LEGEND
<br />SPECIFICATIONS
<br />GENERAL NOTES
<br />No
<br />DIRECTION OF FLOW IN PIPE
<br />PART 1 - GENERAL
<br />PART 2
<br />- PRODUCTS
<br />1.
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY FITTINGS AS
<br />REQUIRED BY ALL APPLICABLE CODES AND GOVERNING AUTHORITIES.
<br />-"
<br />PITCH PIPE DOWN IN DIRECTION OF ARROW
<br />1.1 SECTION INCLUDES
<br />2.1
<br />PIPE HANGERS AND SUPPORTS
<br />A.
<br />GENERAL PROVISIONS SPECIFICALLY APPLICABLE TO DIVISION 15
<br />A. MANUFACTURERS:
<br />2.
<br />CONTRACTOR SHALL VERIFY AND CORRECT AS REQUIRED TO MEET ALL CODES AND
<br />SECTIONS, IN ADDITION TO DIVISION 1 - GENERAL
<br />A.1 B-LINE
<br />REGULATIONS ANY POSSIBLE DISCREPANCIES BETWEEN TYPE AND SIZE OF
<br />-- 0- 0
<br />PIPE UP
<br />REQUIREMENTS.
<br />A.2 OTHER ACCEPTABLE MANUFACTURERS OFFERING
<br />CONNECTION SPECIFIED IN PLUMBING FIXTURE SCHEDULE AND FIXTURES ACTUALLY
<br />EQUIVALENT PRODUCTS.
<br />INSTALLED ON THE SITE.
<br />-
<br />PIPE DOWN
<br />1.2 SCOPE
<br />A.2.1 MICHIGAN HANGER
<br />A.
<br />THE WORK SHALL INCLUDE THE PROVISIONS OF SYSTEMS,
<br />A.2.2 PHD
<br />3.
<br />ALL DRAINAGE PIPING 2j" AND LARGER SHALL HAVE A MINIMUM J" PER FOOT
<br />EJ
<br />EXPANSION JOINT
<br />EQUIPMENT AND MATERIALS SPECIFIED IN THIS DIVISION AND AS
<br />SLOPE. ALL DRAINAGE PIPING 2" AND SMALLER SHALL HAVE A MINIMUM �" PER
<br />CALLED FOR ON THE DRAWINGS. WORK SHALL ALSO INCLUDE
<br />2.2
<br />PIPING INSULATION:
<br />FOOT SLOPE, UNLESS OTHERWISE NOTED.
<br />SUPERVISION, OPERATION, METHODS AND LABOR FOR THE
<br />A. RESIDENTIAL UNITS: (FBC ENERGY CODE SECTION R403.5.3)
<br />FLEXIBLE PIPE CONNECTOR
<br />FABRICATION, START-UP AND TESTS FOR A COMPLETE OPERATIONAL
<br />A.A. HOT WATER PIPING 3/4 AND LARGER = R-3 MINIMUM FOR
<br />4.
<br />VENT PIPING SHOWN ON FLOOR PLANS IS ONLY INDICATIVE EXCEPT FOR VTR
<br />PLUMBING INSTALLATION.
<br />THE FIRST 8' OF PIPING.
<br />LOCATIONS.
<br />--I®�-
<br />BALL VALVE
<br />A.B. HOT WATER RETURN PIPING = R-3. IF A HOT WATER
<br />B.
<br />DRAWINGS FOR THE WORK ARE DIAGRAMMATIC IN NATURE AND ARE
<br />CIRCULATION SYSTEM IS INSTALLED THE ENTIRE LENGTH OF
<br />5.
<br />VALVES AND FITTINGS SHALL BE OF SAME SIZE OF LINE ON WHICH THEY ARE
<br />_
<br />CHECK VALVE, HORIZONTAL SWING
<br />INTENDED TO CONVEY THE SCOPE THE INSTALLATION AND TO
<br />THE HOT WATER SUPPLY PIPING AND RETURN PIPING
<br />LOCATED, UNLESS OTHERWISE INDICATED ON DRAWINGS.
<br />INDICATE THE GENERAL ARRANGEMENNTT AND LOCATIONS OF THE WORK.
<br />SHALL BE INSULATED (R-3).
<br />GATE VALVE
<br />BECAUSE OF THE SCALE THE DRAWINGS, CERTAIN BASIC ITEMS
<br />B. COMMERCIAL SPACE: (FBC ENERGY CODE C404.4)
<br />6.
<br />CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER TRADES.
<br />SUCH AS PIPE FITTINGS, ACCESS PANELS, AND SLEEVES MAY NOT BE
<br />BA ALL HOT WATER PIPING TO BE INSULATED PER TABLE
<br />BUTTERFLY VALVE
<br />SHOWN. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR SELECTING
<br />C403.2.10
<br />7.
<br />CONTRACTOR SHALL FIELD VERIFY ALL GIVEN MEASUREMENTS PRIOR TO LAYING AND
<br />Dui
<br />THE EQUIPMENT TO FIT THE SPACE PROVIDED. THE LOCATION AND
<br />B.B. HOT WATER RETURN PIPING TO BE INSULATED PER TABLE
<br />CONNECTING ALL SANITARY AND WASTE PIPING AND NOTIFY ARCHITECT OF ANY
<br />per-
<br />GLOBE VALVE
<br />SIZES FOR PIPE FITTINGS, SLEEVES, INSERTS, FIRE AND/OR SMOKE
<br />C403.2.10
<br />DISCREPANCIES.
<br />DAMPERS, AND OTHER BASIC ITEMS REQUIRED BY CODE AND OTHER
<br />C. ALL COMMERCIAL HOT WATER SYSTEMS SHALL BE EQUIPPED WITH
<br />BALANCING VALVE
<br />SECTIONS SHALL BE COORDINATED AND INCLUDED FOR THE PROPER
<br />A CIRCULATING PUMP PER FBC-ENERGY EFFICENCY CODE SECTION
<br />8.
<br />AIR CHAMBERS SHALL NOT BE CONSIDERED AN EQUAL TO WATER ARRESTORS AS
<br />INSTALLATION OF THE WORK.
<br />C404.6
<br />SPECIFIED.
<br />- 61 �
<br />BALANCING COCK
<br />C.
<br />EQUIPMENT SPECIFICATIONS MAY NOT DEAL INDIVIDUALLY WITH MINUTE
<br />D. ALL PIPING WITHIN THE ATTIC OR UNCONDITIONED SPACE SHALL BE
<br />INSULATED.
<br />9.
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING FIRE RATING AND
<br />ITEMS REQUIRED SUCH AS COMPONENTS, PARTS, CONTROLS AND
<br />E. MANUFACTURERS:
<br />WEATHERPROOFING INTEGRITY OF ALL PIPING AND PENETRATIONS.
<br />STRAINER, Y-TYPE AND BLOWOFF VALVE
<br />DEVICES WHICH MAY BE REQUIRED TO PRODUCE THE EQUIPMENT
<br />A.1 NS CORNING
<br />-
<br />PRESSURE RELIEF VALVE (WATER)
<br />PERFORMANCE SPECIFIED OR AS REQUIRED TO MEET THE EQUIPMENT
<br />WARRANTIES. WHERE SUCH ITEMS ARE REQUIRED, THEY SHALL BE
<br />A.2 JOHNS MANVILLE
<br />A.3 KNAUF
<br />10.
<br />ALL WATER SUPPLY AND SANITARY LINES SHALL BE RUN AS CLOSE TO PLANS AS
<br />POSSIBLE WITH NO CHANGES IN SIZING.
<br />Y
<br />INCLUDED BY THE INSTALLER OF THE EQUIPMENT, WHETHER OR NOT
<br />F. ASTM C547, RIGID MOLDED NON-COMBUSTIBLE FIBERGLASS
<br />PRESSURE REDUCING VALVE
<br />SPECIFICALLY INDICATED IN THE CONTRACT DOCUMENTS WITH NO
<br />IND.
<br />INSULATION. 'K' VALUE ® 75 DEGREES F.
<br />11.
<br />CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL NECESSARY SUPPORTING
<br />PRV
<br />ADDITIONAL COST INCURRED.
<br />.024
<br />G. VAPOR BARRIER JACKET, KRAFT PAPER WITH GLASS FIBER YARN AND
<br />DEVICES FOR ALL FIXTURES INCLUDED IN CONTRACT OR HEREIN SPECIFIED OR
<br />�MAV
<br />D.
<br />WHERE NOTED ON THE DRAWINGS OR INDICATED IN OTHER SECTIONS
<br />BONDED TO ALUMINUM FILM. CLOSURE SYSTEM SHALL BE UL 181.
<br />OTHERWISE.
<br />MANUAL AIR VENT
<br />OF THE SPECIFICATION, THE CONTRACTOR FOR THIS DIVISION SHALL
<br />2.3
<br />PIPING: DRAINAGE, WASTE &VENT PIPING
<br />12.
<br />CHANGES IN THE DIRECTION OF SANITARY PIPING SHALL NOT BE MADE WITH
<br />INSTALL PLUMBING EQUIPMENT FURNISHED BY OTHERS, AND SHALL
<br />A. PVC: ASTM D2665 SCHEDULE 40 PVC SOLID WALL PIPING.
<br />FITTINGS WHICH WILL CAUSE EXCESSIVE REDUCTION IN THE VELOCITY OF FLOW OR
<br />SOLENOID VALVE
<br />MAKE ALL FINAL CONNECTIONS. CONTRACTOR SHALL INSTALL
<br />A.1 FITTINGS: ASTM D2665 SCHEDULE 40 PVC DWV FITTINGS.
<br />CREATE ANY OTHER ADVERSE EFFECT UNLESS PHYSICALLY IMPOSSIBLE (IE: USE OF
<br />EQUIPMENT AND SYSTEMS IN STRICT ACCORDANCE WITH
<br />A.2 JOINTS: ASTM D2564 SOLVENT CEMENT. JOINTS SHALL
<br />SANITARY TEE IN A HORIZONTAL CONNECTION, USE OF A DOUBLE SANITARY TEE IN
<br />VALVE OS & Y
<br />MANUFACTURERS RECOMMENDATIONS.
<br />BE INSTALLED IN ACCORDANCE WITH ASTM D2855.
<br />A VERTICAL STACK, IN GENERAL, USE OF SHORT -RADIUS FITTINGS FOR BRANCH TO
<br />E.
<br />COORDINATE WITH ALL TRADES IN SUBMITTAL OF SHOP DRAWINGS.
<br />B. FIRE WRAPPED PVC OR CAST IRON PIPING TO BE USED IN ALL
<br />HOUSE DRAIN OR STACK CONNECTION).
<br />E
<br />CAPPED LINE
<br />TIGHT SPACE CONDITIONS SHALL BE DETAILED TO THE SATISFACTION
<br />PLENUM SPACES.
<br />C. FOAM CORE SCHEDULE 40 DWV PIPE IS NOT AN ACCEPTABLE
<br />13.
<br />ALL DRAINAGE PIPING SHALL BE MARKED WITH THE SEAL OF APPROVAL OF THE
<br />- SAN
<br />SANITARY SEWER (ABOVE GRADE)
<br />OF ALL TRADES, SUBJECT TO THE REVIEW AND FINAL ACCEPTANCE OF
<br />THE ARCHITECT/ENGINEER. IN THE EVENT THAT THE CONTRACTOR
<br />ALTERNATE TO STANDARD SCHEDULE 40 PVC.
<br />NATIONAL SANITATION FOUNDATION.
<br />INSTALLS HIS WORK BEFORE COORDINATING WITH OTHER TRADES OR
<br />2.4
<br />PIPING: WATER PIPING
<br />14.
<br />DO NOT PENETRATE FOUNDATIONS WITH PIPING, COORDINATE WITH GENERAL
<br />- -SAN - -
<br />SANITARY SEWER (BELOW GRADE)
<br />SO AS TO CAUSE ANY INTERFERENCE WITH THE WORK OF THE OTHER
<br />A. CPVC PIPING: ASTM F441 /F441 M-15 CHLORINATED POLY PLASTIC
<br />CONTRACTOR TO DROP FOUNDATIONS AS REQUIRED TO CLEAR PLUMBING SERVICES
<br />-
<br />DOMESTIC COLD WATER
<br />TRADES THIS CONTRACTOR SHALL MAKE ALL REQUIRED CHANGES TO
<br />CORRECT THE CONDITION AT NO ADDITIONAL COST TO THE PROJECT.
<br />PIPE. SCHEDULE 40 AND 80 HOT AND COLD WATER DISTRIBUTION
<br />WHERE ABSOLUTELY NECESSARY. ALL PIPING PENETRATING A BEARING WALL OR
<br />PIPING. IS AN ACCEPTABLE ALTERNATE UPON APPROVAL OF ENGINEER,
<br />FOOTING MUST BE SLEEVED AND LOCATION APPROVED BY STRUCTURAL ENGINEER.
<br />BP
<br />BOOSTED PRESSURE DOMESTIC COLD WATER
<br />F.
<br />CONTRACTOR SHALL VERIFY ALL EQUIPMENT CONNECTION SIZES PRIOR
<br />BUILDING OWNER AND PROJECT OWNER.
<br />A.A. IT IS NOT ACCEPTABLE TO ROUTE CPVC PIPING BELOW
<br />15.
<br />ROUTE ALL PIPING CONCEALED ABOVE CEILINGS, WITHIN WALLS, OR IN CHASES.
<br />TO INSTALLATION OF ANY SYSTEMS. THIS CONTRACTOR SHALL ADJUST
<br />GRADE OR WITHIN CONCRETE.
<br />PIPING EXPOSED SHALL BE SLOPED AND PAINTED TO MATCH ARCHITECTURAL
<br />--
<br />DOMESTIC HOT WATER
<br />PIPING SYSTEM SIZES AS REQUIRED TO MATCH EQUIPMENT
<br />B. PEX PIPING: ASTM F877-18 CROSSLINKED POLYETHYLENE HOT AND
<br />FINISHES. PIPING IN MECHANICAL ROOMS MAY BE EXPOSED.
<br />CONNECTIONS. UTILIZE REDUCERS WHERE EQUIPMENT CONNECTIONS
<br />COLD WATER DISTRIBUTION PIPING. IS AN ACCEPTABLE ALTERNATE
<br />- - - -
<br />DOMESTIC HOT WATER RETURN
<br />ARE SMALLER THAN PIPE SIZES INDICATED ON PLANS, NO PIPING
<br />UPON APPROVAL OF ENGINEER, BUILDING OWNER AND PROJECT
<br />16.
<br />PROVIDE ACCESS PANELS TO ALL VALVES WITHIN CHASES OR ABOVE NON-
<br />SHALL BE DECREASED IN SIZE (IN THE DIRECTION OF FLOW).
<br />OWNER
<br />ACCESSIBLE CEILINGS. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPES.
<br />-CD- -
<br />CONDENSATE DRAIN (BELOW GRADE)
<br />1.3 EXAMINATION OF BIDDING DOCUMENTS:
<br />2.5
<br />PIPING: CONDENSATE PIPING
<br />17.
<br />SEE ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF PLUMBING FIXTURE
<br />CD
<br />CONDENSATE DRAIN (ABOVE GRADE)
<br />A.
<br />EACH BIDDER SHALL EXAMINE THE BIDDING DOCUMENTS CAREFULLY
<br />A. ALL PIPING RECEIVING CONDENSATE OR DRAINAGE FROM ANY TYPE OF
<br />MOUNTING HEIGHTS, AND DIMENSIONS.
<br />AND NOT LATER THAN TEN (10) DAYS PRIOR TO THE DATE FOR
<br />EVAPORATOR PRODUCING COLD WATER SHALL BE INSULATED.
<br />- - ST - -
<br />STORM SEWER (BELOW GRADE)
<br />RECEIPT OF BIDS, SHALL MAKE WRITTEN REQUEST TO THE ENGINEER
<br />18.
<br />CONTRACTOR SHALL VERIFY INVERT ELEVATIONS OF SEWERS TO WHICH NEW SEWER
<br />FOR INTERPRETATION OR CORRECTION OF ANY AMBIGUITY,
<br />PART 3
<br />- INSTALLATION
<br />LINES ARE TO BE CONNECTED BEFORE INSTALLATION OF NEW SEWER LINE.
<br />ST
<br />STORM SEWER (ABOVE GRADE)
<br />INCONSISTENCY OR ERROR THEREIN. ANY INTERPRETATION OR
<br />SEC
<br />SECONDARY STORM SEWER
<br />CORRECTION WILL BE ISSUED AS AN ADDENDUM BY THE ENGINEER.
<br />3.1
<br />INSTALL IN STRICT ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
<br />19.
<br />ALL VENTS THROUGH ROOF SHALL BE MINIMUM OF 10'-0" FROM ANY AIR INTAKES.
<br />ONLY A WRITTEN INTERPRETATION OR CORRECTION TO BID
<br />- - GR - -
<br />GREASE SEWER (BELOW GRADE)
<br />DOCUMENTS BY ADDENDUM SHALL BE BINDING. NO BIDDER SHALL
<br />3.2
<br />PROVIDE NON -CONDUCTING DIELECTRIC CONNECTIONS WHEREVER JOINTING
<br />20.
<br />CONTRACTOR SHALL INSTALL DIELECTRIC UNIONS AT CONNECTIONS OF DISSIMILAR
<br />RELY UPON ANY INTERPRETATION OR CORRECTION GIVEN BY ANY
<br />DISSIMILAR METALS.
<br />METALS.
<br />GR
<br />GREASE SEWER (ABOVE GRADE)
<br />OTHER METHOD.
<br />3.3
<br />ROUTE PIPING IN ORDERLY MANNER AND MAINTAIN GRADIENT.
<br />21.
<br />CONTRACTOR SHALL SUBMIT SHOP DRAWINGS (INCLUDING PIPE ROUTING AND
<br />- -SCW - -
<br />SOFT COLD WATER
<br />1.4 SUBSTITUTIONS:
<br />EXCEPT AS PROVIDED BELOW, EACH BIDDER REPRESENTS THAT HIS
<br />3.4
<br />INSTALL PIPING TO CONSERVE BUILDING SPACE AND NOT INTERFERE WITH
<br />EQUIPMENT LOCATIONS) TO ARCHITECT ENGINEER FOR REVIEW AND APPROVAL PRIOR
<br />VENT
<br />BID IS BASED UPON THE MATERIALS AND EQUIPMENT DESCRIBED IN
<br />BID
<br />USE OF SPACE.
<br />TO THE INSTALLATION OR PURCHASING OF ANY PIPING AND/OR EQUIPMENT.
<br />- - G -
<br />GAS LINE (BELOW GRADE)
<br />THE BIDDING DOCUMENTS.
<br />3.5
<br />GROUP PIPING WHENEVER PRACTICAL AT COMMON ELEVATIONS,
<br />22.
<br />PROVIDE 1/2" C.W. SUPPLY WITH ANGLE STOP AND FLEXIBLE SUPPLY TO
<br />G
<br />GAS LINE (ABOVE GRADE)
<br />B.
<br />NO SUBSTITUTIONS FOR OTHER MATERIALS AND EQUIPMENT WILL BE
<br />REFRIGERATORS WITH ICE MAKERS AT HEIGHT REQUIRED BY MANUFACTURER OF
<br />CONSIDERED UNLESS WRITTEN REQUEST HAS BEEN SUBMITTED TO
<br />3.6
<br />INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION WITHOUT
<br />EQUIPMENT INSTALLED.
<br />!�
<br />POINT OF CONNECTION NEW
<br />THE ENGINEER FOR APPROVAL AT LEAST TEN (10) DAYS PRIOR TO
<br />STRESSING PIPE, JOINTS, OR CONNECTED EQUIPMENT.
<br />TO EXISTING
<br />THE DATE FOR RECEIPT OF BIDS. EACH SUCH REQUEST SHALL
<br />23.
<br />PROVIDE 1/2" H.W. SUPPLY WITH ANGLE STOP AND FLEXIBLE SUPPLY TO
<br />INCLUDE A COMPLETE DESCRIPTION OF THE PROPOSED SUBSTITUTE,
<br />3.7
<br />PROVIDE CLEARANCE FOR INSTALLATION OF INSULATION AND ACCESS TO
<br />DISHWASHER MACHINE, AT HEIGHT REQUIRED BY MANUFACTURER OF EQUIPMENT
<br />!�
<br />POINT OF REMOVAL FOR DEMOLITION
<br />THE NAME OF THE MATERIAL OR EQUIPMENT FOR WHICH IT IS TO BE
<br />VALVES AND FITTINGS.
<br />INSTALLED.
<br />SUBSTITUTED, DRAWINGS, CUTS, PERFORMANCE AND TEST DATA OR
<br />AT
<br />DELTA T (TEMPERATURE DIFFERENCE)
<br />INFORMATION NECESSARY FOR A COMPLETE EVALUATION.
<br />3.8
<br />PROVIDE ACCESS WHERE VALVES AND FITTINGS ARE NOT EXPOSED.
<br />24.
<br />ALL WATER PIPING INSTALLED IN EXTERIOR WALLS SHALL BE PLACED ON THE
<br />COORDINATE SIZE AND LOCATION OF ACCESS DOORS WITH APPROPRIATE
<br />INTERIOR SIDE OF THE WALL, SO THAT WALL INSULATION CAN BE PLACED ON THE
<br />C.
<br />IF THE ENGINEER APPROVES ANY PROPOSED SUBSTITUTION, SUCH
<br />ARCHITECTURAL SECTION.
<br />EXTERIOR SIDE OF THE PIPING.
<br />APPROVAL WILL BE ISSUED AS AN ADDENDUM FORWARDED TO ALL
<br />A
<br />PHOTO DETAIL OR SECTION IDENTIFICATION TARGET
<br />PARTICIPATING BIDDERS.
<br />3.9
<br />ESTABLISH ELEVATIONS OF BURIED PIPING OUTSIDE THE BUILDING TO
<br />25.
<br />IF NO PLUMBING ELEVATION OR INVERT IS NOTED ON PLANS THE MINIMUM DEPTH
<br />A = DETAIL NUMBER.
<br />ENSURE PROPER SLOPE AND COVER.
<br />OF THE PLUMBING TO CIVIL CONNECTION SHALL BE CALCULATED BASED ON THE
<br />B
<br />B = SHEET NUMBER ON WHICH DETAIL IS LOCATED.
<br />D.
<br />IF ANY BIDDER IS UNABLE TO PROCURE WRITTEN APPROVAL OF ANY
<br />FURTHERS POSSIBLE PLUMBING FIXTURE DISTANCE TIMES 1 %. TOTAL LINE
<br />SUBSTITUTION FROM THE ENGINEER PRIOR TO THE OPENING OF BIDS,
<br />3.10
<br />ESTABLISH ELEVATIONS OF EXISTING BURIED PIPING FOR CONNECTION TO
<br />LENGTH*1 %=DEPTH B.F.F. AT CIVIL POINT OF CONNECTION.
<br />THEN HE SHALL BASE HIS BID ON ITEMS AND SYSTEMS AS SPECIFIED
<br />NEW WORK TO ENSURE PROPER SLOPE AND COVER.
<br />HB -{-
<br />HOSE BIBB
<br />IN BID DOCUMENTS.
<br />FD ®
<br />FLOOR DRAIN
<br />3.11
<br />WHERE PIPE SUPPORT MEMBERS ARE WELDED TO STRUCTURAL BUILDING
<br />E.
<br />SUBSTITUTIONS REQUESTED ON THE BID PROPOSAL FORM WHICH ARE
<br />FRAMING, SCRAPE, BRUSH CLEAN, AND APPLY ONE COAT OF ZINC RICH
<br />HD O
<br />HUB DRAIN
<br />PRIOR APPROVED BY THE ENGINEER WILL BE INCORPORATED INTO
<br />PRIMER TO WELDING.
<br />THE CONTRACT WITH THE SUCCESSFUL BIDDER.
<br />TD ®
<br />TRENCH DRAIN
<br />3.12
<br />EXTEND CLEANOUTS TO FINISHED FLOOR OR WALL SURFACE. LUBRICATE
<br />F.
<br />REQUESTS FOR ANY SUBSTITUTIONS NOT SUBMITTED AND APPROVED
<br />THREADED CLEANOUT PLUGS WITH MIXTURE OF GRAPHITE AND LINSEED
<br />--A--
<br />COMPRESSED AIR (BELOW GRADE)
<br />IN ACCORDANCE WITH THE ABOVE INSTRUCTIONS WILL BE DENIED BY
<br />OIL. ENSURE CLEARANCE AT CLEANOUT FOR RODDING OF DRAINAGE
<br />THE ENGINEER.
<br />SYSTEM.
<br />A
<br />COMPRESSED AIR (ABOVE GRADE)
<br />1.5 REGULATORY REQUIREMENTS:
<br />3.13
<br />RESET SPRINKLER HEADS FROM UPRIGHT POSITION TO DOWN POSITION TO
<br />00
<br />FLOOR CLEANOUT
<br />A.
<br />ALL INSTALLATIONS AND EQUIPMENT SHALL BE IN STRICT
<br />CENTER OF NEW CEILING TILE.
<br />ACCORDANCE WITH ALL APPLICABLE STATUTES, CODES AND
<br />0
<br />CLEANOUT
<br />REGULATIONS OF THE GOVERNMENTAL BODIES HAVING JURISDICTION.
<br />3.14
<br />TORQUE ALL HUBLESS CAST IRON COUPLING IN STRICT ACCORDANCE WITH
<br />B.
<br />CONFORM TO THE 2020 FLORIDA PLUMBING CODE.
<br />THE MANUFACTURER'S RECOMMENDATIONS. UTILIZE COUPLING
<br />-�--
<br />EXTERIOR CLEANOUT
<br />C.
<br />CONFORM TO THE 2020 FLORIDA FIRE PREVENTION CODE.
<br />MANUFACTURER'S PRE-SET TORQUE WRENCH.
<br />D.
<br />CONFORM TO THE 2020 FLORIDA BUILDING CODE.
<br />HORIZONTAL CLEANOUT
<br />3.15
<br />INSTALL WATER HAMMER SHOCK ARRESTORS AT EACH FIXTURE OR
<br />1.6 CUTTING AND PATCHING:
<br />BATTERY OF FIXTURES WHERE QUICK CLOSING VALVES ARE UTILIZED. .
<br />PD
<br />PAN DRAIN (FROM WATER HEATER)
<br />A.
<br />SUBMIT WRITTEN REQUEST IN ADVANCE OF CUTTING OR ALTERING
<br />ARRESTORS SHALL BE FACTORY FABRICATED AND CONFORM TO ASSE
<br />ELEMENTS.
<br />1010. INSTALL ARRESTORS AND SIZE PER PLUMBING AND DRAINAGE
<br />FW
<br />FILTERED WATER
<br />INSTITUTE STANDARD P.D.I. WH-201. ACCEPTABLE MANUFACTURERS ARE
<br />n
<br />B.
<br />EMPLOY SKILLED AND EXPERIENCED INSTALLER TO PERFORM
<br />ZURN, JOSAM, SIOUX CHIEF. PPP INC. FOR 1-11 FU'S PROVIDE PDI-A,
<br />�IJ
<br />SHOCK ABSORBER
<br />CUTTING AND PATCHING WHICH EFFECT:
<br />FOR 12-32 FU'S PDI-B, 33-60 FU'S PDI-C, 61-113 FU'S PDI-D.
<br />B.1 STRUCTURAL INTEGRITY OF ELEMENT.
<br />INSTALL PER MANUFACTURER'S INSTRUCTIONS.
<br />B.2 INTEGRITY OF WEATHER.
<br />GD
<br />GARBAGE DISPOSAL
<br />B.3 EFFICIENCY, MAINTENANCE, OR SAFETY OF ELEMENT.
<br />B.4 VISUAL QUALITIES OF SIGHT.
<br />DW
<br />DISHWASHER
<br />B.5 WORK OF OWNER OR SEPARATE CONTRACTOR.
<br />NOTE:
<br />SYMBOLS SHOWN ON THIS
<br />PLUMBING LEGEND ARE FOR REFERENCE PURPOSES ONLY.
<br />ALL OF THESE SYMBOLS MAY NOT BE USED FOR THIS PROJECT.
<br />Joseph, Lawpence & Co
<br />Consulting Lngineeps
<br />1180 HARWOOD AVE., SUITE 3000
<br />ALTAMONTE SPRINGS, FLORIDA 32714
<br />TEL: 321.972.4466
<br />WWW,JLCING.COM
<br />CA NO. 28730
<br />FORUME
<br />ARCHITECTURE &
<br />INTERIOR DESIGN, INC.
<br />237 S. Westmonte Drive, Suite 220
<br />Altamonte Springs, FL 32714
<br />407.830.1400
<br />AA0002731
<br />www.forumarchitecture.com
<br />Zephyr
<br />Commons
<br />Apartments
<br />City of Zephyrhills, FL
<br />JLC21.0058.00
<br />Adam Joseph Barney
<br />P.E. #: 69124
<br />SET DISTRIBUTIONS:
<br />0 SHEET REVISIONS:
<br />EDITED BY: SMB/AJB
<br />PROJECT NO. 4097
<br />Apartments
<br />Symbols, Abbreviations,
<br />and General Notes -
<br />Plumbing
<br />P14.00