My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7350 Dairy Rd (2)
Zephyrhills
>
Building Department
>
Building Plans
>
7350 Dairy Rd (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 11:48:05 AM
Creation date
1/21/2025 3:28:51 PM
Metadata
Fields
Template:
Building Plans
Street #
7350
Location
Dairy Rd
Contractor
Ryam Companies
Building Plans - Permit #
17782
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SKILLED NURSING - 10 BED CONVERSION <br />FLTSP15008 <br />manufacturers of the primary materials with a warehousing facility in Project's vicinity. <br />Supplier to have on staff a certified Architectural Hardware Consultant (AHC) available during <br />the course of the Work to consult with Contractor, Architect, and Owner concerning both <br />standard and electromechanical door hardware and keying. <br />D. Windstorm Assembly Installer Qualifications: Installers are to be factory trained and certified <br />prior to project bid, and are responsible for commissioning, servicing, and warranting the <br />installed equipment specified for the project. <br />E. Source Limitations: Obtain each type and variety of door hardware specified in this section <br />from a single source unless otherwise indicated. <br />Electrified modifications or enhancements made to a source manufacturer's product line <br />by a secondary or third party source will not be accepted. <br />2. Provide electromechanical door hardware from the same manufacturer as mechanical <br />door hardware, unless otherwise indicated. <br />F. Each unit to bear third party permanent label demonstrating compliance with the referenced <br />standards. <br />G. Keying Conference: Conduct conference to comply with requirements in Division 01 Section <br />"Project Meetings." Keying conference to incorporate the following criteria into the final keying <br />schedule document: <br />1. Function of building, purpose of each area and degree of security required. <br />2. Plans for existing and future key system expansion. <br />3. Requirements for key control storage and software. <br />4. Installation of permanent keys, cylinder cores and software. <br />5. Address and requirements for delivery of keys. <br />H. Pre -Submittal Conference: Conduct coordination conference in compliance with requirements <br />in Division 01 Section "Project Meetings" with attendance by representatives of Supplier(s), <br />Installer(s), and Contractor(s) to review proper methods and the procedures for receiving, <br />handling, and installing door hardware. <br />1. Prior to installation of door hardware, conduct a project specific training meeting to <br />instruct the installing contractors' personnel on the proper installation and adjustment of <br />their respective products. Product training to be attended by installers of door hardware <br />(including electromechanical hardware) for aluminum, hollow metal and wood doors. <br />Training will include the use of installation manuals, hardware schedules, templates and <br />physical product samples as required. <br />2. Inspect and discuss electrical roughing -in, power supply connections, and other <br />preparatory work performed by other trades. <br />3. Review sequence of operation narratives for each unique access controlled opening. <br />4. Review and finalize construction schedule and verify availability of materials. <br />5. Review the required inspecting, testing, commissioning, and demonstration procedures <br />I. At completion of installation, provide written documentation that components were applied to <br />manufacturer's instructions and recommendations and according to approved schedule. <br />DOOR HARDWARE 087100 - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.