSTALLING PLUMBING CONTRACTOR AND "OWNER" SHALL REFER TO 7-ELEVEN. <br />1.2 SCOPE OF WORK <br />1.2.1 PLUMBING CONTRACTOR SHALL FURNISH AND INSTALL PLUMBING FIXTURES, ACCESSORIES, AND <br />ATTENDANT PIPING AS STATED HEREIN. REFER TO THE PLUMBING PLANS AND THE "MATERIALS" PORTION OF <br />THIS SPECIFICATION FOR EQUIPMENT TO BE FURNISHED. EXACT LOCATION OF ALL EQUIPMENT SHALL BE <br />DETERMINED BY REFERENCE TO THE PLANS AND MEASUREMENTS AT THE BUILDING SITE AND IN COOPERATION <br />WITH OTHER CONTRACTORS AND IN ALL CASES SHALL BE SUBJECT TO THE OWNERS APPROVAL. <br />1.3 GENERAL <br />1.3.1 ALL SAFETY PRECAUTIONS SHALL BE TAKEN TO PROTECT PERSON, PROPERTY, AND EQUIPMENT. <br />1.3.2 NO COMPENSATION FOR WORK PERFORMED OVER AND ABOVE PROJECTS SUM SHALL BE <br />ALLOWED DUE TO CONDITIONS WITH WHICH THE PLUMBING CONTRACTOR SHOULD HAVE BEEN FAMILIAR. <br />1.3.3 ANY DEVIATION BY PLUMBING CONTRACTOR FROM THE PLANS AND SPECIFICATIONS, OR ANY <br />SUBSTITUTION OF EQUIPMENT FROM THAT SPECIFIED, SHALL FIRST RECEIVE OWNER'S APPROVAL. <br />1.4 OPERATIONS AND INSTALLATION <br />1.4.1 ALL DELIVERIES TO COINCIDE WITH CONSTRUCTION SCHEDULE. MATERIALS SHALL BE STORED <br />WHERE AND/OR AS DIRECTED BY THE GENERAL CONTRACTOR. STORAGE MUST BE IN SUCH A PLACE AS TO <br />AVOID ACCIDENTAL MUTILATION BY EQUIPMENT BY ANY CONTRACTOR WHILE PERFORMING THEIR WORK, <br />WHETHER ON SITE OR OFF. <br />1.4.2 ALL UNDER FLOOR PIPING SHALL BE INSTALLED IN CONJUNCTION WITH THE GENERAL <br />CONTRACTOR'S WORK SCHEDULE. NO UNDERGROUND WORK SHALL BE COVERED OR ENCLOSED UNTIL IT HAS <br />BEEN INSPECTED AND TESTED. <br />1.4.3 PLUMBING CONTRACTOR SHALL DO THE NECESSARY TRENCHING, SHORING AND BACKFILLING <br />REQUIRED TO FULFILL HIS CONTRACT. BOTTOMS OF TRENCHES SHALL BE CUT TO GRADE. <br />1.4.4 ALL OPENINGS AND STUB -UP FOR PLUMBING PIPING AND FIXTURES SHALL BE CAREFULLY LOCATED <br />AND COORDINATED, OTHERWISE, PLUMBING CONTRACTOR SHALL CUT NEW OPENINGS AT HIS OWN EXPENSE, <br />AND REIMBURSE OTHER SUBCONTRACTORS FOR ANY DAMAGE DONE TO THEIR WORK. <br />1.5 CODE AND PERMIT REQUIREMENTS <br />1.5.1 ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE LOCAL LAWS, REGULATIONS, <br />ORDINANCES, STATUTES, AND CODES, WHICH SHALL BE DELINEATED, AND ALL MODIFICATIONS REQUIRED BY <br />THE INSPECTION AUTHORITIES SHALL BE MADE BY PLUMBING CONTRACTOR WITHOUT ADDITIONAL COST TO <br />OWNER. <br />1.5.2 PLUMBING CONTRACTOR SHALL OBTAIN, PAY FOR AND FURNISH ALL PERMITS REQUIRED BY LOCAL <br />OR STATE ORDINANCES OR CODES, AND THESE COSTS SHALL BE STATED SEPARATELY ON THE PLUMBING <br />CONTRACTOR'S INVOICES. <br />2. MATERIALS <br />2.1 DOMESTIC WATER PIPING: <br />2.1.1 ABOVE AND BELOW GRADE WATER PIPING SHALL BE PEX TUBING CONFORMING TO ASTM F877 <br />CROSS -LINKED POLYETHYLENE TUBING HOT AND COLD WATER DISTRIBUTION SYSTEMS, ASTM F876 CROSS - <br />LINKED POLYETHYLENE TUBE, ASTM F1807 FITTING AND ASTM F2159 FITTINGS, COMPLY WITH NSF STANDARD <br />14 AND 61. PEX TUBING SHALL BE WATTS WATERPEX CROSS -LINKED POLYETHYLENE OR EQUAL. ALL PEX <br />TUBING BELOW GRADE SHALL BE SLEEVED WITH PVC PIPE. <br />2.1.1.1 FITTINGS: FITTINGS SHALL BE MECHANICAL CRIMP FITTINGS IN COMPLIANCE WITH ASTM F1807 <br />AND F2159. PEX FITTINGS SHALL BE WATTS BRASS CRIMPRING FITTINGS USING EITHER WATTS COPPER <br />CRIMPRING OR STAINLESS STEEL CINCHCLAMP OR EQUAL. INSTALLED IN ACCORDANCE WITH MANUFACTURER'S <br />RECOMMENDATIONS. <br />2.2 FILTERED WATER PIPING: <br />2.2.1 ABOVE AND BELOW GRADE FILTERED WATER PIPING SHALL BE CPVC TUBING CONFORMING TO <br />ASTM D2846 AND CSA B137 CHLORINATED POLY (VINYL CHLORIDE) PLASTIC HOT AND COLD WATER <br />DISTRIBUTION SYSTEMS, ASTM D1784 RIGID AND CHLORINATED PVC COMPOUNDS, ASTM F493 SOLVENT <br />CEMENTS, COMPLY WITH NSF STANDARD 14 AND 61. CPVC TUBING SHALL BE FLOWGUARD GOLD CPVC CTS OR <br />EQUAL. <br />2.2.1.1 FITTINGS: FITTINGS SHALL BE SOCKET TYPE JOINTS IN COMPLIANCE WITH ASTM D2846 AND <br />CSA B137. CPVC FITTINGS SHALL BE FLOWGUARD GOLD CPVC CTS FITTINGS OR EQUAL. JOINING MATERIAL <br />SHALL BE ASTM F493 SOLVENT CEMENT. INSTALLED IN ACCORDANCE WITH MANUFACTURER'S <br />RECOMMENDATIONS. <br />2.3 SOIL, WASTE AND VENT PIPES: <br />2.3.1 ABOVE AND BELOW GRADE SOIL, WASTE AND VENT PIPING SHALL BE PVC PLASTIC, SCHEDULE 40 <br />DWV PIPE CONFORMING TO ASTM D2665 WITH PLAIN ENDS. CELLULAR (FOAM) CORE PVC NOT ALLOWED. <br />INSTALL PER ASTM D2665 AND ASTM D2321. <br />2.3.1.1 FITTINGS SHALL BE PVC SOCKET -TYPE DWV PIPE FITTINGS; ASTM D2665 MADE TO ASTM D3311 <br />DRAIN, WASTE AND VENT PATTERNS. <br />2.4 FLASHING: <br />SHEET LEAD. 4 POUNDS PER SQUARE FOOT, MINIMUM. <br />rev 02/01 /13 <br />CONTI <br />MODU <br />TI <br />LAVSHROUD <br />N.T.S. <br />2.5 INSULATION: <br />2.5.1 DOMESTIC COLD WATER (WITHIN BUILDING): <br />COPPER PIPE: NOT USED. <br />PEX TUBING: NO INSULATION REQUIRED. <br />EXCEPTION: FOR NON -RECIRCULATING HOT WATER SYSTEM, PROVIDE 1/2" WALL <br />ONE-PIECE FIBERGLASS COVERING HAVING A CONDUCTIVITY NOT EXCEEDING 0.27 WITH FIRE <br />RESISTANTJACKET WITH SELF-SEALING LAP TO PROVIDE A CONTINUOUS VAPOR BARRIER BY <br />CERTAINTEED, OWENS-CORNING OR ARMSTRONG ON THE FIRST 8 FEET OF INLET PIPING AT <br />WATER HEATER. <br />CPVC TUBING: NO INSULATION REQUIRED. <br />2.5.2 DOMESTIC HOT WATER: <br />COPPER PIPE: NOT USED. <br />PEX TUBING: 1/2" WALL ONE-PIECE FIBERGLASS COVERING HAVING A <br />CONDUCTIVITY NOT EXCEEDING 0.27 WITH FIRE RESISTANT JACKET WITH SELF-SEALING LAP <br />TO PROVIDE A CONTINUOUS VAPOR BARRIER BY CERTAINTEED, OWENS-CORNING OR <br />ARMSTRONG. (SEE BELOW FOR PLUMBING FITTING INSULATION REQUIREMENTS) <br />FOR HOT WATER PIPING BEING SERVED BY SYSTEM WITH RECIRCULATING PUMP, <br />PROVIDE 1" WALL ONE-PIECE FIBERGLASS COVERING HAVING A CONDUCTIVITY NOT <br />EXCEEDING 0.27 WITH FIRE RESISTANT JACKET WITH SELF-SEALING LAP TO PROVIDE A <br />CONTINUOUS VAPOR BARRIER BY CERTAINTEED, OWENS-CORNING OR ARMSTRONG. (SEE <br />BELOW FOR PLUMBING FITTING INSULATION REQUIREMENTS) <br />2.5.3 INDIRECT AND CONDENSATE DRAIN PIPING (WITHIN BUILDING): <br />COPPER PIPE: PROVIDE 1" FLEXIBLE UNICELLULAR INSULATION BY ARMACELL. <br />PVC PIPING: NO INSULATION REQUIRED. <br />FOR PIPING AT HANGERS, PROVIDE 8" LONG SECTIONS OF HIGH DENSITY, HIGH TEMPERATURE <br />CALCIUM SILICATE BY JOHNS-MANVILLE, FIBERGLASS BY KNAUF, OR 8" LONG STYROFOAM <br />BILLETS BY DOW. INSULATION SHALL BE CONTINUOUS ALONG THE PIPE SURFACE, EXCEPT <br />AT VALVES, UNIONS, AND WHERE PIPING IS EXPOSED AT FIXTURES. <br />FOR HOT AND COLD WATER PIPING EXPOSED, CONCEALED IN WALLS, AND/OR INSTALLED <br />INSIDE MASONRY UNITS OF WALLS, COVER FITTINGS WITH ZESTON, KNAUF, OR EQUAL ONE- <br />PIECE PVC PREMOLDED INSULATING COVERS. FITTING COVERS, JACKETS AND ADHESIVES <br />SHALL NOT EXCEED FLAME SPREAD RATING OF 25 AND SMOKE DEVELOPMENT RATING OF <br />50 PER ASTM E84. AT ALL ELBOWS AND TEES, FILL VOIDS BETWEEN COVERS AND PIPING <br />WITH FIBERGLASS INSULATION AND TAPE JOINTS. INSTALL PIPE INSULATION IN COMPLIANCE <br />WITH MANUFACTURER'S RECOMMENDATIONS. WHERE PREMOLDED INSULATING FITTINGS <br />ARE NOT APPROVED BY LOCAL AUTHORITIES, MITER INSULATION AT FITTINGS. <br />2.6 INDIRECT AND CONDENSATE DRAIN LINES: <br />PROVIDE HARD DRAWN, TYPE "M" OR "L" COPPER PIPE FOR ALL CONDENSATE DRAIN PIPING <br />FROM COOLER AND FREEZER EVAPORATORS. PROVIDE HEAT TRACE FOR ALL CONDENSATE <br />DRAIN PIPING LOCATED IN FREEZERS, AND ROUTE TO FLOOR DRAIN IN BUILDING. <br />PROVIDE PVC PIPE FOR ALL OTHER INDIRECT AND CONDENSATE DRAIN PIPING FROM HVAC, <br />PLUMBING, AND BEVERAGE EQUIPMENT, AND ROUTE TO FLOOR DRAIN IN BUILDING. <br />3. TESTING AND INSPECTION: <br />3.1 THE ENTIRE PLUMBING SYSTEM SHALL BE TESTED BEFORE COVERING OR ENCLOSING. <br />3.2 INSPECTION: <br />WORK SHALL BE INSPECTED FOR COMPLIANCE WITH CODES, ORDINANCES, REGULATIONS <br />AND ADHERENCE TO CONTRACT DOCUMENTS. PLUMBING CONTRACTOR SHALL SUPPLY <br />OWNER WITH SIGNED FORMS OR PROOF OF ACCEPTANCE BY THE LOCAL AUTHORITY <br />BEFORE CONTINUING FROM ONE STAGE TO ANOTHER. FINAL APPROVAL SHALL BE OBTAINED <br />BEFORE FINAL PAYMENT IS MADE ON THE CONTRACT. <br />3.3 PERFORMANCE REQUIRED: <br />3.3.1 PLUMBING CONTRACTOR SHALL INSTALL ALL PLUMBING SYSTEMS LEAK FREE <br />AND AS PER PLANS AND SPECIFICATIONS. <br />3.3.2 ALL EXPOSED EQUIPMENT SHALL BE INSTALLED IN A WORKMANLIKE MANNER <br />AND WILL BE SUBJECT TO ARCHITECTURAL INSPECTION FOR AESTHETIC APPEARANCE. <br />4. CUTTING AND CLEANING: <br />4.1 PLUMBING CONTRACTOR SHALL CLEAN ENTIRE SITE OF DEBRIS, TOOLS AND <br />EQUIPMENT RELATED TO THIS WORK. <br />4.2 PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING <br />OF HIS WORK WHICH MAY BE REQUIRED TO RELIEVE THE WORK OF OTHER CONTRACTORS. <br />5. GUARANTEES: <br />5.1 PLUMBING CONTRACTOR SHALL GUARANTEE ALL OF THE WORK AND THE COMPLETE <br />OPERATION WILL BE FREE FROM DEFECTS IN WORKMANSHIP AND MATERIALS. PLUMBING <br />CONTRACTOR AGREES TO REPLACE, WITHOUT EXPENSE TO THE OWNER, ANY PART OF HIS <br />WORK ON THIS INSTALLATION WHICH PROVES TO BE DEFECTIVE WITHIN ONE (1) YEAR AFTER <br />ACCEPTANCE OF THE WORK. <br />HEAT TRAP - <br />DOWN TO MID <br />POINT OF <br />HEATER TANK, <br />TYP. OF 2. <br />SET DISCHARGE <br />TEMPERATURE <br />TO 120 DEG. F <br />SHELF TO SUPPORT <br />WEIGHT OF 650 LBS. <br />I r <br />1 0 <br />LO <br />I I I <br />I <br />I 1 I <br />I I <br />I I 1 <br />I I I <br />1 1 <br />I I 1 <br />I 1 WATER I <br />1 1 1 1 <br />1 HEATER <br />I <br />I <br />I <br />WATER H EAT E R <br />N.T.S. <br />FINISH FLOOR <br />S3 <br />CO <br />FS <br />3-COMPARTMENT SINK WITH FLOOR SIN <br />N.T.S. <br />HW SUPPLY TO SYSTEM <br />RE: PLAN. <br />BALL VALVE, TYP. <br />CW SUPPLY TO WATER <br />HEATER. RE: PLAN <br />SECONDARY BY-PASS TO BE - <br />INSTALLED ONLY WHEN <br />BOOSTER PUMP IS INSTALLED <br />OPTIONAL BOOSTER PUMP, - <br />REF NOTE #8 BELOW <br />ASSE 1013 COMPLIANT <br />CASH ACME RP500 LEAD <br />FREE RPZ BACKFLOW <br />PREVENTER, DO NOT <br />MOUNT HIGHER THAN 5'4" <br />3/4" SUPPLY <br />3/4" Y-STRAINER <br />ROUTE DISCHARGE <br />TO AN APPROVED <br />RECEPTOR <br />3/4" FLEXIBLE <br />TUBING 10 FT <br />REQUIRED <br />3/4" BALL VALVE <br />SET SURGE <br />TANK ON <br />SHELF <br />3/4" <br />BY-PASS <br />NOTE: <br />CORD FROM <br />BOOSTER PUMP <br />TO PLUG. <br />COARSE <br />FILTER <br />DRAIN 3-COMP SINK <br />INDIRECTLY TO FLOOR <br />SINK WITH AIR GAP 1.5X <br />DIAMETER OF DRAIN <br />PIPE <br />3/4" <br />PLUG <br />XC2I IXCzI IXCzI IXC2 <br />o Z <br />co <br />TAG <br />POST <br />MIX <br />TAG ICE <br />MAKER <br />SS -IMF <br />PRESSURE ❑ <br />REDUCING <br />VALVE, SS -IMF <br />REF NOTE <br />#8 BELOW <br />SPRING -LOADED <br />CHECK VALVE <br />REF. 1/P1.1 <br />FOR ROUTING <br />DIAGRAM <br />ROUTE OVER FLOW TO AN <br />APPROVED RECEPTOR <br />CPVC BEVERAGE TUBING <br />3/4" REINFORCED PLASTIC LINE TO <br />SLURPEE ABOVE CEILING. PROVIDE <br />WILKINS 740 BACKFLOW PREVENTER <br />CONFORMING TO ASSE 1022. <br />TAG SLURPEE <br />3/4" REINFORCED PLASTIC LINE TO <br />POST MIX ABOVE CEILING. PROVIDE <br />WILKINS 740 BACKFLOW PREVENTER <br />CONFORMING TO ASSE 1022. <br />U aie; <br />106 N 37TH STREET, SUITE C <br />ROGERS, ARKANSAS 72756 <br />W W W. BATESARCH ITECTS.COM <br />TEL: 479.633.8165 <br />Copyright 2016 Bates & Associates, Architects <br />E Drawings and Specifications as instruments of service are and shall remain <br />the property of the Architect. They are not to be used on other projects or <br />extensions to this project except by agreement in writing and with <br />appropriate compensation to the Architect. <br />Contractor is responsible for confirming and correlating dimensions at job <br />site; the Architect will not be responsible for construction means, methods, <br />techniques, sequences or procedures, or for safety precautions and <br />programs in connection with the project. <br />SITE/STORE #: <br />1037728 <br />CONSTRUCTION MANAGER <br />CREIGHTON CONST. & MGMT <br />900 SW PINE ISLAND ROAD, SUITE 202, <br />CAPE CORAL, FL 33991 <br />DEVELOPER CONTACT <br />TENANT <br />7-ELEVEN INC. <br />1722 ROUTH ST. SUITE 1000 DALLAS, TX 75201 <br />DANIELTUBB <br />STRUCTURAL CONSULTANT <br />ARCH CONSULTING ENGINEERS <br />510 S CONGRESS SUITE B-100 AUSTIN, TX 78704 <br />JUSTIN BILLODEAU <br />MEP CONSULTANT <br />WALTER J. FITZGERALD, P.E. 24636 <br />2566 NEBRASKA AVE. APT 443 <br />PALM HARBOR, FL 34684 PH (813) 785-7526 <br />■ I� <br />C <br />1/2" LINE TO ICE MAKER ABOVE CEILING. <br />PROVIDE WILKINS 740 BACKFLOW <br />PREVENTER CONFORMING TO ASSE 1022 <br />-REGULATOR @ ICE MAKER <br />TO < 60 PSI - <br />TAG COFFEE <br />** 3/4" LINE TO COFFEE BREWER(S), TEA <br />BREWER, AND CAPPUCCINO MACHINE:. <br />PROVIDE WILKINS 740 BACKFLOW <br />PREVENTER CONFORMING TO ASSE 1022. <br />SHUT OFF VALVE (TYP.) <br />3/4" LINE SPLITS INTO 1/2" LINES WITH <br />SHUT OFF VALVES AT EACH COFFEE <br />BREWER, TEA BREWER, AND CAPPUCCINO <br />MACHINE. <br />EVERPURE FILTER SYSTEM MODEL <br />EXPANSION TANK. RE: <br />WATER HEATER SCHEDULE. <br />FLEXIBLE CONNECTOR TYP <br />1. WATER SUPPLY MUST BE 3/4" INCH. <br />2. WATER SHUT-OFF VALVE SHALL BE "BALL LOCK" TYPE. POSITIVE ON -OFF. <br />3. DRAIN MUST BE PROVIDED TO PERMIT FLUSHING OF NEW FILTERS. <br />T & P RELIEF <br />4. WATER FOR ICE MAKERS, COFFEE MAKERS, AND CAPPUCCINO MACHINES SHALL BE ROUTED THROUGH THE SS -IMF UNITS. <br />5. WATER FOR FSD AND FCB EQUIPMENT SHOULD NOT BE ROUTED THROUGH THE SS -IMF UNITS (WILL REDUCE CARBONATION). <br />6. XC2(CARBON) FILTERS MUST BE REPLACED IN SETS. <br />GALVANIZED SHEET METAL <br />DRAIN PAN 4" DEEP <br />7. COARSE FILTER AND SS -IMF UNITS MAY BE CHANGED INDIVIDUALLY. <br />8. MINIMUM SUPPLY WATER PRESSURE TO THE FILTER SYSTEM IS 40 PSI. BELOW 40 PSI REQUIRES A PRESSURE BOOSTER PUMP. <br />IF REQUIRED, CONTRACTOR TO PROVIDE SHURFLO WATER BOOSTER MODEL 24VDC WB PUMP, K NEMA 5-15US (PART # 94-189-000) WITH <br />1/2" MALE CONNECTIONS. ALSO HONEYWELL PRESSURE REDUCING VALVE MODEL DSO5C1030 (SET AT 55 PSI) INSTALLED AFTER TEE TO <br />SURGE TANK AND BEFORE FIRST TEE TO BEVERAGE EQUIPMENT. <br />PIPE FULL SIZE <br />WITH AIR GAP <br />EVERPU RE WATER PURIFICATION SYSTEM <br />1 <br />N.T.S. <br />N <br />C� <br />G <br />N <br />0 <br />V <br />ui <br />W <br />p <br />06 <br />U) <br />M <br />O <br />O <br />CM <br />M <br />- <br />o <br />M <br />CO <br />LL <br />z <br />O <br />� <br />Li_ <br />z <br />I- <br />W <br />(J) <br />J <br />O <br />J <br />Q <br />W <br />LU <br />� <br />= <br />U <br />z <br />Q <br />o0 <br />W <br />= <br />z <br />O <br />Cn <br />v <br />J <br />W <br />o <br />cn <br />I- <br />W <br />z <br />w <br />Q <br />I` <br />N <br />= <br />101- <br />U <br />W <br />Cn <br />U <br />O <br />`\\%111111111//7/�/ <br />B�IFIC,9� <br />. VA nl0%A':, <br />?mTSTATE Wff lz;z <br />sloe Va. <br />sees <br />03 �31 �ZrJi (� <br />Architect Name - RYAN M FAUST <br />Architect Number - AR97905 <br />THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENT TO WHICH <br />THEY ARE AFFIXED AND WE EXPRESSLY DISCLAIM ANY RESPONSIBIUTY FOR <br />ALL OTHER PLANS, SPECIFICATIONS, ESTIMATES, REPORTS OR OTHER <br />DOCUMENTS OR INSTRUMENTS RELATING TO OR INTENDED TO BE USED <br />FOR ANY PART OR PARTS OF THE PROJECT. <br />REVISIONS <br />NO. DATE DESCRIPTION <br />A PROJECT NUMBER: <br />16-021 <br />RELEASE DATE: 03/31/2016 <br />PLUMBING DETAILS & <br />SPECIFICATIONS <br />u <br />6 5 4 3 2 1 <br />