Laserfiche WebLink
N <br />N <br />O <br />N <br />CN <br />0 <br />701 <br />bi <br />_ <br />— — — — — — <br />I <br />I i <br />iJ `J i <br />I <br />I <br />I I <br />1 <br />I <br />I <br />I I <br />I 4 <br />I 20.3 <br />i I <br />20.3 <br />I <br />I I <br />I I <br />I 3 I <br />20.3 <br />I I <br />I <br />I I <br />2 <br />3 <br />I 20.3 <br />I <br />I I <br />20.3 I <br />F`� --�J <br />I <br />I I <br />8 <br />20.3 <br />L— <br />_J <br />L- <br />5 <br />20.3 <br />5 <br />20.3 <br />9 <br />20.3 <br />1 l Trash Compactor &Maintenance Building -Foundation Plan <br />20.31J SCALE: %" = 1'-0" <br />5 <br />20.3 <br />;LM11 q6' <br />I 11 <br />FA <br />.�" - <br />.�w-m <br />", 5 <br />20.3 <br />2 � Trash Compactor &Maintenance Building -Foundation Plan <br />20.31% SCALE: Y8" = 1'-0" <br />® Key Notes <br />Foundation Plan <br />1. TOP OF SLAB ELEVATION = 0'-0", TYP. (U.N.O.) <br />2. CONCRETE SLAB -ON -GRADE: 4" THICK (MIN.) 3,000 PSI CONCRETE SLAB ON <br />GRADE w/ 6x6-W1.4xW1.4 W.W.F. @ MID -DEPTH OF SLAB ON 10 MIL. VAPOR <br />RETARDER OVER WELL COMPACTED SOIL, TYP. <br />POST -TENSION FOUNDATION ALTERNATE: <br />GENERAL CONTRACTOR MAY PROVIDE A MONOLITHIC POST -TENSION <br />FOUNDATION DESIGN AS A VALUE ENGINEERING ALTERNATE TO THE <br />CONVENTIONALLY REINFORCED FOUNDATION SHOWN. IF THIS <br />ALTERNATE IS USED, THE CONTRACTOR MUST PROVIDE COMPLETE SHOP <br />DRAWINGS & CALCULATIONS SIGNED & SEALED BY A REGISTERED <br />PROFESSIONAL ENGINEER IN THE STATE OF FLORIDA FOR REVIEW & <br />APPROVAL BY THE ARCHITECT & STRUCTURAL ENGINEER. NOTE THAT <br />REINFORCING STEEL FOR CURBS/ISLAND & SPREAD FOOTINGS MAY NOT BE <br />OMITTED OR REDUCED. <br />3. PLUMBING FIXTURES: GENERAL PLUMBING FIXTURE LOCATIONS ARE <br />INDICATED. REFER TO FLOOR PLANS AND VERIFY SPECIFIC FIXTURE <br />LOCATIONS w/ ACTUAL EQUIPMENT REQUIREMENTS. <br />4. CONTROL JOINTS (C.J.): PROVIDE SAWED CONTROL JOINTS ON SLAB <br />SURFACE AS INDICATED ON PLANS. SEE TYPICAL CONTROL JOINT/ <br />CONSTRUCTION JOINT DETAIL "2/S17.32", TYP. <br />5. EXPANSION JOINT: Y2" THICK x 4" WIDE CONTINUOUS BITUMINOUS <br />MATERIAL WHERE SLABS ABUT EACH OTHER. <br />6. ALL STUD WALL SILL PLATES & OTHER MEMBERS IN CONTACT w/ CONCRETE <br />OR MASONRY SHALL BE PRESSURE TREATED, TYP. <br />7. EXTERIOR LOAD -BEARING CMU WALLS @ 1st FLOOR: <br />8" CMU w/ 9 GA. LADDER REINF. @ 16" O.C. PROVIDE #6 VERTICAL REINF. IN <br />SOLID GROUTED CELLS @ ALL CORNERS, INTERSECTIONS, & WALL ENDS & AT <br />24" O.C. (MAX.). LAP 48 BAR O's ABOVE FINISHED FLOOR WHERE REQUIRED, <br />TYP. (U.N.O.) <br />® Key Notes <br />Roof Framing Plan <br />1. ROOF TRUSS BRG. ELEVATION = 9'-0"±, TYP. (U.N.O.) <br />2. TRUSS SHOP DRAWINGS: PROVIDE SHOP DRAWINGS SHOWING TRUSS <br />LAYOUT, PROFILES, CONNECTIONS, & LOAD DIAGRAMS FOR FLOOR TRUSS <br />SYSTEM SIGNED & SEALED BY A PROFESSIONAL ENGINEER REGISTERED IN THE <br />STATE OF FLORIDA FLORIDA. <br />3. ROOF TRUSSES: PROVIDE ENGINEERED, PRE -FABRICATED 2x WOOD TRUSSES <br />FOR LOADS, SPANS, & CONDITIONS SHOWN. SPACE TRUSSES @ 24" O.C. <br />MAX. & AS REQUIRED BY TRUSS MANUF. PROVIDE ALL REQUIRED INFILL <br />FRAMING, BLOCKING, & BRACING AS REQ'D. TO FRAME ENTIRE ROOF <br />ASSEMBLY. PROVIDE ALL NECESSARY SUPPORT CONDITIONS FOR FRAMING <br />ATTACHED TO WOOD TRUSSES. SECURE BEARING POINTS OF EACH TRUSS w/ <br />GALVANIZED HURRICANE STRAPS AS SPECIFIED & DETAILED. <br />4. ROOF SHEATHING: PROVIDE 19/2" EXTERIOR GRADE, SPAN RATED, CODE <br />CERTIFIED O.S.B. SHEATHING w/ H-CLIPS AS REQ'D., TYP. <br />5. ROOF SHEATHING NAILING SCHEDULE: <br />• NAIL @ 6" O.C. AT DIAPHRAGM BOUNDARIES, OVER PERIMETER WALLS, <br />AND AT ALL RIDGES, HIPS,& VALLEYS. <br />• NAIL @ 12" O.C. ALL INTERIOR SUPPORTS AND ALL OTHER PANEL EDGES. <br />• UNBLOCKED DIAPHRAGM, USE 8d RING SHANK OR 10d COMMON NAILS <br />w/ 1%" MINIMUM PENETRATION, TYP. <br />7. OVERFRAMING BY TRUSS ENGINEER. <br />8. TYPICAL TRUSS TO HAVE SIMPSON "H10A" @ EACH BEARING POINT, TYP <br />9. TYPICAL 2-PLY,GIRDER TRUSS TO HAVE SIMPSON "LGT2" & "MTS12" @ EACH <br />BEARING POINT, & TYPICAL 3-PLY GIRDER TRUSS TO HAVE SIMPSON <br />"LGT3-SDS2.5" @ EACH BEARING POINT, TYP. (U.N.O.) <br />Typical Sheet Notes <br />Foundation & Roof Framing Plans <br />A. SEE SHEET "S20.30" FOR GENERAL STRUCTURAL NOTES, TYP. <br />B. SEE ARCHITECTURAL DRAWINGS FOR DIMENSIONS, TYPICALLY. <br />C. COORDINATE w/ SITE & CIVIL DRAWINGS FOR CONTINUATION OF SIDEWALK, <br />TYP. <br />D. ALL MASONRY WALLS TO BE 8" CMU (f m = 1,500 PSI) SET IN RUNNING BOND <br />w/ 9 GA. LADDER REINF. @ 16" O.C., TYP. SEE SHEET "S20.34" FOR TYPICAL <br />MASONRY DETAILS. <br />E. "P-#" INDICATES SOLID GROUTED CMU PILASTER SET IN RUNNING BOND w/ 9 <br />GA. LADDER REINF. @ 16" O.C. SEE SHEET "S20.34" FOR MASONRY PILASTER <br />REINFORCING DETAILS, TYP. <br />F. SEE SHEET "S20.35" FOR COMPONENT & CLADDING DESIGN WIND PRESSURE <br />TABLE, <br />G. SEE SHEET "S20.35" FOR PRE -CAST LINTEL SCHEDULE, TYP. <br />v� <br />ro <br />ro <br />_0 <br />lJ. <br />L <br />L <br />3 <br />v <br />U <br />C <br />ro <br />L <br />0 <br />U <br />U <br />ro <br />C <br />t <br />0 <br />L <br />ro <br />ro <br />U <br />0 <br />v <br />t <br />N <br />,C <br />L <br />ro <br />b <br />0 <br />�4 <br />.c0 <br />G <br />G <br />CC <br />G <br />_v <br />7 <br />ro <br />U <br />a. <br />ro <br />v <br />Cn. <br />G <br />0 <br />U <br />U <br />,v <br />0 <br />L <br />a <br />r <br />L <br />0 <br />C <br />0 <br />'4-j <br />U <br />U <br />n. <br />ro <br />kA <br />ro <br />n. <br />v <br />v <br />Ix <br />'0 <br />v <br />3 <br />0 <br />C <br />to <br />Iv <br />v <br />C <br />C <br />W <br />c <br />v <br />0 <br />z <br />4. <br />0 <br />41 <br />^^A <br />.t.l <br />a <br />}FORUME <br />m <br />0 <br />ARCHITECTURE & <br />Z INTERIOR DESIGN, INC. <br />237 S. Westmonte Drive, Suite 220 <br />Altamonte Springs, FL 32714 <br />407.830,1400 <br />www.forumarchitecture.com <br />Zephyr <br />Commons <br />City of Zephyrhills, FL <br />O <br />i MAL WE <br />IPT <br />o r.DES 61114 <br />o - r- <br />F I <br />o. <br />v 2965 WEST STATE ROAD 434, SUITE 100 ■ LONGWOOD, FL 32779 <br />z TEL 407/682-2086 ■ FAX 407/682-2386 <br />0 WWW.SCD-ENG.COM <br />w ®®�499�BBB9dA <br />z ®® °SC RO ®®® <br />O <br />W <br />Q A TAT 22 ° W <br />of <br />® ° <br />®® AL Q®®®e® <br />W Robert C. Scroggins, P.E. <br />FL Registration No. 56158 <br />Z This document has been electronically signed and sealed by Robert C. Scroggins, PE on the Date <br />0 <br />6 and/or Time Stamp shown using a digital signature. Pdnted copies of this document are not <br />w considered signed and seated and the signature must be verified on any electronic copies. <br />uj <br />SET DISTRIBUTIONS: <br />0 <br />a <br />U_ <br />U <br />W <br />a <br />to <br />W <br />x <br />F <br />0 <br />0 <br />r <br />J <br />Z <br />O <br />0 <br />W <br />W <br />W <br />a <br />0 <br />Z <br />d <br />Z <br />z <br />0 <br />W <br />0 <br />x 0 SHEET REVISIONS: <br />W <br />F <br />Z <br />EDITED BY: RCS, TLW <br />SC&D PROJECT NO. 21-020 <br />FORUM PROJECT NO. 4097 <br />z <br />z Trash Compactor & <br />Maintenance Building - <br />Foundation & Roof <br />fy <br />W <br />z Framing Plans <br />cc <br />W <br />D <br />F- <br />U <br />W <br />F- <br />2 <br />U <br />a <br />S20.31 <br />0 <br />LL <br />