Laserfiche WebLink
1 <br />G <br />F <br />E <br />1 <br />C <br />I <br />a <br />O <br />rn <br />N <br />DO <br />I <br />0 <br />v A <br />0 <br />co <br />N <br />N <br />_O <br />Q - <br />MECHANICAL SPECIFICATIONS <br />MECHANICAL SPECIFICATIONS <br />MAINTENANCE AND SHALL BE SEALED AIRTIGHT. THE FILTERS SHALL BE REMOVABLE FROM EITHER SIDE <br />OPEN AND CLOSED POSITIONS. THE MECHANICAL CONTRACTOR SHALL PROVIDE A VOLUME DAMPER <br />OF THE FILTER SECTION(S). THE MECHANICAL CONTRACTOR SHALL PROVIDE A TOTAL OF THREE (3) <br />WITH A 2" STANDOFF WITH A LOCKING QUADRANT THAT IS 24 GAUGES OR 2 GAUGES HEAVIER. <br />1. GENERAL RESPONSIBILITIES OF THE CONTRACTORS <br />COMPLETE SETS OF FILTERS FOR ALL MECHANICAL EQUIPMENT IN THE SIZE AND ARRANGEMENT <br />RECOMMENDED BY THE MANUFACTURER. THE 2" FILTERS SHALL PROVIDE ASHRAE 52.2 FILTRATION <br />ALL DUCT SHALL MEET THE CONSTRUCTION REQUIREMENTS AS SPECIFIED BY SMACNA: - <br />PRIOR TO STARTING THE PROJECT, THE MECHANICAL CONTRACTOR SHALL PROVIDE THE SERVICES OF <br />EFFICIENCY AS SHOWN ON THE CONSTRUCTION DOCUMENTS OR MINIMUM MERV 6 FILTRATION <br />A STRUCTURAL PROFESSIONAL ENGINEER WHO SHALL CERTIFY THE INSTALLATION AND ATTACHMENT <br />EFFICIENCY IF NO HIGHER VALUE IS SPECIFIED. <br />• ON SYSTEMS UP TO 1 IWG EXTERNAL PRESSURE: FIRST TWENTY FEET OF DUCTWORK ON SUPPLY <br />OF ALL ITEMS REQUIRING STRUCTURAL SUPPORT OR WIND LOADING ARE ACCEPTABLE AND MEET THE <br />AND RETURN SHALL BE 2 IWG. OTHERWISE PROVIDE 1 IWG DUCTWORK ON SUPPLY AND RETURN <br />CODE REQUIREMENTS. ALL DETAILS SHOWN ARE ONLY INTENDED TO BE USED BUDGETING PURPOSES. <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE A SECONDARY FLOAT SWITCH ON THE SECONDARY <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE A SIGNED AND SEAL LETTER FROM THE STRUCTURAL <br />DRAIN OF EACH AIR HANDLER. THE FLOAT SWITCH SHALL SHUT ITS ASSOCIATED AIR HANDLER DOWN IF <br />• EXHAUST DUCTWORK SHALL BE 1 IWG MORE THAN THE DESIGN EXTERNAL STATIC PRESSURE <br />ENGINEER STATING THAT THE ENTIRE MECHANICAL INSTALLATION MEETS FLORIDA WIND LOAD AND <br />OVERFLOW IS DETECTED. <br />STRUCTURAL SUPPORT REQUIREMENTS. <br />• OUTSIDE AIR DUCTWORK SHALL BE THE SAME GAUGE AS REQURIED FOR THE RETURN WITH IN <br />ALL REFRIGERANT LINES AND ACCESSORIES SHALL BE SIZED AND INSTALLED PER THE EQUIPMENT <br />THE FIRST TWENTY FEET. <br />THE GENERAL AND MECHANICAL CONTRACTORS SHALL PROVIDE THE LABOR, MATERIALS, AND <br />MANUFACTURER'S' RECOMMENDATIONS. THE MECHANICAL CONTRACTOR AND MANUFACTURER SHALL <br />EQUIPMENT REQUIRED FOR THE HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM(S) AS <br />STUDY THE COMPLETE SET OF CONSTRUCTION DOCUMENTS AND EXISTING AND PROPOSED <br />• TRANSFER DUCTWORK: 0.5 IWG <br />DESCRIBED IN THE COMPLETE SET OF CONSTRUCTION DOCUMENTS. ALL WORK SHALL CONFORM TO <br />CONDITIONS TO ENSURE THAT THE MECHANICAL EQUIPMENT HAS THE CAPACITY TO PROPERLY <br />THE REQUIREMENTS OF THE 2014 FLORIDA BUILDING CODE AND 2014 FLORIDA ENERGY CODE, 2011 <br />RETURN OIL TO THE COMPRESSOR(S). THE MECHANICAL CONTRACTOR SHALL ENSURE THAT THE <br />NATIONAL ELECTRIC CODE, NFPA NATIONAL FIRE CODES, AND ALL OTHER STATE AND LOCAL CODES. <br />MANUFACTURER(S) IWARE AWARE OF THE HORIZONTAL DISTANCE AND VERTICAL RISE BETWEEN EACH <br />5. DUCT LEAKAGE PERFORMANCE <br />AIR HANDLER AND ITS ASSOCIATED CONDENSING UNIT. REFRIGERANT LINES SHALL BE FILLED WITH <br />THE OWNER SHALL NOT BE RESPONSIBLE FOR ANY PORTION OF THE SCOPE OF WORK UNLESS <br />DRY NITROGEN DURING SOLDERING. THE MECHANICAL CONTRACTOR SHALL TEST, CLEAN, AND <br />DUCT CONSTRUCTION AND SEALING SYSTEMS SHALL MEET THE REQUIREMENTS OF THE 2014 FLORIDA <br />SPECIFICALLY NOTED IN THE CONSTRUCTION DOCUMENTS. <br />DEHYDRATE ALL REFRIGERANT LINES AND PROVIDE THE CRITICAL CHARGE(S) OF REFRIGERANT PER <br />ENERGY CODE AND SMACNA'S "HVAC DUCT CONSTRUCTION STANDARDS". IF THERE IS A CONFLICT <br />THE MECHANICAL EQUIPMENT MANUFACTURER'S' RECOMMENDATIONS. THE MECHANICAL <br />AMONG THE STANDARDS, THEN THE MORE STRINGENT STANDARD SHALL BE ENFORCED. <br />THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION SCHEDULES OF ALL <br />CONTRACTOR SHALL PROVIDE ALL NECESSARY VALVES, TRAPS, SIGHT GLASSES, AND OTHER <br />TRADES. FIXED WORK SUCH AS DUCTWORK AND SANITARY AND STORM PIPING SHALL BE INSTALLED <br />ACCESSORIES AS RECOMMENDED BY THE MECHANICAL EQUIPMENT MANUFACTURER(S). SERVICE <br />THE MECHANICAL CONTRACTOR SHALL SEAL ALL TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND <br />PRIOR TO ANY TRADE WORK THAT CAN BE EASILY RELOCATED OR OFFSET SUCH AS ELECTRICAL <br />FITTINGS SHALL BE ACCESSIBLE. <br />DUCT WALL PENETRATIONS TO A MAXIMUM ALLOWABLE DUCT LEAKAGE CLASS OF THREE (3) CFM PER <br />CONDUIT AND FIRE PROTECTION AND WATER PIPING. ALL ELECTRICAL CONDUIT AND WATER PIPING <br />100 SQUARE FEET OF DUCT AREA (1.5%) FOR ROUND DUCT AND SIX (6) CFM PER 100 SQUARE FEET OF <br />SHALL BE INSTALLED AS CLOSE TO WALLS AND AS CLOSE TOGETHER AS POSSIBLE TO ALLOW FOR <br />EACH DX SPLIT SYSTEM'S AIR HANDLER AND CONDENSING UNIT SHALL BE BY ONE MANUFACTURER AND <br />DUCT AREA (3%) FOR ALL OTHER DUCT TYPES. TRANSVERSE JOINTS ARE CONNECTIONS OF TWO DUCT <br />MAXIMUM DUCT ACCESSIBILITY. <br />SHALL HAVE OR EXCEED THE CAPACITIES LISTED IN THE EQUIPMENT SCHEDULE(S) ON THE <br />OR FITTING ELEMENTS ORIENTED PERPENDICULAR TO THE DIRECTION OF THE AIRFLOW. <br />CONSTRUCTION DOCUMENTS. EACH ELECTRIC HEATER SHALL HAVE OR EXCEED THE CAPACITIES AND <br />LONGITUDINAL SEAMS ARE JOINTS ORIENTED IN THE DIRECTION OF THE AIRFLOW. DUCT WALL <br />ALL CONTRACTORS SHALL COORDINATE THE SCOPE OF THEIR WORK AND THEIR CONSTRUCTION <br />ELECTRICAL REQUIREMENTS LISTED IN THE EQUIPMENT SCHEDULE(S) ON THE CONSTRUCTION <br />PENETRATIONS ARE OPENINGS MADE BY SCREWS, NON -SELF-SEALING FASTENERS, PIPES, TUBING, <br />SCHEDULES WITH THE OWNER TO PREVENT ANY INTERRUPTIONS UNACCEPTABLE TO THE OWNER. <br />DOCUMENTS. THE MANUFACTURER(S) AND THE MECHANICAL CONTRACTOR SHALL PROVIDE <br />RODS, AND WIRE. ROUND AND FLAT -OVAL SPIRAL LOCK SEAMS NEED NOT BE SEALED PRIOR TO <br />THIS MAY REQUIRE WORK AFTER NORMAL OPERATING HOURS AND/OR ON WEEKENDS. <br />PROTECTION FOR ALL DX MECHANICAL EQUIPMENT INCLUDING, BUT NOT LIMITED TO, AN <br />ASSEMBLY BUT SHALL BE COATED AFTER ASSEMBLY TO REDUCE LEAKAGE. ALL OTHER CONNECTIONS <br />ANTI -SHORT -CYCLE TIMER FOR EACH COMPRESSOR, HEAD PRESSURE CONTROL, HIGH PRESSURE <br />ARE CONSIDERED TRANSVERSE JOINTS INCLUDING, BUT NOT LIMITED TO, SPIN -INS, TAPS OR OTHER <br />2. BIDS, SHOP DRAWINGS, EQUIPMENT SUBMITTALS, AND CHANGE ORDERS <br />CONTROL (MANUAL RESET), AND LOW PRESSURE CONTROL (AUTO RESET). <br />BRANCH CONNECTIONS, ACCESS DOOR FRAMES, AND DUCT CONNECTIONS TO EQUIPMENT. MORE <br />INFORMATION IS AVAILABLE IN CHAPTER 35 OF ASHRAE'S"FUNDAMENTALS HANDBOOK". <br />EACH PROSPECTIVE CONTRACTOR SHALL EVALUATE THE SCOPE OF WORK THOROUGHLY PRIOR TO <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE ALL STARTERS, CONTACTORS, RELAYS, CONTROLS, <br />SUBMITTING A BID. SOME CONDUIT, PIPING, AND OTHER OBSTACLES MAY NEED TO BE RELOCATED AND <br />AND ACCESSORIES NECESSARY TO PROVIDE A COMPLETE AND WORKING POWER AND CONTROL <br />6. CONDENSATE DRAIN LINES <br />SUCH RELOCATION SHOULD BE INCLUDED IN EACH PROSPECTIVE MECHANICAL CONTRACTOR'S BID. <br />SYSTEM FOR THE MECHANICAL EQUIPMENT WITHIN THE SCOPE OF WORK. THE ELECTRICAL <br />CONTRACTOR WILL PROVIDE ALL DISCONNECT SWITCHES, CONDUIT, AND WIRING FOR THE <br />CONDENSATE DRAIN LINES SHALL BE CONSTRUCTED OF PVC (MINIMUM SCHEDULE 40), COPPER (TYPE <br />E R HALL PROVIDE A DETAILED T BREAKDOWN FOR <br />EACH PROSPECTIVE MECHANICAL CONTRACTOR S O COS <br />ALL <br />E F WORK. L ELECTRICAL W RK HALL COMPLY WITH <br />MECHANICAL EQUIPMENT WITHIN THE SCOPE O O ALLO SH <br />E EEL (MINIMUM SCHEDULE 40 . PVC MAY ONLY BE ALLOWED IN A <br />'L' OR HEAVIER OR GALVANIZED M <br />)� ( ) <br />EACH TASK IN THE SCOPE OF WORK AS SHOWN ON THE CONSTRUCTION DOCUMENTS, INCLUDING <br />THE REQUIREMENTS OF THE NATIONAL ELECTRIC CODE. THE MECHANICAL CONTRACTOR SHALL BE <br />MECHANICAL ROOM WITH A DUCTED RETURN AND UNDERGROUND. THE MECHANICAL CONTRACTOR <br />EQUIPMENT, MATERIALS, AND LABOR. ANY PROPOSED VALUE -ENGINEERING, INCLUDING <br />RESPONSIBLE FOR THE PROPER OPERATION OF THE COMPLETE SYSTEM AND SHALL ENSURE THAT <br />SHALL PROVIDE A P-TRAP AT EACH AIR HANDLER'S CONDENSATE DRAIN LINE CONNECTION. EACH <br />SUBSTITUTIONS FOR SCHEDULED EQUIPMENT, SHALL BE PRESENTED SEPARATELY AS AN ALTERNATE <br />WIRING DIAGRAMS ARE PROVIDED TO THE OWNER. NO WIRING OF ANY KIND SHALL BE EXPOSED IN <br />CONDENSATE DRAIN LINE SHALL BE SLOPED DOWN A MINIMUM OF ONE -EIGHTH (1/8) INCH PER LINEAR <br />WITH A SIMILAR COST BREAKDOWN. THE SCOPE OF WORK SHALL BE BID WITH THE SCHEDULED <br />FINISHED AREAS. <br />FOOT TOWARD THE ASSOCIATED POINT OF DISCHARGE. THE MECHANICAL CONTRACTOR SHALL <br />- HALL BE <br />EQUIPMENT AND ANY PROPOSED VALUE ENGINEERING ORE EQUIPMENT SUBSTITUTIONS S Q Q <br />IR CONDENSATE PIPE SUPPORTS: <br />PROVIDE M O CON S <br />IDENTIFIED AS ALTERNATE DEDUCTIONS FROM THE CONTRACTOR'S BASE BID. ANY CHANGE ORDERS <br />THE MECHANICAL CONTRACTOR SHALL ENSURE THAT ALL MECHANICAL EQUIPMENT IS STARTED, <br />MUST BE SUBMITTED WITH BOTH THE ORIGINAL COST BREAKDOWN AND THE NEW COST BREAKDOWN <br />TESTED, ADJUSTED, AND PLACED IN SATISFACTORY OPERATING CONDITION PRIOR TO SUBSTANTIAL <br />THE DIAMETER OF THE CONDENSATE DRAIN LINE SHALL BE EQUAL TO OR GREATER THAN THE <br />FOR COMPARISON. <br />COMPLETION. THE MECHANICAL CONTRACTOR SHALL GUARANTEE ALL WORKMANSHIP, MATERIALS, <br />CONDENSATE DRAIN LINE CONNECTION. TO AVOID EXCESSIVE DIPS IN AND TO PREVENT ANY SHIFTING <br />AND MECHANICAL EQUIPMENT TO BE FREE OF DEFECTS FOR A PERIOD OF ONE YEAR FROM THE DATE <br />OF THE CONDENSATE DRAIN LINES', THE MECHANICAL CONTRACTOR SHALL PROVIDE SUPPORTS AT THE <br />EACH PROSPECTIVE MECHANICAL CONTRACTOR SHALL PROVIDE A CONSTRUCTION SCHEDULE <br />OF FINAL ACCEPTANCE BY THE OWNER AND SHALL REPAIR ANY DEFECTS OCCURRING WITHIN THAT <br />CONDENSATE DRAIN LINES CONSTRUCTED OF PVC SIX 6 <br />FOLLOWING INTERVALS: THREE (3) FEET FORCO S ( ) <br />DETAILING THE START DATE, DURATION, ASSIGNED MAN-HOURS, AND FINISH DATE OF EACH TASK IN <br />TIME WITHOUT COST TO THE OWNER. ALL MECHANICAL EQUIPMENT IN THE SCOPE OF WORK SHALL BE <br />FEET FOR CONDENSATE DRAIN LINES CONSTRUCTED OF COPPER, AND TEN (10) FEET FOR <br />THE SCOPE OF WORK AS SHOWN ON THE CONSTRUCTION DOCUMENTS. IF ANY PROPOSED <br />COVERED FOR THE DURATION OF THE MANUFACTURERS' WARRANTIES AND THE CONTRACTOR SHALL <br />CONDENSATE LINES CONSTRUCTED OF STEEL. CONDENSATE DRAIN LINE SUPPORTS SHALL BE FIXED <br />VALUE -ENGINEERING OR EQUIPMENT SUBSTITUTIONS AFFECT THIS SCHEDULE, THEN THOSE IMPACTS <br />PROVIDE THE OWNER WITH ORIGINALS OF ALL MANUFACTURERS' GUARANTEES AND WARRANTIES. ALL <br />SOLIDLY IN PLACE. <br />SHALL BE IDENTIFIED SEPARATELY. <br />COMPRESSORS SHALL BE PROVIDED WITH A MINIMUM FIVE (5) YEAR WARRANTY. THE CONTRACTOR <br />SHALL PROVIDE THE COST OF ALL WARRANTIES TO THE OWNER AND GIVE THE OWNER THE OPTION TO <br />THE MECHANICAL CONTRACTOR SHALL ROUTE CONDENSATE DRAIN LINES TO THE NEW DRYWELL <br />PRIOR TO STARTING THE PROJECT, THE MECHANICAL CONTRACTOR SHALL STUDY THE COMPLETE SET <br />DEDUCT THIS COST FROM THE CONTRACTOR PRICE AND PURCHASE THE WARRANTIES DIRECTLY. <br />UNLESS OTHERWISE NOTED ON THE CONSTRUCTION DOCUMENTS. CONDENSATE DRAIN LINES SHALL <br />OF CONSTRUCTION DOCUMENTS AND COORDINATE WITH THE OTHER TRADES AS REQUIRED TO <br />NOT BE ROUTED TO THE SANITARY SEWER SYSTEM OR TO SCUPPERS. <br />PROVIDE SHOP DRAWINGS TO SUBMIT TO THE MECHANICAL ENGINEER FOR APPROVAL. THE SHOP <br />THE MECHANICAL CONTRACTOR SHALL COORDINATE ALL MECHANICAL EQUIPMENT VOLTAGE <br />DRAWINGS MAY BE SUBMITTED AS HAND -DRAWN NOTES UPON A COPY OF THE CONSTRUCTION <br />REQUIREMENTS WITH THE VOLTAGE AVAILABLE AT THE PROJECT SITE PRIOR TO ORDERING ANY <br />THE MECHANICAL CONTRACTOR SHALL INSULATE EACH CONDENSATE DRAIN LINE WITH ONE-HALF (1/2) <br />DOCUMENTS IF PERMISSION IS OBTAINED FROM THE MECHANICAL ENGINEER. THE CONSTRUCTION <br />MECHANICAL EQUIPMENT. <br />INCH ARMAFLEX WHEREVER THAT CONDENSATE DRAIN LINE IS ROUTED WITHIN THE STRUCTURE OR <br />DOCUMENTS ARE DIAGRAMMATIC IN NATURE AND INTENDED SOLELY TO CLARIFY THE SCOPE OF WORK <br />THE CONDENSATE MAY OTHERWISE CAUSE DAMAGE. <br />AND INDICATE THE GEQUIPMENT <br />GENERAL ARRANGEMENT OF SYSTEMS. THE CONSTRUCTION DOCUMENTS ARE NOT <br />G <br />THE MECHANICAL CONTRACTOR SHALL RETURN ANY EXISTING MECHANICAL IN THE SCOPE <br />ALL OBSTACLES. DRAWINGS SHALL SHOW THE <br />INTENDED TO ALERT THE CONTRACTOR(S) OF O CLES. THE SHOP D GS <br />WORK A REQUESTED B E NER. THIS MAY INCLUDE MAKING PROVISIONS TO RECLAIM THE <br />OF WO SY THE OW <br />7. CONTROLS <br />COORDINATION OF DUCTWORK AND MECHANICAL EQUIPMENT INSTALLATION WITH EXISTING AND NEW <br />REFRIGERANT. THE MECHANICAL CONTRACTOR SHALL REMOVE EXISTING MECHANICAL EQUIPMENT <br />OBSTACLES INCLUDING, BUT NOT LIMITED TO, ELECTRICAL CONDUITS, FIRE PROTECTION PIPING, RAIN <br />NOT REQUESTED BY THE OWNER FROM THE PROJECT SITE AND DISPOSE OF IT IN ACCORDANCE WITH <br />SEE CONTROLS NOTE ON SHEET M-1 AND SEPARATE CONTROLS DRAWING PACKAGE. THE OWNER MAY <br />LEADERS, SANITARY DRAINS, STRUCTURAL MEMBERS, AND WATER PIPING, AS WELL AS THE <br />ALL APPLICABLE LAWS. <br />BID OUT CONTROLS TO A SEPARATE CONTRACTOR OR MAY BID THIS WORK TO BE INCLUDED IN THE <br />MECHANICAL EQUIPMENT MANUFACTURER'S' RECOMMENDED CLEARANCES THE MECHANICAL <br />SCOPE OF THE MECHANICAL CONTRACTOR. <br />CONTRACTOR SHALL ALSO SHOW THE EXISTING CONDITIONS ON THE SHOP DRAWINGS WHERE THE <br />4. DUCTWORK CONSTRUCTION <br />EXISTING CONDITIONS ARE DIFFERENT FROM THOSE SHOWN ON THE CONSTRUCTION DOCUMENTS. <br />SENSORS SHALL BE INSTALLED AT 4' ABOVE THE FINISHED FLOOR UNLESS OTHERWISE NOTED ON THE <br />THE SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION'S "HVAC DUCT <br />CONSTRUCTION DOCUMENTS. THE MECHANICAL CONTRACTOR SHALL COORDINATE THE EXACT <br />PRIOR TO STARTING THE PROJECT, THE MECHANICAL CONTRACTOR SHALL STUDY THE COMPLETE SET <br />CONSTRUCTION STANDARDS" SHALL BE CONSIDERED PART OF THE SPECIFICATIONS FOR THIS <br />LOCATION OF EACH SENSOR WITH THE ARCHITECT AND OWNER AND SUBMIT THE PROPOSED LOCATION <br />OF CONSTRUCTION DOCUMENTS AND COORDINATE WITH THE MANUFACTURER(S) AS REQUIRED TO <br />PROJECT. ANY WORK THAT DOES NOT COMPLY WITH THESE STANDARDS MAY BE REJECTED AT ANY <br />TO THE MECHANICAL ENGINEER FOR APPROVAL. THE MECHANICAL CONTRACTOR SHALL PROVIDE <br />PROVIDE EQUIPMENT SUBMITTALS TO SUBMIT TO THE MECHANICAL ENGINEER FOR APPROVAL. THE <br />TIME DURING THE PROJECT, <br />COORDINATION OF ALL SENSOR FINISHES WITH ROOM FINISHES AT NO ADDITIONAL COST TO THE <br />EQUIPMENT SUBMITTALS SHALL INCLUDE DIMENSIONS, WEIGHTS, SPECIFIED ACCESSORIES AND <br />OWNER. <br />REQUIRED CLEARANCES, AS WELL AS FAN CURVES, SOUND LEVELS, CONSTRUCTION DETAILS, <br />ALL RETURN, EXHAUST AND OUTSIDE AIR DUCTWORK SHALL BE UNISULATED SHEET METAL. ALL <br />WARRANTY INFORMATION, AND ALL OTHER RELEVANT DATA PRESENTED IN THE SAME FORMAT AS THE <br />SUPPLY DUCTWORK SHALL BE SHEET METAL WITH EXTERNAL WRAP INSULATION, R-4.2 OR GREATER. <br />EQUIPMENT SCHEDULES ON THE CONSTRUCTION DOCUMENTS. <br />8. TESTING AND BALANCING THE HEATING, VENTILATION, AND AIR CONDITIONING SYSTEM <br />ROUND DUCTWORK MAY BE SPIRAL OR SNAP -LOCK. <br />THE BASE PRICE SHALL USE ALL EQUIPMENT AS SPECIFIED. ALL VALUE ENGINEERING ALTERNATES <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE THE SERVICES OF AN INDEPENDENT TEST AND <br />SHALL BE LISTED AS ALTERNATES FOR THE OWNERS CONSIDERATION. IF ALTERNATE PRICING IS NOT <br />ALL DUCT DIMENSIONS SHOWN ON THE CONSTRUCTION DOCUMENTS ARE INSIDE CLEAR DIMENSIONS. <br />BALANCE AGENCY TO TEST, BALANCE, AND CERTIFY THE PERFORMANCE OF THE COMPLETE HEATING, <br />ACCEPTED BY THE OWNER AND ENGINEER, THEN THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE FLEXIBLE CONNECTIONS BETWEEN EACH ITEM OF <br />VENTILATION, AND AIR CONDITIONING SYSTEM, TO INCLUDE SUPPLY, RETURN, OUTSIDE, AND EXHAUST <br />AS SPECIFIED. THE OWNER WILL CONSIDER A CHEAPER PIECE OF EQUIPMENT IF THE DEDUCT IS <br />MECHANICAL EQUIPMENT AND ITS ASSOCIATED DUCT(S). ALL ITEMS OF THE HEATING, VENTILATION, <br />BALANCE CONTRACTOR HALL PERFORM ALL TESTING ADJUSTING <br />AIR SYSTEMS. THE TEST ANDS <br />ENOUGH AND THE PERFORMANCE IS STILL ACCEPTABLE. THE OWNER WILL CONSIDER A MORE <br />AND AIR CONDITIONING SYSTEM INCLUDING, BUT NOT LIMITED TO, AIR HANDLERS, FANS, DUCTWORK, <br />BALANCING, AND DATA RECORDING NECESSARY TO ESTABLISH THE CAPACITY AND QUALITY OF THE <br />EXPENSIVE PIECE OF EQUIPMENT IF BETTER PERFORMANCE WOULD JUSTIFY THE ADDITIONAL <br />DIFFUSERS, AND GRILLES SHALL NOT BE SUPPORTED BY THE CEILING OR CEILING SUSPENSION <br />SYSTEMS AND CONFIRM THE SATISFACTORY COMPLETION OF ALL ASPECTS OF THE SCOPE OF WORK. <br />UPFRONT COST. PLEASE PROVIDE ALL ALTERNATES THAT WOULD BE USEFUL FOR THE OWNER TO <br />SYSTEM, BUT INSTEAD SHALL BE SUPPORTED BY THE BUILDING STRUCTURE. <br />CONSIDER TO SAVE MONEY OR IMPROVE PERFORMANCE. ALTERNATES MUST MEET THE <br />THE TEST AND BALANCE CONTRACTOR SHALL BE AN APPROVED MEMBER OF THE AABC OR NEBB AND <br />SPECIFICATION REQUIREMENTS AND THE CONTRACTOR ASSUMES FULL RESPONSIBILITY OF <br />ALL ELBOWS GREATER THAN FORTY-FIVE (45) DEGREES ELBOWS SHALL HAVE A ONE AND ONE-HALF <br />SHALL SPECIALIZE IN THE TESTING AND BALANCING OF HEATING, VENTILATION, AND AIR CONDITIONING <br />COORDINATING WITH OTHER TRADES FOR ALL CHANGES AND COST REQUIRED. <br />(1.5) CENTERLINE RADIUS -TO -WIDTH OR RADIUS -TO -DEPTH RATIO OR SHALL BE CONSTRUCTED WITH <br />SYSTEMS. <br />SINGLE BLADE TURNING VANES. ANGULAR TAPERS SHALL BE LIMITED TO THIRTY (30) DEGREES FOR <br />ALTERNATIVES TO THE SCHEDULED EQUIPMENT AND MATERIALS MUST BE EQUAL TO OR EXCEED <br />CONTRACTING TAPERS AND TWENTY (20) DEGREES FOR EXPANDING TAPERS. <br />THE TEST AND BALANCE CONTRACTOR SHALL ENSURE THAT THE BUILDING IS UNDER POSITIVE <br />THOSE SCHEDULED. IF SUBSTITUTIONS FOR SCHEDULED EQUIPMENT AND MATERIALS ARE TO BE <br />SSU A THE T H CONCLUSION OF THE TEST AND BALANCE PROCESS. IF THE BUILDING IS NOT UNDER <br />PRESSURE <br />MADE, THEN THE MECHANICAL CONTRACTOR SHALL FIRST SUBMIT TO THE MECHANICAL ENGINEER <br />THE MAXIMUM LENGTH OF NEW FLEXIBLE SUPPLY DUCT SHALL BE 1U-0". FLEXIBLE RETURN DUCT <br />POSITIVE PRESSURE AT THE CONCLUSION OF THE TEST AND BALANCE PROCESS, THEN THE TEST AND <br />COMPARATIVE LITERATURE CLEARLY SHOWING THE EQUIVALENT OPERATING CAPABILITIES AND OTHER <br />SHALL BE LIMITED ONLY TO THE VERTICAL RISE ABOVE THE RETURN AIR DISTRIBUTION DEVICE PER THE <br />BALANCE AND MECHANICAL CONTRACTORS SHALL IMMEDIATELY AND WITHOUT DELAY NOTIFY THE <br />PROPERTIES OF THE SUBSTITUTIONS. ALL DEVIATIONS MUST BE CLEARLY IDENTIFIED AND A REQUEST <br />DETAIL. FLEXIBLE DUCT SHALL BE INSTALLED AND SUPPORTED SO AS TO PREVENT THE USE OF <br />ARCHITECT AND MECHANICAL ENGINEER. THE TEST AND BALANCE CONTRACTOR SHALL WORK WITH <br />MUST BE MADE SPECIFIC FOR ALL DEVIATIONS. WHEN SUBSTITUTIONS ARE MADE, THE CONTRACTOR <br />EXCESS DUCT MATERIAL, PREVENT DISLOCATION OR DAMAGE, AND PREVENT CONSTRICTION OF THE <br />THE ENGINEER TO COMFORT BALANCE AS REQUIRED TO SATISFY THE CLIENT. <br />ASSUMES FULL RESPONSIBILITY OF COORDINATING WITH OTHER TRADES ON ANY CHANGES REQUIRED <br />DUCT BELOW THE RATED DUCT DIAMETER. FLEXIBLE DUCT BENDS SHALL MAINTAIN A CENTERLINE <br />FOR THE SUBSTITUTION, INCLUDING COSTS, ASSOCIATED WITH DUCTWORK, PIPING, ELECTRICAL AND <br />RADIUS OF NOT LESS THAN ONE AND ONE-HALF (1.5) DUCT DIAMETERS. SAGS SHALL NOT EXCEED <br />CONTROLS CONTRACTOR SHALL PROVIDE REQUIRED BAS HARDWARE, SOFTWARE, PERSONNEL AND <br />STRUCTURAL TO IMPLEMENT THE SUBSTITUTED ITEM(S). <br />ONE-HALF (0.5) INCH PER LINEAR FOOT OF FLEXIBLE DUCT. HANGERS, SADDLES, AND OTHER <br />ASSISTANCE TO TAB AGENCY AS REQUIRED TO BALANCE THE SYSTEMS. CONTROLS CONTRACTOR <br />SUPPORTS SHALL HAVE A MINIMUM WIDTH OF ONE AND ONE-HALF (1.5) INCHES. THE MECHANICAL <br />SHALL ALSO PROVIDE TRENDING REPORT TO DEMONSTRATE THAT SYSTEMS ARE COMPLETE. <br />THE MECHANICAL CONTRACTOR SHALL VERIFY THE LOCATIONS OF THE DIFFUSERS AND GRILLES AND <br />CONTRACTOR SHALL PROVIDE SUPPORT FOR FLEXIBLE DUCTWORK WITH A MAXIMUM SPACING OF 5'-0", <br />MECHANICAL CONTRACTOR SHALL PROVIDE TAB AGENCY ONE COMPLETE SET OF CONTRACT <br />SUBMIT A REQUEST -FOR -INFORMATION IF THERE IS A CONFLICT BETWEEN THE ARCHITECTURAL AND <br />UNLESS OTHERWISE NOTED ON THE CONSTRUCTION DOCUMENTS OR AUTHORIZED BY THE <br />DOCUMENTS, CHANGE ORDERS, AND APPROVED SUBMITTALS. MECHANICAL CONTRACTOR SHALL <br />MECHANICAL PORTIONS OF THE CONSTRUCTION DOCUMENTS. THE MECHANICAL CONTRACTOR SHALL <br />MECHANICAL ENGINEER. <br />COORDINATE MEETINGS AND ASSISTANCE FROM SUPPLIERS AND CONTRACTORS AS REQUIRED BY TAB <br />ALSO VERIFY THE TYPES OF CEILINGS IN THE SCOPE OF WORK PRIOR TO ORDERING DIFFUSERS AND <br />AGENCY. MECHANICAL CONTRACTOR SHALL PROVIDE ADDITIONAL VALVES DAMPERS SHEAVES AND <br />GRILLES. THE MECHANICAL CONTRACTOR SHALL COORDINATE THE FINISH OF ALL DIFFUSERS AND <br />SURFACES UPON WHICH CLOSURE OR SEALING PRODUCTS ARE TO BE APPLIED SHALL BE CLEAN AND <br />BELTS AS REQUIRED BY TAB AGENCY. MECHANICAL CONTRACTOR SHALL FLAG ALL MANUAL VOLUME <br />GRILLES, EXPOSED DUCTWORK, GRAVITY VENTILATORS, LOUVERS, AND WALL CAPS WITH THE <br />DRY IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. ALL DUCTWORK <br />DAMPERS WITH FLUORESCENT OR OTHER HIGH -VISIBILITY TAPE. MECHANICAL CONTRACTOR SHALL <br />ARCHITECT ALL VISIBLE EXTERIOR COMPONENTS (SUCH AS EXPOSED DUCTWORK AND LOUVERS) <br />SHALL BE SEALED WITH A NON -HARDENING, NON -MIGRATING MASTIC OR LIQUID ELASTIC SEALANT AS <br />PROVIDE ACCESS TO ALL DAMPERS, VALVES, TEST PORTS, NAMEPLATES AND OTHER APPURTENANCES <br />SHALL BE PROVIDED WITH A PAINT -GRIP FINISH. <br />REQUIRED TO MEET THE 2014 FLORIDA ENERGY CODE. THE MECHANICAL CONTRACTOR SHALL <br />AS REQUIRED BY TAB AGENCY. MECHANICAL CONTRACTOR SHALL REPLACE OR REPAIR INSULATION AS <br />PROVIDE HOT -DIPPED GALVANIZED STEEL FASTENERS, ANCHORS, RODS, STRAPS, TRIM, AND ANGLES <br />REQUIRED BY TAB AGENCY. <br />ANY CHANGE ORDER SUBMITTED BY THE GENERAL, MECHANICAL, OR ELECTRICAL CONTRACTORS FOR <br />FOR INTERIOR DUCTWORK SUPPORTS. INTERIOR DUCTWORK SUPPORT SPACING SHALL NOT EXCEED <br />- <br />WORK WITHIN THE SCOPE OF THIS PROJECT SHALL NOT EXCEED THE VALUES LISTED IN THE MOST <br />5'-0". <br />THE TEST AND BALANCE CONTRACTOR SHALL, UPON COMPLETION OF ALL NECESSARY TESTING AND <br />CURRENT VERSIONS OF THE MEANS COST DATA BOOKS FOR THE APPLICABLE TRADES. EVERY CHANGE <br />BALANCING AND AT LEAST ONE (1) WEEK PRIOR TO SUBSTANTIAL COMPLETION, ONE COPY OF THE TEST <br />ORDER SHALL BE ACCOMPANIED BY A DETAILED COST BREAKDOWN FOR EACH TASK, INCLUDING <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE INSULATION WITH A MINIMUM R-VALUE OF 4.2 ON ALL <br />AND BALANCE REPORT TO THE MECHANICAL ENGINEER. <br />EQUIPMENT, MATERIALS, AND LABOR. THE MECHANICAL ENGINEER MAY, AT HIS DISCRETION, REQUIRE <br />SUPPLY DUCTWORK. ALL DUCTWORK INSULATION, FITTINGS, COVERS, AND FINISHES SHALL HAVE A <br />THE CONTRACTOR(S) TO PROVIDE A FINAL, VERIFIABLE ACCOUNTING OF EQUIPMENT, MATERIALS, AND <br />MAXIMUM FLAME SPREAD RATING OF 25, A MAXIMUM SMOKE DEVELOPMENT RATING OF 50, AND SHALL <br />THE MECHANICAL CONTRACTOR SHALL INCLUDE IN HIS/HER BID THE COST OF ANY SHEAVE CHANGES <br />LABOR AFTER THE WORK IS COMPLETE AND PRIOR TO THE MECHANICAL ENGINEER'S APPROVAL OF <br />BE IN COMPLIANCE WITH NFPA 90A. PROVIDE MINIMUM OF 1/2" FIBERGLASS WITH FOIL/SCRIM VAPOR <br />REQUIRED FOR REBALANCING THE SYSTEM-. <br />THE CONTRACTOR'S' FINAL PAY APPLICATION(S). LABOR RATES FOR CHANGE ORDERS SHALL NOT <br />BARRIER ON THE BACK PAN OF ALL NEW SUPPLY AIR DEVICES. <br />EXCEED $50/HOUR ($75/HR OVERTIME) FOR ANY CHANGE ORDERS INCLUDING ALL OVERHEAD AND <br />9. SUBSTANTIAL AND FINAL COMPLETION <br />PROFIT UNLESS APPROVED BY THE ENGINEER OF RECORD, MATERIALRATES FOR PIPING SHALL NOT <br />ALL OUTSIDE AIR INTAKES SHALL BE A MINIMUM OF 10', 15" 30" FROM CLASS 2, CLASS 3 AND CLASS 4 <br />EXCEED A 0.35 MULTIPLER FOR NIBCO MATERIALS UNLESS APPROVED BY ENGINEER OF RECORD. <br />EXHAUST. THE MECHANICAL CONTRACTOR SHALL PROVIDE SCREENS ON ALL OUTSIDE AIR INTAKES <br />THE MECHANICAL CONTRACTOR SHALL MAINTAIN A SET OF CONTINUOUSLY UPDATED, REPRODUCIBLE <br />AND EXHAUST OUTLETS AT NO LESS THAN 1/4" BY 1/4 AND NO GREATER THAN 1/2" BY 1/2" . THE <br />AS -BUILT DRAWINGS DURING CONSTRUCTION AND PROVIDE A COMPLETE SET OF THOSE DRAWINGS IN <br />MECHANICAL CONTRACTOR SHALL PROVIDE A MOTORIZED DAMPERS ON THE OUTSIDE AIR DUCT. THE <br />BOTH ELECTRONIC AND HARDCOPY FORMATS TO THE OWNER UPON FINAL COMPLETION. <br />3. MECHANICAL EQUIPMENT INSTALLATION <br />MOTORIZED DAMPER SHALL BE INTERLOCKED WITH THE RESTRROM EXHAUST FAN AND CONTROLLED <br />BY THE BUILDING MANAGEMENT SYSTEM. <br />THE MECHANICAL CONTRACTOR SHALL CLEAN ALL COOLING AND HEATING COILS, CONDENSATE PANS, <br />ALL MECHANICAL EQUIPMENT SHALL BE INSTALLED AS REQUIRED BY THE MANUFACTURER'S' <br />AND CONDENSATE DRAIN LINES PRIOR TO SUBSTANTIAL COMPLETION. THE MECHANICAL CONTRACTOR <br />INSTALLATION AND MAINTENANCE MANUALS. THOSE MANUALS WILL TYPICALLY PROVIDE MORE DETAIL <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE AN OPPOSED -BLADE VOLUME DAMPER AT EVERY <br />SHALL ALSO REPLACE ALL FILTERS AND BELTS PRIOR TO SUBSTANTIAL COMPLETION AND PROVIDE <br />THAN THE CONSTRUCTION DOCUMENTS. IF THERE IS A CONFLICT BETWEEN THE INSTALLATION AND <br />RECTANGULAR TAKE -OFF FOR A DIFFUSER OR GRILLE. DAMPER BLADES SHALL BE CONSTRUCTED OF <br />TWO (2) COMPLETE REPLACEMENT SETS OF FILTERS AND (2) SETS OF BELTS FOR ALL MECHANICAL <br />MAINTENANCE MANUALS AND THE CONSTRUCTION DOCUMENTS, THEN THE MECHANICAL CONTRACTOR <br />AT LEAST TWO GAUGES HEAVIER THAN THE DUCT IN WHICH THEY ARE INSTALLED (MINIMUM 22 GAUGE). <br />EQUIPMENT TO THE OWNER UPON FINAL COMPLETION. <br />SHALL SUBMIT A REQUEST -FOR -INFORMATION TO THE MECHANICAL ENGINEER. <br />PIVOT RODS OVER 12" SHALL BE CONTINUOUS. A SEAL SHALL BE INSTALLED WHERE THE ROD <br />PENETRATES THE DUCT. ADJUSTMENT AND LOCKING HARDWARE SHALL BE SUSTAINABLE ENOUGH TO <br />THE MECHANICAL AND ELECTRICAL CONTRACTORS SHALL PROVIDE TWO (2) BOUND COPIES OF ALL <br />ALL MECHANICAL EQUIPMENT SHALL BE INSTALLED SUCH THAT SUFFICIENT CLEARANCES ARE <br />ADJUST THE DAMPER WITHOUT VIBRATION AND TO PERMANENTLY LOCK THE DAMPER IN POSITION. <br />MECHANICAL AND ELECTRICAL CONTRACTOR WARRANTIES, MANUFACTURER'S' WARRANTIES, PARTS <br />PROVIDED FOR MAINTENANCE. ALL MECHANICAL EQUIPMENT AT A HEIGHT GREATER THAN SIXTEEN (16) <br />GROOVED LOCKING RINGS SHALL BE USED IN DUCT. FRICTION LOCK DAMPERS ARE NOT ALLOWED. A 2" <br />LISTS, AND INSTALLATION AND MAINTENANCE MANUALS FOR ALL MECHANICAL EQUIPMENT, AS WELL AS <br />FEET SHALL HAVE A PERMANENT MEANS OF ACCESS. ALL COMPRESSORS SHALL HAVE A MINIMUM OF <br />STANDOFF SHALL BE USED AND ACCESSIBLE FOR ADJUSTMENT WITHOUT DAMAGING THE INSULATION. <br />INSTRUCTIONS FOR OPERATING AND MAINTAINING ALL MECHANICAL EQUIPMENT TO THE OWNER UPON <br />THIRTY (30) INCHES OF CLEAR SPACE ON THE SERVICE SIDE(S). <br />MECHANICAL CONTRACTOR SHALL VERIFY DAMPERS ARE FULLY FUNCTIONAL AND ARE LEFT WIDE <br />FINAL COMPLETION. <br />OPEN AND SECURELY LOCKED IN PREPARATION FOR TEST AND BALANCE START UP. (ROUND OR OVAL <br />THE MECHANICAL CONTRACTOR SHALL PROVIDE VIBRATION ISOLATION AS RECOMMENDED BY THE <br />BRANCHES, OUTLETS, AND TAKE -OFFS FOR DIFFUSERS AND GRILLES SHALL BE PROVIDED WITH <br />MANUFACTURER(S) AND/OR REQUIRED BY THE MECHANICAL ENGINEER TO ENSURE QUIET OPERATION <br />STANDARD VOLUME DAMPERS.) NOT ALL DAMPERS ARE SHOWN ON THE CONSTRUCTION DOCUMENTS. <br />OF THE MECHANICAL EQUIPMENT. NO UNDUE VIBRATION OR SOUND SHALL BE TRANSMITTED TO THE <br />HOWEVER, DAMPERS ARE REQUIRED FOR EVERY BRANCH, OUTLET, AND TAKE -OFF. SOME DAMPERS <br />STRUCTURE OR ANY OCCUPIED SPACES WITHIN THE STRUCTURE. <br />MAY BE REQUIRED AFTER TRANSITIONS. <br />THE FILTER RACKS SHALL BE INSTALLED SUCH THAT SUFFICIENT CLEARANCES ARE PROVIDED FOR <br />THE MECHANICAL CONTRACTOR SHALL CLEARLY AND PERMANENTLY MARK EACH VOLUME DAMPER'S <br />b <br />MECHANICAL LEGEND <br />SD RG EG <br />® ® NEW CEILING DIFFUSER/GRILLE (LAY -IN) <br />SUPPLY DIFFUSER AIR FLOW <br />O NEW CEILING DIFFUSER/GRILLE (LINEAR SLOT) <br />NEW DUCTWORK <br />NEW POINT OF CONNECTION <br />DUCTWORK CROSSOVER OR CROSSUNDER AT <br />THE MECHANICAL CONTRACTOR'S DISCRETION <br />9U- ELBOW WITH TURNING VANES <br />45' ELBOW WITH TURNING VANES <br />SPIN -IN FITTING WITH DAMPER <br />FLEXIBLE DUCT CONNECTION <br />CD NEW CONDENSATE LINE <br />NEW REFRIGERANT LINES <br />—G� DOOR GRILLE <br />MD MOTORIZED DAMPER (WITH ACCESS DOOR ON <br />ACCESSIBLE SIDE) <br />VOLUME DAMPER <br />SD <br />SMOKE DETECTOR <br />ODDC <br />THERMOSTAT (INSTALL AT 48" AFF) <br />GDDC <br />TEMPERATURE SENSOR <br />TC <br />TIME CLOCK <br />ElTHERMOSTAT <br />(NON - DDC) <br />W x D <br />RECTANGULAR DUCT WIDTH x DEPTH INCHES <br />0 ROUND DUCT DIAMETER (INCHES) <br />EQ EQUIPMENT TAG <br />NO <br />MECHANICAL SHEET INDEX <br />M-0 <br />MECHANICAL SPECIFICATIONS <br />M-1.1 <br />MECHANICAL DESIGN PLAN <br />M-1.2 <br />MECHANICAL ROOF PLAN <br />M-2.1 <br />MECHANICAL SCHEDULES <br />M-2.2 <br />MECHANICAL DETAILS <br />M-2.3 <br />FAN COIL UNIT WIRING DIAGRAM <br />co <br />cow <br />p <br />mCO <br />oa <br />r <br />U <br />o <br />(0 <br />Qi <br />3 <br />C <br />N O <br />O <br />� y <br />O <br />W <br />o <br />Z <br />C <br />� <br />C <br />Q <br />o <br />3 <br />M111-0 <br />O <br />N 2 <br />N <br />^� <br />0) <br />U_ 41 <br />r <br />�v <br />//{i <br />O m <br />� E <br />W <br />./ <br />1u <br />"tW15 <br />c <br />U <br />"� <br />N <br />U -y <br />cn <br />w <br />V) <br />•. ry f <br />• • 'S! <br />d a <br />U <br />! <br />a <br />®�a•� <br />cl <br />L <br />� N <br />C <br />O <br />O <br />00 <br />>42 <br />r <br />Q <br />a om <br />W <br />C: <br />'ITm� <br />� <br />U <br />c <br />a <br />00 <br />EN <br />0 <br />2 <br />0 <br />_ <br />0 <br />a .� <br />�a <br />Lo O <br />U <br />0) U <br />c <br />CCD <br />M <br />■+ <br />m N N <br />Oi T <br />0 <br />�LOo <br />00 <br />/� ♦ <br />, <br />co <br />C7 O <br />O <br />@ L <br />v <br />p U C <br />■� <br />U- a <br />co m <br />Q.-0 U <br />n <br />1..� <br />Y <br />LL(6 <br />�� <br />r <br />� � L <br />106 <br />m <br />L <br />4-j <br />V) <br />cn F— N <br />L <br />CCU <br />U <br />Q fp U <br />U co <br />■ � <br />T -L <br />T � O <br />-t 0 LL <br />O <br />U <br />N <br />L <br />Q <br />m <br />MA <br />O <br />O <br />O <br />O <br />m <br />Q <br />LLJ <br />E <br />U_ <br />O <br />Li <br />c <br />LL <br />o <br />.N <br />p <br />EE <br />' <br />O <br />U <br />mv <br />� <br />u) <br />m <br />_J <br />= <br />m <br />>r"- <br />= <br />cLLJ <br />J <br />2 <br />(/) <br />N <br />CCD <br />N <br />1 1 1 2 1 3 1 4 1 5 ' 6 17 8 9 110 11 12 ' <br />THE DESIGN AND CONCEPTS DEPICTED HEREWITH ARE THE SOLE PROPERTY OF ROBERT REID WEDDING ARCHITECTS & PLANNERS, AIA, INC. MECHANICAL SPECIFICATIONS �C LEGEND <br />NO REPRODUCTION, REVISIONS OR REUSE OF THIS DRAWING IS AUTHORIZED WITHOUT SPECIFIC WRITTEN PERMISSION. ALL RIGHTS RESERVED. <br />.11 SCALE: N.T.S <br />sheet no. <br />M-0 <br />