My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7350 Dairy Rd (2)
Zephyrhills
>
Building Department
>
Building Plans
>
7350 Dairy Rd (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 11:48:05 AM
Creation date
1/21/2025 3:28:51 PM
Metadata
Fields
Template:
Building Plans
Street #
7350
Location
Dairy Rd
Contractor
Ryam Companies
Building Plans - Permit #
17782
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SKILLED NURSING - 10 BED CONVERSION <br />FLTSP15008 <br />2. Wood Doors: DHI WDHS.3, "Recommended Locations for Architectural Hardware for <br />Wood Flush Doors." <br />3. Where indicated to comply with accessibility requirements, comply with ANSI A117.1 <br />"Accessibility Guidelines for Buildings and Facilities." <br />4. Provide blocking in drywall partitions where wall stops or other wall mounted hardware <br />is located. <br />C. Retrofitting: Install door hardware to comply with manufacturer's published templates and <br />written instructions. Where cutting and fitting are required to install door hardware onto or into <br />surfaces that are later to be painted or finished in another way, coordinate removal, storage, and <br />reinstallation of surface protective trim units with finishing work specified in Division 9 <br />Sections. Do not install surface -mounted items until finishes have been completed on substrates <br />involved. <br />D. Thresholds: Set thresholds for exterior and acoustical doors in full bed of sealant complying <br />with requirements specified in Division 7 Section "Joint Sealants." <br />E. Storage: Provide a secure lock up for hardware delivered to the project but not yet installed. <br />Control the handling and installation of hardware items so that the completion of the work will <br />not be delayed by hardware losses before and after installation. <br />3.4 FIELD QUALITY CONTROL <br />A. Field Inspection: Supplier will perform a final inspection of installed door hardware and state in <br />report whether work complies with or deviates from requirements, including whether door <br />hardware is properly installed, operating and adjusted. <br />3.5 ADJUSTING <br />A. Initial Adjustment: Adjust and check each operating item of door hardware and each door to <br />ensure proper operation or function of every unit. Replace units that cannot be adjusted to <br />operate as intended. Adjust door control devices to compensate for final operation of heating <br />and ventilating equipment and to comply with referenced accessibility requirements. <br />3.6 CLEANING AND PROTECTION <br />A. Protect all hardware stored on construction site in a covered and dry place. Protect exposed <br />hardware installed on doors during the construction phase. Install any and all hardware at the <br />latest possible time frame. <br />B. Clean adjacent surfaces soiled by door hardware installation. <br />C. Clean operating items as necessary to restore proper finish. Provide final protection and <br />maintain conditions that ensure door hardware is without damage or deterioration at time of <br />owner occupancy. <br />DOOR HARDWARE 087100 - 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.