My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
7780 Gall Blvd
Zephyrhills
>
Building Department
>
Building Plans
>
7780 Gall Blvd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 11:49:16 AM
Creation date
1/21/2025 3:28:54 PM
Metadata
Fields
Template:
Building Plans
Street #
7780
Location
Gall Blvd
Contractor
Marand Builders
Building Plans - Permit #
14730
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 17, 2013 WELLS FARGO AGRIBOARD PANEL REPAIR 501-2717-033 <br />ZEPHYR COMMONS <br />3. Review and finalize construction schedule and verify availability of <br />materials, Installer's personnel, equipment, and facilities needed to make <br />progress and avoid delays. <br />4. Review deck substrate requirements for conditions and finishes, including <br />flatness and fastening. <br />5. Review structural loading limitations of roof deck during and after roofing. <br />6. Review base flashings, special roofing details, roof drainage, roof <br />penetrations, equipment curbs, and condition of other construction that <br />will affect roofing system. <br />7. Review governing regulations and requirements for insurance and <br />certificates if applicable. <br />8. Review temporary protection requirements for roofing system during and <br />after installation. <br />9. Review roof observation and repair procedures after roofing installation. <br />G. Preinstallation Roofing Conference: Conduct conference at Project site. <br />1. Meet with Owner, Architect, Owner's insurer if applicable, testing and <br />inspecting agency representative, roofing Installer, roofing system <br />manufacturer's representative, deck Installer, and installers whose work <br />interfaces with or affects roofing, including installers of roof accessories <br />and roof -mounted equipment. <br />2. Review methods and procedures related to roofing installation, including <br />manufacturer's written instructions. <br />3. Review and finalize construction schedule and verify availability of <br />materials, Installer's personnel, equipment, and facilities needed to make <br />progress and avoid delays. <br />4. Examine deck substrate conditions and finishes for compliance with <br />requirements, including flatness and fastening. <br />5. Review structural loading limitations of roof deck during and after roofing. <br />6. Review base flashings, special roofing details, roof drainage, roof <br />penetrations, equipment curbs, and condition of other construction that <br />will affect roofing system. <br />7. Review governing regulations and requirements for insurance and <br />certificates if applicable. <br />8. Review temporary protection requirements for roofing system during and <br />after installation. <br />9. Review roof observation and repair procedures after roofing installation. <br />1.8 DELIVERY, STORAGE, AND HANDLING <br />A. Deliver roofing materials to Project site in original containers with seals unbroken <br />and labeled with manufacturer's name, product brand name and type, date of <br />manufacture, approval or listing agency markings, and directions for storing and <br />mixing with other components. <br />B. Store liquid materials in their original undamaged containers in a clean, dry, <br />protected location and within the temperature range required by roofing system <br />manufacturer. Protect stored liquid material from direct sunlight. <br />THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 07543 - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.