GENERAL PROVISIONS
<br />1 . THE CONTRACTOR SHALL OBTAIN FROM THE OWNER COPIES OF ALL AVAILABLE REGULATORY AGENCY PERMITS AND LOCAL
<br />AGENCY PERMITS.
<br />2. ALL CONSTRUCTION PROJECTS I OR MORE ACRES IN SIZE THAT DISCHARGE TO OFFSITE AREAS ARE REQUIRED TO COMPLY WITH
<br />THE REQUIREMENTS OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) GENERAL PERMIT FOR
<br />STORMWATER DISCHARGE FROM SMALL AND LARGE CONSTRUCTION ACTIVITIES. IN ORDER TO MEET NPDES REQUIREMENTS, THE
<br />CONTRACTOR IS RESPONSIBLE FOR PREPARING A STORMWATER POLLUTION PREVENTION PLAN (SWPPP), IMPLEMENTING,
<br />INSPECTING, MAINTAINING, AND REPORTING ON ALL ELEMENTS OF THE SWPPP, COMPLETING AND SUBMITTING THE REQUIRED
<br />NOTICE OF INTENT (NOI) AND NOTICE OF TERMINATION (NOT) FORMS AS THE OPERATOR, AND PAYING ALL ASSOCIATED FEES. FOR
<br />PROJECTS LESS THAN 1 ACRE IN SIZE THAT ARE NOT REQUIRED TO COMPLY NTH THE NPIDES GENERAL PERMIT, THE
<br />CONTRACTOR IS STILL RESPONSIBLE FOR IMPLEMENTING AND MAINTAINING EROSION AND SEDIMENT CONTROL MEASURES PRIOR
<br />TO AND DURING CONSTRUCTION IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS.
<br />3. BASE SURVEY INFORMATION INCLUDING BUT NOT LIMITED TO ELEVATIONS, EASEMENTS, RIGHTS OF WAY, AND OTHER
<br />TOPOGRAPHIC INFORMATION HAS BEEN PREPARED BY OTHER PROFESSIONALS. CPH, INC. ASSUMES NO RESPONSIBILITY FOR THE
<br />ACCURACY OF THIS INFORMATION.
<br />4. THIS SET OF PLANS MAY CONTAIN DRAWINGS PREPARED BY OTHER PROFESSIONALS, WHICH CONTAIN THE NAME, ADDRESS, AND
<br />LOGO OF THE PROFESSIONAL. CPH, INC. IS NOT RESPONSIBLE FOR DRAWINGS PREPARED BY OTHER PROFESSIONALS.
<br />5. THE CONTRACTOR SHALL SUBMIT (6) COPIES OF SHOP DRAWINGS TO THE ENGINEER FOR APPROVAL PRIOR TO ORDERING THE
<br />MATERIALS REQUIRED FOR CONSTRUCTION. PRIOR TO SUBMISSION, THE CONTRACTOR SHALL THOROUGHLY CHECK SHOP
<br />DRAWINGS, PRODUCT DATA, AND SAMPLES FOR COMPLETENESS AND FOR COMPLIANCE WITH THE CONSTRUCTION PLANS AND
<br />SHALL VERIFY ALL DIMENSIONS AND FIELD CONDITIONS AND SHALL COORDINATE THE SHOP DRAWINGS WITH THE REQUIREMENTS
<br />FOR OTHER RELATED WORK- THE CONTRACTOR'S RESPONSIBILITY FOR ERRORS AND OMISSIONS IN SUBMITTALS IS NOT
<br />RELIEVED BY THE ENGINEER'S REVIEW OF SUBMITTALS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER, IN WRITING AT THE
<br />TIME OF SUBMISSION, OF DEVIATIONS IN SUBMITTALS FROM THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.
<br />6. PROTECT BENCHMARKS, PROPERTY CORNERS, AND OTHER SURVEY MONUMENTS FROM DAMAGE OR DISPLACEMENT. IF MARKER
<br />NEEDS TO BE REMOVED IT SHALL BE REFERENCED BY LICENSED LAND SURVEYOR AND REPLACED, AS NECESSARY, BY SAME.
<br />7. THE CONTRACTOR IS RESPONSIBLE FOR ALL QUALITY CONTROL TESTING. AS A MINIMUM, TESTING SHALL INCLUDE A) PIPING AND
<br />STRUCTURAL EXCAVATION, BEDDING AND BACKFILL MATERIALS AND DENSITY TESTS; B) DETERMINATION OF COMPACTIVE EFFORT
<br />NEEDED FOR COMPLIANCE WITH THE DENSITY REQUIREMENTS C) PORTLAND CEMENT CONCRETE AND ASPHALT PAVING QUALITY
<br />CONTROL TESTING INCLUDING DESIGN MIX REVIEW, MATERIAL�, FIELD SLUMP AND AIR CONTENT, AND FIELD AND LAB CURED
<br />STRENGTH SAMPLES AND TESTING.
<br />8. IN ADDITION TO QUALITY CONTROL TESTING, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REQUIRED TESTING OR APPROVALS
<br />FOR ANY WORK (OR ANY PART THEREOF) IF LAWS OR REGULATIONS OF ANY PUBLIC BODY HAVING JURISDICTION SPECIFICALLY
<br />REQUIRE TESTING, INSPECTIONS OR APPROVAL. THE CONTRACTOR SHALL PAY ALL COSTS IN CONNECTION THEREWITH AND
<br />SHALL FURNISH THE OWNER AND ENGINEER THE REQUIRED CERTIFICATES OF INSPECTION, TESTING OR APPROVAL-
<br />9. ANY DESIGN OR TESTING LABORATORY UTILIZED BY THE CONTRACTOR SHALL BE AN INDEPENDENT LABORATORY ACCEPTABLE TO
<br />THE OWNER AND THE ENGINEER, APPROVED IN WRITING, AND COMPLYING WITH THE LATEST EDITION OF THE "RECOMMENDED
<br />REQUIREMENTS FOR INDEPENDENT LABORATORY QUALIFICATION", PUBLISHED BY THE AMERICAN COUNCIL OF INDEPENDENT
<br />LABORATORIES.
<br />10. TESTING RESULTS SHALL BE PROVIDED TO THE OWNER/OPERATOR AND THE ENGINEER. ALL TEST RESULTS SHALL BE PROVIDED
<br />(PASSING AND FAILING) ON A REGULAR AND IMMEDIATE BASIS.
<br />11. THE ENTIRE PROJECT SITE SHALL BE THOROUGHLY CLEANED AT THE COMPLETION OF THE WORK. CLEAN ALL INSTALLED
<br />PIPELINES, STRUCTURES, SIDEWALKS, PAVED AREAS, ACCUMULATED SILT IN PONDS, PLUS ALL ADJACENT AREAS AFFECTED BY
<br />CONSTRUCTION, AS DIRECTED BY THE OWNER OR JURISDICTIONAL AGENCY. EQUIPMENT TO CLEAN THESE SURFACES SHALL BE
<br />SUBJECT TO APPROVAL BY THE OWNER.
<br />UTILITY GENERAL NOTES
<br />1 . THE UTILITY DATA SHOWN ON THESE PLANS WAS LOCATED BY THE RESPECTIVE UTILITY, OR IS BASED ON UTILITY DRAWINGS,
<br />MAPS, OR FIELD RECONNAISSANCE.
<br />2. THE LOCATION, MATERIAL TYPE, AND SIZE OF ALL EXISTING UTILITIES SHOWN ON THE PLANS HAVE BEEN DETERMINED FROM THE
<br />BEST INFORMATION AVAILABLE AND ARE GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR- THE ENGINEER ASSUMES NO
<br />RESPONSIBILITY FOR THEIR ACCURACY. PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITY, IT SHALL BE THE CONTRACTOR'S
<br />RESPONSIBILITY TO NOTIFY THE VARIOUS UTILITIES AND TO MAKE THE NECESSARY ARRANGEMENTS FOR ANY RELOCATIONS OF
<br />THESE UTILITIES WITH THE OWNER OF THE UTILITY. THE CONTRACTOR SHALL EXERCISE CAUTION WHEN CROSSING AN
<br />UNDERGROUND UTILITY, WHETHER SHOWN ON THE PLANS OR LOCATED BY THE UTILITY COMPANY. ANY UTILITIES, WHETHER
<br />SHOWN ON THESE PLANS OR NOT, THAT INTERFERE WITH THE PROPOSED CONSTRUCTION SHALL BE CLOSELY COORDINATED
<br />WITH THE ENGINEER AND THE RESPECTIVE UTILITY COMPANY FOR RELOCATION OR PROPER INSTRUCTION.
<br />3. A SINGLE POINT UTILITY IDENTIFICATION SERVICE HAS BEEN SETUP FOR EXISTING UTILITIES. THE CONTRACTOR IS TO CONT ACT
<br />THE SUNSHINE STATE ONE CALL CENTER BY DIALING "81 1" AT LEAST TWO (2) AND NO MORE THAN FIVE (5) WORKING DAYS PRIOR
<br />TO THE SPECIFIC CONSTRUCTION ACTIVITY FOR FIELD LOCATION. NOTE THAT NOT ALL UTILITIES PARTICIPATE IN THIS PROGRAM.
<br />THE CONTRACTOR SHOULD CONTACT ALL NON -PARTICIPATING UTILITIES SEPARATELY FOR FIELD LOCATION OF THEIR FACILITIES
<br />AT LEAST TWO (2) WORKING DAYS PRIOR TO CONSTRUCTION.
<br />4. THE FOLLOWING UTILITIES INFORMATION/CONTACTS SHOWN ON COVER SHEET.
<br />5. THE CONTRACTOR SHALL KEEP LOCATE TICKETS UP TO DATE AT ALL TIMES.
<br />6. THE CONTRACTOR IS RESPONSIBLE FOR ALL COORDINATION WITH EACH UTILITY AND ALL COSTS ASSOCIATED WITH THE
<br />PROTECTION OF EXISTING FACILITIES DURING CONSTRUCTION. THE CONTRACTOR SHALL ALSO COORDINATE NECESSARY
<br />RELOCATIONS OR OTHER CONSTRUCTION RELATED MATTERS WITH EACH UTILITY.
<br />7. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN IN SERVICE ALL EXISTING PIPING ENCOUNTERED DURING
<br />CONSTRUCTION UNLESS OTHERWISE INDICATED IN THE DRAWINGS. ANY PIPING WHICH CAN BE REMOVED DURING
<br />CONSTRUCTION WITHOUT UNDUE INTERRUPTION OF SERVICE MAY BE REMOVED AND REPLACED BY THE CONTRACTOR WITH THE
<br />PERMISSION OF THE OWNER AND THE ENGINEER.
<br />8. THE CONTRACTOR SHALL FIELD LOCATE ALL WATER AND SEWER SERVICES AND LATERALS WITHIN THE PROPOSED
<br />CONSTRUCTION AREA PRIOR TO CONSTRUCTION AND ADJUST THE PROPOSED CONSTRUCTION AS NEEDED TO ACCOMMODATE
<br />THESE EXISTING LINES.
<br />9. TYPICAL DETAILS AND PROPOSED CONSTRUCTION AS SHOWN ILLUSTRATE THE ENGINEER'S INTENT AND ARE NOT PRESENTED AS
<br />A SOLUTION TO ALL CONSTRUCTION PROBLEMS ENCOUNTERED IN THE FIELD. THE CONTRACTOR MAY ALTER THE PROPOSED
<br />CONSTRUCTION TO SUIT FIELD CONDITIONS, PROVIDED IT COMPLIES WITH THE PROJECT SPECIFICATIONS AND APPROVAL IS
<br />RECEIVED FROM THE ENGINEER. WHERE SUCH PROPOSED REVISIONS DEVIATE FROM THE FIDEP CONSTRUCTION PERMIT, THEN
<br />� SUCH REVISIONS WILL ALSO REQUIRE APPROVAL FROM FDEP.
<br />.
<br />10. FOR EACH RESPECTIVE PIPELINE CONSTRUCTION REQUIRED, THE CONTRACTOR SHALL FIELD VERIFY THE LOCA-FION, DEPTH, SIZE,
<br />I MATERIAL TYPE, AND ALIGNMENT OF ALL EXISTING PIPES, CABLES, ETC. TO BE CROSSED OR CONNECTED TO. IF THE
<br />CONTRACTOR DEEMS NECESSARY (A) A CHANGE IN ALIGNMENT OR DEPTH, OR THE NEED FOR ADDITIONAL FITTINGS, BENDS, OR
<br />COUPLINGS, WHICH REPRESENT A DEPARTURE FROM THE CONTRACT DRAWING, OR (B) A NEED FOR RELOCATION OF EXISTING
<br />UTILITIES, THEN DETAILS OF SUCH DEPARTURES, RELOCATIONS, OR ADDITIONAL FITTINGS, INCLUDING CHANGES IN RELATED
<br />PORTIONS OF THE PROjECT AND THE REASONS THEREFORE, SHALL BE SUBMIT-TED WITH SHOP DRAWINGS. APPROVED
<br />DEPARTURES FOR THE CONTRACTOR'S CONVENIENCE SHALL BE MADE AT NO ADDITIONAL COST TO THE OWNER.
<br />11. THE CONTRACTOR SHALL PROVIDE AT HIS OWN EXPENSE ALL NECESSARY TEST PUMPING EQUIPMENT, WATER, WATER METERS,
<br />. I
<br />PRESSURE GAUGES, AND OTHER EQUIPMENT, MATERIAL AND FACILITIES REQUIRED FOR ALL HYDROSTATIC, LEAKAGE, AND
<br />PRESSURE TESTING. THE CONTRACTOR SHALL CONTACT THE ENGINEER AND THE OWNER IN WRITTEN FORM, FORTY-EIGHT (48)
<br />HOURS IN ADVANCE OF PROPOSED TESTING. THE CONTRACTOR SHALL PERFORM SATISFACTORY PRETESTING PRIOR TO
<br />NOTIFICATION.
<br />AS -BUILT DRAWING REQUIREMENTS
<br />.
<br />�
<br />.
<br />1. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER AT LEAST THREE WEEKS PRIOR TO FINAL
<br />. INSPECTION. ALL AS -BUILT DATA SHALL BE PROVIDED BY A FLORIDA LICENSED SURVEYOR, SIGNED, SEALED AND DATED BY THE
<br />RESPONSIBLE PARTY. .�
<br />2. ALL RECORD DRAWING$ SHALL BE PREPARED BY THE CONTRACTOR IN ACAD FORMAT USING CONSTRUCTION PLAN SHEETS
<br />� PROVIDED BY THE ENGINEER. AS -BUILT INFORMATION SHALL BE FIELD VERIFIED, MEASURED, ADDED TO THE ACAD FILES OF THE
<br />I CONSTRUCTION PLAN SHEETS PROVIDED BY THE ENGINEER, AND CERTIFIED, SIGNED AND SEALED BY THE CONTRACTOR'S
<br />LICENSED SURVEYOR WHO WILL BE RESPONSIBLE FOR THE ACCURACY OF ALL DIMENSIONS AND ELEVATIONS.
<br />1
<br />3. THE X, Y AND (Z) LOCATION BASED ON THE COORDINATE SYSTEM FLORIDA EAST ZONE STATE PLANE COORDINATE FEET NAD 83,
<br />�
<br />� OF ALL VALVES (CENTER OF PIPE), MANHOLES, INLETS, VALVE BOXES (GRADE), HYDRANTS (GRADE), BLOW OFFS (GRADE), SAMPLE
<br />POINTS (GRADE) AND METER BOXES (GRADE) ETC. SHALL BE CLEARLY SHOWN. ACCEPTABLE POSITION ACCURACY SHALL BE
<br />SUB -METER OR BETTER FOR COMPATIBILITY WITH GLOBAL POSITIONING SYSTEM (GPS) EQUIPMENT. THE VERTICAL DATUM USED
<br />�
<br />SHALL BE NAVID 88 UNLESS OTHERWISE SHOWN ON THE CONSTRUCTION PLANS.
<br />.
<br />4. THE AS -BUILT INFORMATION IS TO INCLUDE, BUT NOT BE LIMITED TO, THE FOLLOWING:
<br />.
<br />�
<br />. A. HORIZONTAL LOCATIONS ANDVERTICAL ELEVATIONS FOR ALL UTILITY AND STORM STRUCTURES INCLUDING BUT NOT
<br />I LIMITED TO MANHOLES, INLETS AND CLEANOUTS, INCLUDING STRUCTURE TOP AND INVERT ELEVATIONS.
<br />t B. DISTANCE ALONG PIPELINES BETWEEN STRUCTURES.
<br />C. STORMWATER POND TOP OF BERM AND POND BOTTOM ELEVATIONS AND HORIZONTAL DIMENSIONS MEASURED AT A
<br />MINIMUM OF TEN LOCATIONS PER POND, AT LOCATIONS DESIGNATED BY THE ENGINEER. TOP OF POND HORIZONTAL
<br />DIMENSIONS ARE ALSO TO BE TIED TO PROPERTY CORNERS, EASEMENTS, AND RIGHTS -OF -WAY.
<br />D_ STORMWATER CONTROL STRUCTURE DIMENSIONS AND ELEVATIONS, INCLUDING ALL WEIRS, SLOTS, ORIFICES, GRATES, AND
<br />SKIMMERS.
<br />E. STORMWATER CONVEYANCE SYSTEMS INCLUDING DIMENSIONS, ELEVATIONS, CONTOURS, AND CROSS SECTIONS.
<br />F. HORIZONTAL LOCATIONS AND VERTICAL ELEVATIONS OF ALL UTILITY VALVES, FITTINGS, CONNECTION POINTS, ETC.
<br />G. VERTICAL ELEVATIONS OF ALL PIPELINES AT CROSSINGS OF POTABLE WATER MAINS (WHETHER THE WATER MAIN IS
<br />EXISTING OR NEW) IN ORDER TO DOCUMENT THATTHE MINIMUM REQUIRED VERTICAL SEPARATION HAS BEEN MET.
<br />H. UTILITY PIPELINE TIED HORIZONTALLY TO EDGE OF PAVEMENT AND RIGHT-OF-WAY LINES, LOCATED EVERY 200-FT PLUS ALL
<br />CHANGES IN HORIZONTAL OFFSET.
<br />1. PAVEMENT WIDTH AND ELEVATIONS AT THE CENTERLINE AND EDGE OF PAVEMENT EVERY 200 FEET PLUS AT ALL CHANGES IN
<br />LONGITUDINAL SLOPE, CROSS SLOPE, INLET LOCATIONS, AND AT ALL DRIVEWAY AND STREET INTERSECTIONS. FOR PARKING
<br />LOTS, RECORD CENTERLINE AND EDGE OF PAVEMENT ELEVATIONS ALONG ALL DRIVE AISLES AND ISLANDS.
<br />J_ ALL PARKING AREAS AND SIDEWALK RAMPS DESIGNATED FOR HANDICAP ACCESS SHALL CONTAIN HORIZONTAL AND
<br />VERTICAL MEASUREMENTS IN ORDER TO VERIFY REQUIRED WIDTHS AND SLOPES HAVE BEEN MET-
<br />K. HORIZONTAL AND VERTICAL DATA FOR ANY CONSTRUCTION THAT DEVIATES FROM THE APPROVED ENGINEERING DRAWINGS.
<br />L. WHERE THE PLANS CONTAIN SPECIFIC HORIZONTAL LOCATION DATA, SUCH AS STATION AND OFFSET, THE AS -BUILT
<br />DRAWINGS ARE TO REFLECT THE ACTUAL HORIZONTAL LOCATION.
<br />M. WHERE THE PLANS CONTAIN SPECIFIC VERTICAL ELEVATION DATA, THE AS -BUILT DRAWINGS ARE TO REFLECT THE ACTUAL
<br />MEASURED VERTICAL ELEVATION-
<br />5. RECORD DRAWINGS ARE TO BE PREPARED BY THE CONTRACTOR, CERTIFIED BY THE CONTRACTOR'S LICENSED SURVEYOR, AND
<br />DELIVERED TO THE ENGINEER FOR REVIEW. THE ENGINEER WILL REVIEW THE DRAWINGS FOR COMPLETENESS IN ACCORDANCE
<br />WITH THE REQUIREMENTS OF THESE NOTES WITHIN SEVEN (7) FULL WORKING DAYS. FOR PRELIMINARY REVIEW, SUBMITTAL IN
<br />ACAD AND PDF FORMAT IS SUFFICIENT AND SIGNED AND SEALED COPIES ARE NOT NECESSARY. FINAL SUBMITTAL OF COMPLETE
<br />RECORD DRAWINGS SHALL CONSIST OF ONE SET SIGNED AND SEALED BY THE CONTRACTOR'S LICENSED SURVEYOR PLUS ACAD
<br />AND PDF FILES OF THE RECORD DRAWINGS DELIVERED TO THE ENGINEER. IF THE DRAWINGS ARE FOUND TO BE INCOMPLETE OR
<br />INACCURATE, THE DRAWINGS WILL BE RETURNED TO THE CONTRACTOR FOR CORRECTION-
<br />6. IN CASES WHERE THE OWNER DETERMINES PARTIAL CLEARANCES FROM PERMITTING AGENCIES ARE BENEFICIAL TO THE OWNER
<br />FOR COMPLETED PORTIONS OF THE PROJECT, PROVIDE PRELIMINARY RECORD DRAWINGS (ACAD FORMAT) TO THE ENGINEER FOR
<br />ITS USE IN PREPARING THE PARTIAL CLEARANCE APPLICATIONS FOR THE OWNER.
<br />7. COMPLETE RECORD DRAWINGS THAT ARE FOUND TO BE SATISFACTORY AS A RESULT OF THE ENGINEER'S REVIEW WILL BE USED
<br />AS THE BASIS FOR THE FINAL PROJECT RECORD DRAWINGS PREPARED BY THE ENGINEER USING THE CONTRACTOR PROVIDED
<br />RECORD DRAWINGS PLUS ENGINEER ADDED INFORMATION.
<br />8. COMPLETE SIGNED AND SEALED RECORD DRAWINGS ARE REQUIRED TO BE DELIVERED TO THE OWNER PRIOR TO FINAL
<br />INSPECTION OF THE PROJECT. FINAL INSPECTIONS WILL ONLY BE SCHEDULED UPON RECEIPT OF SIGNED AND SEALED RECORD
<br />DRAWINGS THAT HAVE BEEN REVIEWED BY THE ENGINEER AND DELIVERED BY THE ENGINEER TO THE OWNER.
<br />TRAFFIC CONTROL
<br />1 . THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A MAINTENANCE OF TRAFFIC (M,O.T.) PLAN PRIOR TO CONSTRUCTION, THE
<br />M.O.T. PLAN SHALL SHOW ALL PROPOSED TRAFFIC CONTROL SIGNS, PAVEMENT MARKINGS, AND BARRICADES, AND SHALL DETAIL
<br />ALL PROPOSED CONSTRUCTION SEQUENCING. THE M.O.T. PLAN AND INSTALLED TRAFFIC CONTROL MEASURES SHALL BE
<br />APPROVED BY THE ENGINEER, OWNER, AND ROADWAY JURISDICTIONAL AGENCY PRIOR TO CONSTRUCTION. IN GENERAL,
<br />ROADWAY AND DRIVEWAY LANE CLOSURES ARE PROHIBITED DURING CONSTRUCTION UNLESS SPECIFICALLY DETAILED ON THESE
<br />PLANS. IN THE EVENT IT IS DETERMINED THAT ROADWAY AND DRIVEWAY LANE CLOSURES WILL BE ALLOWED, THE CLOSURES
<br />SHALL BE RESTRICTED TO THE HOURS BETWEEN 9:00 A.M. AND 4:00 P.M. UNLESS OTHERWISE AUTHORIZED IN THE APPROVED
<br />M.O.T.
<br />2. ALL TRAFFIC CONTROL MEASURES SHALL BE IN ACCORDANCE WITH FDOT INDEX NO. 600 AND THE MANUAL ON UNIFORM TRAFFIC
<br />CONTROL DEVICES (MUTCD). ALL TRAFFIC CONTROL MEASURES SHALL BE INSTALLED PRIOR TO CONSTRUCTION AND MAINTAINED
<br />DURING CONSTRUCTION-
<br />3. INSPECT TRAFFIC CONTROL DEVICES ON A DAILY BASIS TO ENSURE PLACEMENT OF BARRICADES AND FUNCTION OF LIGHTS IS
<br />MAINTAINED THROUGHOUT CONSTRUCTION.
<br />4. CONTACT PROPERTY OWNERS AFFECTED BY CONSTRUCTION. COORDINATE TEMPORARY DRIVEWAY CLOSURES AND
<br />SEQUENCING. MAINTAIN ACCESS FOR ALL PROPERTY OWNERS DURING CONSTRUCTION.
<br />5. WET UNSTABILIZED AREAS AS NECESSARY TO CONTROL DUST.
<br />6. ADJUST TRAFFIC CONTROL DEVICES AS REQUIRED UNDER EMERGENCY CONDITIONS.
<br />7. THE CONTRACTOR IS EXPECTED TO COORDINATE ITS ACTIVITIES WITH OTHER CONTRACTORS WHO MAY BE WORKING IN THE
<br />IMMEDIATE VICINITY.
<br />8. WHEN WORK OCCURS WITHIN 15-FT OF ACTIVE ROAD TRAVEL LANES BUT NO CLOSER THAN 2-FT FROM THE EDGE OF PAVEMENT,
<br />SIGNAGE AND WARNING DEVICES ARE TO BE INSTALLED IN ACCORDANCE WITH FDOT INDEX NO. 600 AND 602.
<br />9. TYPE I OR TYPE 11 BARRICADES AT 20-FT CENTERS SHALL BE PLACED AND MAINTAINED ALONG THE EDGE OF THE ROAD
<br />WHEREVER DROP-OFFS OR OTHER HAZARDS EXIST AND TO BLOCK ENTRANCE INTO COMPLETED OR PARTIALLY COMPLETED
<br />PAVEMENTS UNTIL SUCH PAVEMENTS ARE OPEN TO PUBLIC USE.
<br />SITE PREPARATION
<br />1- UNLESS OTHERWISE DIRECTED BY THE OWNER OR ENGINEER, THE CONTRACTOR IS EXPECTED TO CONTAIN ALL CONSTRUCTION
<br />ACTIVITIES WITHIN THE PROPERTY, RIGHT-OF-WAY, AND EASEMENTS AS INDICATED ON THE DRAWINGS. AT NO TIME SHALLTHE
<br />CONTRACTOR DISTURB SURROUNDING PROPERTIES OR TRAVEL ON SURROUNDING PROPERTIES WITHOUT WRITTEN CONSENT
<br />FROM THE PROPERTY OWNER. ANY REPAIR OR RECONSTRUCTION OF DAMAGED AREAS IN SURROUNDING PROPERTIES SHALL BE
<br />REPAIRED BY THE CONTRACTOR ON AN IMMEDIATE BASIS. ALL COSTS FOR REPAIRS SHALL BE THE RESPONSIBILITY OF THE
<br />CONTRACTOR AND NO EXTRA COMPENSATION SHALL BE PROVIDED.
<br />2. STAKE OUT THE CONSTRUCTION, ESTABLISH LINES AND LEVELS, TEMPORARY BENCH MARKS, BATTER BOARDS, CENTERLINES,
<br />BASELINES, AND REFERENCE POINTS FOR THE WORK, AND VERIFY ALL DIMENSIONS RELATING TO INTERCONNECTION WITH
<br />EXISTING FEATURES. REPORT ANY INCONSISTENCIES IN THE PROPOSED GRADES, LINES AND LEVELS, DIMENSIONS AND
<br />LOCATIONS TO THE ENGINEER BEFORE COMMENCING WORK.
<br />3. PROTECT ALL TREES AND SHRUBS LOCATED OUTSIDE THE RIGHT-OF-WAY, EASEMENTS, AND OWNER SECURED PROPERTY,
<br />PARTICULARLY THOSE TREES AND SHRUBS LOCATED ADJACENT TO WORK AREAS.
<br />4. WITHIN THE RIGHT-OF-WAY, EASEMENTS, AND OWNER SECURED PROPERTY, THE INTENT IS TO ALLOW TREES AND SHRUBS TO
<br />REMAIN IN ACCORDANCE WITH THE FOLLOWING SCHEDULE: NEW ROADWAY CONSTRUCTION - TREES AND SHRUBS TO REMAIN
<br />WHERE LOCATED MORE THAN 15 FEET FROM THE BACK OF CURB, OR OUTSIDE THE LIMITS OF EXCAVATION OR FILL AREAS,
<br />WHICHEVER IS FURTHER. UTILITY PIPELINE CONSTRUCTION - TREES AND SHRUBS TO REMAIN OUTSIDE A 15 FOOT WIDE PATH,
<br />CENTERED ON THE PIPELINE.
<br />5. TREES TO REMAIN IN THE CONSTRUCTION AREA SHALL BE BOXED, FENCED OR OTHERWISE PROTECTED IN ACCORDANCE WITH
<br />DETAILS ON THE DRAWINGS. DO NOT PERMIT HEAVY EQUIPMENT OR STOCKPILES WITHIN BRANCH SPREAD
<br />.
<br />�
<br />6. AREAS TO RECEIVE CLEARING AND GRUBBING SHALL INCLUDE ALL AREAS TO BE OCCUPIED BY THE PROPOSED IMPROVEMENTS,
<br />AREAS FOR FILL AND SITE GRADING, AND BORROW SITES. REMOVE TREES OUTSIDE OF THESE AREAS ONLY AS INDICATED ON THE
<br />DRAWINGS OR AS APPROVED IN WRITING BY THE ENGINEER-
<br />7. CLEARING SHALL CONSIST OF REMOVING TREES AND BRUSH AND DISPOSAL OF OTHER MATERIALS THAT ENCROACH UPON OR
<br />OTHERWISE OBSTRUCT THE WORK.
<br />8. EXERCISE EXTREME CARE DURING THE CLEARING AND GRUBBING OPERATIONS. DO NOT DAMAGE EXISTING STRUCTURES, PIPES
<br />OR UTILITIES.
<br />9. GRUBBING SHALL CONSIST OF REMOVING AND DISPOSING OF STUMPS, ROOTS LARGER THAN 2" IN DIAMETER, AND MATTED
<br />ROOTS. REMOVE TO A DEPTH OF NOT LESS THAN 18" BELOW THE ORIGINAL SURFACE LEVEL OF THE GROUND.
<br />10. ALL COMBUSTIBLE DEBRIS AND REFUSE FROM SITE PREPARATION OPERATIONS SHALL BE REMOVED TO LEGAL OFFSITE DISPOSAL
<br />AREAS.
<br />DEWATERING
<br />1 . DESIGN AND PROVIDE A DEWATERING SYSTEM USING ACCEPTED AND PROFESSIONAL METHODS CONSISTENT WITH CURRENT
<br />INDUSTRY PRACTICE. PROVIDE A DEWATERING SYSTEM OF SUFFICIENT SIZE AND CAPACITY TO CONTROL GROUNDWATER IN A
<br />MANNER THAT PRESERVES STRENGTH OF FOUNDATION SOILS, DOES NOT CAUSE INSTABILITY OR RAVELING OF EXCAVATION
<br />SLOPES, AND DOES NOT RESULT IN DAMAGE TO EXISTING STRUCTURES. WHERE NECESSARY TO THESE PURPOSES, LOWER
<br />WATER LEVEL IN ADVANCE OF EXCAVATION, UTILIZING WELLS, WELLPOINTS, OR SIMILAR POSITIVE METHODS. MAINTAIN THE
<br />GROUNDWATER LEVEL TO A MINIMUM OF 2 FEET BELOW EXCAVATIONS. PROVIDE PIEZOMETERS IF DIRECTED BY THE ENGINEER
<br />TO DOCUMENT THE GROUNDWATER LEVEL IS BEING MAINTAINED.
<br />2. CONTROL, BY ACCEPTABLE MEANS, ALL WATER REGARDLESS OF SOURCE AND BE FULLY RESPONSIBLE FOR DISPOSAL OF THE
<br />WATER. NO ADDITIONAL PAYMENT WILL BE MADE FOR ANY SUPPLEMENTAL MEASURES TO CONTROL SEEPAGE, GROUNDWATER,
<br />OR ARTESIAN HEAD.
<br />3. DEWATERING DISCHARGE FROM THE SITE SHALL COMPLY WITH ALL NPDES GENERAL PERMIT REQUIREMENTS AND STATE WATER
<br />QUALITY STANDARDS. PROVIDE ALL TESTING AND PERM17TING REQUIRED AND COMPLY WITH ALL TREATMENT OR DISPOSAL
<br />METHODS REQUIRED TO MEET ALL LOCAL, STATE AND FEDERAL REQUIREMENTS.
<br />4. OPEN PUMPING WITH SUMPS AND DITCHES SHALL BE ALLOWED, PROVIDED IT DOES NOT RESULT IN BOILS, LOSS OF FINES,
<br />SOFTENING OF THE GROUND, OR INSTABILITY OF SLOPES, SUMPS SHALL BE LOCATED OUTSIDE OF LOAD BEARING AREAS SO THE
<br />BEARING SURFACES WILL NOT BE DISTURBED. WATER CONTAINING SILT IN SUSPENSION SHALL NOT BE PUMPED INTO SEWER
<br />LINES OR ADJACENT STREAMS. DURING NORMAL PUMPING, AND UPON DEVELOPMENT OF WELL(S), LEVELS OF FINE SAND OR SILT
<br />IN THE DISCHARGE WATER SHALL NOT EXCEED 5 PPM.
<br />5. IF DEWATERING EQUIPMENT NEEDED EXCEEDS ANY OF THE FOLLOWING: 1) 6" PUMP VOLUTE; 2) 100,000 GPD TOTAL 24 HOUR (1
<br />DAY)DEWATERING,AND; 3) 1,000,000 GPD PUMP CAPACITY, THE CONTRACTOR SHALL BE REQUIRED TO PERMIT THE DEWATERING
<br />SYSTEM WITH THE WATER MANAGEMENT DISTRICT-
<br />6. CONTINUOUSLY MAINTAIN EXCAVATIONS IN A DRY CONDITION WITH POSITIVE DEWATERING METHODS DURING PREPARATION OF
<br />SUB -GRADE, INSTALLATION OF PIPE, AND CONSTRUCTION OF STRUCTURES UNTIL THE CRITICAL PERIOD OF CONSTRUCTION
<br />AND/OR BACKFILL IS COMPLETED TO PREVENT DAMAGE OF SUB -GRADE SUPPORT, PIPING, STRUCTURE, SIDE SLOPES, OR
<br />ADJACENT FACILITIES FROM FLOTATION OR OTHER HYDROSTATIC PRESSURE IMBALANCE-
<br />7. WHEN CONSTRUCTION IS COMPLETE, REMOVE ALL DEWATERING EQUIPMENT FROM THE SITE, INCLUDING WELLS AND RELATED
<br />TEMPORARY ELECTRICAL SERVICE.
<br />EXCAVATION, TRENCHING, AND FILL
<br />1 . THE CONTRACTOR SHALL RECOGNIZE AND ABIDE BY ALL OSHA EXCAVATION SAFETY STANDARDS, INCLUDING THE FLORIDA
<br />TRENCH SAFETY ACT (FS 553.60-553.64). ANY MATERIAL, CONSTRUCTION METHODS, OR MATERIAL COST TO COMPLY WITH THESE
<br />LAWS SHALL BE INCIDENTAL TO THE CONTRACT.
<br />2. ROUGH EXCAVATE AND GRADE ANY PROPOSED STORMWATER PONDS AT THE START OF SITE GRADING ACTIVITIES. DIRECT SITE
<br />RUNOFF TO THE PONDS TO MINIMIZE RUNOFF TO OFFSITE AREAS-
<br />3. POND CONSTRUCTION SHALL RESULT IN THE FINISHED POND HAVING SIDE SLOPES AND DIMENSIONS THAT ARE IN ACCORDANCE
<br />WITH THE CONSTRUCTION DRAWINGS. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO ENSURE THAT THESE REQUIREMENTS
<br />HAVE BEEN MET. IF THE CONSTRUCTED SIDE SLOPES ARE STEEPER THAN THE REQUIRED SIDE SLOPES, OR THE POND VOLUME IS
<br />NOT WITHIN THREE (3) PERCENT OF THE DESIGN VOLUME, THE CONTRACTOR MAY BE REQUIRED TO MAKE CORRECTIONS TO THE
<br />POND AT NO ADDITIONAL COST TO THE OWNER.
<br />4. FIELD DENSITY TESTING FREQUENCIES: A) ONE TEST FOR EACH 1 0,000 SQUARE FEET OR FRACTION THEREOF PER LIFT OF
<br />GENERAL BACKFILLING, MINIMUM 2 TESTS EACH LAYER- B) ONE TEST FOR EACH 1 00 SQUARE FEET OR FRACTION THEREOF OF
<br />BACKFILL AROUND AND UNDER STRUCTURES; C) ONE fEST FOR EACH 300 LINEAL FEET OR FRACTION THEREOF PER LIFT OF
<br />GENERAL BACKFILLING IN THE PIPELINE TRENCH ' D) ONE TEST PER LIFT PER EACH CHANGE IN TYPE OF FILL; E) ONE TEST PER 1000
<br />SQUARE FEET OF PAVEMENT SUBGRADE, MINIMUM OF 2 TESTS.
<br />5. IT IS INTENDED THAT PREVIOUSLY EXCAVATED MATERIALS CONFORMING TO THE FOLLOWING REQUIREMENTS BE UTILIZED
<br />WHEREVER POSSIBLE.
<br />A- ACCEPTABLE MATERIALS: AASHTO M145 CLASSIFICATION A-1, A-3, A-24, A-2-61 ASTM D2487 CLASSIFICATION GW, GP, GM, SM,
<br />SW, SP; UNLESS OTHERWISE DISAPPROVED WITHIN THE SOIL AND SUBSURFACE INVESTIGATION REPORTS. NO MORE THAN
<br />10% OF ACCEPTABLE MATERIALS SHALL PASS THE NUMBER 200 SIEVE.
<br />B. UNACCEPTABLE MATERIALS: AASHTO M145 CLASSIFICATION A-2-5, A-2-7, A-4, A-5, A-6, A-7, A-8, ASTM D2487 CLASSIFICATION
<br />GC� SC, ML, MIA, CL, CH, OL, OH, PT; UNLESS OTHERWISE APPROVED WITHIN THE SOIL AND SUBSURFACE INVESTIGATION
<br />REPORTS.
<br />6. PROVIDE BARRIERS, WARNING LIGHTS AND OTHER PROTECTIVE DEVICES AT ALL EXCAVATIONS.
<br />7. SIDEWALKS, ROADS, STREETS, AND PAVEMENTS SHALL NOT BE BLOCKED OR OBSTRUCTED BY EXCAVATED MATERIALS, EXCEPT
<br />AS AUTHORIZED BY THE ENGINEER, IN WHICH CASE ADEQUATE TEMPORARY PROVISIONS MUST BE MADE FOR SATISFACTORY
<br />TEMPORARY PASSAGE OF PEDESTRIANS, AND VEHICLES. MINIMIZE INCONVENIENCE TO PUBLIC TRAVEL OR TO TENANTS
<br />OCCUPYING ADJOINING PROPERTY.
<br />8. FURNISH, INSTALL, AND MAINTAIN, WITHOUT ADDITIONAL COMPENSATION, SHEETING, BRACING, AND SHORING SUPPORT
<br />REQUIRED TO KEEP EXCAVATIONS WITHIN THE PROPERTY OR EASEMENTS PROVIDED, TO SUPPORT THE SIDES OF THE
<br />EXCAVATION, AND TO PREVENT ANY MOVEMENT WHICH MAY DAMAGE ADJACENT PAVEMENTS OR STRUCTURES, DAMAGE OR
<br />DELAY THE WORK, OR ENDANGER LIFE AND HEALTH- VOIDS OUTSIDE THE SUPPORTS SHALL BE IMMEDIATELY FILLED AND
<br />COMPACTED.
<br />9. SHEETING, SHORING, AND BRACING USED FOR THE SUPPORT OF EXCAVATIONS OVER 20 FEET DEEP SHALL BE DESIGNED BY A
<br />PROFESSIONAL ENGINEER LICENSED BY THE STATE OF FLORIDA.
<br />10, ALL EXCAVATIONS SHALL BE MADE BY OPEN CUT UNLESS OTHERWISE INDICATED. SLOPE SIDES OF TRENCHES IN ACCORDANCE
<br />WITH OSHA REQUIREMENTS AND THE RECOMMENDATIONS CONTAINED WITHIN THE PROJECT GEOTECHNICAL REPORT.
<br />11. EXCAVATE TRENCHES TO DEPTH INDICATED OR REQUIRED FOR INDICATED FLOW LINES AND INVERT ELEVATIONS. OVER
<br />EXCAVATE TRENCHES A MINIMUM OF 2 FEET WHERE EXCAVATIONS OCCUR WITHIN UNSUITABLE SOILS, AND REPLACE OVER
<br />EXCAVATED MATERIAL WITH SUITABLE SOILS.
<br />12. EXCEPT AS OTHERWISE INDICATED, EXCAVATE FOR PRESSURE PIPING SO TOP OF PIPING IS MINIMUM 3 FEET BELOW FINISHED
<br />GRADE.
<br />13. TRENCH BOTTOMS AND THE BOTTOMS OF ALL STRUCTURES SHALL BE KEPT DRY, COMPACTED, AND STABLE TO A DEPTH TWO
<br />FEET BELOW THE BOTTOM OF THE TRENCH OR STRUCTURE.
<br />14. ALL BEDDING, FILL, AND BACKFILL MATERIAL SHALL BE SUITABLE SOILS OR FLOWABLE FILL. WHERE TRENCH OR EXCAVATION IS
<br />WITHIN THE INFLUENCE AREA OF ROADWAYS, STRUCTURES, FOUNDATIONS, OR SLABS, PLACE BACKFILL IN LAYERS OF 8 INCH
<br />LOOSE DEPTH. IN ALL OTHER AREAS, PLACE FILL AND BACKFILL IN LAYERS OF 12 INCH LOOSE DEPTH.
<br />15. MINIMUM DENSITY REQUIREMENT (ASTM D1557 OR AASHTOT180): BACKFILL AND FILL UNDER AND WITHIN THE INFLUENCE AREA
<br />OF ROADWAYS, STRUCTURES, SLABS, FOUNDATIONS = 98 PERCENT; BACKFILL AND FILL PLACED WITHIN PUBLIC ROAD
<br />RIGHT-OF-WAY AND UTILITY EASEMENTS = 95 PERCENT, BACKFILL AND FILL PLACED WITHIN POND AND ROAD EMBANKMENT = 95
<br />PERCENT; BACKFILL AND FILL PLACED IN ALL OTHER AREAS = 90 PERCENT.
<br />UTILITY SEPARATION REQUIREMENTS
<br />1, THE HORIZONTAL SEPARATION BETWEEN WATER MAINS AND SANITARY SEWER, STORM SEWER, WASTEWATER FORCE MAINS,
<br />STORMWATER FORCE MAINS, AND ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEMS SHALL BE IN ACCORDANCE WITH THE
<br />FOLLOWING:
<br />A. THE OUTSIDE OF WATER MAINS SHALL BE A MINIMUM OF THREE FEET FROM THE OUTSIDE OF ANY EXISTING OR PROPOSED
<br />STORM SEWER, STORMWATER FORCE MAJN, VACUUM TYPE SANITARY SEWER.
<br />B. THE OUTSIDE OF WATER MAINS SHALL BE A MINIMUM OF SIX FEET FROM THE OUTSIDE OF ANY EXISTING OR PROPOSED
<br />GRAVITY SANITARY SEWER AND WASTEWATER FORCE MAIN. THE MINIMUM HORIZONTAL SEPARATION DISTANCE BETWEEN
<br />THE OUTSIDE OF WATER MAINS AND THE OUTSIDE OF GRAVITY SANITARY SEWERS CAN BE REDUCED TO THREE FEET WHERE
<br />THE BOTTOM OF THE WATER MAIN IS AT LEAST SIX INCHES ABOVE THE TOP OF THE SEWER.
<br />0. THE OUTSIOM OP WATER MAINS SHALL BE A MINIMUM OFTEN FERT FROM ALL PARTS OF ANY EXISTING OR PROPOSED ONSITE
<br />SEWAGE TREATMENT AND DISPOSAL SYSTEM SUCH AS SEPTIC TANKS, DRAJNFIELDS, AND GREASE TRAPS. ONSITE SEWAGE
<br />TREATMENT AND DISPOSAL SYSTEMS DO NOT INCLUDE PACKAGE SEWAGE TREATMENT FACILITIES AND PUBLIC
<br />WASTEWATER TREATMENT FACILITIES.
<br />2. THE VERTICAL SEPARATION BETWEEN WATER MAINS AND SANITARY AND STORM SEWER, WASTEWATER OR STORMWATER FORCE
<br />MAINS MAINS SHALL BE IN ACCORDANCE WITH THE FOLLOWING:
<br />A. WHEREVER POSSIBLE, WATER MAINS SHALL CROSS OVER EXISTING OR PROPOSED GRAVITY SANITARY SEWER, VACUUM
<br />TYPE SANITARY SEWER, AND STORM SEWER, SO THE OUTSIDE OF THE WATER MAIN IS AT LEAST SIX INCHES ABOVE THE
<br />OUTSIDE OF THE SEWER. WHERE IT IS NOT POSSIBLE FOR THE WATER MAIN TO CROSS OVER EXISTING OR PROPOSED
<br />GRAVITY SANITARY SEWER, VACUUM TYPE SANITARY SEWER, AND STORM SEWER, THEN THE WATER MAIN CAN CROSS
<br />UNDER THESE TYPES OF PIPELINE SYSTEMS PROVIDED THE OUTSIDE OF THE WATER MAIN IS AT LEAST 12 INCHES BELOW
<br />THE OUTSIDE OF THE PIPELINE. AT THE CROSSING, THE PROPOSED PIPE JOINTS SHALL BE ARRANGED SO THAT ALL WATER
<br />MAIN JOINTS ARE AT LEAST THREE FEET FROM VACUUM TYPE SANITARY SEWER OR STORM SEWER JOINTS, AND AT LEAST
<br />SIX FEET FROM GRAVITY SANITARY SEWER JOINTS.
<br />B. WHEREVER POSSIBLE, WATER MAINS SHALL CROSS OVER EXISTING OR PROPOSED WASTEWATER FORCE MAINS AND
<br />STORMWATER FORCE MAINS. WHETHER THE WATER MAIN GROSSES OVER OR UNDER THESE TYPES OF PIPELINE SYSTEMS,
<br />THE OUTSIDE OF THE WATER MAIN SHALL BE AT LEAST 12 INCHES FROM THE OUTSIDE OF THE EXISTING OR PROPOSED
<br />WASTEWATER FORCE MAIN AND STORMWATER FORCE MAIN. ATTHE CROSSING, THE PROPOSED PIPE JOINTS SHALL BE
<br />ARRANGED SO THAT ALL WATER MAIN JOINTS ARE AT LEAST THREE FEET FROM RECLAIMED WATER MAIN JOINTS AND
<br />STORMWATER FORCE MAIN JOINTS, AND AT LEAST SIX FEET FROM THE JOINTS OF WASTEWATER FORCE MAINS.
<br />3. NO WATER MAIN SHALL PASS THROUGH OR COME IN CONTACT WITH ANY PART OF A SANITARY SEWER MANHOLE.
<br />4. NEW OR RELOCATED FIRE HYDRANTS SHALL BE LOCATED SUCH THAT THE UNDERGROUND DRAIN (-WEEP HOLE) IS AT LEAST:
<br />A. THREE FEET FROM ANY EXISTING OR PROPOSED STORM SEWER, STORMWATER FORCE MAIN, OR VACUUM TYPE SANITARY
<br />SEWER.
<br />B_ SIX FEET FROM ANY EXISTING OR PROPOSED GRAVITY SANITARY SEWER AND WASTEWATER FORCE MAIN.
<br />C_ TEN FEET FROM ANY ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM SUCH AS SEPTIC TANKS, DRAINFIELDS, AND
<br />GREASE TRAPS. ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEMS DO NOT INCLUDE PACKAGE SEWAGE TREATMENT
<br />FACILITIES AND PUBLIC WASTEWATER TREATMENT FACILITIES.
<br />5. THE FOLLOWING ARE ACCEPTABLE ALTERNATIVE CONSTRUCTION FEATURES TO BE CONSIDERED FOR COST EVALUATION WITH NO
<br />GUARANTEE THEY WILL BE APPROVED FOR IMPLEMENTATION WHERE IT IS NOT POSSIBLE TO MEET THE SEPARATION
<br />REQUIREMENTS. EXCEPTIONS FROM MEETING THE PIPE SEPARATION REQUIREMENTS, WITHOUT MITIGATION, SHALL BE ALLOWED
<br />ONLY BY FIDEP IF TECHNICAL OR ECONOMIC JUSTIFICATIONS FOR EACH EXCEPTION PROVIDED BY THE ENGINEER ARE
<br />ACCEPTABLE TO FIDEP AND ARE ONLY TO BE IMPLEMENTED UPON RECEIPT OF EXPRESSED WRITTEN CONSENT FROM THE
<br />ENGINEER AND APPROVAL FROM FIDEP ON A CASE BY CASE BASIS. ALL POSSIBLE MEASURES TO ACHIEVE COMPLIANCE WITH THE
<br />PIPE SEPARATION REQUIREMENTS SHALL BE CONSIDERED FIRST ALONG WITH DESIGN CHANGES TO MEET THE REQUIREMENTS
<br />BEFORE THE ENGINEER SUBMITS A JUSTIFICATION OF AN EXCEPTION TO FIDEP FOR APPROVAL. IMPLEMENTATION OF THESE
<br />MEASURES WITHOUT THE EXPRESSED WRITTEN CONSENT OF THE ENGINEER AND APPROVAL BY FDEP COULD RESULT IN THE
<br />REQUIREMENT THAT THE INSTALLED UNAPPROVED MEASURES BE REMOVED AND REPLACED AT NO ADDITIONAL COST.
<br />A. WHERE A WATER MAIN IS LESS THAN THE REQUIRED MINIMUM HORIZONTAL DISTANCE FROM ANOTHER PIPELINE OR WHERE
<br />A WATER MAIN CROSSES ANOTHER PIPELINE AND JOINTS IN THE WATER MAIN ARE LESS THAN THE MINIMUM REQUIRED
<br />DISTANCE BETWEEN THE JOINTS IN THE OTHER PIPELINE:
<br />1) USE OF PRESSURE RATED PIPE CONFORMING TO AWWA STANDARDS FOR A GRAVITY OR VACUUM TYPE PIPELINE.
<br />2) USE OF WELDED, FUSED, OR OTHERWISE RESTRAINED JOINTS FOR EITHER PIPELINE.
<br />3) USE OF WATERTIGHT CASING PIPE OR CONCRETE ENCASEMENT AT LEAST FOUR INCHES THICK FOR EITHER PIPE-
<br />B. WHERE A WATER MAIN IS LESS THAN THREE FEET HORIZONTALLY FROM ANOTHER PIPELINE OR WHERE A WATER MAIN
<br />CROSSES ANOTHER PIPELINE LESS THAN THE REQUIRED MINIMUM SEPARATION:
<br />1 ) USE OF PIPE OR CASING PIPE, HAVING HIGH IMPACT STRENGTH (AT LEAST EQUAL TO 0.25 INCH THICK DUCTILE ]RON
<br />PIPE), OR CONCRETE ENCASEMENT AT LEAST FOUR INCHES THICK FOR THE WATER MAIN AND FOR THE OTHER PIPELINE
<br />IF THE OTHER PIPELINE COVEYS WASTEWATER.
<br />WATER DISTRIBUTION SYSTEMS
<br />1 . THE ENTITY THAT WILL OPERATE AND MAINTAIN THE WATER SYSTEMS SHOWN ON THESE PLANS IS CITY OF ZEPHYRHILLS, THE
<br />CONTRACTOR SHALL MEET ALL THE REQUIREMENTS OF CITY OF ZEPHYRHILLS.
<br />2. ALL WATER MAIN PIPE SHALL BE EITHER DUCTILE IRON OR PVC, UNLESS OTHERWISE INDICATED ON THE DRAWINGS.
<br />3. INSTALL ALL WATER MAINS AT A MINIMUM 36 INCHES OF COVER.
<br />4. BURIED DUCTILE IRON PIPE SHALL CONFORM WITH ANSIIAVWVA C150/A21.50 AND C151/ A21-51, AND SHALL HAVE A MINIMUM
<br />WORKING PRESSURE OF 150 PSI. BURIED PIPE SHALL COMPLY WITH THE FOLLOWING PRESSURE CLASS (PC) DESIGNATIONS
<br />UNLESS OTHERWISE INDICATED ON THE DRAWINGS: A) 12" DIAMETER AND SMALLER = PC 350-1 B) 14" THROUGH 24" DIAMETER = PC
<br />250, C) 30" THROUGH 64" DIAMETER = PC 200.
<br />5� EXPOSED PIPE 4" AND LARGER SHALL BE DUCTILE IRON FLANGED AND SHALL CONFORM WITH AWWA/ANSI C1 15/A21.15, AND SHALL
<br />HAVE A MINIMUM WORKING PRESSURE OF 150 PSI. FLANGED PIPE SHALL COMPLY WITH THE FOLLOWING THICKNESS CLASS (TC)
<br />DESIGNATIONS UNLESS OTHERWISE INDICATED ON THE DRAWINGS: A) 4" DIAMETER = TC 54; B) 6" THROUGH 24" DIAMETER = TC 53
<br />6. DUCTILE IRON PIPE AND FITTINGS WITHIN 1 0 FEET OF GAS MAINS SHALL HAVE AN 8-MIL POLYETHYLENE WRAP IN ACCORDANCE
<br />WITH ANSI/AWWA C105/A21.5.
<br />7. PVC PIPE 4" - 12" SHALL CONFORM TO AWWA C900. PIPE 14" - 30" SHALL CONFORM TO AV,ANA C905. PIPE SHALL CONFORM TO ASTM
<br />D1784, TYPE 1, GRADE 1, 4000 PSI DESIGN STRESS, AND SHALL BE NATIONAL SANITATION FEDERATION (NSF) APPROVED. PIPE
<br />SHALL BE CLASS 235 (DR18) WITH MARKINGS ON EACH SECTION SHOWING CONFORMANCE TO THE ABOVE SPECIFICATIONS -
<br />JOINTS SHALL BE RUBBER GASKETED CONFORMING TOAWWAC900 OR C905 THE BELL SHALL BE INTEGRAL WITH THE PIPE AND
<br />OF EQUAL OR GREATER PRESSURE RATING. THE BELL OF PIPE AND FITTINGS USING PUSH -ON JOINTS SHALL HAVE AN INTEGRAL
<br />GROOVE TO RETAIN THE GASKET IN PLACE.
<br />8. ALL FITTINGS SHALL BE MANUFACTURED OF DUCTILE IRON, CONFORMING TO ANSI/AWWA C1 IO/A21.10 OR ANSI/AWWA C1 53/A21-53.
<br />ALL FULL BODY (Cl IO/A21.10) FITTINGS SHALL BE PRESSURE RATED TO 250 PSI, MINIMUM- ALL COMPACT FITTINGS (C153/A21.53)
<br />SHALL BE PRESSURE RATED TO 350 PSI, MINIMUM.
<br />9- ALL DUCTILE IRON PIPE AND FITTINGS SHALL BE LINED AND COATED- INTERIOR LINING SHALL BE STANDARD THICKNESS CEMENT
<br />MORTAR LINING PER ANSIIAWWAC104/A21.4. EXTERIOR COATING FOR BURIED PIPE AND FITTINGS SHALL BEA PETROLEUM
<br />ASPHALTIC COATING IN ACCORDANCE WITH ANSUAWWA C110/A21.10. EXTERIOR COATING OF EXPOSED PIPE AND FITTINGS SHALL
<br />BE FACTORY APPLIED RUST INHIBITING EPDXY PRIMER, MINIMUM 3 MILS DRY FILM THICKNESS, AFTER INSTALLATION, EXTERIOR
<br />SURFACES SHALL BE PAINTED WITH A TWO COAT SYSTEM. THE FIRST COAT (INTERMEDIATE COAT) SHALL BE 4.0-10.0 MIL DFT
<br />TNEMEC COLOR HI -BUILD EPDXOLINE 11 SERIES N69 OR APPROVED EQUAL, AND THE FINAL COAT SHALL BE 2-0-3.0 MIL DFT TNEMEC
<br />ENDURASHIELD SERIES 73 OR APPROVED EQUAL. THE FINAL COAT PAINT COLOR SHALL BE AS SELECTED BY THE LOCAL UTILITY.
<br />10. MECHANICAL AND PUSH ON JOINTS FOR DUCTILE IRON PIPE AND FITTINGS SHALL BE RUBBER GASKETED, CONFORMING TO
<br />ANSI/AVWVAC1111A21.11. LUBRICANTS OTHER THAN THAT FURNISHED BY THE PIPE MANUFACTURER WITH THE PIPE SHALL NOT BE
<br />USED-
<br />11. RESTRAINED JOINTS FOR DUCTILE IRON PIPE BELL JOINTS SHALL BE AMERICAN FAST GRIP GASKET, MCWANE SURE GRIP 350
<br />GASKET, U.S. PIPE FIELD LOK 350 GASKET, OR EBAA IRON MEGA LUG SERIES 110OHD. RESTRAINED JOINTS FOR DUCTILE IRON PIPE
<br />AND FIT71NG MECHANICAL JOINTS SHALL BE EBAA IRON MEGA LUG SERIES 1100, STAR GRIP SERIES 3000, OR TYLER UNION
<br />TUF-GRIP SERIES TLD. LOCKING BELL JOINT RESTRAINT SHALL BE AMERICAN FLEX RING JOINT, AMERICAN LOK-RING JOINT, OR
<br />U.S. PIPE TR-FLEX. RESTRAINED JOINTS FOR PVC PIPE MECHANICAL JOINTS SHALL BE TYLER UNION SERIES 2000 TUF GRIP TLP,
<br />JCM SUR-GRIP BELL RESTRAINER, FORD UNI-FLANGE SERIES 1500 CIRCLE LOCK, OR EBAA IRON MEGA LUG SERIES 2000PV.
<br />RESTRAINED JOINTS FOR PVC PIPE PUSH ON JOINTS SHALL BE EBAA IRON MEGA LUG SERIES 1500 OR SERIES 1600 (C900 PVC),
<br />SERIES 2800 (C905 PVC), FORD UNI-FLANGE SERIES 1390, OR SMITH-BLAIR BELL-LOK SERIES 165- PIPE JOINTS SHALL BE
<br />RESTRAINED UPSTREAM AND DOWNSTREAM OF FITTINGS IN ACCORDANCE WITH THE MANUFACTURER'S REQUIREMENTS OR THE
<br />TABLE SHOWN IN THE DRAWINGS, WHICHEVER IS GREATER.
<br />12. POLYETHYLENE PIPE AND TUBING USED FOR SERVICE LINES %-3 INCH DIAMETER SHALL BE POLYETHYLENE IN ACCORDANCE WITH
<br />AWWA C901, STANDARD CODE DESIGNATION PE 4710, SDR 9 (OUTSIDE DIAMETER BASED DIMENSION RATIO), 250 PSI. PIPE SHALL
<br />BE COLOR CODED BLUE (POTABLE WATER). PIPE AND FITTINGS SHALL BE NSF APPROVED FOR THE USAGE TO WHICH THEY ARE
<br />TO BE APPLIED. JOINTS IN SDR-PR PE PIPE SHALL BE BUTT HEAT FUSION OR SOCKET HEAT FUSION TYPE- FITTINGS SHALL BE
<br />MANUFACTURED OF THE SAME MATERIAL AS THE PIPE AND SHALL BE OF THE SAME SDR OR LESS. PROVIDE ADAPTERS AS
<br />REQUIRED TO JOIN PE PIPE TO PIPE, FITTINGS AND EQUIPMENT OF OTHER MATERIALS.
<br />13. SERVICE SADDLES SHALL MEET THE REQUIREMENTS OF AWWA C800 AND SHALL CONSIST OF EPDXY COATED DUCTILE IRON
<br />BODIES IN ACCORDANCE WITH ASTM A536, WITH DOUBLE STAINLESS STEEL STRAPS, BOLTS, WASHERS AND NUTS. STAINLESS
<br />STEEL SHALL BE TYPE 304, AND NUTS ARE TO BE TEFLON COATED. THE DUCTILE IRON BODY IS TO BE FUSION BONDED NYLON
<br />COATED, MINIMUM THICKNESS 12 MILS, OUTLET OF SADDLE IS TO HAVE NPT THREADS. SERVICE SADDLES SHALL BE
<br />MANUFACTURED BY FORD, MUELLER, OR SMITH-BLAIR.
<br />14. ALL SERVICES SHALL INCLUDE THE FOLLOWING: CURB STOPS, UNIONS AS REQUIRED, CORPORATION STOPS. CONFORMANCE
<br />WITH AWWA C800 AND C901 IS REQUIRED. THE CONTRACTOR SHALL CUT "W"IN THE TOP CURB OF EACH WATER SERVICE AND A'V'
<br />AT ALL VALVE LOCATIONS. CUT WS AND V'S SHALL BE HIGHLIGHTED WITH BLUE PAINT.
<br />15. UNLESS OTHERWISE NOTED IN THE PLANS, THE UTILITY COMPANY SHALL PROVIDE AND INSTALL WATER METERS- CONTRACTOR
<br />SHALL CONSTRUCT WATER SERVICE TO THE CORPORATION STOP.
<br />16. UNLESS OTHERWISE INDICATED OR SPECIFIED, ALL VALVES TWO INCHES AND SMALLER SHALL BE ALL BRASS OR BRONZE, VALVES
<br />OVER TWO INCHES SHALL BE IRON BODY, FULLY BRONZE OR BRONZE MOUNTED.
<br />17. VALVES 4 INCHES AND LARGER SHALL BE LINED AND COATED. BURIED AND EXPOSED VALVES SHALL BE COATED INSIDE AND OUT
<br />WITH A RUST INHIBITING EPDXY PRIMER, FOLLOWED BY AN EPDXY COATING MEETING THE REQUIREMENTS OF AWWA C550,
<br />APPLIED AT THE FACTORY. THE INTERIOR OF VALVES WITH A CAST IRON OR DUCTILE IRON BODY SHALL BE COATED WITH AN
<br />EPDXY PROTECTIVE COATING MEETING NSF INTERNATIONAL STANDARD 61 AND AWWA C550. AFTER INSTALLATION, EXTERIOR
<br />SURFACES SHALL BE PAINTED WITH A TWO COAT SYSTEM. THE FIRST COAT (INTERMEDIATE COAT) SHALL BE 4.0-10.0 MIL DFT
<br />TNEMEC COLOR HI -BUILD EPDXCLINE 11 SERIES N69 OR APPROVED EQUAL, AND THE FINAL COAT SHALL BE 2.0-3.0 MIL DFT TNEMEC
<br />ENDURASHIELD SERIES 73 OR APPROVED EQUAL. THE FINAL COAT PAINT COLOR SHALL BE AS SELECTED BY THE LOCAL UTILITY.
<br />18. ALL VALVES 12" AND SMALLER SHALL BE GATE VALVES UNLESS OTHERWISE INDICATED ON THE DRAWINGS- GATE VALVES 3
<br />INCHES TO 12 INCHES SHALL CONFORM TO AWWA C509 OR AWWA C515- THE VALVES SHALL BE IRON BODY, CAST IRON FULLY
<br />ENCAPSULATED MOLDED RUBBER WEDGE COMPLYING WITH ASTM D2000, NON -RISING STEM WITH O-RING SEALS. VALVES SHALL
<br />OPEN COUNTERCLOCKWISE.
<br />19. TAPPING SLEEVES ARE TO BE 18-8 TYPE 304 STAINLESS STEEL AND STAINLESS STEEL OUTLET, AS MANUFACTURED BY JCM OR
<br />APPROVED EQUAL. TAPPING VALVES SHALL BE RESILIENT SEATED GATE VALVES AND SHALL CONFORM TO THE REQUIREMENTS
<br />OF AWWA C509- TAPPING VALVES SHALL BE AMERICAN FLOW CONTROL SERIES 2500, CLOW SERIES F-61 00, OR MUELLER SERIES
<br />A2361.
<br />20. VALVES 14" AND LARGER SHALL BE BUTTERFLY VALVES. BUTTERFLY VALVES SHALL MEET OR EXCEED THE DESIGN STRENGTH,
<br />TESTING AND PERFORMANCE REQUIREMENTS OF AWWA C504, CLASS 150. VALVE BODY SHALL BE MECHANICAL JOINT END TYPE
<br />VALVE CONSTRUCTED OF CAST IRON OR DUCTILE IRON. DISC SHALL BE ONE PIECE CAST DESIGN WITH NO EXTERNAL RIBS
<br />TRANSVERSE TO FLOW. DISC SHALL BE CAST IRON OR DUCTILE IRON. THE RESILIENT SEAT SHALL MATE WITH A 304 OR 316
<br />STAINLESS STEEL SURFACE.
<br />21. VALVE SEATS SHALL BE MECHANICALLY RETAINED, AND MAY BE INSTALLED ON EITHER THE BODY OR DISC- O-RING SEATS ON
<br />VALVE DISCS ARE UNACCEPTABLE- SEATS FOR VALVES 14" DIAMETER AND LARGER SHALL BE FULLY FIELD REPLACEABLE
<br />WITHOUT THE USE OF SPECIAL TOOLS. OPERATORS OF THE ENCLOSED TRAVELING -NUT TYPE SHALL BE PROVIDED UNLESS
<br />OTHERWISE INDICATED,
<br />22. ALL BURIED VALVES SHALL BE PROVIDED WITH ADJUSTABLE VALVE BOXES APPROXIMATELY 5 INCHES IN DIAMETER WITH A
<br />MINIMUM THICKNESS OF 3116 INCH CAST IRON. BOXES SHALL BE OF SUFFICIENT LENGTH TO OPERATE ALL VALVES BURIED IN THE
<br />GROUND, CONSISTING OF BASE. CENTER SECTION, AND TOP SECTION WITH COVER- VALVE BOXES LOCATED IN UNPAVED AREAS
<br />SHALL BE SLIP TYPE DESIGN TO PERMIT MOVEMENT OF THE TOP SECTION WITHOUT TRANSMITTING FORCES ONTO THE VALVE
<br />BODY. VALVE BOXES CAST INTO CONCRETE OR ASPHALT SURFACING SHALL HAVE BRASS COVERS. ALL VALVE BOX COVERS
<br />SHALL BE INTERNALLY CHAINED TO VALVE BOXES WITH AN APPROXIMATELY 18 INCH GALVANIZED CHAIN. VALVE BOX COVERS
<br />SHALL BE CAST WITH THE INSCRIPTION "WATER".
<br />23. PVC PIPES SHALL BE COLOR CODED BLUE (WATER MAINS) AND STENCILED (0.75-INCH LETTERING ON THE PIPE IN AT LEAST THREE
<br />AREAS PER PIPE SECTION) 'POTABLE WATER MAIN" AS APPLICABLE.
<br />24. INSTALL IDENTIFICATION TAPE ALONG ALL DUCTILE IRON PIPE AND PVC PIPE, MINIMUM THICKNESS 4 MILS, WIDTH 6 INCHES,
<br />LETTER SIZE 1 INCH. APPLY TAPE TO SURFACE OF PIPE, CONTINUOUSLY EXTENDING FROM JOINT TO JOINT. TAPE COLOR AND
<br />LETTERING SHALL BE BLACK PRINTING ON BLUE BACKGROUND (WATER MAINS). PLACE TAPE AS FOLLOWS: 2" - 8" PIPE -CENTER
<br />ALONG TOP HALF OF PIPE; 10" - 18" PIPE -PLACE ALONG BOTH SIDES OF THE TOP HALF OF PIPE; 20" PIPE AND LARGER -PLACE ON
<br />BOTH SIDES OF TOP HALF OF PIPE WITH A THIRD STRIP CENTERED ALONG TOP HALF OF PIPE.
<br />25. INSTALL WARNING TAPE ALONG ALL PIPELINES, PLACED 2 FEET ABOVE PIPE. TAPE SHALL BE 6-INCH WIDE VINYL CONTINUOUS
<br />TAPE. TAPE SHALL BE COLORED BLUE (WATER MAINS).
<br />26. INSTALL LOCATING WIRE ALONG ALL PVC PIPELINES. WIRE SHALL BE COLOR -CODED 10 GAUGE CONTINUOUS INSULATED WIRE.
<br />COLOR CODING SHALL BE SIMILAR TO WARNING TAPE COLORS. INSTALL LOCATOR WIRE ALONG ALL PRESSURIZED PIPELINES 2"
<br />AND LARGER- LOOP WIRE INTO ALL VALVE BOXES. LOOPING TO OCCUR EVERY 500 FEET MINIMUM. WHERE THERE ARE NO VALVE
<br />BOXES TO ALLOW LOOPING, PROVIDE ACCESS BOXES PER CITY REQUIREMENTS- CHECK WIRE FOR ELECTRICAL CONTINUITY.
<br />27. ALL CHANGES IN DIRECTION SHALL BE MADE WITH FITTINGS OR APPROVED JOINT DEFLECTION. BENDING OF PIPE, EXCEPT
<br />COPPER AND POLYETHYLENE, IS PROHIBITED. JOINT DEFLECTION SHALL NOT EXCEED 76% OF THE MANUFACTURERS
<br />RECOMMENDED MAXIMUM DEFLECTION.
<br />28. TEST PROCEDURES SHALL BE APPROVED BY THE ENGINEER. ALL TESTS SHALL BE MADE IN THE PRESENCE OF THE ENGINEER
<br />AND UTILITY. NOTIFY THE ENGINEER AND THE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE ANY WORK IS TO BE INSPECTED
<br />OR TESTED.
<br />29. PROVIDE ALL EQUIPMENT FOR TESTING. INCREMENTS ON GAGES USED FOR LOW PRESSURE AIR TESTING SHALL BE OF SCALED
<br />TO THE NEAREST 0.1 PSI. GAGES, PUMPS, AND HOSES SHALL BE IN GOOD WORKING ORDER WITH NO NOTICEABLE LEAKS.
<br />30. ALL SERVICE LINES SHALL BE COMPLETED PRIOR TO TESTING, AND ARE SUBJECT TO THE SAME TESTING REQUIREMENTS AS THE
<br />MAIN LINE.
<br />31. THE SEQUENCE OF TESTING AND DISINFECTION SHALL BE AS FOLLOWS: 1) CONDUCT PRESSURE AND LEAKAGE TESTING; 2)
<br />PERFORM FLUSHING PER UTILITY REQUIREMENTS AND AWWA C651; 3) DISINFECT THE WATER MAIN, INCLUDING VALVES AND
<br />FITTINGS; AND 4) DECHLORINATE AND FLUSH AFTER DISINFECTION.
<br />32. APPLY HYDROSTATIC TEST PRESSURE OF 150 PSI (WATER MAINS), 200 PSI (FIRE MAINS), FOR 10 MINUTES AND FOR SUCH
<br />ADDITIONAL PERIOD NECESSARY FOR THE ENGINEER TO COMPLETE THE INSPECTION OF THE LINE UNDER TEST. DO NOT EXCEED
<br />PIPE MANUFACTURER'S SUGGESTED TIME DURATION AT THE TEST PRESSURE- IF DEFECTS ARE NOTED, REPAIRS SHALL BE MADE
<br />AND THE TEST REPEATED UNTIL ALL PARTS OF THE LINE WITHSTAND THE TEST PRESSURE.
<br />33. APPLY LEAKAGE TEST PRESSURE OF 150 PSI (WATER MAINS), 200 PSI (FIRE MAINS). MAINTAIN PRESSURE ATA MAXIMUM
<br />VARIATION OF 5% DURING THE ENTIRE LEAKAGE TEST. THE DURATION OF THE LEAKAGE TEST SHALL BE TWO HOURS MINIMUM,
<br />AND FOR SUCH ADDITIONAL TIME NECESSARY FOR THE ENGINEER TO COMPLETE INSPECTION OF THE SECTION OF LINE UNDER
<br />TEST LEAKAGE MEASUREMENTS SHALL NOT BE STARTED UNTIL A CONSTANT TEST PRESSURE HAS BEEN ESTABLISHED. THE LINE
<br />LEAKAGE SHALL BE MEASURED BY MEANS OF A WATER METER INSTALLED ON THE SUPPLY SIDE OF THE PRESSURE PUMP.
<br />34, NO LEAKAGE IS ALLOWED IN EXPOSED PIPING, BURIED PIPING WITH FLANGED, THREADED, OR WELDED JOINTS OR BURIED
<br />NON -POTABLE PIPING IN CONFLICT WITH POTABLE WATER LINES.
<br />35- TESTED SECTIONS OF BURIED PIPING WITH SLIP -TYPE OR MECHANICAL JOINTS VIALL NOT BE ACCEPTED IF IT HAS A LEAKAGE RATE
<br />IN EXCESS OF THAT RATE DETERMINED BY THE FORMULA L = SDP/148000 WHERE L = MAXIMUM PERMISSIBLE LEAKAGE RATE, IN
<br />GALLONS PER HOUR, THROUGHOUT THE ENTIRE LENGTH OF LINE BEING TESTED; S = LENGTH OF LINE TESTED (IN FEET); D =
<br />NOMINAL INTERNAL DIAMETER (IN INCHES) OF THE PIPE AND P = THE SQUARE ROOT OF THE ACTUAL PRESSURE IN PSIG ON ALL
<br />JOINTS IN THE TESTED PORTION OF THE LINE. THIS A&UAL PRESSURE SHALL BE DETERMINED BY FINDING THE DIFFERENCE
<br />BETWEEN THE AVERAGE ELEVATION OF ALL TESTED PIPE JOINTS AND THE ELEVATION OF THE PRESSURE GAUGE AND ADDING
<br />THE DIFFERENCE IN ELEVATION HEAD TO THE AUTHORIZED TEST PRESSURE.
<br />36. ALL APPARENT LEAKS DISCOVERED WITHIN ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE OF THE WORK BY THE OWNER
<br />SHALL BE LOCATED AND REPAIRED BY CONTRACTOR, REGARDLESS OF THE TOTAL LINE LEAKAGE RATE.
<br />37. PRIOR TO DISINFECTION, CONDUCT FULL DIAMETER FLUSHING OF PIPELINE IN SECTIONS IN ORDER TO REMOVE ANY SOLIDS OR
<br />CONTAMINATED MATERIAL THAT MAY HAVE BECOME LODGED IN THE PIPE.
<br />38. OBTAIN A MINIMUM FLUSHING VELOCITY OF 2.5 FEET PER SECOND PER AWWA C651.
<br />39. ALL TAPS REQUIRED FOR FLUSHING AND THE TEMPORARY OR PERMANENT RELEASE OF AIR AS NEEDED FOR FLUSHING SHALL BE
<br />PROVIDED BY THE CONTRACTOR.
<br />40. DISINFECT ALL POTABLE WATER LINES, FIRE LINES, VALVES, FITTINGS, HYDRANTS- THE WATER MAIN DISINFECTION AND
<br />BACTERIOLOGICAL SAMPLING AND METHODS OF DISINFECTION FOR ALL WATER CONTAINMENT DEVICES AND PIPING SYSTEMS
<br />SHALL CONFORM TO AWWA C651. THE DISCHARGE LOCATIONS FOR THE CHLORINATED WATER SHALL BE APPROVED BY THE
<br />OWNER. NEUTRALIZE THE CHLORINE RESIDUAL BY MEANS OF A REDUCING AGENT IN ACCORDANCE WITH AWWA C651.
<br />41. ALL DISINFECTION WORK SHALL BE ACCEPTABLE TO THE STATE HEALTH AUTHORITY. IF ANY REQUIREMENTS OF THIS SECTION
<br />ARE IN CONFLICT WITH REQUIREMENTS OF THE AUTHORITY FOR DISINFECTION, THOSE OF THE AUTHORITY SHALL GOVERN. ALL
<br />BACTERIOLOGICAL TESTING SHALL BE PERFORMED BY A STATE CERTIFIED LABORATORY CONTRACTED BY THE CONTRACTOR -
<br />PROPER CHAIN OF CUSTODY PROCEDURES MUST BE FOLLOWED AND SAMPLES SHALL ONLY BE COLLECTED BY CERTIFIED
<br />LABORATORY PERSONNEL- COPIES OF ALL TESTING RESULTS AND ALL RELATED CORRESPONDENCE FROM THE TESTING LAB
<br />SHALL BE SUBMITTED TO THE OWNER, UTILITY, AND ENGINEER,
<br />SANITARY SEWER SYSTEMS
<br />1- THE ENTITY THAT WILL OPERATE AND MAINTAIN THE SEWER SYSTEM SHOWN ON THESE PLANS IS CITY OF 7FPHYRHII LS, THE
<br />CONTRACTOR SHALL MEET ALL THE REQUIREMENTS OF CITY OF ZEPHYRHII I S
<br />2. PVC SEWER PIPE SHALL BE TYPE PSM PVC PIPE CONFORMING TO ASTM D3034 AND SHALL BE SDR 35 FOR 4" THROUGH 15", AND
<br />ASTM F 679, WALL THICKNESS T-1, FOR PIPE 18" THROUGH 27".
<br />3. INSTALL ALL SEWER MAINS AT A MINIMUM 36 INCHES OF COVER.
<br />4. JOINTS SHALL MEET THE REQUIREMENTS OF ASTM D3212 USING RUBBER GASKETS CONFORMING TO ASTM F477.
<br />5. FITTINGS SHALL CONFORM TO THE SAME REQUIREMENTS AS THE PIPE. PROVIDE ADAPTERS AS REQUIRED TO JOIN PVC PIPE TO
<br />PIPE, FITTINGS AND EQUIPMENT OF OTHER MATERIALS. SOLVENT CEMENT SHALL BE AS RECOMMENDED BY THE PIPE
<br />MANUFACTURER.
<br />6. PVC SEWER PIPE SHALL BE COLOR CODED GREEN, STENCILED "SEWER LINE" (2" LETTERING ON TWO SIDES OF THE PIPE IN AT
<br />LEAST THREE AREAS PER PIPE SECTION).
<br />7. INSTALL ADHESIVE IDENTIFICATION TAPE ALONG PIPELINE. TAPE SHALL BE MINIMUM THICKNESS 4 MILS, WIDTH 6 INCHES, LETTER
<br />SIZE I INCH. TAPE COLOR AND LETTERING SHALL BE "SEWER LINE", BLACK PRINTING ON GREEN BACKGROUND. PLACE TAPE AS
<br />FOLLOWS: 2" - 8" PIPE - CENTER ALONG TOP HALF OF PIPE; 1 0" - 18" PIPE - PLACE ALONG BOTH SIDES OF THE TOP HALF OF PIPE; 20"
<br />PIPE AND LARGER - PLACE ON BOTH SIDES OF TOP HALF OF PIPE WITH A THIRD STRIP CENTERED ALONG TOP HALF OF PIPE.
<br />8. INSTALL WARNING TAPE ALONG ALL SEWER PIPELINES. TAPE SHALL BE 6-INCH WIDE VINYL CONTINUOUS TAPE, COLORED GREEN
<br />WITH BLACK LETTERING CODED AND WORDED'CAUTION: SEWER BURIED BELOW". INSTALL ALONG PIPELINE, 2 FEET ABOVE PIPE,
<br />MINIMUM OF 1 FOOT BELOW GRADE.
<br />9. CONNECTIONS TO EXISTING SEWER SHALL BE CONDUCTED IN SUCH A MANNER THAT THE EXISTING SEWER REMAINS IN
<br />OPERATION. PROVIDE BYPASS PUMPING OF EXISTING FLOWS OR COLLECT AND LEGALLY DISPOSE OF EXISTING SEWER FLOW AS
<br />NEEDED TO ACCOMMODATE CONSTRUCTION WHILE KEEPING EXISTING SEWER IN SERVICE-
<br />10. PRIOR TO INSPECTIONS AND TESTING, CLEAN ALL INSTALLED LINES AND MANHOLES. TEST PROCEDURES SHALL BE APPROVED BY
<br />THEENGINEER. ALL TESTS SHALL BE MADE IN THE PRESENCE OF THE ENGINEER AND UTILITY. NOTIFY THE ENGINEER AND THE
<br />UTILITY COMPANIES AT LEAST 72 HOURS BEFORE ANY WORK IS TO BE INSPECTED OR TESTED-
<br />11. PROVIDE ALL EQUIPMENT FOR TESTING. INCREMENTS ON GAGES USED FOR LOW PRESSURE AIR TESTING SHALL BE OF SCALED
<br />TO THE NEAREST 0.1 PSI. GAGES, PUMPS, AND HOSES SHALL BE IN GOOD WORKING ORDER WITH NO NOTICEABLE LEAKS.
<br />12. ALL SERVICE LATERALS SHALL BE COMPLETED PRIOR TO TESTING, AND ARE SUBJECT TO THE SAME TESTING REQUIREMENTS AS
<br />THE MAIN LINE.
<br />13. PROVIDE LIGHT SOURCE AND MIRRORS FOR LAMPING OF SEWER. ANY SEWER IN WHICH THE DIRECT LIGHT OF A LAMP CANNOT BE
<br />VIEWED IN EITHER DIRECTION, FULL CIRCLE, BETWEEN ADJACENT MANHOLES SHALL BE CONSIDERED UNSATISFACTORY, UNLESS
<br />THE LINE IS DESIGNED WITH HORIZONTAL DEFLECTIONS, AND SHALL BE REPAIRED BY THE CONTRACTOR WITHOUT ADDITIONAL
<br />COMPENSATION.
<br />14. CONDUCT LOW PRESSURE AIR TESTING (4.0 PSI INITIAL PRESSURE) OF INSTALLED SEWER PIPING IN ACCORDANCE WITH ASTM
<br />F1417. MAXIMUM ALLOWABLE LEAKAGE IS 0.0015 CUBIC FEET PER MINUTE PER SQUARE FOOT INTERNAL SURFACE AREA BEING
<br />TESTED. ALLOWABLE AIR PRESSURE DROP DURING THE TESTIS 0.5 PSIG. MINIMUM REQUIRED TEST TIME (DURATION) IS: A) 4"
<br />PIPE = 1 MIN 53 SEC; B) 6" PIPE = 2 MIN 50 SEC, OR 0.427 X LENGTH OF PIPE TESTED, WHICHEVER IS GREATER; C) 8" PIPE = 3 MIN 47
<br />SEC, OR 0.760 X LENGTH OF PIPE TESTED, WHICHEVER IS GREATER, D) IT PIPE = 4 MIN 43 SEC, OR 1.1 87 X LENGTH OF PIPE
<br />TESTED, WHICHEVER IS GREATER. E) 12" PIPE = 5 MIN 40 SEC, OR 1.709 X LENGTH OF PIPE TESTED, WHICHEVER IS GREATER.
<br />15. CONDUCT LEAKAGE TESTING OF MANHOLES BY PLUGGING INVERTS AND FILLING MANHOLE WITH WATER. ALLOWABLE WATER
<br />DROP IN MANHOLE TO BE FIELD DETERMINED BY UTILITY AND ENGINEER. MINIMUM TEST DURATION IS 1 HOUR.
<br />16. CONDUCT DEFLECTION TESTING OF PIPELINE AFTER THE FINAL BACKFILL HAS BEEN IN PLACE AT LEAST 30 DAYS. MAXIMUM
<br />ALLOWABLE PIPE DEFLECTION IS 5%. MEASURE DEFLECTION BY MANUALLY PULLING A MANDREL THROUGH THE PIPE- THE
<br />MINIMUM MANDREL OUTER DIAMETER SHALL BE IN ACCORDANCE WTH THE FOLLOWING: 6" SEWER = 5.45" MANDREL 8"SEWER =
<br />7.28" MANDREL; 1 0" SEWER = 9-08" MANDREL; 12' SEWER = 10.79" MANDREL; 15" SEWER = 13.20" MANDREL; 18- SEWE� = 16.13"
<br />, R = 19.00'MANDREL; 24" SEWER = 21.36" MANDREL, 2TSEWER = 24.06" MANDREL.
<br />17. DEFLECTION TESTING IS CONSIDERED SATISFACTORY IF THE MANDREL CAN BE PULLED BY HAND THROUGH THE PIPE BEING
<br />TESTED. IF THE MANDREL CANNOT BE PULLED THROUGH THE PIPE, REPLACE OR CORRECT THE PIPE AND RETEST UNTIL TESTING
<br />ISSATISFACTORY. ANY PIPE REMOVED OR CORRECTED DUE TO FAILING DEFLECTION TESTING SHALL ALSO BE RE -TESTED FOR
<br />LEAKAGE.
<br />PRECAST STRUCTURES AND APPURTENANCES
<br />1 . ALL MANHOLES SHALL BE PRECAST CONSTRUCTION. THE MINIMUM SIZE DIAMETER OF MANHOLES SHALL BE 48" FOR SEWER LINES
<br />21" IN DIAMETER OR LESS. INTEGRALLY CAST STEPS WITHIN PRECAST STRUCTURES ARE NOT ALLOWED.
<br />2. BASES SHALL BE ONE-PIECE PRECAST BASE SECTIONS CONSISTING OF INTEGRALLY CAST SLAB, BOTTOM RING SECTION AND
<br />CONCRETE FLOW CHANNELS. BASE SECTIONS SHALL HAVE INTEGRAL INVERTS WITH GASKETS TO MATCH THE PIPE. THE
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING ALL INVERT ANGLES. PROVIDE OUTLET STUBS WITH JOINTS TO MATCH
<br />THE PIPE.
<br />3. RISERS SHALL BE PRECAST REINFORCED CONCRETE PER ASTM C478, MANUFACTURED USING SULFATE RESISTANT CEMENT (ASTM
<br />C150,TYPEII). RISERS SHALL BE 48-INCH DIAMETER UNLESS OTHERWISE INDICATED AND SHALL HAVE A MINIMUM WALL
<br />THICKNESS OF 5 INCHES.
<br />4. GASKETS FOR SEATING PRECAST SECTIONS SHALL BE COLD ADHESIVE PREFORMED PLASTIC GASKETS CONFORMING TO FDOT
<br />SPECIFICATION 942-2, UNLESS OTHERWISE INDICATED.
<br />5. UNLESS OTHERWISE INDICATED, CONE TOP SECTIONS SHALL BE PRECAST, ECCENTRIC TYPE WITH 24-INCH DIAMETER TOP
<br />OPENING CONFORMING TO ASTM C478. PROVIDE 8-INCH MINIMUM THICKNESS FLAT SLAB TOPS WITH ECCENTRIC 24 INCH
<br />DIAMETER OPENING, UNLESS OTHERWISE INDICATED.
<br />6- PROVIDE A FLEXIBLE WATERTIGHT SEAL OF THE PIPE TO THE MANHOLE- CONNECTION OF CONCRETE PIPE TO THE MANHOLE
<br />SHALL BE MADE WITH NON -SHRINK METALLIC GROUT. CONNECTION OF DUCTILE IRON OR PVC PIPE TO THE MANHOLE SHALL
<br />PROVIDE A WATERTIGHT CONNECTION PER ASTM C923. WHERE CONNECTORS ARE USED, THEY SHALL BE INSTALLED IN THE
<br />MANHOLE WALL BY ACTIVATING THE EXPANDING MECHANISM IN STRICT ACCORDANCE WITH THE RECOMMENDATION OF THE
<br />CONNECTOR MANUFACTURER. THE USE OF ADHESIVES OR LUBRICANTS FOR INSTALLATION OF RUBBER CONNECTORS IS
<br />PROHIBITED.
<br />7. FRAMES AND COVERS SHALL BE GREY IRON PER ASTM A48, CLASS 30B AND SHALL BE U.S. FOUNDRY TYPE 227AS, TRAFFIC
<br />BEARING (AASHTO H-20 LOADING), UNLESS OTHERWISE NOTED IN THE DRAWINGS- CASTINGS SHALL BE SMOOTH, CLEAN, FREE
<br />FROM BLISTERS, BLOWHOLES, AND SHRINKAGE- RAISED LETTERING ON COVERS SHALL BE "STORM", 'SEWER', OR AS DETAILED
<br />ON THE DRAWINGS.
<br />8. PROVIDE INLETS, FRAMES, AND GRATES IN ACCORDANCE WITH DETAILS ON THE DRAWINGS. ALL FRAMES AND INLET GRATES
<br />SHALL BE PRODUCTS OF U.S- FOUNDRY & MANUFACTURING CORPORATION, OR EQUAL.
<br />9. ALL INLET GRATES SHALL BE SECURED BY CHAIN AND EYEBOLT TO THE TOP OF THE STRUCTURE.
<br />10. MANHOLE COATINGS AND FINISHES SHALL BE:
<br />A. SANITARY SEWER MANHOLE INTERIOR -BITUMINOUS EPDXY COATING, MINIMUM DRY FILM THICKNESS= 16 MILS.
<br />B. INTERIOR OF MANHOLES WHICH RECEIVE FORCE MAIN DISCHARGE - INTEGRALLY ATTACHED INTERIOR LINER, FULL HEIGHT,
<br />FIBERGLASS LINER. LINER THICKNESS TO BE IN ACCORDANCE WITH THE DRAWINGS.
<br />C. EXTERIOR - BITUMINOUS EPDXY COATING, MINIMUM DRY FILM THICKNESS = 16 MILS.
<br />11. AS -BUILT INFORMATION SHALL INCLUDE ALL RIM, TOP AND INVERT ELEVATIONS FOR ALL PRECAST STRUCTURES.
<br />PAVING, SIDEWALKS, AND CURBING
<br />1. MATERIALS AND CONSTRUCTION METHODS FOR THE ROADWAY AND PAVING CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE
<br />FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, LATEST
<br />EDITION.
<br />2- ROADWAY PAVING, BASE, AND SUBGRADE THICKNESSES SHALL BE IN ACCORDANCE WITH DETAILS ON THESE DRAWINGS.
<br />3. SIDEWALKS ARE TO BE CONSTRUCTED IN THE AREAS AS SHOWN ON THE CONSTRUCTION PLANS. THE SIDEWALK SHALL BE
<br />CONSTRUCTED OF 4" OF CONCRETE WITH A 28-DAY COMPRESSION STRENGTH OF 3000 PSI. JOINTS SHALL BE EITHER TOOLED OR
<br />SAWCUTATA DISTANCE OF 10'. HANDICAPPED RAMPS SHALL BE PROVIDED AT ALL INTERSECTIONS AND SHALL BE IN
<br />ACCORDANCE WITH THE FLORIDA ACCESSIBILITY CODE FOR BUILDING CONSTRUCTION, LATEST EDITION.
<br />4. CURBING SHALL BE CONSTRUCTED WHERE NOTED ON THE CONSTRUCTION PLANS. CONCRETE FOR CURBS SHALL BE FDOT CLASS
<br />"T" CONCRETE WITH A28-DAY COMPRESSION STRENGTH OF 3000 PSI. ALL CURBS SHALL HAVE SAW CUT CONTRACTION JOINTS
<br />AND SHALL BE CONSTRUCTED AT INTERVALS NOT TO EXCEED 10'-O" ON CENTER. CONSTRUCTION OF CURBS SHALL BE IN
<br />CONFORMANCE WITH FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION (LATEST EDITION) SECTION 520
<br />AND DETAILS PROVIDED ON THE CONSTRUCTION PLANS.
<br />5, FIELD OOMPACTION DRINSITY. STABILITY, AND THICKNESS TESTING FREQUENCIES OF SUB -BASE, BASE, AND ASPHALT SHALL BE
<br />TESTED ONCE EVERY 300 LINEAR FEET OF PAVING PER 24-FT VIADE STRIP, STAGGERED LEFT, CENTER AND RIGHT OF CENTERLINE.
<br />WHERE LESS THAN 300 LINEAR FEET OF SUB -BASE, BASE, AND ASPHALT IS PLACED IN ONE DAY, PROVIDE MIN. OF ONE TEST FOR
<br />EACH PER DAY'S CONSTRUCTION ATA LOCATION DESIGNATED BY THE ENGINEER. ASPHALT EXTRACTION GRADATION SHALL BE
<br />TESTED FROM GRAB SAMPLES COLLECTED ONCE EVERY 1800 SQUARE YARDS OF ASPHALT DELIVERED TO THE SITE (OR A
<br />MINIMUM OF ONCE PER DAY).
<br />PAVING TIMING REQUIREMENTS
<br />1. INSTALL SUBGRADE AND BASE COURSE MATERIALS WITHIN 48 HOURS OF THE REMOVAL/OPEN CUTTING OF EXISTING PAVEMENT
<br />CONSISTING OF STREETS, DRIVEWAYS, OR SIDEWALK. INSTALL FINAL SURFACE COURSES WITHIN 14 DAYS AFTER REMOVAL OF
<br />EXISTING PAVEMENT.
<br />2. AREAS TO RECEIVE ASPHALT SHALL RECEIVE EROSION CONTROL MEASURES NO LATER THAN 48 HOURS AFTER ACCEPTANCE OF
<br />BASECOURSE- TEMPORARY EROSION CONTROL CONSISTS OF PLACEMENT OF A BITUMINOUS PRIME COAT AND SANDING THE
<br />SURFACE. PERMANENT EROSION CONTROL CONSISTS OF PLACEMENT OF THE STRUCTURAL COURSE.
<br />3. AREAS TO RECEIVE CONCRETE PAVING SHALL BE EITHER PROTECTED WITH A LAYER OF FDOT COARSE AGGREGATE MATERIAL OR
<br />SHALL BE PAVED WITHIN 48 HOURS OF ACCEPTANCE OF THE SUBGRADE.
<br />SIGNS AND PAVEMENT MARKINGS
<br />I . ALL SIGNS AND PAVEMENT MARKINGS SHALL BE IN ACCORDANCE WITH THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES"
<br />AND THE LATEST IMPLEMENTED EDITION OF FDOT ROADWAY AND TRAFFIC DESIGN STANDARDS. STANDARD INDEX NO. 11200,
<br />11860,11862,11863,11864,11865,17302; 17344,17346,17349, AND 17355 APPLY. GENERALLY, ALL MARKINGS SHALL CONFORM TO
<br />THE FOLLOWING: 6" EDGE LINES, 6" LANE LINES, 6" SINGLE CENTERLINES, AND 6" DOUBLE LINE PATTERNS, UNLESS OTHERWISE
<br />NOTED ON THE PLANS.
<br />2. ALL PAVEMENT MARKINGS SHALL BE THERMOPLASTIC WITH RAISED PAVEMENT MARKERS (TYPE 911 - 4" X 4"). RAISED PAVEMENT
<br />MARKERS ARE TO BE INSTALLED IN ACCORDANCE WITH THESE PLANS AND FDOT INDEX NO- 17352.
<br />3. PARKING STALL PAVEMENT MARKINGS SHALL BE PAINTED. PAINT SHALL MEET THE REQUIREMENTS OF FDOT SPECIFICATION
<br />SECTION 971, NON -REFLECTIVE WHITE TRAFFIC PAINT.
<br />4. ALL ROADWAY TRAFFIC SIGNS SHALL BE MANUFACTURED USING HIGH INTENSITY RETROREFLECTIVE MATERIALS. THE BACK OF
<br />ALL FINISHED PANELS SHALL BE STENCILED VIATH THE DATE OF FABRICATION, THE FABRICATOR'S INITIALS, AND THE NAME OF THE
<br />SHEETING IN THREE-INCH LETTERS.
<br />5- INTERNAL SITE TRAFFIC SIGNS ARE NOT REQUIRED TO BE RETROREFLECTIVE.
<br />6. THE CONTRACTOR SHALL VERIFY THE REQUIRED LENGTH OF THE SIGN COLUMN SUPPORTS IN THE FIELD PRIOR TO FABRICATION.
<br />7- ALL PAVEMENT MARKINGS REQUIRE LAYOUT APPROVAL IN THE FIELD BY THE ENGINEER PRIOR TO INSTALLATION.
<br />8. PRIOR TO FINAL PAVEMENT MARKING INSTALLA-FION, A TWO WEEK CURE TIME OF THE ASPHALT IS REQUIRED.
<br />GRADING
<br />1 . GRADING SHOWN ON THESE PLANS IS PROVIDED TO THE CONTRACTOR TO EXPRESS THE GENERAL GRADING INTENT OF THE
<br />PROJECT. THE CONTRACTOR SHALL BE EXPECTED TO GRADE THE ENTIRE SITE TO PROVIDE POSITIVE DRAINAGE IN ALL AREAS
<br />THROUGHOUT THE SITE. SMOOTH TRANSITIONS SHALL BE PROVIDED BETWEEN CONTOURS OR SPOT ELEVATIONS AS SHOWN ON THE
<br />PLANS TO ACCOMPLISH THE GRADING INTENT. ALL SLOPES SHALL BE STABILIZED IMMEDIATELY AFTER FINAL GRADING HAS BEEN
<br />COMPLETED. CONTRACTOR SHALL NOTIFY OWNER AND ENGINEER PRIOR TO DEMOBILIZATION OF GRADING EQUIPMENT TO
<br />DETERMINE THAT THE GRADING INTENT HAS BEEN ACHIEVED-
<br />2. ALL PAVING SURFACES IN INTERSECTIONS AND ADJACENT SECTIONS SHALL BE GRADED TO DRAIN POSITIVELY AND TO PROVIDE A
<br />SMOOTHLY TRANSITIONED DRIVING SURFACE FOR VEHICLES WITH NO SHARP BREAKS IN GRADE, AND NO UNUSUALLY STEEP OR
<br />REVERSE CROSS SLOPES. THE STANDARD CROWN MAY HAVE TO BE CHANGED IN ORDER TO DRAIN POSITIVELY IN THE AREA OF
<br />INTERSECTIONS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ACCOMPLISH THE ABOVE AND THE ENGINEER SHALL BE CONSULTED
<br />SO THAT HE MAY MAKE ANY AND ALL REQUIRED INTERPRETATIONS OF THE PLANS OR GIVE SUPPLEMENTARY INSTRUCTIONS TO
<br />ACCOMPLISH THE INTENT OF THE PLANS.
<br />3. UNIFORMLY SMOOTH GRADE THE SITE. DEPRESSIONS FROM SETTLEMENT SHALL BE FILLED AND COMPACTED. TOPS OF
<br />EMBANKMENTS AND BREAKS IN GRADE SHALL BE ROUNDED. FINISHED SURFACES SHALL BE REASONABLY SMOOTH, COMPACTED,
<br />FREE FROM IRREGULAR SURFACE CHANGES AND COMPARABLE TO THE SMOOTHNESS OBTAINED BY BLADE -GRADER OPERATIONS.
<br />4� SLOPE GRADES TO DRAIN AWAY FROM STRUCTURES AT A MINIMUM OF '/,INCH PER FOOT FOR 1 0 FEET. FINISHED SURFACES
<br />ADJACENT TO PAVED AREAS AND WITHIN 10 FEET OF STRUCTURES SHALL BE WITHIN I INCH OF THE PROPOSED GRADE. ALL OTHER
<br />AREAS SHALL BE WITHIN 3 INCHES OF THE PROPOSED GRADE.
<br />5. NEWLY GRADED AREAS SHALL BE PROTECTED FROM TRAFFIC AND EROSION. ALL SETTLEMENT OR WASHING AWAY THAT MAY OCCUR
<br />FROM ANY CAUSE PRIOR TO SEEDING OR ACCEPTANCE SHALL BE REPAIRED AND GRADES RE-ESTABLISHED TO THE REQUIRED
<br />ELEVATIONS AND SLOPES AT NO ADDITIONAL COST TO THE OWNER
<br />STORM SEWER SYSTEMS
<br />I . ALL STORM SEWER PIPE SHALL BE REINFORCED CONCRETE PIPE (RCP) UNLESS OTHERWISE INDICATED ON THE DRAWINGS.
<br />ROUND CONCRETE PIPE SHALL COMPLY WITH ASTM C76. ELLIPTICAL CONCRETE PIPE SHALL COMPLY WITH ASTM C507. PIPE
<br />JOINTS SHALL COMPLY WITH ASTM C443 AND FDOT SPECIFICATION SECTION 430, AND RUBBER GASKETS SHALL COMPLY
<br />WITH FDOT SPECIFICATION SECTION 942. MINIMUM COVER OVER THE PIPE, INCLUDING COVER OVER THE BELL OF THE PIPE
<br />WHERE APPLICABLE, SHALL BE 30 INCHES.
<br />2. RCP PIPE SHALL NOT BE SHIPPED FROM MANUFACTURER UNTIL THE COMPRESSIVE STRENGTH OF THE PIPE HAS REACHED
<br />4000 PSI AND A MINIMUM OF 5 DAYS HAVE PASSED SINCE THE MANUFACTURING OR REPAIR OF THE PIPE HAS BEEN
<br />COMPLETED.
<br />3. CORRUGATED POLYETHYLENE PIPE AND FITTINGS 4 INCH THROUGH 10 INCH DIAMETER SHALL COMPLY WITH AASHTO M252,
<br />TYPE S. PIPE 12 INCH THROUGH 43 INCH DIAMETER SHALL COMPLY WITH AASHTO M294, TYPE S, AND ASTM F2306. PIPE 54
<br />INCH THROUGH 60 INCH DIAMETER SHALL COMPLY WITH FDOT SPECIFICATION SECTION 948 (CLASS 11 PIPE) AND SHALL
<br />COMPLY WITH AASHTO M294. VIRGIN MATERIAL FOR THE PRODUCTION OF PIPE AND FITTINGS SHALL BE HIGH DENSITY
<br />POLYETHYLENE CONFORMING TO THE MINIMUM REQUIREMENTS OF CELL CLASSIFICATION 424420C FOR 4-INCH THROUGH
<br />10-INCH DIAMETERS AND 435400C FOR 12-INCH THROUGH 60-INCH DIAMETERS PER ASTM D3350. THE 12-INCH THROUGH
<br />60-INCH VIRGIN PIPE MATERIAL SHALL COMPLY WITH THE NOTCHED CONSTANT LIGAMENT -STRESS (NCLS) TEST AS
<br />SPECIFIED INASTIM F2306. BELL JOINTS FOR 4 INCH THROUGH 10 INCH DIAMETER PIPE SHALL BE PUSH -ON SLEEVE. BELL
<br />JOINTS FOR 12 INCH THROUGH 60 INCH DIAMETER PIPE SHALL BE INTEGRALLY FORMED ON PIPE. PIPE JOINTS SHALL BE
<br />WATERTIGHT PER ASTM D3212. GASKETS SHALL BE INSTALLED BY PIPE MANUFACTURER AND SHALL COMPLY WITH ASTM
<br />F477.
<br />4. UNDERDRAIN PIPE SHALL BE PERFORATED POLYVINYL CHLORIDE PIPE IN ACCORDANCE WITH ASTM F758. FILTER FABRIC
<br />UNDERDRAIN SOCK SHALL BE TYPE D-3 IN ACCORDANCE WITH FDOT INDEX NO. 199.
<br />5. ALL PIPE JOINTS SHALL BE WRAPPED WITH FILTER FABRIC. FILTER FABRIC SHALL BE IN ACCORDANCE WITH FDOT INDEX NO.
<br />199, TYPE D-3, A,O.S. 70-100. INSTALL IN ACCORDANCE WITH FDOT INDEX NO, 280. PROVIDE MINIMUM 12" OVERLAP.
<br />6. INSTALL POLYETHYLENE PIPE IN ACCORDANCE WITH ASTM D2321. BACKFILL AND COMPACT EVENLY ON EACH SIDE TO
<br />PREVENT DISPLACEMENT. MINIMUM COVER OVER POLYETHYLENE PIPE SHALL BE AS FOLLOWS: A) PIPE UNDER FLEXIBLE
<br />PAVEMENT, RIGID PAVEMENT, OR UNPAVED AREAS WHERE BEDDING IS SUITABLE SOILS AS DEFINED IN THE GENERAL
<br />NOTES: MINIMUM COVER SHALL BE 36 INCHES OR ONE PIPE DIAMETER, WHICHEVER IS GREATER; B) PIPE UNDER FLEXIBLE
<br />PAVEMENT, RIGID PAVEMENT, OR UNPAVED AREAS WHERE BEDDING IS MANUFACTURED AGGREGATES CLASS 1A OR 1 B AS
<br />DEFINED IN ASTM D2321: MINIMUM COVER SHALL BE 30 INCHES OR ONE PIPE DIAMETER, WHICHEVER IS GREATER.
<br />7. INSTALL UNDERDRAINS IN ACCORDANCE WITH FDOT SPECIFICATION SECTION 440. INSTALL CLEANOUTS AS SHOWN ON THE
<br />DRAWINGS.
<br />8. PRIOR TO INSPECTIONS AND TESTING, CLEAN ALL INSTALLED LINES AND STRUCTURES.
<br />9. ALL STORM PIPE SHALL BE SUBJECTED TO LEAKAGE TESTING. WHEN THE GROUND WATER LEVEL IS ABOVE THE TOP OF THE
<br />PIPE. AN INFILTRATION TEST SHALL BE PERFORMED BY SEALING OFF A LENGTH OF PIPE AND MEASURING THE DEPTH OF
<br />FLOW OVER A MEASURING WEIR, OR BY PUMPING THE INFILTRATEDIWATER INTO CONTAINERS FOR MEASUREMENT. TESTS
<br />SHALL BE CONDUCTED FOR A MINIMUM OF FOUR HOURS. INFILTRATION LEAKAGE SHALL NOT EXCEED 150 GALLONS PER 24
<br />HOURS. PER INCH DIAMETER, PER MILE OF PIPE. WHEN THE GROUND WATER LEVEL IS BELOW THE TOP OF THE PIPE, THE
<br />PIPE SHALL BE TESTED FOR LEAKAGE BY EXFILTRATION. EXFILTRATION LEAKAGE TEST SHALL CONSIST OF ISOLATING THE
<br />PARTICULAR SECTION, FILLING WITH WATER TO A POINT 4 FEET ABOVE THE TOP OF THE PIPE AT THE UPPER MANHOLE OR
<br />INLET, AND ALLOWING IT TO STAND NOT LESS THAN FOUR HOURS. THE SECTION SHALL -THEN BE REFILLED WITH WATER UP
<br />TO THE ORIGINAL LEVEL AND AFTER TWO HOURS THE DROP IN WATER SURFACE SHALL BE MEASURED. THE COMPUTED
<br />LEAKAGE SHALL NOT EXCEED 150 GALLONS PER INCH DIAMETER, PER 24 HOURS, PER MILE OF PIPE.
<br />I
<br />, -
<br />,
<br />.1 - 11 � 1�' I � , , I - , - � � Iff-H, -
<br />� I I I I I , , `� �,' I I � I _�- ,2 � I -
<br />- . : I I �
<br />I
<br />- 1. ', I
<br />, �
<br />- �, I - I I I I - . I - �
<br />.
<br />.
<br />- I
<br />. -
<br />I
<br />. ,
<br />- - . �
<br />I I
<br />-
<br />I
<br />I
<br />- 0 ,
<br />I
<br />,
<br />, I
<br />11: 1 7
<br />1 - I "
<br />I
<br />i I - . I ,
<br />I I - I �. I -_ .. ... 11 � _, �� I I �,� ,
<br />I , : , - �,' , - - I - ` - - I I
<br />� -_ f I I
<br />I I I I �
<br />I , I
<br />-
<br />A Full Service
<br />A & AT- f
<br />M =Firm
<br />Architects
<br />Engineers
<br />Environmental
<br />Landscape Architects
<br />M/E/P
<br />Planners
<br />Structural
<br />Surveyors
<br />Traffic / Transportation
<br />Offices in:
<br />* Florida
<br />9 Puerto Rico
<br />* Connecticut
<br />9 Maryland
<br />,%1111,111
<br />k� .
<br />N * "
<br />-, t.0 ;
<br />io. �- ..
<br />.� �_, %
<br />I.- 0
<br />00,
<br />,0 �J�
<br />!�", �-f
<br />,
<br />wr;1
<br />M 2. Im
<br />0-
<br />w
<br />>_
<br />�
<br />=
<br />;�:7
<br />w
<br />LLJ
<br />CL
<br />w
<br />0
<br />LL C
<br />01
<br />�_ (n
<br />.-
<br />� >
<br />ED a)
<br />D (r_
<br />U)
<br />to
<br />Ir-
<br />()
<br />w
<br />0
<br />N
<br />ID
<br />It- �
<br />" M
<br />�
<br />C%j 0
<br />.-
<br />'ro I a, I
<br />N
<br />a_
<br />z
<br />3:
<br />CD
<br />C14
<br />LO
<br />_-)
<br />3
<br />(O
<br />w
<br /><
<br />r-
<br />W
<br />. .
<br />>,
<br />-0
<br />. .
<br />�;,
<br />-0
<br />. .
<br />>�
<br />-0
<br />-0
<br />`
<br />>N
<br />n
<br />-a
<br />a)
<br />-0
<br />a)
<br />. :
<br />C
<br />0)
<br />a
<br />.65
<br />C
<br />*�:
<br />:
<br />!
<br />_�e
<br />0
<br />>
<br />0
<br />"
<br />. .
<br />(1)
<br />-iq-
<br />. .
<br />Q)
<br />0
<br />z
<br />�0
<br />CD
<br />"
<br />(1)
<br />(1)
<br />ca
<br />L_
<br />1.w
<br />a)
<br />_r_
<br />8-
<br />CL
<br />0
<br />w-]
<br />_�,
<br />M
<br />-0
<br />0
<br />N
<br />0
<br />0
<br />C)
<br />U)
<br />0
<br />3
<br />--i
<br />Q
<br />-
<br />Plans Prepared By.
<br />CPH,
<br />Inc.
<br />1031-C W. 23rd St.
<br />Panama City, FL 32405
<br />Ph: 850.563.1490
<br />Licenses:
<br />Eng. C.O.A. No. 3215
<br />Survey L.B. No. 7143
<br />Arch. Lic. No. AA2600926
<br />Lndscp. Lic. No. LCO000298
<br />&w4
<br />S
<br />Sheet No.
<br />" AM
<br />� Aw
<br />& AL
<br />.
<br />M
<br />5:
<br />0
<br />a
<br />a
<br />.
<br />�w
<br />..
<br />Al,
<br />M
<br />
|