My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7920 Gall Blvd (2)
Zephyrhills
>
Building Department
>
Building Plans
>
7920 Gall Blvd (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 10:58:52 PM
Creation date
1/21/2025 3:53:09 PM
Metadata
Fields
Template:
Building Plans
Street #
7920
Location
Gall Blvd
Contractor
Wilson and Company Inc
Building Plans - Permit #
13397
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NO <br />ti <br />L! <br />rn <br />N_ <br />O <br />CV <br />r <br />N <br />CEILING PLAN - LEVEL 1 <br />1 /8" = 1'-01, <br />GENERAL RCP NOTES <br />1. REFLECTED CEILING PLANS INDICATE: <br />A GENERAL TYPE AND SPECIFIC LOCATION OF LIGHT FIXTURES <br />OF SIGNAL & EQUIPMENT DEVICES. <br />2. ELECTRICAL ENGINEERING DRAWINGS INDICATE: <br />A CIRCUITING AND WIRING OF LIGHT FIXTURES, AND SWITCHES. <br />B. LIFE SAFETY EQUIPMENT. <br />C. LOCATION OF REQUIRED EMERGENCY LIGHT FIXTURES. <br />D. LIGHT FIXTURE SPECIFICATIONS. <br />3. MECHANICAL ENGINEERING DRAWINGS INDICATE: <br />A DUCTS, AIR MOVEMENT REQUIREMENTS, AND SIZES OF GRILLES AND <br />REGISTERS. <br />4. DESIGN BUILD FIRE PROTECTION DRAWINGS INDICATE: <br />A LAYOUT, LOCATION, AND SIZE OF SPRINKLER LINES AND HEADS. <br />B. PRESSURE REQUIREMENTS. <br />C. SPRINKLER HEAD SPECIFICATIONS. <br />D. LOCATION OF FIRE PROTECTION RISERS AND WALL HYDRANTS. <br />5. ALL STROBES SHALL BE LOCATED @+W' AFF. SEE ENGINEERS DRAWINGS <br />FOR LOCATIONS AND SPECIFICATIONS. <br />6. ALL STROBES TO ALIGN VERTICALLY WITH RECEPTACLE BELOW WHERE <br />OCCURS. <br />7. ARCHITECTTO REVIEWALL LIGHT/CEILING FIXTURE LOCATIONS PRIORTO <br />INSTALLATION. <br />8. INSTALL THE SUSPENDED CEILING GRID TO BE LEVEL WITHIN ATOLERANCE <br />OF 1/8' IN 1Z-G'. ANCHORAS REQUIRED. <br />9. ARCHITECT TO REVIEW LOCATIONS OF ALL SLOT DIFFUSERS, SPRINKLERS, <br />SMOKE DETECTORS, ETC. IN GYP BD CEILINGS AND RETURN WITHIN 5 BUSINESS <br />DAYS OF RECEIPT. <br />10. WHERE ACOUSTICAL PANELS ARE REQUI RED TO BE CUT, CUT THE PANELS <br />TO MAINTAI N A SHARP AND NEAT EDGE. <br />11. INSTALL NEW SPRINKLER HEADS AND LIGHT FIXTURES AT THE CENTER OF <br />THE ACOUSTICAL CEILING PANEL UON. <br />12. MEP & FP TO COMPLY WITH ALL APPLICABLE CODES AND SUBMIT SHOP <br />DRAWINGS FOR ARCHITECT REVIEWOF ALL LOCATIONS OF DEVICES PRIOR TO <br />INSTALLATION AND RETURN WITHIN 5 BUSINESS DAYS OF RECEIPT. <br />13 RELOCATE EXISTING SPRINKLER HEADS IN ACCORDANCE WITH APPLICABLE <br />CODES AS REQUIRED TO COORDINATE WITH NEW CONSTRUCTION. <br />14. INSTALL SUSPENDED CEILING GRID TO BE CENTERED IN ROOM, UON. <br />15. COORDINATE CEILING MOUNTED SPEAKERS AND A/V DEVICES WITH A/V <br />VENDOR <br />KEYED NOTES <br />31 PROVIDE POWER & CABLE IN CEILING FOR CEILING <br />SUSPENDED AV EQUIPMENT. MIN 6'-0" WHIP. <br />33 ALIGN EDGE OF SOFFIT WITH FACE OF MULLION <br />38 GC TO VERIFY LIGHT LOCATION WITH FINAL FURNITURE <br />LAYOUT. <br />RCP LEGEND <br />2 X2 GRID AND TILE SYSTEM -SEE SPECIFICATIONS <br />GYPSUM BOARD CEILING AS INDICATED ON PLAN. SEE <br />FINISH PLAN FOR PAINT SPECS. <br />9-O"AFF FINISHED CEILING HEIGHT AS INDICATED ON PLAN UON <br />8-0" AFF FINISHED CEILING HEIGHT AS INDICATED ON PLAN LION <br />CEILING MOUNTED EXIT SIGN <br />2'x4 RECESSED FLUORESCENT LIGHT FIXTURE <br />F1 LIGHTOLIER- COFFAIRE II <br />STATIC 2 LAMP S.O. T5 <br />Zx4' DIMMABLE RECESSED FLUORESCENT LIGHT <br />F1D FIXTURE LIGHTOLIER- COFFAIRE II <br />STATIC LAMP S.O. T5 <br />F3 O 5' RECESSED DOVVN LIGHT <br />OC1VENTRY-6HF1 <br />F4 DECORATIVE PENDANT <br />LIGHTOLIER - LYTESPACE ACCENT SYSTEM W/ <br />TALL BELL SHADE 48686LC LIGHT CARAMEL <br />LAMP AT 4-6" AFF AND 9-0' AFF <br />F5 I_ —C CHAJN HUNG FIXTURE WITH WIRE <br />GUARD <br />TRACK LIGHT - HUNG @ MIN. TU' AFF. <br />MFG: TECH LIGHTING <br />F12 STYLE: 700M10A (24" LENGTHS IN ANTIQUE BRONZE <br />W/ BROWN INSULATORS) <br />LAMPS: AERO"FIREBIRD" GLASS <br />Project <br />HUMANA- ZEPHYRHILLS, <br />FLORIDA - GUIDANCE <br />CENTER <br />7920 GALL BLVD. <br />ZEPHYRHILLS, FLORIDA 33541 <br />Prepared for <br />HUMANA INC. <br />Contract No: 12.01622.00 <br />�. I `° K <br />q;�S A <br />One Tampa City Center, Suite 1800 <br />Tampa, FL 33602 USA <br />t +1 813 229 0300 f +1 813 223 7116 <br />FL Reg: AAC001139 <br />All reproduction & intellectual property rights reserved © 2012 <br />-In Association with <br />SDM Consulting Engineers <br />MEP Engineer <br />135 Almeria Ave_ <br />Coral CGables, FL 33134 <br />305.446.2788 <br />Key Plan <br />C' <br />Professional Seals <br />No. Revision Description YYYY-MM-DD <br />Drawn by HOK Reviewed by HOK <br />Project No 12.01622.00 <br />Sheet Title: <br />LEVEL 1 REFLECTED <br />CEILING PLAN <br />Original drawing is 36 x 24 Do not scale contents of this drawing <br />Sheet Number <br />
The URL can be used to link to this page
Your browser does not support the video tag.