Laserfiche WebLink
N <br />N <br />O <br />N <br />N <br />CN <br />N <br />0 <br />QUALITY ASSURANCE PLAN <br />TABLE 1 <br />REQUIRED GEOTECHNICAL SPECIAL INSPECTIONS <br />SYSTEM or MATERIAL <br />INSPECTION <br />REMARKS <br />FLORIDA <br />BUILDING CODE <br />REFERENCE <br />CODE OR STANDARD <br />REFERENCE <br />FREQUENCY <br />CONTINUOUS1 PERIODIC <br />SOILS <br />SITE PREPARATION FOR FILLS <br />GEOTECHNICAL REPORT <br />X <br />X <br />BY THE GEOTECHNICAL ENGINEER <br />FILL MATERIAL VERIFICATION <br />FILL PLACEMENT & COMPACTION <br />LIFT THICKNESS <br />TABLE 2 <br />REQUIRED SPECIAL INSPECTIONS <br />SYSTEM or MATERIAL <br />REMARKS <br />FLORIDA <br />BUILDING CODE <br />REFERENCE <br />CODE OR STANDARD <br />REFERENCE <br />FREQUENCY <br />CONTINUOUS <br />PERIODIC <br />SPECIAL INSPECTIONS APPLY TO VERIFICATION OF <br />FABRICATORS <br />X <br />DETAILED FABRICATION AND QUALITY CONTROL <br />PROCEDURES INCLUDING REVIEW FOR COMPLETENESS <br />AND ADEQUACY RELATIVE TO THE CODE REQUIREMENT <br />SPECIAL INSPECTIONS APPLY TO REVIEW OF WRITTEN <br />APPROVED FABRICATORS <br />X <br />PROCEDURES AND QUALITY CONTROL MANUALS AND <br />PERIODIC AUDITING OF FABRICATION PRACTICES <br />CONCRETE <br />REINFORCING STEEL <br />1907.5 <br />ACI 318 1.3.2.0 <br />X <br />1914.4 <br />ACI 318 7.5 <br />VERIFYING USE OF <br />1904 <br />ACI 318 1.3.2.A <br />REQUIRED MIX DESIGN(S) <br />1905.2-4 <br />ACI 318 CHAPTER 4 <br />X <br />1914.2 <br />ACI 318 5.2-5.4 <br />CONCRETE PLACEMENT <br />1905.4 10 <br />ACI 318 1.3.2.DACI <br />X <br />318 5.9-5.10 <br />CONCRETE PLACEMENT <br />ASCE 9 CHAPTER 3 <br />X <br />AT COMPOSITE SLABS <br />CONCRETE/SHOTCRETE CURING <br />1905.11-13 1914.9 <br />ACI 318 1.3.2.D <br />X <br />PLACEMENT OF EMBEDDED ITEMS IN <br />PRECAST MEMBERS AFTER CONCRETE <br />ACI 318 16.7 <br />X <br />PLACEMENT <br />ALL CONNECTIONS VISUALLY INSPECTED REFER TO <br />S MEMBERS <br />ERECTION OF PRECAST R <br />ACI 1 1. <br />3 8 3 2.E <br />X <br />ANCHOR BOLT AND WELDING REQUIREMENTS <br />VERIFICATION OF IN -SITU CONCRETE <br />PRIOR TO REMOVAL OF FORMS AND <br />1906.2.2.1 <br />ACI 318 6.2.2.1 <br />X <br />SHORES FROM ELEVATED BEAMS AND <br />SLABS <br />MATERIAL VERIFICATION OF <br />ACI 318 3.5.2 <br />REINFORCING STEEL FOR <br />1903.5.2 <br />AWS D1.4 <br />X <br />CERTIFIED MILL TEST REPORTS <br />WELDING <br />SECTION 7 <br />MATERIAL VERIFICATION OF WELD <br />X <br />MANUFACTURER'S CERTIFIED TEST REPORTS <br />FILLER METALS <br />VERIFYING USE OF PROPER <br />WPS'S <br />X <br />COPY OF WELDING PROCEDURE SPECIFICATIONS <br />VERIFYING WELDER <br />X <br />COPY OF QUALIFICATION CARDS <br />QUALIFICATIONS <br />WELDING REINFORCING EXCEPT <br />ALL WELDS VISUALLY INSPECTED PER <br />AS NOTED OTHERWISE <br />X <br />AWS D1.4 7.5 <br />WELDING REINFORCING STEEL IN <br />SHEAR WALL BOUNDARY <br />X <br />ELEMENTS <br />WELDING SHEAR REINFORCEMENT <br />X <br />PLACEMENT OF CAST -IN -PLACE <br />ANCHOR BOLTS <br />ACI 318 1.3.2.0 <br />X <br />ALL BOLTS VISUALLY INSPECTED <br />MASONRY <br />VERIFICATION OF SITE -PROPORTIONED <br />MORTAR AND GROUT <br />X <br />PLACEMENT OF MASONRY UNITS AND <br />MORTAR JOINT CONSTRUCTION <br />ACI 530 1.14.1 <br />X <br />VERIFICATION OF SIZE AND LOCATION <br />X <br />OF STRUCTURAL ELEMENTS <br />ACI 530 1.14.2' <br />ACI 530 1.14.3' <br />ANCHORAGE OF MASONRY TO FRAMES <br />ACI 530 1.14.4 <br />STRUCTURAL MEMBERS, AND <br />DIAPHRAGMS INCLUDING TYPE, SIZE, <br />X <br />X <br />AND LOCATION OF ANCHORS <br />TYPE, GRADE, AND SIZE OF <br />REINFORCING STEEL <br />X <br />REINFORCING STEEL AND <br />X <br />CONNECTOR PLACEMENT <br />MATERIAL VERIFICATION OF <br />X <br />CERTIFIED MILL TEST REPORTS <br />REINFORCING STEEL FOR WELDING <br />MATERIAL VERIFICATION <br />X <br />MANUFACTURER'S CERTIFIED TEST REPORTS <br />OF WELD FILLER METALS <br />AWS D1.4 SECTION 7 <br />VERIFYING USE OF PROPER WPS'S <br />X <br />COPY OF WELDING PROCEDURE SPECIFICATIONS <br />VERIFYING WELDER QUALIFICATIONS <br />X <br />COPY OF QUALIFICATION CARDS <br />WELDING REINFORCING STEEL <br />X <br />ALL WELDS VISUALLY INSPECTED PER AWS D1.4 7.5 <br />COLD/HOT WEATHER <br />MASONRY PROTECTION <br />X <br />ACI 530 1.14.1 <br />ACI 530 1.14.2' <br />VERIFYING USE OF REQUIRED <br />GROUT MIX DESIGN <br />ACI 530 1.143 <br />ACI 530 1.14.4 <br />X <br />VERIFYING GROUT SPACE IS CLEAN <br />PRIOR TO GROUTING <br />X <br />X <br />GROUT PLACEMENT <br />X <br />POST INSTALLED CONCRETE ANCHORS <br />SPECIAL INSPECTIONS APPLY TO ANCHOR PRODUCT <br />NAME, TYPE, & DIMENSIONS, HOLE DIMENSIONS, <br />INSTALLATION <br />1703.4.2 <br />ICC EVALUATION <br />X <br />COMPLIANCE WITH DRILL BIT REQUIREMENTS, <br />REPORT <br />CLEANLINESS OF THE HOLE & ANCHOR, ADHESIVE <br />EXPIRATION DATE, ANCHOR/ADHESIVE INSTALLATION, <br />ANCHOR EMBEDDMENT, & TIGHTENING TORQUE <br />TABLE 3 <br />REQUIRED ARCHITECTURAL SPECIAL INSPECTIONS <br />SYSTEM or MATERIAL <br />INSPECTION <br />REMARKS <br />FLORIDA <br />BUILDING CODE <br />REFERENCE <br />CODE or STANDARD <br />REFERENCE <br />FREQUENCY <br />CONTINUOUS PERIODIC <br />CLADDING <br />ERECTION AND FASTENING I X <br />VENEER <br />PLACEMENT AND FASTENING <br />X <br />REFER TO TABLE 2 FOR MORTAR AND <br />ANCHORAGE SPECIAL INSPECTION <br />SPRAYED FIRE-RESISTANT MATERIALS <br />SURFACE CONDITIONS <br />ICC EVALUATION <br />REPORT <br />X <br />SPECIAL INSPECTIONS APPLY TO CLEANLINESS OF STEEL, <br />PRODUCT NAME AND TYPE, MATERIAL EXPERATION <br />DATE, AMBIENT CONDITIONS, APPLICATION <br />PROCEDURES, AND MATERIAL THICKNESS AND DENSITY <br />APPLICATION <br />X <br />EXTERIOR INSULATION AND FINISH SYSTEMS <br />INSTALLATION X <br />SMOKE CONTROL SYSTEMS <br />INSTALLATION <br />X <br />RECORD DEVICE LOCATION(S) <br />WOOD FRAMED CONSTRUCTION <br />FABRICATION OF PREFABRICATED <br />STRUCTURAL ELEMENTS <br />1704.2 <br />X <br />VERIFY STRUCTURAL PANEL GRADE & THICKNESS <br />VERIFY NOMINAL SIZE OF FRAMING MEMBERS @ <br />FABRICATION OF HIGH -LOAD <br />1704.6.1 <br />X <br />ADJOINING PANEL EDGES. <br />DIAPHRAGMS <br />TABLE 2306.3.2 <br />VERIFY NAIL/STAPLE DIAMETER & LENGTH, NUMBER OF <br />FASTENER LINES & SPACING BETWEEN FASTENERS IN <br />EACH LINE & AT EDGE MARGINS <br />PRE -FABRICATED WOOD SHEAR PANELS <br />1703.4, 1704.13.3 <br />X <br />.7.2 <br />2304.7.2 <br />ROOF SHEATHING SPAN RATING or <br />TABLES 2304 1), <br />X <br />SIZE, SPECIES, &GRADE OF SHEATHING <br />(ES <br />& <br />ROOF SHEATHING FASTENING <br />2304.9.1, 2304.9.2 <br />X <br />TABLE 2304.9.1 <br />ROOF FRAMING SIZE, GRADE, SPECIES, & <br />2306.1, 2306.1.1, <br />X <br />SPACING <br />2308.10.3 <br />ROOF RAFTER FASTENING <br />TABLES 2304.9.1, <br />X <br />2308.10.4.1 <br />ANCHORAGE TO WALL PLATE <br />2308.10.1 <br />X <br />BEAM SIZE & MATERIAL <br />2306.1 <br />X <br />WALL SHEATHING FASTENING <br />2304.6 <br />X <br />BRACING P , SIZE, GRADE, SPECIES, & <br />FASTENING <br />2306.4 <br />X <br />PLATES, STUDS, & HEADERS SIZE, GRADE, <br />2306.1 <br />X <br />SPECIES, SPACING, & FASTENING <br />2304.7.1, TABLES <br />FLOOR FRAMING SHEATHING & <br />2304.7(3) & (4), 2304.9.1, <br />X <br />FASTENING <br />2304.9.2, TABLE 2304.9.1 <br />TRUSSINSTALLATION, TEMP RA & <br />PERMANENT BRACING <br />X <br />TRUSS/JOIST HANGERS/CONNECTORS <br />1715.1, 2304.9.3 <br />X <br />STRUCTURAL <br />STEEL <br />FABRICATION OF PREFABRICATED <br />X <br />REFER TO INSPECTION OF FABRICATOR REQUIREMENTS <br />STRUCTURAL ELEMENTS <br />MATERIAL VERIFICATION OF <br />ASTM A6 <br />STRUCTURAL STEEL <br />2203.1 <br />RISC ASD A3.1a <br />X <br />CERTIFIED MILL TEST REPORTS <br />AISC LRFD A3.1a <br />MATERIAL VERIFICATION OF HIGH <br />AISC ASD A3.4 <br />X <br />MANUFACTURER'S CERTIFIED TEST REPORTS <br />STRENGTH BOLTS <br />AISC LRFD A3.3 <br />MATERIAL VERIFICATION OF ANCHOR <br />AISC ASD A3.5 <br />X <br />MANUFACTURER'S CERTIFIED TEST REPORTS <br />BOLTS AND THREADED RODS <br />AISC LRFD A3.4 <br />MATERIAL VERIFICATION OF WELD <br />X <br />MANUFACTURER'S CERTIFIED TEST REPORTS <br />FILLER METALS <br />AWS D1.1 SECTION 6 <br />VERIFYING USE OF PROPER WPS'S <br />X <br />COPY OF WELDING PROCEDURE SPECIFICATIONS <br />VERIFYING WELDER QUALIFICATIONS <br />X <br />COPY OF QUALIFICATION CARDS <br />COMPLETE AND PARTIAL <br />X <br />ALL WELDS VISUALLY INSPECTED PER AWS D1.1 6.9 <br />PENETRATION GROOVE WELDS <br />MULTIPASS FILLET WELDS <br />X <br />SINGLE PASS FILLET WELDS <br />GREATER THAN 5/6" <br />X <br />SINGLE PASS FILLET WELDS LESS <br />THAN OR EQUAL TO 16' <br />X <br />INSTALLATION OF COMPOSITE <br />ICC EVALUATION <br />SPECIAL INSPECTIONS APPLY TO <br />SLAB DECKING <br />1703.4.2 <br />REPORT <br />X <br />DECKING TYPE, DEPTH, AND GAGE <br />ASCE 9 CHAPTER 3 <br />SPECIAL INSPECTIONS APPLY TO DECKING DEPTH AND <br />INSTALLATION OF ROOF DECKING <br />1703.4.2 <br />ICC EVALUATION <br />X <br />GAGE, POWER ACTUATED FASTENERS, SCREWS, <br />REPORT <br />PROPRIETARY SIDE SEAM ATTACHMENTS, AND BUTTON <br />PUNCHES <br />FLOOR AND ROOF DECK WELDS <br />AWS D1.3 SECTION 7 <br />X <br />ALL WELDS INSPECTED PER AWS D1.3 7.1 <br />WELDING STUDS EXCEPT <br />X <br />ALL WELDS VISUALLY INSPECTED PER AWS D1.1 7.8 <br />AS NOTED OTHERWISE <br />AWS DIA SECTION 7 <br />WELDING STUDS IN STRUCTURAL <br />X <br />DIAPHRAGMS <br />WELDING STAIR AND RAILING SYSTEMS <br />AWS DIA SECTION 6 <br />X <br />ALL WELDS VISUALLY INSPECTED PER AWS D1.1 6.9 <br />SNUG -TIGHT HIGH STRENGTH BOLT <br />X <br />ALL JOINTS VISUALLY INSPECTED <br />INSTALLATION <br />PRETENSIONED HIGH STRENGTH BOLT <br />INSTALLATION USING <br />RCSC SPECIFICATION <br />ALL JOINTS VISUALLY INSPECTED. JOINTS USING <br />TURN -OF -THE -NUT METHOD WITH <br />FOR STRUCTURAL <br />DIRECT TENSION INDICATORS, ALL BOLTS SHALL <br />MATCH MARKING, DIRECT TENSION <br />JOINTS USING ASTM <br />X <br />INSPECTED AFTER SNUGGING AND AFTER <br />BE BE INSPSIONING <br />INDICATOR METHOD, OR TWIST -OFF <br />A325 OR A490 BOLTS <br />TYPE TENSION CONTROL BOLT <br />SECTION 9 <br />METHOD <br />PRETENSIONED HIGH STRENGTH BOLT <br />INSTALLATION USING <br />TURN -OF -THE -NUT METHOD WITHOUT <br />X <br />ALL JOINTS VISUALLY INSPECTED <br />MATCH MARKING OR CALIBRATED <br />WRENCH METHOD <br />VERIFICATION OF FRAME JOINT DETAIL <br />INCLUDING APPLICATION, COMPONENT <br />X <br />LOCATIONS, BRACING, AND STIFFENERS <br />TABLE 4 <br />REQUIRED TESTING for SPECIAL INSPECTIONS <br />SYSTEM or MATERIAL <br />TESTING <br />REMARKS <br />FLORIDA <br />BUILDING CODE <br />CODE or STANDARD <br />FREQUENCY <br />REFERENCE <br />REFERENCE <br />GEOTECHNICAL <br />PREPARED SUBGRADE DENSITY <br />ASTM D2922 or <br />EACH 5,000 SF OF <br />PER GEOTECHNICAL REPORT <br />ASTM D1556 <br />PREPARED SUBGRADE <br />FILL IN -PLACE DENSITY <br />1803.5 <br />ASTM D2922 or <br />EACH 2,500 SF OF EACH <br />PER GEOTECHNICAL REPORT <br />ASTM D1556 <br />LIFT PLACED EACH DAY <br />CONCRETE <br />EACH 150 CY NOR LESS <br />CONCRETE STRENGTH <br />ASTM C39 <br />THAN EACH 5000 SF OF <br />SLAB OR WALL PLACED <br />EACH DAY <br />CONCRETE SLUMP <br />ASTM C143 <br />CONCRETE AIR CONTENT <br />ASTM C231 <br />CONCRETE TEMPERATURE <br />ASTM C1064 <br />MASONRY <br />(6) UNITS PER EACH 50000 <br />UNIT STRENGTH <br />2105.2.2.1.2 <br />ASTM C140 <br />PRIOR TO CONSTRUCTION <br />GROUT STRENGTH <br />2105.2.2.1.2 <br />ASTM C1019 <br />EACH 500E WALL <br />A H <br />PLACED EACH DAY <br />(5) PRISMS PRIOR TO <br />CONSTRUCTION AND (1) <br />PRISM STRENGTH <br />2105.2.2.2 <br />ASTM C1314 <br />PRISM FOR EACH 5000 SF <br />OF WALL PLACED EACH <br />DAY <br />STEEL <br />MAGNETIC PARTICAL (MT) AND <br />MT - AWS D1.1 6.14.4 UT - <br />PER DRAWINGS <br />ULTRASONIC (UT) TESTING OF WELDS <br />AWS DIA 6.13 & 6.14.3 <br />PRE -CONSTRUCTION TESTING OF <br />AWS Dl.i 7.7.1 <br />EACH SIZE AND TYPE OF <br />WELDING STUDS <br />STUD EACH SHIFT <br />RCSC SPECIFICATION <br />EACH COMBINATION OF <br />PRE -INSTALLATION VERIFICATION OF <br />FOR STRUCTURAL <br />DIAMETER, LENGTH, <br />PRETENSIONED HIGH STRENGTH BOLTS <br />JOINTS USING ASTM <br />GRADE, AND LOT TO BE <br />A325 OR A490 BOLTS <br />USED IN THE WORK <br />SECTION 7 <br />THRESHOLD INSPECTION PLAN for 4 STORY APARTMENT BUILDINGS <br />THRESHOLD INSPECTION NOTES <br />1. THRESHOLD INSPCECTIONS SHALL BE PROVIDED BY THE OWNER OR OWNER'S REPRESENTATIVE. <br />2. THE THRESHOLD INSPECTOR SHALL OBSERVE THE WORK ASSIGNED FOR CONFORMANCE TO APPROVED <br />DESIGN DRAWINGS, SPECIFICATIONS AND CODE PROVISIONS. <br />3. THE THRESHOLD INSPECTOR SHALL BE A PERSON CERTIFIED, LICENSED, OR REGISTERED UNDER FLORIDA <br />STATUTE CHAPTER 471 AS AN ENGINEER OR UNDER FLORIDA STATUTE CHAPTER 481 AS AN ARCHITECT. <br />4. THE THRESHOLD INSPECTOR SHALL BE APPROVED BY THE OWNER, BUILDING OFFICIAL, ARCHITECT, AND <br />ENGINEER OF RECORD. <br />5. THE THRESHOLD INSPECTOR SHALL FURNISH THE CODE REQUIRED REPORTS IN A TIMELY MANNER (2 <br />WEEKS MAXIMUM) TO THE BUILDING OFFICIAL, ARCHITECT, AND ENGINEER OR RECORD. <br />6. PERIODIC INSPECTIONS SHALL OCCUR AFTER SUBSTANTIAL COMPLETION OF THE FOUNDATION, EACH <br />FLOOR, ROOF, MINIMUM. <br />THRESHOLD INSPECTION PLAN <br />1. RESPONSIBILITY <br />THE SPECIAL INSPECTOR IS RESPONSIBLE TO BOTH THE OWNER & THE BUILDING OFFICIAL TO VERIFY THAT <br />CONSTRUCTION OF THE STRUCTURAL COMPONENTS IS IN ACCORDANCE WITH THE PLANS, <br />SPECIFICATIONS, & THE STATE BUILDING CODE TO THE BEST OF HIS/HER KNOWLEDGE & ABILITY. <br />11. NARRATIVE DESCRIPTION <br />THE SPECIAL INSPECTOR IS RESPONSIBLE FOR SEEING THAT THE WORK IS EXECUTED IN FULL ACCORDANCE <br />WITH THE PLANS AND SPECIFICATIONS, EXCEPT AS VARIATIONS THEREFROM ARE PERMITTED IN WRITING <br />BY THE ARCHITECT AND ENGINEER. THE SPECIAL INSPECTOR IS RESPONSIBLE FOR THOROUGH <br />KNOWLEDGE OF THE SPECIFICATIONS, THE BUILDING CODE, AND FOR THE EXERCISE OF GOOD <br />JUDGMENT. IT IS SUGGESTED THE SPECIAL INSPECTOR HAVE AUTHORITY TO: <br />V. DETAILED SUGGESTED INSPECTION NOTES <br />A. FORBID THE USE OF MATERIALS, EQUIPMENT, OR WORKMANSHIP WHICH DOES NOT CONFORM TO <br />SPECIFICATIONS OR WHICH WILL CAUSE IMPROPER CONSTRUCTION RELATIVE TO THE SPECIFICATIONS <br />OR BUILDING CODE. <br />B. STOP ANY WORK WHICH IS NOT BEING DONE IN ACCORDANCE WITH THE PLANS, SPECIFICATIONS, <br />AND THE BUILDING CODE. <br />C. REQUIRE THE REMOVAL OR REPAIR OF FAULTY CONSTRUCTION OR OF CONSTRUCTION PERFORMED <br />WITHOUT INSPECTION AND NOT CAPABLE OF BEING INSPECTED OR TESTED IN PLACE. <br />D. REQUEST INTERPRETATIONS (RFI'S) FROM DESIGN ARCHITECT AND ENGINEER. <br />Ill. REPORTING INFORMATION <br />THE INSPECTOR'S REPORTS ARE SECONDARY TO ACTUAL OBSERVATION DURING CONSTRUCTION. <br />HOWEVER, THEY ARE OF EXTREME IMPORTANCE IN THAT THEY ENABLE THE BUILDING OFFICIAL TO KEEP <br />IN TOUCH WITH THE WORK WHILE IT IS IN PROGRESS AND WILL BE OF VALUE IN THE FUTURE IN CASE OF <br />CHANGES IN THE STRUCTURE OR ITS USE. THE REPORT MAY CONSIST OF A RECORD OF THE PROGRESS, <br />WORKING CONDITIONS, INSTRUCTIONS GIVEN TO THE CONTRACTOR, DEVIATIONS FROM <br />SPECIFICATIONS WITH REASONS, AND PROBLEMS ENCOUNTERED WITH SOLUTIONS. THE REPORTS SHALL BE <br />IN WRITING AND SHALL BE MADE OUT PROMPTLY AT THE END OF THE PERIOD COVERED. THE REPORTS <br />WILL CONSIST OF ANY OR ALL OF THE FOLLOWING. <br />A. REPORT OF EACH INSPECTION <br />B. JOBSITE LOG OF AREAS INSPECTED <br />C. SPECIAL RECORDS (MILL TEST REPORTS, CONCRETE TESTS, ETC.) <br />D. RECORD OF PLACING AND CURING CONCRETE <br />E. PHOTOGRAPHS <br />SUGGESTED INSPECTION REPORT <br />DATE, SHIFT, TYPE, AND LOCATION OF WORK; CONTRACTOR'S REPRESENTATIVE; INSPECTOR <br />MATERIALS: <br />KINDS, SOURCES, AMOUNTS RECEIVED, REJECTED, USED, WASTED, AND ON HAND; FIELD SAMPLES SHIPPED <br />TO LABORATORY <br />PARTS OF STRUCTURE PEP PARED FOR PLACING: <br />EXCAVATION, SHORING, FORMS, REINFORCEMENT, CONSTRUCTION JOINTS, OPENINGS, DOWELS, <br />EMBEDDED FIXTURES <br />PLACING: <br />WEATHER (TEMPERATURE, HUMIDITY, WIND, SKY, TIMES OF OBSERVATION) ADEQUACY OF <br />ORGANIZATION AND EQUIPMENT TIMES OF STARTING AND STOPPING PLACEMENT, DELAYS, UNUSUAL <br />BATCHES, KINDS AND VOLUMES OF CONCRETE PLACED, PARTS OF STRUCTURE COMPLETED <br />TESTS OF CONCRETE: <br />CONSISTENCY AT FORMS, SPECIMENS FOR STRENGTH TESTS (IDENTIFICATION OF SAMPLE, MIX DATA, <br />CURING, AGE OF TEST SPECIMENS SHIPPED TO LABORATORY) <br />CURING, FORM REMOVAL: <br />(FOR VARIOUS PARTS FO STRUCTURE); CURING; DATA AND AGE (IN HOURS) AT BEGINNING ± DATE OF <br />COMPLETION, FORMS REMOVED, SIDES, BOTTOM OF MEMBER (STATE AGE OF CONCRETE), CONDITION OF <br />FORMED SURFACES, DEFECTIVE AREAS REPAIRED ± DEFECTIVE SECTIONS REPLACED <br />SPECIAL WORK: <br />(GROUTING, SPRAYED MORTAR, ORNAMENTAL CONCRETE): <br />GENERAL: <br />(CONDITION OF, OR CHANGES IN, ORGANIZATION, EQUIPMENT, OR METHODS OF, UNUSUAL FEATURES) <br />PHOTOGRAPHS: <br />PHOTOGRAPHS TAKEN AT FREQUENT INTERVALS TO SHOW PROGRESS OF THE WORK FORM A VALUABLE <br />PART OF THE RECORDS OF CONSTRUCTION. USUALLY PROGRESS PHOTOGRAPHS ARE TAKEN AT REGULAR <br />INTERVALS AND ADDITIONAL PHOTOGRAPHS ARE TAKEN WHENEVER IT IS DESIRABLE TO RECORD SUCH <br />INFORMATION AS THE CONDITION OF AN EXCAVATION SURFACE, FAULTY METHODS OF PLACING <br />CONCRETE, OR UNUSUAL METHODS OF CONSTRUCTION. <br />IV. DETAILED SUGGESTED PREPARATION NOTES <br />A. PREPARATION <br />1. VERIFY PERMITS OBTAINED <br />2. ADEQUATE SUPERVISION/MEN/EQUIPMENT <br />3. APPROVED PLANS/SPECS/SHOP DRAWINGS ON THE JOB/ REPHORING PLAN/ACTIVITY SCHEDULE <br />4. SET UP LOG/DAILY DIARY <br />5. ARRANGEMENTS FOR TESTING HAVE BEEN MADE <br />6. PRECONSTRUCTION MEETING <br />7. WATCH/OBSERVE FOR DANGEROUS WORK PRACTICES/METHODS <br />SPECIAL INSPECTIONS: <br />1. SPECIAL INSPECTIONS SHALL CONFORM TO SECTIONS 109 & CHAPTER 17 OF THE FLORIDA BUILDING <br />CODE. REFER TO TABLES 1 THROUGH 4 FOR SPECIAL INSPECTION AND TESTING REQUIREMENTS. <br />2. SPECIAL INSPECTIONS & ASSOCIATED TESTING SHALL BE PERFORMED BY AN APPROVED ACCREDITED <br />INDEPENDENT AGENCY MEETING THE REQUIREMENTS OF ASTM E329 (MATERIALS), ASTM D3740 <br />(SOILS), ASTM C1077 (CONCRETE), ASTM A880 (STEEL), AND ASTM E543 (NON-DESTRUCTIVE). THE <br />INSPECTION AND TESTING AGENCY SHALL FURNISH TO THE STRUCTURAL ENGINEER AND/OR <br />ARCHITECT A COPY OF THEIR SCOPE OF ACCREDITATION. SPECIAL INSPECTORS SHALL BE CERTIFIED <br />BY THE BUILDING OFFICIAL. WELDING INSPECTORS SHALL BE QUALIFIED PER SECTION 6.1.4.1.1 OF <br />AWS D1.1 THE OWNER SHALL SECURE AND PAY FOR THE SERVICES OF THE INSPECTION AND TESTING <br />AGENCY TO PERFORM ALL SPECIAL INSPECTIONS AND TEST. <br />3. THE SPECIAL INSPECTOR SHALL OBSERVE THE INDICATED WORK FOR COMPLIANCE WITH THE <br />APPROVED CONSTRUCTION DOCUMENTS. ALL DISCREPANCIES SHALL BE BROUGHT TO THE <br />ATTENTION OF THE CONTRACTOR FOR CORRECTION AND NOTED IN THE INSPECTION REPORTS. <br />4. THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS FOR EACH INSPECTION TO THE <br />BUILDING OFFICIAL, STRUCTURAL ENGINEER OF RECORD, CONTRACTOR, AND OWNER. THE SPECIAL <br />INSPECTION AGENCY SHALL SUBMIT A FINAL REPORT INDICATING THE WORK REQUIRING SPECIAL <br />INSPECTION WAS INSPECTED AND IS IN CONFORMANCE WITH THE APPROVED CONSTRUCTION <br />DOCUMENTS AND THAT ALL DISCREPANCIES NOTED IN THE INSPECTION REPORTS HAVE BEEN <br />CORRECTED. <br />QUALITY ASSURANCE PLAN: <br />1. QUALITY ASSURANCE PLANS SHALL CONFORM TO SECTION 109 OF THE FLORIDA BUILDING CODE. <br />2. REFER TO SPECIAL INSPECTION & STRUCTURAL OBSERVATION SECTIONS FOR SPECIAL INSPECTION, <br />TESTING, AND STRUCTURAL OBSERVATION REQUIREMENTS. <br />STRUCTURAL OBSERVATIONS: <br />1. STRUCTURAL OBSERVATIONS SHALL BE PERFORMED BY THE STRUCTURAL ENGINEER OF RECORD OR <br />A REPRESENTATIVE OF THE STRUCTURAL ENGINEER OF RECORD. <br />EXAMPLES OF ITEMS THAT MAY BE INSPECTED WHEN DEEMED NECESSARY BY THE SPECIAL INSPECTOR. <br />A. FOUNDATIONS: <br />1. EXCAVATION/SUBSURFACE PREPARATION/BEARING CAPACITY <br />2. INDEPENDENT TESTING RECORDS/APPROVALS (DENSITY) <br />3. PLACEMENT AND SIZES OF ANCHOR BOLTS/REBAR/POST-TENSIONING TENDONS <br />4. CONCRETE COVER <br />5. PROVISION FOR UTILITIES/CONDUIT IN STRUCTURAL ELEMENTS <br />6. MOISTURE PROTECTION <br />7. SAFETY - EXCAVATION, TRAFFIC MAINTENANCE - EXISTING STRUCTURES - IMPACT <br />8. STRESSING REPORTS OF POST -TENSIONED TENDONS <br />B. CONCRETE: <br />PROPER INSPECTION REQUIRES ADEQUATE INSPECTION DURING THE PLACING OF CONCRETE AND ITS <br />FINISHING AND INCLUDES PREPARATIONS PRIOR TO THE START OF CONCRETING SUCH AS PROPER <br />FORMWORK, PLACING OF REINFORCING, CLEANING THE SURFACE OF THE FORMWORK, ETC., AS WELL <br />AS PROPER PROTECTION AND CURING OF THE FINISHED CONCRETE. <br />1. REBAR: <br />a. CHECK SHIPMENT - MILL INSPECTION/DAMAGE/EXCESSIVE RUST <br />b. SIZE/GRADE/BENDING <br />c. PLACEMENT (LOCATION) <br />d. SUPPORT/TIE/DEGREE OF SUPPORT AND STABILITY DURING POUR <br />e. COVER <br />f. LENGTH AND SPLICES/LAPS/HOOKED BOTTOMS <br />g. APPROVED SHOP DRAWINGS <br />h. CLEAN BEFORE POUR <br />2. EMBEDDED FIXTURES: <br />a. ANCHOR BOLTS <br />b. INSERTS <br />c. PIPE SLEEVES <br />d. CONDUITS <br />3. OPENINGS WHICH ARE NOT SHOWN ON THE PLANS, INCLUDING REINFORCING STEEL AROUND <br />SUCH OPENINGS: <br />4. PLACEMENT: <br />a. METHODS USED FOR TRANSPORTING, HANDLING AND PLACING CONCRETE SHOULD BE <br />REVIEWED FOR AVOIDANCE OF WHATEVER MAY CAUSE POOR CONSISTENCY CONTROL OR <br />SEGREGATION. <br />b. THE NUMBER AND CONDITION OF CONCRETE VIBRATORS SHOULD BE VERIFIED INCLUDING <br />EXTRA STAND-BYS, TO ELIMINATE AIR AND ROCK POCKETS <br />c. PREPLANNED CONSTRUCTION JOINTS OR EMERGENCY JOINTS SHOULD BE SUBSTANTIATED - <br />JOINTS SHALL BE LOCATED AND MADE SO AS LEAST TO IMPAIR THE STRENGTH OF THE <br />STRUCTURE. JOINTS SHALL BE PROPERLY PREPARED PRIOR TO MAKING THE SECONDARY POUR. <br />d. DROP, VIBRATION, CONSOLIDATION <br />e. TESTS CONDUCTED <br />f. WATER ADDED <br />g. AGE <br />In. DISRUPTION TO REBAR <br />i. CLEAN UP DEBRIS PRIOR TO PLACEMENT <br />5. CURING/STRENGTH <br />a. SPECIAL PROVISIONS CALLED FOR <br />b. TEST REPORTS VERIFIED <br />c. ADDITIONAL TEST NEEDED <br />d. FINISHING, REPAIRING SURFACE DEFECTS <br />C. STEEL/STRUCTURAL: <br />1. ERECTION PROCEDURES (SEQUENCE) <br />2. APPROVED SHOP DRAWINGS <br />3. MILL TEST REPORTS <br />4. MARKSNERIFICATION OF SITE PROVIDED AND SPECIFIED <br />5. WELD TESTS - INSPECTION/TOUCHING UP THE FIELD WELDS WITH PAINT <br />6. BOLTING - SIZE/TYPE/TOURQUE/EDGE/DISTANCES/WASHERS <br />a. TURN -OF -NUT TIGHTENING <br />7. SURFACE FINISH/SHOP CONSTRUCTION - GALVANIZED OR BARE <br />8. IDENTIFICATION OF ASTM SPECIFICATION MARK <br />9. METAL DECK FASTENING/TOUCHING WITH PAINT AND WELDED <br />10. WELDING ELECTRODES <br />NOTE: PREFABRICATED STRUCTURAL STEEL COMPONENTS <br />SPECIAL INSPECTION FOR STRUCTURAL STEEL FABRICATORS WHO ARE CURRENT MEMBERS OF THE <br />AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) AND ACTIVELY PARTICIPATE IN THEIR <br />CERTIFICATION PROCESS, NEED NOT BE PROVIDED. THE CERTIFICATE OF COMPLIANCE SHALL BE <br />PROVIDED AT THE COMPLETION OF FABRICATION. <br />D. MASONRY: <br />1. REINFORCED AND PARTIALLY REINFORCED: <br />a. STEEL PLACEMENT/LAP LENGTHS <br />b. ALIGNMENT FO CELLS TO BE FILLED/SLUMP OF GROUT/CELLS TO BE WET BEFORE POURING <br />c. VERIFICATION OF FILLED CELLS/OBSERVATION HOLES <br />d. MORTAR MIX ADEQUATE <br />E. WOOD CONSTRUCTION: <br />1. FABRICATION OF PRE -FABRICATED STRUCTURAL ELEMENTS: <br />a. CHECK SHIPMENT - MILL INSPECTION/DAMAGE/EXCESSIVE RUST <br />b. SIZE/GRADE/BENDING <br />c. PLACEMENT (LOCATION) <br />d. APPROVED SHOP DRAWINGS <br />2. FABRICATION OF HIGH -LOAD DIAPHRAGMS: <br />a. STRUCTURAL PANEL GRADE & THICKNESS <br />b. NOMINAL SIZE OF FRAMING MEMBERS <br />c. FASTENERS <br />3. ROOF/FLOOR FRAMING: <br />a. ROOF/FLOOR SHEATHING SIZE, SPECIES, GRADE, FASTENERS <br />b. TEMPORARY/PERMANENT TRUSS BRACING <br />c, ROOF/FLOOR/BEAM MEMBER SIZE, SPECIES, GRADE, CONNECTIONS <br />d. ANCHORAGE TO WALL/LOAD PATH <br />4. WALL FRAMING: <br />a. WALL SHEATHING SIZE, SPECIES, GRADE, FASTENERS <br />b, STUD/PLATE/BEAM SIZE, SPECIES, GRADE, CONNECTIONS <br />c. ANCHORAGE TO FLOOR/FOUNDATION, CONTINUOUS LOAD PATH <br />F. MISCELLANEOUS STRUCTURAL COMPONENTS SUCH AS HANDRAILS. GUARDRAILS. STAIRWAYS ETC. <br />G. GENERAL OBSERVATIONS: <br />1. CHECK LOCAL FAILURES: <br />a. HAIRLINE CRACKS <br />b. DEFLECTION <br />c. SETTLEMENT <br />d. OVERLOADS DUE TO STORAGE OF MATERIALS <br />e. HONEY COMBING/EXPOSED REINFORCING STEEL/RUST SPOTS <br />H. RECORDS: <br />1. CONCRETE: <br />a. REBAR MILL REPORTS <br />b. SLUMP TEST ASTM C143 <br />c. COMPRESSION TESTS OF MOLDED CYLINDERS ASTM C31.39 THREE SPECIMENS PER 50 CUBIC <br />YARDS <br />d. CYLINDRICAL CORES (ASTM C42) <br />2. STEEL: <br />a, MILL TEST REPORTS <br />b. WELDING INSPECTION REPORTS <br />3. BUILDING OFFICIAL STANDARD REPORTING FORMS, AS MAY BE REQUIRED <br />4. OTHER RECORDS AS MAY BE DEEMED NECESSARY BY THE SPECIAL INSPECTOR SUCH AS: <br />a. CONCRETE TEST CYLINDER REPORTS <br />b. CHANGES BY THE DESIGN ARCHITECT & ENGINEER <br />c. SOIL DENSITY TEST REPORTS <br />ro <br />+r <br />ro <br />_0 <br />LL <br />dw <br />C <br />3 <br />U <br />C <br />L <br />0 <br />V <br />ro <br />0 <br />ro <br />ro <br />U <br />0 <br />Iv <br />.i� <br />v <br />C <br />E <br />L <br />10 <br />0 <br />ro <br />to <br />0 <br />00 <br />C <br />.c� <br />G <br />C <br />_v <br />.0 <br />V <br />n. <br />ro <br />L <br />C <br />,3 <br />Ca <br />G <br />0 <br />U <br />4-1 <br />,v <br />0 <br />L <br />a <br />L <br />L <br />4- <br />h <br />0 <br />U <br />U <br />a <br />C <br />ro <br />to <br />C <br />ro <br />a <br />v <br />b <br />v <br />3 <br />0 <br />L <br />N <br />C <br />W <br />0) <br />0 <br />C <br />4-1 <br />- <br />0 <br />++ <br />0 <br />v <br />W <br />u <br />3 <br />a <br />J <br />Y <br />m <br />0 <br />w <br />i <br />FORUME <br />ARCHITECTURE & <br />N <br />z INTERIOR DESIGN, INC. <br />i PLANNING I ARCHITECTURE I ANTERIOR DESM <br />rn <br />w <br />0 <br />It <br />237 S. Westmonte Drive, Suite 220 <br />Z Altamonte Springs, FL 32714 <br />05 407.830.1400 <br />www.forumarchitecture.com <br />Zephyr <br />Commons <br />City of Zephyrhills, FL <br />2965 WEST STATE ROAD 434, SUITE 100 ® LONGWOOD, FL 32779 <br />TEL 407/682-2086 a FAX 407/682-2386 <br />WWW.SCD-ENG.COM <br />000%aoumg§jf <br />C. S lRO, /I/Go <br />o ° pGEN�� <br />� o <br />©, u� <br />o 2/I 2 ° fi e <br />TAT OFlL o <br />o�0 6 1O�I O L W� %Q�� <br />Robert C. Scroggins, P.E. <br />FL Registration No. 56158 <br />This document has been electronically signed and sealed by Robert C. Scroggins, PE on the Date <br />and/or Time Stamp shown using a digital signature. Printed copies of this document are not <br />considered signed and sealed and the signature must be verified on any electronic copies. <br />SET DISTRIBUTIONS: <br />u <br />z <br />z <br />W <br />o <br />a <br />E <br />W <br />I- <br />z <br />co <br />W <br />it <br />U <br />W <br />I- <br />U <br />it <br />Q <br />fy <br />tY <br />O <br />W <br />O1 <br />Z SHEET REVISIONS: <br />EDITED BY: RCS, TLW <br />SC&D PROJECT NO. 21-020 <br />FORUM PROJECT NO. 4097 <br />Threshold Inspection & <br />Quality Assurance <br />Plans <br />S3.01 a <br />