Laserfiche WebLink
SKILLED NURSING - 10 BED CONVERSION FLTSP15008 <br />1. ANSI/BHMA Certified Product Standards - A156 Series <br />2. UL 1 OC — Positive Pressure Fire Tests of Door Assemblies <br />1.3 SUBMITTALS <br />A. Product Data: Manufacturer's product data sheets including installation details, material <br />descriptions, dimensions of individual components and profiles, operational descriptions and <br />finishes. <br />B. Door Hardware Schedule: Prepared by or under the supervision of supplier, detailing fabrication <br />and assembly of door hardware, as well as procedures and diagrams. Coordinate the final Door <br />Hardware Schedule with doors, frames, and related work to ensure proper size, thickness, hand, <br />function, and finish of door hardware. <br />Format: Comply with scheduling sequence and vertical format in DHI's "Sequence and <br />Format for the Hardware Schedule." <br />2. Organization: Organize the Door Hardware Schedule into door hardware sets indicating <br />complete designations of every item required for each door or opening. Organize door <br />hardware sets in same order as in the Door Hardware Sets at the end of Part 3. Submittals <br />that do not follow the same format and order as the Door Hardware Sets will be rejected <br />and subject to resubmission. <br />3. Content: Include the following information: <br />a. Type, style, function, size, label, hand, and finish of each door hardware <br />item. <br />b. Manufacturer of each item. <br />C. Fastenings and other pertinent information. <br />d. Location of door hardware set, cross-referenced to Drawings, both on floor <br />plans and in door and frame schedule. <br />e. Explanation of abbreviations, symbols, and codes contained in schedule. <br />f. Mounting locations for door hardware. <br />g. Door and frame sizes and materials. <br />h. Warranty information for each product. <br />4. Submittal Sequence: Submit the final Door Hardware Schedule at earliest possible date, <br />particularly where approval of the Door Hardware Schedule must precede fabrication of <br />other work that is critical in the Project construction schedule. Include Product Data, <br />Samples, Shop Drawings of other work affected by door hardware, and other information <br />essential to the coordinated review of the Door Hardware Schedule. <br />C. Shop Drawings: Details of electrified access control hardware indicating the following: <br />Wiring Diagrams: Upon receipt of approved schedules, submit detailed system wiring <br />diagrams for power, signaling, monitoring, communication, and control of the access <br />control system electrified hardware. Differentiate between manufacturer -installed and <br />field -installed wiring. Include the following: <br />DOOR HARDWARE 087100 - 2 <br />