Laserfiche WebLink
HI <br />GI <br />FI <br />E <br />D <br />C <br />p <br />PLUMBING SPECIFICATIONS <br />PART 1-GENERAL <br />1.01 GENERAL DOCUMENTS <br />A. THE REQUIREMENTS OF THE GENERAL CONDITIONS & SPECIFICATION BOOK SHALL APPLY TO <br />ALL PLUMBING WORK. INSTALLATION SHALL BE IN ACCORDANCE WITH THE FLORIDA BUILDING <br />CODE 2014 - PLUMBING WITH CURRENT AMENDMENTS. <br />B. THE PLUMBING WORK SHALL FURNISHING ALL LABOR, EQUIPMENT, MATERIALS AND SERVICE <br />NECESSARY FOR AND REASONABLY INCIDENTAL TO THE PROPER COMPLETION OF ALL <br />PLUMBING WORK SHOWN ON THE DRAWINGS AND AS SPECIFIED. ALL MATERIAL SHALL BE NEW. <br />C. ALL MATERIALS AND EQUIPMENT SHALL BE THE STANDARD CATALOGED PRODUCT OF A <br />REPUTABLE MANUFACTURER REGULARLY MANUFACTURING THE PARTICULAR ITEM FREE FROM <br />DEFECTS AND IN NEW CONDITION. <br />1.02 SUBMITTALS <br />A. MATERIALS OR PRODUCTS SPECIFIED HEREIN AND/OR INDICATED ON DRAWINGS BY TRADE <br />NAME MANUFACTURER'S NAME OR CATALOG NUMBERS SHALL BE INTERPRETED AS <br />ESTABLISHING A STANDARD OF QUALITY AND DESIGN. EQUAL TO THAT SPECIFIED. <br />SUBSTITUTIONS SHALL NOT BE ALLOWED UNLESS THEY ARE SUBMITTED FOR REVIEW AN AND <br />APPROVED BY BID DATE. <br />1.03 WORK BY OTHERS <br />A. THE FOLLOWING SYSTEMS AND/OR EQUIPMENT ARE NOT APART OF THIS SECTION, BUT SHALL <br />BE PROPERLY CONNECTED WITH ALL PLUMBING SERVICES: - ELECTRICAL POWER WIRING BY <br />ELECTRICAL SUB -CONTRACTOR. <br />1.04 SHOP DRAWINGS <br />A. FURNISH SIX (6) COPIES OF SHOP DRAWING OF EQUIPMENT AND FIXTURES FOR APPROVAL <br />PRIOR TO PURCHASING. <br />1.05 RECORD DRAWINGS <br />A. AFTER COMPLETION OF ALL WORK, THE PLUMBING CONTRACTOR SHALL PROVIDE THE OWNER, <br />ENGINEER, AND ARCHITECT WITH AS BUILT RECORD DRAWINGS AS OUTLINED IN <br />SPECIFICATIONS. <br />PART 2 - INSTALLATION <br />2.01 MATERIAL <br />A. SOIL, WASTE & VENT PIPING: ABOVE AND BELOW FLOOR SLAB SHALL BE ASTM D 2665 PVC-DWV <br />SCHEDULE 40 PIPE AND FITTINGS WITH SOLVENT WELD JOINTS. <br />B. ROOF DRAIN PIPING: ABOVE AND BELOW FLOOR SLAB SHALL BE ASTM D 2665 PVC-DWV <br />SCHEDULE 40 PIPE AND FITTINGS WITH SOLVENT WELD JOINTS. <br />C. DOMESTIC WATER PIPING: <br />a. INTERIOR COLD AND HOT WATER PIPING ABOVE SLAB: DOMESTIC WATER PIPING SHALL BE <br />TYPE'L' COPPER ASTM B88 WITH SOLDER -JOINT FITTINGS. <br />b. PIPING BELOW SLAB SHALL BE ASTM F 441 SCHEDULE 40 CPVC PLASTIC PIPING WITH SOLVENT <br />WELD JOINTS. <br />D. PIPE INSULATIONS:HOT WATER SUPPLY AND RETURN PIPING SHALL BE INSULATED WITH 1" THICK <br />FIBERGLASS OR EQUAL, IN COMPLIANCE WITH APPLICABLE ENERGY CODES, STORM WATER <br />PIPING INCLUDING ROOF DRAIN SUMPS ALL HORIZONTAL RAINWATER LEADERS & ANY PIPING <br />AB E COLD WATER DISCHARGE FORM A/C UNITS ICE MACHINES ETC. SHALL <br />ABOVE SLAB RECEIVING EIVIN G <br />BE INSULATED WITH 1" THICK FIBERGLASS (OR EQUAL) INSULATION WITH VAPOR JACKET. <br />2.02 VALVES <br />A. EQUAL TO NIBCO, CRANE, OR WALWORTH. ALL BRONZE 150 LB. GATE VALVES WITH RISING <br />STEMS. <br />2.03 SPECIALTIES <br />A. PIPE PROTECTIVE COATING: FOR STEEL OR COPPER PIPE, PERMACEL OR SCOTHWRAP VINYL <br />TAPE APPLIED OVER PIPE TO A TOTAL MINIMUM THICKNESS OF 20 MLS. APPLY TO ALL WATER <br />PIPE IN CONTACT WITH MASONRY OR CONCRETE. <br />B. PIPE HANGERS: HANGERS FOR BARE COPPER PIPE THROUGH 4 INCH (4") DIAMETER OR SMALLER <br />SHALL BE ADJUSTABLE RING TYPE, PLASTIC COATED EQUAL TO MICHIGAN 102a, FOR STEEL PIPE <br />MICHIGAN 100. <br />C. DRAINS AND CLEANOUTS: SEE SCHEDULE ON DRAWINGS. <br />D. DIELECTRIC UNIONS: EBCO OR CAPITOL AT ALL POINTS OF CONNECTION BETWEEN DISSIMILAR <br />PIPE METALS. <br />E. FLASHING AND VENT STACKS: ALL VENTS EXTENDING THROUGH THE ROOF SHALL BE PROVIDED <br />WITH FOUR POUND SHEET LEAD FLASHING EXTENDING UPWARD AROUND THE PIPE AND TURNED <br />DOWN INSIDE THE PIPE OR AS OTHERWISE SHOWN ON THE DRAWINGS. THE ROOF FLASHING <br />SHALL BE INSTALLED BY LICENSED ROOFING CONTRACTOR. <br />F. ESCUTCHEONS AND SLEEVES. WHERE PIPES PIERCE EXPOSED PARTITIONS, FLOORS, WALL, OR <br />CEILINGS, PROVIDE CHROME PLATED ESCUTCHEONS TO COVER THE RAW EDGE. <br />G. SLEEVES SHALL BE PROVIDED A ALL PIPE PENETRATIONS OF MASONRY AND CONCRETE WALLS <br />AND FLOORS. <br />H. PROVIDE UL LISTED FIRE STOPPING PIPE PENETRATION ASSEMBLIES AT ALL PIPING THROUGH <br />RATED WALLS AND ASSEMBLIES. <br />PART 3 - EXECUTION <br />3.01 INSTALLATION <br />A. INSTALL PIPE ABOVE GROUND PLUMB AND SQUARE WITH BUILDING LINES, ADEQUATELY <br />SUPPORTED WITHOUT SAGS OR HIGH POINTS. CONCEAL PIPING IN OCCUPIED AREAS AND <br />MAINTAIN HEAD ROOM AND ACCESS SPACE IN UNFINISHED AREAS. SLEEVE PIPING THROUGH ALL <br />WALLS, SLABS, OR PARTITIONS WITH ESCUTCHEONS AT ALL FINISHED SURFACE. PROVIDE <br />AT L FINAL CONNECTIONS AND STOPS ON ALL SUPPLIES. ALL PIPE OPENINGS <br />UNIONS A L F CO SHALL <br />BE PLUGGED DURING INSTALLATION. <br />B. SANITARY DRAINAGE PIPING 3" & LARGER SHALL BE INSTALLED WITH A MINIMUM 1/8" PER FOOT <br />SLOPE UNLESS NOTED OTHERWISE. ALL DRAINAGE PIPING 2-1/2" AND SMALLER SHALL BE <br />INSTALLED WITH A MINIMUM OF 1/4" PITCH PER FOOT. <br />C. ALL FIXTURES AND TRIM FOR HANDICAPPED SHALL BE INSTALLED IN COMPLIANCE WITH 2O14 <br />FLORIDA ACCESSIBLITY CODE FOR BUILDING CONSTRUCTION. <br />D. INSTALL ALL PIPING TO ALLOW FOR EXPANSION. <br />E. SEE RISER DIAGRAMS FOR ALL DRAINAGE & VENT PIPE SIZING FOR THE PLUMBING SYSTEMS. <br />REFER TO PLUMBING FLOOR PLAN (WATER SYSTEM) & SCHEDULES FOR ALL WATER PIPING <br />SYSTEM SIZING. <br />F. ALL EXPOSED TO VIEW PIPING AND FITTINGS SHALL BE POLISHED CHROME FINISH. <br />G. ALL WORK ASSOCIATED WITH HANDICAPPED TOILETS SHALL COMPLY WITH ADA REQUIREMENTS <br />AND FLORIDA BUILDING CODE - CHAPTER 11 FLORIDA ACCESSIBILITY CODE FOR BUILDING <br />CONSTRUCTION. <br />H. FINAL CONNECTIONS T DRAINAGE AND WATER SERVICE LINES TO EXISTING OR C O NEW <br />AT 5-0" FROM THE BUILDING WALLS SHALL BE BY THE PLUMBING CONTRACTOR. <br />3.02 DISINFECTING OF POTABLE WATER SYSTEM <br />A. THE SYSTEM SHALL BE FILLED WITH A SOLUTION CONTAINING 50 PARTS PER MILLION OF <br />AVAILABLE CHLORINE AND ALL ALLOWED TO STAND 24 HOURS BEFORE FLUSHING AND <br />RETURNING TO SERVICE. DISINFECTION PROCEDURE AND -RESULT SHALL BE SUBJECT TO THE <br />APPROVAL OF THE LOCAL PLUMBING INSPECTOR. <br />3.03 TEST A. ALL PLUMBING SYSTEMS SHALL BE TESTED IN ACCORDANCE WITH THE FLORIDA BUILDING CODE <br />PLUMBING. ALL TESTS SHALL BE APPROVED BY THE LOCAL PLUMBING INSPECTOR AND SHALL BE <br />OBSERVED BY A REPRESENTATIVE OF THE ARCHITECT. -- <br />3.04 SYSTEM IDENTIFICATION <br />A. THE PLUMBING CONTRACTOR SHALL PROVIDE IDENTIFICATION TAGS FOR ALL NEW PIPING AND <br />VALVES IN THE BUILDING AS PER OWNER ACCEPTED STANDARDS, THE PIPE MARKS SHALL <br />INCLUDE PIPING SYSTEM IDENTIFICATION AND DIRECTIONS OF FLOW. EVERY 10 FEET AND <br />CHANGED OF DIRECTION. <br />3.05 SPECIFICATIONS AND DRAWINGS <br />PLUMBING T SHALL FURNISH AND INSTALL COMPLETE SANITARY STORM A U G CONTRACTOR SHA U , AND <br />DOMESTIC WATER PIPING SYSTEMS: INCLUDING ALL ASSOCIATED DEVICES, EQUIPMENT, <br />CONTROLS, AND CONNECTIONS TO NEW SERVICES, SUPPORTS, AND HARDWARE REQUIRED FOR <br />THE SATISFACTORY OPERATIONS OF THE SYSTEMS, WHETHER SPECIFICALLY SHOWN OR NOT <br />ON THE DRAWINGS. <br />B. THE PLANS SHOW THE LOCATION OF ALL FIXTURES AND EQUIPMENT -AND ARE INTENDED TO <br />DEPICT THE GENERAL INTENT OF THE WORK IN SCOPE, LAYOUT, AND QUALITY OF <br />WORKMANSHIP. THEY ARE NOT INTENDED TO SHOW IN=MINUTE DETAIL EVERY AND ALL <br />ACCESSORIES INTENDED FOR THE PURPOSE OF EXECUTION OF THE WORK, BUT IT SHALL BE <br />UNDERSTOOD THAT SUCH DETAILS WILL BE PART OF THIS WORK. <br />C. WHERE DRAWINGS AND SPECIFICATIONS CONFLICT, IT SHALL BE THE RESPONSIBILITY OF THIS <br />CONTRACTOR TO BRING SUCH CONFLICT TO THE ATTENTION OF THE ENGINEER FOR <br />CLARIFICATION. <br />D. REFER TO ARCHITECTURAL DRAWINGS AND VERIFY FIELD CONDITION FOR EXACT LOCATION OF <br />ALL PLUMBING FIXTURES. <br />E. CONTRACTOR SHALL KEEP A RECORD OF THE LOCATIONS OF ALL CONCEALED WORK AND UPON <br />COMPLETION OF THE JOB, SHALL SUPPLY AS -BUILT DRAWINGS SHOWING IN COLORED PENCIL ON <br />BLACK LINE PRINTS ANY DEVIATION FORM THE ORIGINAL DRAWINGS. THESE DRAWINGS SHALL <br />INDICATE DIMENSION OF BURIED UTILITY LINES FROM BUILDING WALLS. <br />F. ALL DOCUMENTS, TEST REPORTS, & AS -BUILT DRAWINGS SHALL BE ATTACHED TO THE CLOSING <br />DOCUMENTS OF THE PROJECT. <br />3.06 WARRANTY <br />A. THE PLUMBING CONTRACTOR SHALL WARRANT HIS WORK TO BE FREE FROM DEFECTS IN <br />MATERIALS AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FORM FINAL ACCEPTANCE OF <br />ALL WORK. - <br />3.07 COORDINATION A. GENERAL CONTRACTOR SHALL PROVIDE SHOP DRAWING COORDINATING ALL TRADES AND <br />EXISTING OBSTACLES PRIOR TO STARTING CONSTRUCTION. _ I Z D INVERT ELEVATIONS <br />B. VERIFY LOCATIONS SIZES, AN OF SANITARY DRAIN AND DOMESTIC <br />WATER PIPING CONNECTIONS WITH FIELD CONDITIONS AND CIVIL ENGINEERING DRAWINGS <br />PRIOR TO PROCEEDING WITH THE INSTALLATION OF ANY NEW WORK. SHALL ANY <br />DISCREPANCIES BE DISCOVERED CONTRACTORS SHOULD OBTAIN DIRECTION FROM THE <br />ENGINEER BEFORE PROCEEDING. <br />C. COORDINATE WITH ARCHITECTURAL DRAWINGS FOR WALL AND PARTITION CONSTRUCTION AND <br />THICKNESS WHERE PLUMBING PIPING, FIXTURES CARRIERS OR EQUIPMENT IS INDICATED. <br />BEFORE STARTING CONSTRUCTION. IDENTIFY ANY CONFLICT PRIOR TO STARTING <br />CONSTRUCTION. <br />D. COORDINATE EXACT LOCATION, ELEVATIONS, AND SIZES OF ALL SLEEVES IN NEW STRUCTURE <br />WITH STRUCTURAL AND ARCHITECTURAL DRAWINGS AND FIELD CONDITIONS. <br />3.08 PERMITS A. PLUMBING CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AT HIS EXPENSE. <br />B. THE PLUMBING CONTRACTOR SHALL VERIFY THESE DRAWINGS WITH EXISTING FIELD <br />CONDITIONS AND SHALL COORDINATE WITH CIVIL ENGINEER LOCATIONS AND ELEVATIONS OF <br />PROCEEDING IT N PLUMBING SERVICE LINES BEFORE ROCEEDI G WITH CONSTRUCTION. THE WATER AND SEWER <br />SERVICE LINES SHOWN ON THE DRAWINGS ARE FOR REFERENCE AND BUILDING PERMIT ONLY. <br />REFER TO CIVIL ENGINEERS DRAWING AND VERIFY FIELD CONDITIONS FOR DRAINAGE AND <br />WATER SERVICE LINES LAYOUT AND DETAILS. <br />C. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT/ENGINEER IMMEDIATELY IF ANY OF THE WORK <br />INDICATED IN THE CONTRACT DOCUMENTS CANNOT BE PERFORMEDDUETO EXISTING FIELD <br />CONDITIONS. <br />D. PLUMBING CONTRACTOR SHALL FURNISH AND INSTALLCOMPLETESANITARY AND DOMESTIC <br />WATER PIPING SYSTEMS: INCLUDING ALL ASSOCIATED DEVICES, EQUIPMENT, CONTROLS, AND <br />CONNECTIONS TO EXISTING SERVICES, SUPPORTS, AND HARDWARE REQUIRED FOR THE <br />SATISFACTORY OPERATION OF THE SYSTEMS. <br />E. PLUMBING CONTRACTOR SHALL PROVIDE ROUTING AND OFFSETS NECESSARY TO AVOID <br />CONFLICT WITH STRUCTURE, FINISHES, AND WORK OF OTHER TRADES. <br />F. WALL AND PARTITION CONSTRUCTION AND THICKNESS FOR PLUMBING PIPING OR EQUIPMENT IS <br />INDICATED SHALL BE AS PER EQUIPMENT MANUFACTURERS SHOP DRAWINGS AND ANY <br />CONFLICT SHALL BE IDENTIFIED PRIOR TO STARING CONSTRUCTION. <br />G. COORDINATE EXACT LOCATION SIZE AND ELEVATIONS OF PIPE SLEEVES IN EXISTING <br />STRUCTURE WITH STRUCTURAL ENGINEER. <br />H. THE LOCATION AND ELEVATION OF PLUMBING PIPING AT CEILING, WALLS, AND BELOW SLAB FOR <br />OWNER FURNISHED, CONTRACTOR INSTALLED EQUIPMENT IS SHOWN AS PER EQUIPMENT DATA <br />SHEETS. THE CONTRACTOR SHALL PROVIDE PLUMBING -ROUGH -INS AS PER OWNERS PROVIDED <br />FINAL. <br />PLUMBING FUTURE SCHEDULE <br />COLD I HOT II <br />MARK FIXTURE I WASTE I VENT I MANUFACTURER - MODEL # ?' DESCRIPTION <br />I WATER WATER I I <br />r I g FULLY EXPOSED TWO LEVEL BASINS,18 GAUGE, STAINLESS STEEL WITH SATIN FINISH <br />i ELKAY-#EDFPBM117RAC <br />WF WATER FOUNTAIN 2 2 + 1/2 # _ 'AND HIGH SHINE OUTER EDGE. AS PER MANUFACTURE'S SPECIFICATIONS PROVIDE <br />I <br />38 X8 P-TRAP ACCESS PANELS. MOUNT AT ADA HEIGHT. (NOTE 5) <br />t <br />} 'GALVANIZED STEEL REMOTE WATER COOLER, CAPACITY: 10 GPH Q 50-, <br />I I, I <br />,REMOTE ELECTRIC WATER I ;, ;, I ELKAY-#ER101Y' $REFRIGERANT. R134A WITH STAINLESS STEEL GRILL. <br />REWC 2 2„ : 1 /2. <br />j CHILLER` - RECIPROCATING TYPE, 115V, 60HZ, 46OWSINGLE PHASE, NON -FILTERED. INSTALL IN <br />CEI LI N G ABOVE FOUNTAINS. <br />WATER CLOSET FOR H/C, ! I ; 'FLOOR MOUNTED,1.0 GPF; PRESSURE ASSIST FLUSH, VITREOUS CHINA 2-1/4" <br />E x <br />I. K LER HIGHLINE" 'GLAZED TRAPWAY 12 ROUGH ELONGATED 17-1/8 HIGHBOWL, SIPHON JET, ATER <br />4�2„ 1�,WC_L#TANKTYPEFLOOR <br />I MOUNTED I I I#K-3519 ;SAVER. SEAT: OLSONITE #10 HEAVY DUTY, OPEN FRONT, LESS COVER. (NOTE 1 ) <br />LEFT SIDE TRIP LEVER <br />WATER CLOSET FOR H/C, I ;FLOOR MOUNTED,1.0 GPF, PRESSURE ASSIST FLUSH,. VITREOUS CHINA, 2-1/4" <br />R L IGL 2" ROUGH ELONGATED 17-1.18" HIGH BOWL SIPHON:J s TANKTYPEFLOOR KOHLER "HIGHLINE" GLAZED 1 ET, WATER <br />I <br />4 � I <br />WC R <br />2 1 /2' <br />MOUNTED j - I#K-351'0-RA kSAVER. SEAT: OLSONITE #1D HEAVY DUTY, OPEN FRONT, LESS COVER. (NOTE 1) <br />RIGHT SIDE TRIP LEVER ± I I I <br />* VITREOUS CHINA22" X18", WALL MOUNTED, WICONCEALED ARM CARRIERS <br />f <br />I ; �SU,PPORTED FROM FLOOR (WITHSTANDING 250# OF LOAD APPLIED ON THE FRONT OF <br />I $ <br />;THE FIXTURE),W/SINGLE FAUCET HOLE &FRONT OVERFLOW, W/WFi1TE K-2057 <br />" ! LAVATORYWALL t :KOHLER-#K-2035-1 BATHROOM SINK SHROUD. <br />LAV MOUNTED FOR H/C I 2` 2 1I2 _ R KOHLER - #K-16027.4-CP z FAUCET W/LEVER HANDLE, 1/2 GPM, VANDAL. RESISTANT FLOW DEVICES FOR 4 <br />1 I {ZURN-#Z-1231 FAUCET HOLES, ADJUSTABLE HOT LIMIT SAFETY STOP. (NOTES 1,2 �&3) <br />' I I } * LAVATORY SUPPORT SYSTEM WITH CONCEALED ARMS. COMPLETE WITH DURX <br />! I °COATED RECTANGULAR STEEL UPRIGHTS WITH WELDED FEET, ADJUSTABLE <br />p <br />I € i #SUPPORT PLATE, AND MOUNTING FASTENERS_ <br />' ' * COUNTER -TOP TYPE, SINGLE COMPARTMENT, SELF RIMMING WITH COATED <br />?UNDERSIDE 31 X21"WITH 6" HEIGHT FOR HIC,16 GAGE,316 STAIN LESS STEEL, WITH <br />II SINGLE I 3 IJUST WG - iOPENING <br />DROPPED LEDGE & RAISED FAUCET DECK. THREE HOLE CENTERED -RIGHT. DRAIN <br />SCS COMPARTMENT SINK `2" 2r, 1/2„1/2 I#SL-AD/� 2131-AGR OFFSET TO BACK. <br />JUST MFG - #J-900 '* SINGLE LEVER HIGH ARC FAUCET WITH1.5 GPM LAMINAR FLOW, CP SUPPLY STOPS <br />! I & ESCUTCHEONS. 1-1/2"PVC TRAP W/ CLEANOUT PLUG. TRUEBRO "BASIN GUARD" <br />I r <br />I ; ! 1 UNDERSINK ENCLOSURE. (NOTES 1, 2 & 3) <br />j I MUSTEE: #63M <br />24"x24"X10" FLOOR MOUNT MOP SINK, MOLDED FIBERGLASS; W/STRAIN ER. <br />I FAUCET: #63.600A <br />: *'FAUCET SHALL BE POLISHED CHROME, FINISH WITH WRIST BLADES INTEGRAL <br />I B. GUARD: #63.401 20-3/4 <br />MSB MOP SERVICE BASIN 3 2„ 1/2 1/2 STOPS, ADJUSTABLE WALL BRACKET, 3/4" HOSE THREAD ON SPOUT, AND INTEGRAL <br />HOSE: #65.700 <br />I VACUUM BREAKER. <br />I !MOP HANGER: #65.600 I <br />I ' W. GUARDS:67.2424 <br />NOTES: <br />1.SIN S &WATER CLOSET SUPPLY SHALL BE BRASS WITH BRASSANGLE STOPS FOR 1/2" WATER SUPPLYLINES WITH LOOSE KEY TH GAP AND WALL. FLANGE. ALL COMPONENTS SHALL BE POLISHED CHROME FINISH, <br />K (W ), <br />MANUFACTURER: E.B.C_, INC.OR APPROVED EQUAL. <br />2. CAST BODY "P" TRAP 1-1/2"X1-1/2" WITH ;HEAVY CAST J-BEND & FLAT CLEANOUT PLUG, SLIP NUTS AND WALL FLANGE. ALL COMPONENTS SHALL BE POLISHED CHROME FINISH. MANUFACTURER: E_B.C.,INC. OR APPROVED <br />EQUAL. <br />3. STRAINERS SHALL BE FUR.NISFIED WITH FIXTURES. <br />4, PROVIDE WATER SUPPLY& "P TRAP FOR ELECTRIC WATER COOLERS AS PER MANUFACTURERS RECOMMENDATIONS. <br />PLUMBING SURE &TRIM SHALL BE APPROVED BYTHE OWNER BEFORE FINAL ORDER IS E. <br />5. ALL:PLU FIXTURES _ MAD <br />__.._E TO.ARCHITECTURAL-DRAWINGS FOR PLUMBING FIXTURE ACCESSIBILITY REQUIREMENTS. <br />- - - - <br />6.REF R_Q <br />SPECIALTIES SCHEDULE <br />MARK ! DESCRIPTION/LOCATION <br />MANUFACUREIR MODEL NUM. <br />DESCRIPTION <br />10.5-12 <br />GPM. SET TO TEMPER. HOT WATER TO 110- F 1 /2'"-1 ": MATCH PIPE SIZE SHOWN ON PLAN. PROVIDE WATTS "CS" CHECK STOP <br />TMV 1 THERMOSTATIC MIXING VALVE <br />- <br />� WATTS LMMV I <br />1/ISOLATION <br />/STRAINERON HOTAND COLD WATER INLET. <br />1 <br />WALL CLEAN OUT TEE TO MATCH PIPE MATERIAL. PROVIDE GAS AND WATER TIGHT ABS OR PVC PLUG AND ROUND, SMOOTH <br />WCO WALL CLEAR OUT <br />I ZURN I Z-1446 <br />1STAJNLESS STEEL WALL ACCESS COVER WITH STAINLESS STEEL SCREW. <br />W/B WATER VALVE BOA{ <br />SPECIALTY i I <br />( #OB-821-LL, <br />PLASTIC ICE MAKER VALVE BOX, 3/8 COLD WATER OUTLET, 6-13/16 X4-7/8 DIMENSION. WITH WATER HAMGER ARRESTOR. LEAD <br />PRODUCTS !FREE. <br />SA WATER HAMMER ARRESTOR <br />ZURN Z-1700 SHOKTROL i <br />3/4" SIZE <br />ID i FLOOR DRAIN <br />F _R <br />4 <br />ZURN FD1-PV -R6-SS <br />� 4 <br />BOTTOM OU LET PVC BODY CLAMPING COLLAR 6 DIAMETER ROU b SS STRAINER IfRAP PRIMER CONNECTION <br />) M T N _,W <br />VR VACUUM RELIEF VALVE <br />I WATTS' # N36-Ml <br />?ALL BRASS BODY (INSTALL AMINI MUMOF 6" ABOVE WATER HEATER) <br />j <br />IZURN HEAVY DUTY ADJUSTABLE FLOOR CLEAN OUT. CAST IRON BODY WTH ROUND ADJUSTABLE POLISHED BRONZE TOP SET <br />FCO FLOOR CLEAR OUT <br />- <br />ZURN Z1400 <br />i <br />ITOP LEVEL TO FINISHED FLOOR. <br />f <br />WATER SAVER TRAP PRIMER, 1-1/2" CHROME PLATED, POLISHED CAST BRASS TRAP AND WASTE ARM WTH CLEANOUT. PROVIDE <br />I <br />WITH 112- COPPER I TUBING F OMTRAP TO WALL ESCUTCHEON. PRIMER TUBING BELOW FLOOR LOPED DOWN TO <br />E PR MER R S <br />TP i TRAP PRIMER <br />- <br />PPP LTP-1500 <br />, <br />FIXTURE SHALL BEPEXWNERE BURIED, COPPER WHERE HUNG. TRAP PRIMER IS IN COMPLIANCE WITH THE FPC 1002.4 AND HAS <br />{ <br />I <br />BEEN TESTED AND MEETS REQUIERMENTS OF THE ASSE STANDARD FORM 1044_ <br />FDF FLOOR DRAIN FUNNEL <br />ZURN' ZB415B <br />8-3/8":FLOOR DRAIN WITH 4" DIAMETER FUNNEL, DURA-COATED CAST IRON BODY, ADJUSTABLE COLLARWITH SEEPAGESLOTS. <br />I <br />RD=P ROOF DRAIN PRIMARY <br />j <br /># ZURN` ZA1.00-ERG <br />PRIMARY ROOF DRAIN, COATED CAST IRON WITH'UNDER DECK CLAMP,"STATIC EXTENTION, INTERNAL MEMBRANE FLASHING <br />1'CLAMP/GRAVEL GUARD, 6-3/4" HIGH DOME, SEE PLAN FOR PIPE SIZE <br />I <br />;PRIMARY ROOF DRAIN, COATED CAST IRON VMTH UNDER DECK CLAMP, STATIC EXTENTION, INTERNAL MEMBRANE FLASHING <br />RD-P2 ROOF DRAIN PRIMARY <br />1 <br />ZURN F Z125-ERG <br />,`CLAMP/GRAVEL GUARD, 6-3/4" HIGH DOME, SEE PLAN FOR PIPE SIZE <br />I <br />AI RD-S ROOF DRN SECONDARY <br />I <br />i ZURN I ZA100-ERC-VV4 <br />SECONDARY ROOF DRAIN, COATED CAST IRON WITH UNDER DECK CLAMP, STATIC EXTENTION, INTERNAL MEMBRANE, FLASHING <br />;CLAMP/GRAVEL GUARD 6-3/4" HIGH DOME INCLUDES "INTERNAL WATER DAM. SEE PLAN FOR PIPE SIZE. <br />'SECONDARY ROOF DRAIN, COATED CAST IRON WITHUNDER DECK CLAW, STATIC EXTENTION, INTERNAL MEMBRANE FLASHING <br />RD-S2 ROOF DRAIN SECONDARY <br />ZURN Z125-ERC-89 <br />ICLAMPIGRAVEL GUARD, 6-3/4" HIGH DOME, INCLUDES 2" WATER DAM. SEE PLAN FOR PIPE SIZE <br />RD-C j ROOF DRAIN CAN, <br />I J.R. SMITH 1680T <br />CANOPY ROOF DRAIN, 3" SIDE OUTLET WITH FLASHING CLAMP AND SUMP RECEIVER, SEE PLAN FOR PIPE SIZE. <br />DS j DOWNSPOUT <br />ZURN' Z199 <br />'ALL NICKEL BODY, OPTIONAL THREADED OR NO HUB INLET AND DECORATIVE FACE. 18"ABOVE FINISH GRADE. <br />} <br />!SELF DRAINING MODERATE CLIMATE NARROW WALL HYDRANT WITH ANTI -SIPHON VANDAL RESISTANT VACUUM. BREAKER 2-5/8"L, <br />WF j WALL HYDRANT <br />MFAB 1 MHY-60 <br />1314" SWT, 1" W.P., POLISHED CHROME PLATED FACE PLATE. <br />CD I CONDENSATE DRAIN <br />f PLASTIC ODDITIES I PBV2330 <br />jPVC CONSTRUCTION, REMOVABLE FLOATING BALL TYPE BACK FLOW DEVICE_ SEE DETAIL. <br />GCO GRADE CLEAR OUT <br />( ZURN Z-1474 <br />jZURN HEAVYDUTY CLEANOUT, CAST IRON BODY WTH ROUND.HEAVY DUTY SCORIATED TOP WITH LIFTING DEVICE, VANDAL <br />!'PROOF SCREWS SET TO TOP LEVEL TO FINISHED GRADE. <br />ELECTRIC WATER HEATER SCHEDULE <br />MARK MAKE & MODEL # TYPE STORAGE GAL I DIMENSIONS INCH 1 REC(GP f 1 A T 1 INPUT BTUH) FLUE INC KILOWATTS VOLTS I PHASE HERTZ I LOCATION NOTES <br />EWH ! AO. SMITH DEL-10 I TANK -ELECTRIC E 10 1 H=18-1/4"W=18" I 15154 I NIA ' N/A 2 120 i 1 1 60 ! SEE PLANS 1,2;3A,5,6 & 7 <br />1, PROVIDE FACTORY INSTALLED CONTROLS INCLUDING T STATS SET ON 140°F. <br />2. PROVIDEALL REQUIRED. OPTIONS TO COMPLETE INSTALATION. <br />-------------- <br />3. INSTALL EVVH IN ACCORDANCE TO FLORIDABUILDING CODE- PLUMBING, MECHANCIAL & NATIONAL ELECTRIC CODES, APPLICABLE STANDARDS AND MANUFACTURERS RECOMMENDATIONS. <br />4. WRE FOR SIMULTANEOUS ELEMENT OPERATION. <br />EXPANSION TANK SCHEDULE <br />MARK; MAKE&MODEL# i TYPE MAX. PRESS. I <br />MAX. OPERATING TEMP.. iTANKVOLUME' AIRPRE-CHARGE CONNECTION SIZE TANK SIZE NOTES <br />EXT AMTROL - ST-5 i POTABLE WATER 150 PSI <br />200-F i 2.0 GAL 1 50 PSI 3/4" MALE ; DIAMETER -$", LENGTH -13" 1 & 2 <br />NOTES: <br />1. PROVIDE BRACKETS FOR TANK SUPPORT. <br />2.TANK SHALL BE LISTED -FOR POTABLE WATER INSTALLATION. <br />. PLUMBING <br />LEGEND <br />DESCRIPTION <br />SYMBOLS <br />NEW SANITARY PIPING <br />NEW VENT PIPING <br />NEW COLD WATER PIPING <br />NEW HOT WATER PIPING <br />NEW STORM DRAIN PIPING <br />SD <br />EX. SANITARY PIPING <br />SS <br />EX. VENT PIPING <br />V <br />EX. COLD WATER PIPING <br />EX. HOT WATER PIPING <br />EX. STORM DRAIN PIPING <br />SD - <br />PIPING T0 BE REMOVED VED <br />0 <br />�,X X X X <br />BALL VALVE <br />j <br />PLUMBING FIXTURES <br />FURNISHED & INSTALLED BY <br />PLUMBING CONTRACTOR <br />o <br />■ <br />DESCRIPTION <br />ABBREVIATIONS <br />SANITARY DRAINAGE SYSTEM <br />SS, W <br />VENT PIPING <br />V <br />COLD WATER SYSTEM <br />CW <br />HOT WATER SYSTEM (110-F) <br />HW <br />INDIRECT DRAIN PIPING <br />ID <br />FINISHED FLOOR ELEVATION <br />F.F.E. <br />ELECTRICAL CONTRACTOR <br />E.C. <br />PLUMBING CONTRACTOR <br />P.C. <br />GENERAL CONTRACTOR <br />G.C. <br />WASTE STACK <br />W.S. <br />FULL LINE SIZE <br />F.L.S. <br />INVERT ELEVATION <br />I.E. <br />EXISTING <br />EX. <br />PLUMBING SHEET INDEX <br />P-0 PLUMBING SPECIFICATIONS <br />P-1.1 PLUMBING PLAN: DOMESTIC WATER <br />P-1.2 PLUMBING PLAN: GRAVITY DRAINAGE <br />P-2 PLUMBING DETAILS & SCHEDULES <br />M uj <br />0,w <br />�w <br />0) <br />Q <br />N c <br />N <br />O <br />y <br />.E ;? <br />cU <br />O <br />p <br />r <br />L^ <br />z C <br />C)LL <br />QL <br />o <br />-°� <br />U <br />0) 3 <br />c <br />o� <br />L <br />N <br />� a <br />0` <br />Lij <br />2 <br />N a <br />W <br />U � <br />a <br />� E <br />W <br />N C <br />comE <br />), a <br />d <br />M <br />- o <br />Q 11 � <br />/�� <br />W <br />�a <br />U N <br />U) <br />- <br />.2 <br />o <br />u) <br />c <br />®� <br />6 z <br />U <br />�Z <br />m <br />_ <br />> <br />W <br />O <br />>2 <br />Q <br />E <br />f <br />m <br />U <br />C <br />W <br />a <br />o 0 <br />o <br />o <br />no <br />y <br />Q T <br />La <br />�o <br />M U <br />U <br />Q0 <br />rn <br />■ <br />.. 0) CO M <br />T <br />4 <br />rn o <br />op U <br />, <br />T V <br />W <br />V, <br />M p) <br />L <br />(.0- <br />^ , <br />co 'L <br />M O <br />W <br />O <br />C) U C <br />■ <br />co m <br />n�' <br />- <br />D <br />U <br />W <br />n <br />E D <br />� � L <br />i+ <br />Q <br />06 <br />a> <br />_ a) <br />J <br />U 0 <br />Y- <br />T 5 O <br />O <br />O <br />O <br />O <br />LL <br />CEO <br />� <br />m <br />!� <br />L LJ <br />E <br />U <br />0 <br />I <br />¢ <br />E <br />i� <br />E <br />o <br />U <br />m <br />O <br />vi <br />c <br />m <br />p <br />J_ <br />F-. <br />= <br />m <br />� <br />Z3 <br />Q <br />CL <br />C/) <br />N <br />IV <br />1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 1 10 1 11 1 12 1 <br />THE DESIGN AND CONCEPTS DEPICTED HEREWITH ARE THE SOLE PROPERTY OF ROBERT REID WEDDING ARCHITECTS & PLANNERS, AIA, INC. PLUMBING SPECIFICATIONS <br />NO REPRODUCTION, REVISIONS OR REUSE OF THIS DRAWING IS AUTHORIZED WITHOUT SPECIFIC WRITTEN PERMISSION. ALL RIGHTS RESERVED. _ <br />SCALE: N.T.S <br />sheet no. <br />P-0 <br />