6 5 4
<br />3
<br />2 I 1
<br />1
<br />M
<br />a
<br />N
<br />v
<br />L ri
<br />N
<br />rn
<br />ID
<br />0
<br />N
<br />0
<br />en
<br />en
<br />EI
<br />CI
<br />O
<br />u
<br />fo
<br />Cr
<br />fa
<br />a�
<br />Q
<br />f71
<br />0
<br />n
<br />M
<br />0
<br />Cr
<br />Y
<br />�I B
<br />I
<br />o-
<br />w
<br />LI
<br />a�
<br />n0
<br />c
<br />tJ
<br />f�
<br />m
<br />J
<br />LL
<br />s
<br />L
<br />N
<br />N
<br />00
<br />0
<br />W
<br />i
<br />to
<br />a�
<br />'o
<br />L
<br />D_
<br />11.0
<br />N
<br />i
<br />E
<br />fo
<br />LA
<br />c
<br />L
<br />O
<br />3
<br />X
<br />O
<br />.G
<br />a
<br />O
<br />L
<br />c
<br />a�
<br />Y
<br />to
<br />L
<br />Qi
<br />U
<br />ELECTRICAL SPECIFICATION
<br />INTRODUCTION
<br />THE CONTRACTING FOR INSTALLATION OF THE ELECTRICAL SYSTEM WILL BE ACCOMPLISHED IN THE FIELD AT THE
<br />DIVISION LEVEL. THESE SPECIFICATIONS ARE TO AID IN PREPARATION OF DIVISION LEVEL STORE PLANS AND CONTRACT
<br />DOCUMENTS. IN CASE OF A CONFLICT BETWEEN THIS SPECIFICATION AND THE CONTRACT DOCUMENTS PROVIDED BY
<br />THE DIVISION CONSTRUCTION MANAGER, THE DIVISION'S PLANS AND SPECIFICATIONS SHALL PREVAIL.
<br />DEFINITIONS
<br />THE FOLLOWING DEFINITIONS APPLY TO THIS PROJECT.
<br />FURNISH - TO SUPPLY THE MATERIAL NECESSARY TO PERFORM THE TASK.
<br />INSTALL - TO SUPPLY THE LABOR NECESSARY TO COMPLETE THE TASK.
<br />PROVIDE - TO FURNISH AND INSTALL MATERIAL AND LABOR TO COMPLETE THE TASK.
<br />1. SCOPE
<br />1.1 E.C. TO PROVIDE ALL LABOR, MATERIALS AND EQUIPMENT (U.N.O.) REQUIRED TO EXECUTE WORK PER NEC AND
<br />ALL APPLICABLE ELECTRICAL CODES IN FORCE AT THE TIME OF PROJECT COMPLETION.
<br />1.2 THIS WORK INCLUDES, BUT IS NOT LIMITED TO: ELECTRICAL SERVICE AND DISTRIBUTION SYSTEMS, PANELBOARDS,
<br />DISCONNECT SWITCHES, LIGHTING FIXTURES, POWER AND CONTROL WIRING WITH FINAL CONNECTIONS TO ALL
<br />EQUIPMENT REQUIRED FOR A COMPLETE SYSTEM.
<br />1.3 E.C. TO VERIFY TYPE OF POWER SERVICE AVAILABLE (UNDERGROUND OR OVERHEAD) AND
<br />MAXIMUM SHORT CIRCUIT CURRENT PRIOR TO SUBMITTING A PROPOSAL.
<br />1.4 E.C. TO VERIFY TYPE OF TELEPHONE SERVICE AVAILABLE (UNDERGROUND OR OVERHEAD)
<br />PRIOR TO SUBMITTING A PROPOSAL.
<br />1.5 E.C. TO VERIFY METERING, IN ACCORDANCE WITH LOCAL ELECTRIC UTILITY COMPANY REQUIREMENTS, FOR
<br />GENERAL SERVICE SCHEDULE.
<br />1.6 E.C. SHALL INSTALL 3-PHASE 4-WIRE 120/208V WYE SERVICE. IF FOR ANY REASON, THIS IS
<br />NOT AVAILABLE, THE E.C. SHALL NOTIFY 7-ELEVEN, IN WRITING PRIOR TO SUBMITTING OF
<br />PROPOSAL (U.N.O.).
<br />1.7 E.C. TO PROVIDE PANELBOARD NAMEPLATES. PROVIDE LAMINATED PLASTIC NAMEPLATES WITH 3/4 INCH
<br />MINIMUM CONTRASTING -COLOR ENGRAVED LETTERS IDENTIFYING EACH PANELBOARD.
<br />2. INSTALLATION
<br />2.1 THE INSTALLATION SHALL COMPLY WITH ALL LAWS IN EFFECT AT THE TIME OF CONSTRUCTION APPLYING TO
<br />ELECTRICAL INSTALLATION, AND WITH THE REGULATIONS OF THE NEC, WHERE SUCH REGULATIONS DO NOT
<br />CONFLICT WITH THE LAWS IN EFFECT, AND WITH THE PUBLIC UTILITY COMPANY FURNISHING THE SERVICE.
<br />2.1.1 THE E.C. SHALL UPGRADE THESE SPECIFICATIONS AS REQUIRED TO MEET COMPLIANCE WITH ALL
<br />APPLICABLE CODES IN EFFECT; HOWEVER, WHERE THESE SPECIFICATIONS MAKE STIPULATIONS OVER AND
<br />ABOVE THE MINIMUM REQUIREMENTS OF APPLICABLE CODES, THE CONTRACTOR SHALL NOT DOWN -GRADE
<br />THESE SPECIFICATIONS TO MINIMUM CODE REQUIREMENTS WITHOUT PRIOR WRITTEN APPROVAL FROM
<br />7-ELEVEN.
<br />2.2 E.C. SHALL PROVIDE ALL REQUIRED ELECTRICAL CONDUIT AND WIRING FOR ALL MOTORS, MOTOR STARTERS
<br />AND ELECTRICAL CONTROLS, U.N.O. E.C. SHALL MAKE ALL LINE VOLTAGE ELECTRICAL CONNECTIONS AS
<br />REQUIRED FOR HVAC SYSTEMS.
<br />2.3 E.C. SHALL INSTALL THE CONNECTIONS TO ALL RECEPTACLES, SALES COUNTERS,
<br />GONDOLAS AND FINAL CONNECTIONS TO ALL FIXTURES AFTER FIXTURES ARE IN PLACE.
<br />2.4 E.C. SHALL VERIFY EXACT LOCATION OF ALL SIGNS WITH 7-ELEVEN REPRESENTATIVE. PROVIDE ALL CONDUITS AND
<br />WIRES WITH STUB -UPS AS DIRECTED BY THE 7-ELEVEN CORPORATION AND INSTALL FINAL CONNECTIONS AS
<br />REQUIRED.
<br />2.5 WIRING
<br />2.5.1 ALL WORK SHALL BE COMPLETED IN A NEAT AND WORKMAN -LIKE MANNER. THE E.C. SHALL
<br />CONTACT THE 7-ELEVEN CORPORATION REPRESENTATIVE SHOULD THIS PLAN REQUIRE MODIFICATION TO
<br />COMPLY WITH LOCAL CODES.
<br />2.5.2 ALL CONDUCTORS SHALL BE RUN IN APPROVED METALLIC RACEWAY OR CONDUIT AND SHALL BE UNIFORMLY
<br />COLOR CODED THROUGHOUT THE ENTIRE SYSTEM. SPLICES, TAPS, AND TERMINALS SHALL BE MADE ONLY IN
<br />J BOXES, OUTLET BOXES AND PANELBOARDS.
<br />2.5.3 THE E.C. SHALL ENSURE THE CONDUCTORS UTILIZED ARE IN KEEPING WITH GOOD PRACTICE FOR THE
<br />CIRCUIT/PROTECTIVE DEVICES EMPLOYED. THE NEUTRAL CONDUCTOR (WHERE USED) SHALL HAVE
<br />THE SAME AMPACITY AS THE ASSOCIATED PHASE.
<br />2.5.4 THE E.C. SHALL ENSURE THAT CIRCUIT AMPACITY AND SHORT CIRCUIT/OVERLOAD PROTECTION IS
<br />APPROPRIATE FOR THE EQUIPMENT BEING INSTALLED. UL LISTING CONDITIONS SHALL BE OBSERVED.
<br />2.5.5 TO COMPLY WITH NEC/UL LISTING CONDITIONS, ROOFTOP UNITS MAYBE SHOWN WITH FUSED
<br />DISCONNECT SWITCHES:
<br />2.5.5.1 ALL FUSES SERVING MOTOR LOADS WILL BE OF THE DUAL ELEMENT TYPE.
<br />2.5.5.2 DUE TO DIFFERENT INTERRUPTING CHARACTERISTICS, PANELBOARD CIRCUIT BREAKERS MAY BE
<br />RATED HIGHER THAN THE DUAL ELEMENT FUSES THEY SUPPLY TO ENSURE SUFFICIENT STARTING
<br />CURRENT.
<br />2.5.6 WIRE SIZES LISTED ARE MINIMUM. CONDUCTORS SHALL BE SELECTED SUCH THAT THE MAXIMUM VOLTAGE
<br />DROP (AT FULL LOAD AMPS) SHALL NOT EXCEED THE FOLLOWING GUIDELINES:
<br />2.5.6.1 PANEL FEEDERS --2% OF CIRCUIT VOLTAGE AT SERVICE.
<br />2.5.6.2 ALL BRANCH LOADS--3%o OF CIRCUIT VOLTAGE AT SERVICE.
<br />2.5.6.3 TOTAL VOLTAGE DROP (SERVICE TO LOAD)--5% OF CIRCUIT VOLTAGE AT SERVICE.
<br />2.5.7 SPECIAL NOTES ON SERVICES:
<br />2.5.7.1 120/208V, 3-PHASE, WYE
<br />THE E.C. SHALL CHECK THE REQUIREMENTS OF ALL EQUIPMENT AND WILL INSTALL
<br />AUTOTRANSFORMERS (BUCK AND BOOST TRANSFORMERS) AS REQUIRED.
<br />2.5.8 THE E.C. SHALL PROVIDE DEDICATED CIRCUITS WITH ISOLATED GROUND FOR ALL CIRCUITS
<br />ORIGINATING FROM PANEL S. THE PURITY OF THE ISOLATED GROUND SHALL BE MAINTAINED BY USING ONLY
<br />INSULATED GROUNDING CONDUCTORS AND ISOLATED GROUND. THE GROUNDING CONDUCTOR FOR THE.
<br />ISOLATED GROUND SHALL NOT MAKE ELECTRICAL CONTACT WITH THE COMMON EQUIPMENT GROUND OR
<br />ANY ITEM CONNECTED TO THE COMMON EQUIPMENT GROUND (I.E. CONDUITS, "J"-BOXES, SWITCH BOXES,
<br />ETC.) AT ANY POINT OTHER THAN AT THE SERVICE GROUNDING TERMINAL. SEE NEC 250.96(B).
<br />2.6 WHEN REQUIRED, E.C. TO ENSURE INTEGRITY OF FIRE RATED WALLS WHERE ELECTRICAL EQUIPMENT
<br />PENETRATES WALLS. SEAL PER SPECIFICATIONS FOR FIRE STOPPING.
<br />2.7 ALL PENETRATIONS THROUGH EXTERIOR WALLS ARE TO BE MADE WITH LB CONDULETS OF THE APPROPRIATE
<br />SIZE PER NEC. ALL PENETRATIONS ARE TO BE SEALED PER NEC. HORIZONTAL OR VERTICAL SUPPORTS FOR
<br />RACEWAYS ARE TO COMPLY WITH NEC. WIRE TIES ARE NOT TO BE USED, U.N.O.
<br />3. MATERIALS:
<br />ALL MATERIALS AND DEVICES SHALL BE UL APPROVED AND SHALL CONFORM TO THE STANDARDS OF NEMA, NEC,
<br />AND IEEE.
<br />3.1 LIGHT FIXTURES: PER SCHEDULE ON ELECTRICAL PLAN.
<br />3.2 RACEWAYS: ALL CONDUIT SHALL BE EITHER RIGID STEEL OR ELECTRICAL METALLIC TUBING (EMT). FOR IN SLAB
<br />AND UNDERGROUND INSTALLATIONS, PVC OR RIGID STEEL SHALL BE USED. REFER TO FUELING SHEETS FOR
<br />APPROVED FUELING SYSTEMS CONDUIT. INSTALL PER NEC.
<br />3.3 FITTINGS AND BUSHINGS:ALL REQUIRED BENDS, FITTINGS, JUNCTION BOXES, ETC., WHETHER OR NOT THEY ARE
<br />SHOWN ON THE DRAWINGS, SHALL BE INSTALLED TO SATISFY ALL APPLICABLE ELECTRICAL CODES AND STANDARDS
<br />OF GOOD PRACTICE. ALL CONDUCTORS ENTERING/LEAVING A CONDUIT OR RACEWAY SHALL BE AFFORDED
<br />ABRASION PROTECTION BY AN ADEQUATE BUSHING OR OTHER APPROVED MEANS.
<br />3.4 OUTLET BOXES: SHALL BE STANDARD, STAMPED GALVANIZED STEEL BOXES; "J"-BOXES AND OUTLET BOXES USED AS
<br />A PULL BOX SHALL BE PROVIDED WITH A SUITABLE COVER OF SAME MATERIAL AS BOX.
<br />3.5 WIRING DEVICES:
<br />INSTALL ON EACH AND EVERY OUTLET BOX, A WIRING DEVICE AND/OR COVERPLATE, ALL AS INDICATED BY SYMBOL
<br />ON THE DRAWINGS.
<br />3.5.1 WALL SWITCHES:
<br />3.5.1.1 SINGLE POLE SWITCHES:
<br />SINGLE POLE WALL SWITCHES SHALL BE SIMILAR AND EQUIVALENT; TO "LEVITON"
<br />#CS120-2W 20A, 120-277VAC TOGGLE SWITCH (WHITE) WITH COVERPLATE FOR SINGLE
<br />GANG OR (WHITE) COVERPLATE FOR DOUBLE GANG.
<br />3.5.1.2 3-WAY SWITCHES:
<br />3-WAY SWITCHES SHALL BE SIMILAR AND EQUIVALENT TO "BRYANT" #4503-1 20A,
<br />120-277VAC 3-WAY SWITCH (WHITE HANDLE) AND (WHITE) COVERPLATE FOR
<br />SINGLE GANG OR (WHITE) COVERPLATE FOR DOUBLE GANG.
<br />3.5.1.3 SINGLE THROW, DOUBLE POLE EVAPORATOR SWITCH
<br />SINGLE THROW, DOUBLE POLE SWITCHES SHALL BE SIMILAR AND EQUIVALENT TO "BRYANT"
<br />#30322D 120-600VAC NEMA 3R ENCLOSED AC MANUAL MOTOR CONTROLLER/DISCONNECT.
<br />3.5.2 NOT USED
<br />3.5.3 CONVENIENCE OUTLET (20A):
<br />20A CONVENIENCE OUTLETS SHALL BE SIMILAR AND EQUIVALENT TO "LEVITON" #CR20-W
<br />2 POLE, 3 WIRE, 20 A 125V, DUPLEX GROUNDING RECEPTACLE WITH (WHITE) COVERPLATE
<br />SIMILAR AND EQUIVALENT TO "LEVITON" #88003 FOR SINGLE DUPLEX OR "LEVITON"
<br />#88016 FOR DOUBLE DUPLEX (QUAD).
<br />3.5.4 OUTLET, ISOLATED GROUND (20A):
<br />ISOLATED GROUND OUTLETS SHALL BE SIMILAR AND EQUIVALENT TO "LEVITON" #5362-IG
<br />2 POLE, 3 WIRE, 20A, 125V, SINGLE, ISOLATED GROUND RECEPTACLE (ORANGE) WITH
<br />(WHITE) COVERPLATE.
<br />3.5.5 GFCI CONVENIENCE OUTLETS (INDOOR & OUTDOOR):
<br />OUTDOOR GFCI OUTLETS SHALL BE WEATHER RESISTANT (WR) LABELED, EQUIVALENT TO
<br />THE "LEVITON" #WR899-W 20A OUTLET WITH OUTDOOR COVERPLATE #4500B AND BACK
<br />PLATE #63101. INDOOR GFCI OUTLETS SHALL BE EQUIVALENT TO "LEVITON" #7899-W, 20A
<br />WITH (WHITE) COVERPLATE.
<br />3.5.6 NOT USED
<br />3.5.7 SAFETY SWITCHES:
<br />SAFETY SWITCHES SHALL BE UL APPROVED GENERAL DUTY SAFETY SWITCHES WITH LOCK OFF
<br />HANDLES SIMILAR AND EQUIVALENT TO THOSE MANUFACTURED BY "SQUARE-D". SWITCHES
<br />WILL BE FUSIBLE OR NON -FUSIBLE AS INDICATED ON PLANS/LOCAL CODES AND WILL BE NEMA
<br />TYPE 1 FOR INDOOR (DRY) INSTALLATION OR A NEMA TYPE 313 ENCLOSURE FOR OUTDOOR
<br />INSTALLATION. FUSED SWITCHES SHALL HAVE REJECTION STYLE FUSE HOLDERS TO MATCH
<br />LPN-RK CLASS RK1 FUSES.
<br />3.5.8 NOT USED
<br />3.5.9 PHOTO CELL (OUTDOOR):
<br />ELECTRONIC LIGHT SENSOR SHALL BE THE TORK EPC-1. ENCLOSED IN A LEXAN HOUSING
<br />WITH A 1/2" CONDUIT MOUNTING AND 180 DEGREE SWIVEL. INSTALL IN A WEATHER
<br />TIGHT JUNCTION BOX ON THE ROOF PER MANUFACTURER'S RECOMMENDATIONS. SET
<br />SENSOR TO 100 FOOT-CANDLE LEVEL.
<br />3.5.9.1 LIGHTING CONTROLLER (OUTDOOR LIGHTING CONTROL):
<br />THE LIGHTING CONTROLLER SHALL BE THE TORK LC-200 IN A NEMA 1 ENCLOSURE.
<br />THE LC-200 IS USED IN CONJUNCTION WITH THE TORK EPC-1 PHOTOCELL. LIGHTING
<br />CONTROLLER HAS A 2 TO 100 FOOT-CANDLE LIGHT ADJUSTMENT.
<br />3.5.10 CONTACTOR (OUTDOOR LIGHTING CONTROL):
<br />THE LIGHTING CONTACTORS FOR USE WITH THE OUTDOOR PHOTO CELLS SHALL BE
<br />SIMILAR AND EQUIVALENT TO "SQUARE-D" ELECTRICALLY HELD LIGHTING CONTACTOR
<br />CLASS 8903 TYPE LG-80 FORM F WITH 120V CONTROL COIL, NORMALLY OPEN CONTACTS
<br />RATED AT 30 AMPS CONTINUOUS, IN NEMA TYPE 1 ENCLOSURE WITH FUSED CONTROL
<br />CIRCUIT. REF LIGHTING CONTACTOR DETAIL.
<br />3.5.11 PHOTO CELL BYPASS SWITCH:
<br />THE PHOTOCELL BYPASS SWITCH SHALL BE A "BRYANT" #4801-L SINGLE POLE LOCK
<br />TYPE 15A 120-277 VOLT SWITCH WITH KEY #6006 AND COVERPLATE (WHITE).
<br />NOTE: NO SUBSTITUTION SHALL BE PERMITTED UNLESS THE E.C. CAN PROVE TO THE 7-ELEVEN
<br />CORPORATION REPRESENTATIVE THAT THE PROPOSED SUBSTITUTE WILL OPERATE WITH
<br />"BRYANT" KEY #6006. THE KEY SHALL BE TURNED OVER TO THE 7-ELEVEN CORPORATION
<br />REPRESENTATIVE AT ACCEPTANCE (NOT LEFT IN SWITCH, CASH REGISTER, ETC.).
<br />3.5.12 HEAT TRACE - FREEZER PIPE FREEZE PROTECTION (WHEN REQUIRED):
<br />HEATING CABLE: FURNISH RAYCHEM 5XL1-CR WITH RAYCLIC-PC ELECTRICAL CONNECTION. XL
<br />TRACE BY TYCO THERMAL CONTROLS, LLC. FOR EXTRA INFORMATION CONCERNING HEAT TRACE
<br />SYSTEM CONTACT DAN PETERSEN WITH INDUSTRIAL HEATER (901-382-4761).
<br />CIRCUIT BREAKER: PROVIDE SQUARE'D' Q0120EPD OR EQUIVALENT GFCI CIRCUIT BREAKER WITH
<br />30mA TRIP.
<br />NOTE: MECHANICAL CONTRACTOR TO INSTALL SELF REGULATING HEATING CABLE PER
<br />MANUFACTURER'S REQUIREMENTS ON CONDENSATE DRAIN LINES INSIDE FREEZER BOXES THAT
<br />ARE TO OPERATE AT OR BELOW 32 DEGREES F.
<br />3.6 SERVICE/DISTRIBUTION EQUIPMENT:
<br />PANEL AND DISTRIBUTION PANEL SHALL BE SQUARE 'D'. ALL SWITCH GEAR TO BE FURNISHED FROM
<br />GRAYBAR, U.N.O. FOR PRICING AND PLACING ORDERS, CONTACT'7-ELEVEN' FOR THE APPROPRIATE
<br />SALES DEPARTMENT.
<br />3.6.1 MAIN POWER SWITCHES
<br />THE MAIN PANEL POWER SWITCHES/CIRCUIT BREAKERS SHALL BE SQUARE'D' TYPE I LINE, RATED AT 65,000
<br />A.I.C. (MIN.) SWITCHES OR CIRCUIT BREAKERS SHALL BE LISTED AS INDICATED ON PLANS.
<br />NOTE: PANEL RATINGS REQUIRED FOR HIGHER AIC REQUIREMENTS SHALL BE PRESENTED TO THE
<br />DISTRIBUTOR FOR MODIFICATIONS TO THE GEAR SUBMITTAL.
<br />3.6.2 PANELBOARDS:
<br />SQUARE 'D' PANELBOARDS USED IN SERIES WITH I -LINE CIRCUIT BREAKERS AND FITTED
<br />WITH SQUARED' BRANCH CIRCUIT BREAKERS ARE AS INDICATED ON PLANS.
<br />USE AN APPROPRIATE SQUARED' CIRCUIT BREAKER WITH EACH PANEL. CIRCUIT
<br />BREAKERS SHALL BE TYPE QOXXX-"QO"-FRAME
<br />3.6.2.1 PANEL 'F', IF REQUIRED, SHALL BE FED BY A SQUARE 'D' BREAKER WITH SHUNT TRIP
<br />AND SHALL BE WIRED FOR EMERGENCY SHUT DOWN.
<br />3.6.2.2 UPON COMPLETION OF WORK, E.C. SHALL PROVIDE A TYPED DIRECTORY IN EACH
<br />PANELBOARD. INCLUDE SYSTEM VOLTAGE, PHASING, CIRCUIT NUMBERING AND DESCRIPTIONS.
<br />3.6.3 WIREWAY:
<br />THE WIREWAY SHALL BE SIMILAR AND EQUIVALENT TO "SQUARE D COMPANY" WIREWAY WITH
<br />APPROPRIATE FITTING FOR THE PARTICULAR INSTALLATION. E.C. SHALL SIZE TO INSTALLATION
<br />IN ACCORDANCE WITH NEC, GOOD PRACTICE AND CODES IN EFFECT AT TIME OF
<br />INSTALLATION.
<br />3.7
<br />OVERCURRENT/SHORT CIRCUIT PROTECTIVE DEVICES:
<br />3.7.1 PANELBOARD BRANCH/FEEDER CIRCUIT BREAKERS:
<br />ALL DOWNSTREAM BREAKERS MUST BE SQUARE'D' TO MAINTAIN SERIES LISTING. IF
<br />FUSIBLE DISCONNECTS ARE USED, SQUARE 'D' PANEL BOARDS AND CIRCUIT BREAKERS
<br />SHALL BE USED.
<br />3.7.2 GROUND FAULT CIRCUIT INTERRUPTER (GFCI) BREAKERS:
<br />GROUND FAULT CIRCUIT INTERRUPTER (GFCI) TYPE CIRCUIT BREAKERS SHALL BE
<br />SIMILAR TO THE PANELBOARD CIRCUIT BREAKERS BUT WITH GROUND FAULT
<br />PROTECTION WITH MATCHING A.I.C. RATING. GFCI BREAKERS SHALL BE UL
<br />APPROVED AS CLASS A DEVICES IN ACCORDANCE WITH UL STANDARD #943.
<br />3.7.3 FUSES, MAIN SWITCHBOARD:
<br />MAIN SWITCHBOARD FUSES, IF REQUIRED, SHALL BE CLASS J CURRENT LIMITING FUSES
<br />AS INDICATED ON PLANS.
<br />3.7.4 FUSES, EQUIPMENT:
<br />EQUIPMENT FUSES, IF REQUIRED, SHALL BE OF THE DUAL ELEMENT, TIME DELAY VARIETY
<br />AS INDICATED ON PLANS. FUSES FOR HVAC/REFRIGERATION SHALL BE SIMILAR AND EQUIVALENT
<br />TO COOPER BUSSMANN FUSE TYPE LPN-RK-SP, CLASS RK1 FOR THE APPROPRIATE AMPERAGE.
<br />3.8 SPD SHALL BE PROVIDED BY GRAYBAR.
<br />3.9 CONDUCTORS:
<br />ALL CONDUCTORS SHALL BE COPPER, TYPE THHN, UNO. MINIMUM CONDUCTOR SIZE SHALL BE
<br />#12 AWG. CONDUCTORS #10 AWG AND LARGER SHALL BE STRANDED. INSULATION TYPE SHALL
<br />CONFORM WITH N.E.C. OR MANUFACTURER REQUIREMENTS. LIGHT FIXTURES SOMETIME REQUIRE
<br />90 DEGREE WIRE. FOR THE PARTICULIAR APPLICATION. USE TYPE THWN IN WETR LOCATIONS.
<br />3.9.1 NM CABLE (ROMEX) SHALL NOT BE USED.
<br />3.9.2 ALUMINUM CONDUCTORS SHALL NOT BE USED U.N.O.
<br />3.9.3 METAL -CLAD CABLE (MC) SHALL BE PERMITTED FOR USE AS BRANCH CIRCUITS
<br />IN WALL, CEILING OR CABINETRY.
<br />4. TESTING AND INSPECTION
<br />4.1 TESTING:
<br />4.1.1 THE E.C. SHALL TEST, PRIOR TO ENERGIZING FOR THE FIRST TIME,
<br />ALL PIECES OF ELECTRICAL EQUIPMENT TO ASSURE THEY HAVE THE
<br />PROPER PHASE TO PHASE AND PHASE TO GROUND INSULATION AND TO BE
<br />FREE OF SHORTS. AFTER ENERGIZING, EACH LUMINAIRE SHALL BE LIT
<br />AND TESTED.
<br />4.1.2 THE VARIOUS CIRCUITS SERVED FROM THE PANELBOARDS VARY IN LOADING.
<br />THE E.C. SHALL CAREFULLY BALANCE THE LOAD ON EACH LEG OF
<br />THE SERVICE. WHEN ALL LOAD IS TURNED ON AND THE SYSTEM IS OPERATING
<br />AT 100%, THE INITIAL UNBALANCE SHALL NOT EXCEED 10%.
<br />NOTE: WITH 3 PHASE DELTA, PHASES A AND C SHALL BE BALANCED WITHIN 10% PHASE B
<br />(HIGH LEG) SHALL BE BALANCED AS CLOSELY AS POSSIBLE.
<br />4.2 INSPECTION:
<br />E.C. SHALL FURNISH AT THE COMPLETION OF THE PROJECT OR
<br />EACH INSPECTION POINT OF THE PROJECT, AN INTERMEDIATE OR FINAL INSPECTION
<br />CERTIFICATE FROM THE LOCAL INSPECTING AUTHORITY.
<br />4.3 PERFORMANCE REQUIRED:
<br />4.3.1 ALL EQUIPMENT AND FIXTURES SHALL BE PROPERLY CONNECTED WITH
<br />ADEQUATE POWER AND CHECKED THOROUGHLY FOR PROPER OPERATION.
<br />4.3.2 ALL EXPOSED EQUIPMENT SHALL BE INSTALLED AS PER DRAWINGS AND IS
<br />SUBJECT TO INSPECTION FOR WORKMAN -LIKE APPEARANCE.
<br />5. INDUSTRY -STANDARDS
<br />5.1 THE FOLLOWING IS A LIST OF ABBREVIATIONS USED IN THE ELECTRICAL NOTES AND
<br />SPECIFICATIONS.
<br />NEC .....................NATIONAL ELECTRIC CODE, REF. COVERSHEET FOR APPLICABLE VERSION
<br />NEMA..................NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
<br />UL........................UNDERWRITERS LABORATORIES, INC.
<br />HVAC...................HEATING, VENTILATING AND AIR CONDITIONING
<br />IEEE ......................INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS
<br />GFCI.....................GROUND FAULT CIRCUIT INTERRUPTER
<br />AIC .......................AMPERES INTERRUPTING CAPACITY
<br />UNO.....................UNLESS NOTED OTHERWISE
<br />EC.........................ELECTRICAL CONTRACTOR
<br />GC.........................GENERAL CONTRACTOR
<br />rev 1 /2013
<br />Udte;
<br />106 N 37TH STREET, SUITE C
<br />ROGERS, ARKANSAS 72756
<br />W W W.BATESARCHITEC rS.COM
<br />TEL: 479.633.8165
<br />E
<br />Copyright 2016 Bates & Associates, Architects
<br />Drawings and Specifications as instruments of service are and shall remain
<br />the property of the Architect. They are not to be used on other projects or
<br />extensions to this project except by agreement in writing and with
<br />appropriate compensation to the Architect.
<br />Contractor is responsible for confirming and correlating dimensions at job
<br />site; the Architect will not be responsible for construction means, methods,
<br />techniques, sequences or procedures, or for safety precautions and
<br />programs in connection with the project.
<br />SITE/STORE #:
<br />1037728
<br />CONSTRUCTION MANAGER
<br />CREIGHTON CONST. & MGMT
<br />900 SW PINE ISLAND ROAD, SUITE 202,
<br />CAPE CORAL, FL 33991
<br />DEVELOPER CONTACT
<br />TENANT
<br />7-ELEVEN INC.
<br />1722 ROUTH ST. SUITE 1000 DALLAS, TX 75201
<br />DANIELTUBB
<br />STRUCTURAL CONSULTANT
<br />ARCH CONSULTING ENGINEERS
<br />510 S CONGRESS SUITE B-100 AUSTIN,
<br />TX 78704
<br />JUSTIN BILLODEAU
<br />MEP CONSULTANT
<br />WALTER J. FITZGERALD, P.E. 24636
<br />2566 NEBRASKA AVE. APT 443
<br />PALM HARBOR, FL 34684 PH (813) 785-7526
<br />D
<br />N
<br />N
<br />V
<br />W
<br />cc
<br />T
<br />W p �. �
<br />U
<br />a-)
<br />O M
<br />O M �
<br />Q
<br />M
<br />CO
<br />�
<br />~ LL C)
<br />O
<br />U)z
<br />CC
<br />LL
<br />zW_O0Q
<br />W � = U
<br />oC
<br />>
<br />Q
<br />Ov
<br />C
<br />oZS oC z
<br />�_
<br />_1 T >- O
<br />W
<br />W M
<br />z
<br />CL
<br />1� N =
<br />U
<br />W
<br />U)
<br />CU
<br />O
<br />M
<br />rol
<br />M
<br />03 /3 (hpi(o
<br />Architect Name - RYAN M FAUST
<br />Architect Number - AR97905
<br />THE SEAL AND SIGNATURE APPLY ONLY TO THE DOCUMENTTO WHICH
<br />THEY ARE AFFIXED AND WE EXPRESSLY DISCLAIM ANY RESPONSIBILITY FOR
<br />ALL OTHER PLANS, SPECIFICATIONS, ESTIMATES, REPORTS OR OTHER
<br />DOCUMENTS OR INSTRUMENTS RELATING TO OR INTENDED TO BE USED
<br />FOR ANY PART OR PARTS OF THE PROJECT.
<br />REVISIONS
<br />NO. DATE IDESCRIPTION
<br />PROJECT NUMBER: 16-021
<br />RELEASE DATE: 03/31/2016
<br />ELECTRICAL
<br />SPECIFICATIONS
<br />0
<br />
|