V
<br />IE
<br />1 7)
<br />REFER TO VALVE DESIGNATION SYMBOLS FOR CONTROLLER, STATION NUMBER AND
<br />i }
<br />THE DRAWINGS ARE DIAGRAMMATIC. THE CONTRACTOR SHALL BE EXPECTED TO MAKE
<br />DESIGNED FLOW RATE FOR EACH REMOTE CONTROL VALVE.
<br />TH05E MODIFICATIONS IN THE FIELD TO REACT TO ACTUAL FIELD CONDITIONS, WITHOUT
<br />DEPARTURE FROM THE DESIGN CONCEPTS OR INTENT.
<br />1 8)
<br />ALL 24 VOLT CONTROL CABLE TO BE UL LISTED, SINGLE STRAND, TYPE OF GOO VOLT
<br />CONTROL CABLE. 51ZE AND COLOR AS FOLLOWS:
<br />a)
<br />COMMON WIRES - 51ZE AWG # 14 OR LARGER AND WHITE IN COLOR.
<br />3)
<br />MATERIALS AND EQUIPMENT OF EQUAL TO OR BETTER THAN MAY BE SUBSTITUTED
<br />b)
<br />HOT WIRES - SIZE AWG # I G OR LARGER AND RED IN COLOR.
<br />PROVIDED THE RECOMMENDED MANUFACTURERS SPECIFICATIONS ARE MET FOR QUALITY,
<br />c)
<br />SPARE WIRES - 51ZE AWG # I G OR LARGER AND BLUE IN COLOR,
<br />PERFORMANCE, INSTALLATION AND WARRANTY, ETC. PROVIDED THE DE51GN INTENT OF THE
<br />IRRIGATION PLANS REMAIN IN FULL COMPLIANCE WITH THE AFOREMENTIONED FLORIDA
<br />1 9)
<br />ALL SPLICES TO THE 24 VOLT CONTROL WIRING SHALL BE MADE WITH KING TECHNOLOGY
<br />IRRIGATION SOCIETY STANDARDS AND SPECIFICATIONS.
<br />(KING G) 51LICONE-FILLED SAFETY CONNECTORS.
<br />20)
<br />ALL CONTROL VALVE WIRES SHALL BE BUNDLED AND TAPED TOGETHER AT 20' INTERVALS
<br />4)
<br />ALL WORK SHALL CONFORM TO ALL APPLICABLE REGULATIONS AND CODES FOR THE
<br />AND PLACED ALONG THE 51DE OF THE MAINLINE PIPE.
<br />LOCATION OF THE WORK. CONTRACTOR SHALL OBTAIN ALL NECE55ARY PERMITS AND
<br />INSPECTIONS IN ORDER TO COMPLETE THE WORK.
<br />2 1)
<br />ALL POP-UP SPRINKLER HEADS SHALL BE INSTALLED LEVEL AND FLUSH TO GRADE. MOUNT
<br />ALL SPRINKLERS ON FLEXIBLE CONNECTIONS AS FOLLOWS:
<br />5)
<br />DO NOT WILLFULLY INSTALL THE IRRIGATION SYSTEM AS SHOWN ON THE DRAWINGS WHEN
<br />a)
<br />1 /2" INLET SPRAY HEADS: 1 8" OF HEAVY WALL PVC IP5 M05E
<br />IT 15 OBVIOUS IN THE FIELD THAT CONDITIONS EX15T THAT MIGHT NOT HAVE BEEN
<br />b)
<br />3/4" INLET ROTOR HEADS: 18" OF HEAVY WALL PVC IP5 M05E
<br />CONSIDERED IN THE DE51GN PROCESS, FOR EXAMPLE: OBSTRUCTIONS, GRADE
<br />DIFFERENCES, WATER LEVELS, DIMENSIONAL DIFFERENCES, ETC. REFER TO THE LANDSCAPE
<br />22)
<br />LOCATION OF ALL SPRINKLER HEADS SHALL BE 51TE ADJUSTED TO MINIMIZE WATER
<br />PLAN TO AVOID CONFLICTS WITH PROPOSED TREES AND SHRUBS.
<br />OVERTHROW ONTO BUILDING SURFACES AND WALKWAYS. THROTTLE VALVES ON SPRAY
<br />ZONES AS REQUIRED TO PREVENT FOGGING.
<br />G)
<br />PIPING MAY SOMETIMES BE INDICATED AS BEING LOCATED IN UNLIKELY AREAS: I.E. UNDER
<br />BUILDINGS OR PAVEMENT, OUTSIDE OF PROPERTY LINES, IN LAKES OR DITCHES, ETC. TH15
<br />23)
<br />THE INSTALLER SHALL BE EXPECTED TO BE FAMILIAR WITH AND FOLLOW THE INSTRUCTIONS
<br />15 DONE FOR GRAPHIC CLARITY ONLY. WHENEVER POSSIBLE, PIPING 15 TO BE INSTALLED IN
<br />CONTAINED HEREIN, ON THE DRAWINGS, IN THE CONSTRUCTION DETAILS, AND IN THE
<br />OPEN, "GREEN" AREAS. ALL LINES SHALL BE INSTALLED ON THE PROPERTY AND INSIDE THE
<br />WRITTEN SPECIFICATIONS. SHOULD A CONFLICT BE DISCOVERED WITHIN THE DOCUMENTS,
<br />LANDSCAPE AREAS.
<br />THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE LANDSCAPE ARCHITECT AND REQUEST
<br />CLARIFICATION..
<br />7)
<br />IF REQUIRED, THE IRRIGATION CONTRACTOR SHALL PROVIDE THE NECESSARY "RIGHT OF
<br />WAY" USE PERMITS.
<br />24)
<br />THE IRRIGATION CONTRACTOR 15 RESPONSIBLE FOR INSTALLING ALL LOW VOLTAGE WIRING
<br />FROM THE CONTROL VALVE TO THE IRRIGATION CONTROLLER, IF SPARE WIRES ARE NOT
<br />8)
<br />MAINLINE SHALL BE INSTALLED WITH A MINIMUM OF 18" DEPTH OF COVER.
<br />AVAILABLE.
<br />9)
<br />LATERAL LINES ARE TO BE INSTALLED WITH A MINIMUM OF 1 2" DEPTH OF COVER.
<br />25)
<br />THE IRRIGATION CONTRACTOR IS TO INSPECT, EVALUATE, AND REPAIR ANY DEFAULTS IN THE
<br />10)
<br />ALL WORK SHALL BE CLOSELY COORDINATED WITH THAT OF OTHER TRADES, IN ORDER TO
<br />EXISTING IRRIGATION SYSTEM AND ITS EQUIPMENT IF APPLICABLE PER SCOPE OF PROJECT.
<br />AVOID POTENTIAL CONFLICTS. REFER TO LANDSCAPE AND UTILITIES PLAN WHEN TRENCHING
<br />TO AVOID TREES, SHRUBS AND UNDERGROUND UTILITIES.
<br />2G)
<br />CONTROLLER(5) SHALL BE DIRECTLY WIRED TO THE HOUSE CIRCUIT OF 1 10 / 120 VOLTS.
<br />1 1)
<br />ALL MATERIAL AND LABOR REQUIRED TO PROVIDE A COMPLETE, OPERATIONAL AND FULLY
<br />27)
<br />EXACT CONTROLLER LOCATION(5) 511ALL BE COORDINATED WITH AN OWNER'S
<br />GUARANTEED 5Y5TEM SHALL BE CONSIDERED PART OF THE WORK WHETHER OR NOT SUCH
<br />REPRESENTATIVE PRIOR TO INSTALLATION. UNLESS OTHERWISE STATED, THE OWNER SHALL
<br />ITEMS ARE SPECIFICALLY INDICATED IN THESE DOCUMENTS.
<br />PROVIDE I 10 VOLT POWER TO THE CONTROLLER LOCATION(5). THE IRRIGATION
<br />CONTRACTOR 15 RESPONSIBLE FOR THE CONNECTION FROM THE POWER SOURCE TO THE
<br />1 2)
<br />THE CONTRACTOR SHALL PREPARE AN A5-13UILT DRAWING ON A REPRODUCIBLE MEDIA
<br />CONTROLLER(5).
<br />(MYLAR OR SEPIA) SHOWING ALL IRRIGATION INSTALLATION. A MYLA , OR SEPIA OF THE
<br />ORIGINAL PLAN MAYBE OBTAINED FROM THE LANDSCAPE ARCHITECT FOR A FEE, THE
<br />26)
<br />INSTALL A SEPARATE TE/ 120VAC- 15A I SURGE ARRESTER TO THE INCOMING (I 10 VOLT)
<br />DRAWING SHALL LOCATE ALL MAIN LINE AND VALVES BY SHOWING EXACT MEASUREMENTS
<br />POWER SUPPLY TO EACH CONTROLLER. PROPERLY GROUND EACH CONTROLLER TO A 5/8" X
<br />FROM HARD SURFACES. WIRE DIRECTION SHALL BE INDICATED.
<br />& COPPER CLAD GROUND ROD WITH AWG #G BARE SOLID COPPER WIRE. A PROPER
<br />GROUND SHOULD HAVE 10 OHMS OR LESS RESISTANCE TO EARTH. USE OF MULTIPLE
<br />1 3)
<br />ALL HEADS SHALL BE THE PROPER TYPE FOR THE AREAS WHERE LOCATED AND SHALL BE
<br />GROUND RODS MAY BE NECESSARY TO ACHIEVE THE DE5IRED RESISTANCE READING.
<br />INSTALLED, PLUMBED, AND TO THE PROPER HEIGHT. ALL HEADS AND OTHER EQUIPMENT
<br />SHALL BE INSTALLED WITH ADEQUATE AND UNIFORM CLEARANCE FROM ALL HAKD5CAPING
<br />29)
<br />THE RAIN SHUTOFF DEVICE SHALL BE INSTALLED TO MEET LOCAL CODES AND/OR MINIMUM
<br />TO MINIMIZE WATER OVER SPRAY ON IMPERVIOUS AREAS.
<br />MANUFACTURER'S RECOMMENDATIONS. OBSTRUCTIONS, VANDALISM AND EASE OF
<br />SERVICE SHALL BE CONSIDERED IN LOCATING THE DEVICE. ALL WIRING BETWEEN THE RAIN
<br />14)
<br />CONTROL WIRING SHALL BE ROUTED WITH THE MAINLINE WHEREVER POSSIBLE.
<br />SWITCH AND THE IRRIGATION CONTROLLER SHALL BE ENCLOSED IN 112" PVC ELECTRICAL
<br />LOW -VOLTAGE WIRING 511ALL BE UFC# 14PVC JACKETED, SINGLE CONDUCTOR CABLE, USE
<br />CONDUIT.
<br />RED WIRES FOR "HOT" AND WHITE FOR VALVES, COMMON WIRES SHALL BE INSTALLED WITH
<br />ADEQUATE SLACK AND 5URGE/EXPAN51ON LOOPS; AND SHALL BE SPLICED ONLY IN VALVE
<br />30)
<br />CONTRACTOR AGREES TO A55UME COMPLETE RESPONSIBILITY FOR THE JOB 51TE
<br />BOXES U51NG SPEARS "DRIPLINE" WIRE CONNECTORS AND SEALANT.
<br />CONDITIONS DURING THE COURSE OF CONSTRUCTION ON THE PROJECT INCLUDING THE
<br />SAFETY OF ALL PERSONS AND PROPERTY. THESE REQUIREMENTS SHALL APPLY
<br />1 5)
<br />UNLESS OTHERWISE INDICATED, ALL SLEEVES ARE TO BE PVC 5CMEDULE 40 AND TWO (2)
<br />CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS AND CONTRACTOR
<br />NOMINAL SIZES LARGER THAN THE PIPE TO BE SLEEVED. FOR EXAMPLE: THE SLEEVE FOR A 2"
<br />AGREES TO DEFEND, INDEMNIFY, AND HOLD OWNER AND DE51GN PROFE5510NAL HARMLESS
<br />PIPE SMALL BE 4". NO IRRIGATION SLEEVE SHALL BE SMALLER THAN 2".
<br />FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE
<br />OF WORK ON THI5 PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF
<br />I G)
<br />WHEREVER PRACTICAL, INSTALL VALVES IN MULCHED BEDS AND/OR OUT OF HIGH TRAFFIC
<br />DE51GN PROFESSIONAL,
<br />AREAS. ALL VALVES, FLUSH VALVES AND WIRE SPLICES SHALL BE INSTALLED IN CARSON
<br />STRUCTURAL FOAM "PLASTIC" VALVE BOXES WITH "PURPLE" LIDS AS FOLLOWS:
<br />3 1)
<br />ANY OTHER EQUIPMENT REQUIRED THAT 15 NOT OTHERWISE DETAILED OR SPECIFIED SHALL
<br />a)
<br />REMOTE CONTROL VALVES: # 141 9B-1 2 STD. RECT. BOX
<br />BE INSTALLED AS PER MANUFACTURER'S RECOMMENDATIONS AND SPECIFICATIONS.
<br />b)
<br />ISOLATION GATE VALVES: #9 10-1 2, 10" ROUND PIT
<br />c)
<br />WIRE SPLICES: #910- 1 2, 10" ROUND PIT
<br />DRIPLINE NOTES
<br />I . INSTALL DRIP TUBING AT GRADE AND COVER WITH MULCH, TYPICAL SPACING FOR DRIP TUBING 15 18"
<br />TO 24" ON CENTER. SPACING TO BE DETERMINED BY PLANT LAYOUT. REFER TO LANDSCAPE PLAN,
<br />ANCHOR TUBING EVERY I O' WITH 1 2" LONG PLASTIC TUBING STAKES. INSTALL FLUSH VALVE
<br />ASSEMBLIES AT ALL TUBING "DEAD ENDS". INSTALL AIR/VACUUM RELIEF VALVES AT "HIGH POINTS" OF
<br />EVERY SECTION.
<br />2. GRID LAYOUT SHALL BE USED ON THI5 PROJECT. USE CENTER GRID LAYOUT WHERE POSSIBLE.
<br />3. WHEN 5LEEVING DRIPLINE, USE BLANK DRIPLINE IN SLEEVE. SLEEVE SHALL BE 2X DRIPLINE DIAMETER.
<br />NO EMITTER DRIPLINE SHALL BE PLACED IN SLEEVE.
<br />4. THE LENGTH OF ANY DRIPLINE TECHUNE CV LATERAL SHALL NOT BE LONGER THAN:
<br />1 2" EMITTERS @ 0.9 GPM
<br />a) @ 15 PSI = G5 FEET
<br />b) @ 25 P51 = 194 FEET
<br />c) @ 35 P51 = 244 FEET
<br />ci) @ 45 PSI = 260 FEET
<br />LATERAL DISTANCE DOUBLED WHEN CENTER FEED LAYOUT USED (SEE CENTER FEED LAYOUT DETAIL.
<br />5. MANUAL FLUSH VALVE SHALL BE USED * PLACED WITH A G" X G" SUMP. VALVES SHALL BE OPENED
<br />EVERY WATERING DAY FOR 2 WEEKS AND THEN A MINIMUM OF 2 TIMES A YEAR TO CLEAR DRIPLINE OF
<br />DEBRIS.
<br />G. AIR/VACUUM RELIEF SHALL BE INSTALLED WHEN THE CHANGE IN SLOPE OCCURS 3% OR GREATER,
<br />7. STAPLES SHALL BE USED AT 3' O.C. AND 2 STAPLES 'X'ED OVER EACH OTHER WITH ANY CHANGE IN
<br />DIRECTION, ELBOWS, OR CROSSES.
<br />8. SUPPLY, EXHAUST HEADERS AND DRIPLINE SHALL NE PLACED 2"- 4" FROM PLANTS AND PAVEMENT
<br />EDGE5.
<br />9, BLANK DRIPLINE SHALL BE USED FOR ALL SUPPLY AND EXHAUST HEADERS; UNLESS OTHERWISE NOTED
<br />ON PLANS.
<br />10. PRIOR TO COVERING DRIPLINE, DRIPLINE CIRCUIT WILL BE PRESSURIZED AND TESTED FOR PROPER
<br />OPERATION.
<br />1 1. DRIPLINE LATERALS SHALL BE LAID IN THE LONGEST RUN, WHETHER IT BE THE WIDTH OR LENGTH OF
<br />THE ZONE.
<br />12. WHEN UTILIZING THE 2 WIRE CONTROLLER MODULE SYSTEM, MODULES SHALL BE PLACED WITHIN A
<br />VALVE BOX. USE 14 GAUGE ELECTRICAL WIRE f- WATERPROOF ALL CONNECTIONS. CONTRACTOR
<br />SHALL INSURE MODULE CONTROL WIRES ARE NOT LONGER THAN MANUFACTURER SPECIFICATIONS.
<br />LINE FLUSHING VALVE
<br />PLUMBED TO PVC
<br />START
<br />CONNECTION
<br />MALE ADAPTER
<br />PVC OR POLY EXHAUST HEADER
<br />SUPPLY HEADER
<br />REMOTE CONTROL
<br />VALVE WITH DI5C
<br />FILTER AND PRV
<br />AREA PERIMETER
<br />BLANK TUBING
<br />(CENTERED ON MOUND OR BERM)
<br />TUBING LATERAL
<br />(OPTIONAL) AIR/VACUUM
<br />RELIEF VALVE
<br />PERIMETER LATERALS
<br />2" TO 4" FROM EDGE
<br />CENTEIz FEED LAYOUT
<br />DE`: AIL - NO 3CA F_
<br />¢.
<br />ti
<br />r _ : I`JD5 AND
<br />5TAJ'L 5-:10 UP roll R -;.Vf. PC1, eu
<br />1
<br />r : D •�1P� uR-'.,1EP � _ r-.:_or•✓ ;� � FIPn.`.eAc
<br />trtPENC= r JT TO `_`UP, 11P_-40' 20'— 4 4T tAi FFf
<br />3 RFMOTe CONTROL VALvE
<br />QrT=FFRCCF CCrJ r r K: Z
<br />L 6
<br />© s,„ 50 T.O.E. 91M E.
<br />7
<br />"A �ff O `l PFVF N R FIP,; 5T:1B UP
<br />5C g
<br />ROUGH IN 5LEEVING DETAIL
<br />NO SCALE tO F'VC SUP UNIONS
<br />GLOBE VALVE=I�aF,�;�•- f-
<br />NO SCALE
<br />F
<br />EXTERIOR''AALL (FF NOTE)
<br />TREE BUBBLER
<br />MODEL PRO.;-06 5F €tA __A.D
<br />1`P TY :C�" OPTIONiP:S`ALLLC'
<br />2 MCDEL RAIN-C:-Ir:.
<br />nNr_s .I+ T
<br />rIJ JTER PPO F> RUN LEAD WIRES IN
<br />5f',L-G 3G OCONDUIT TO CONTROLLER BUBBLER.
<br />MA.RLEX,5TRi=f�T LBC^f✓i':
<br />No.
<br />MOUNT ON ANY 5UP ACL CI'ECr. VALVE:
<br />,,VH` KF IT WILL BE EXP05ff)
<br />[ATER,AL r F ELL TO UNC55TRUC;TED RP•IN°ALL,
<br />BUT NOT IN PATH OF Seri 80 N PPLe
<br />SFFJN<LER SPRAY.
<br />A. eF,°•.L P;P F FINiOh GRADE \
<br />RAIN-CU K 5Cr; 40 THPL-ADED � (
<br />�I\J NO SCALE COUPLER
<br />SPRAY HEAD
<br />PRO FLE;t S`aVi"dG JOINT;
<br />liUINTFR'PRO -FLEr" TUBING
<br />NO SCALE ii55L-050 E,501,•JS (2)..AL50
<br />h 1f•RLEX STRLET ELB C)V,' (1 )
<br />LATERAL. n_E OR ELL.
<br />1. CONfFIC'L:_ER.
<br />SEE iKFllGP,T!ON 5C. ULF FOR l! LATERAL PIPE
<br />'Ji r 13FP-. Of 71 o.�
<br />_.EC Uc.F TO \A/A ILL ,VIM:
<br />BUBBLER
<br />F•:PP O!"KATf
<br />NO SCALE
<br />2. 1/2CGNDULtT V) CCrJD'jl- FOR.
<br />EL`CEKICAL o FEAND
<br />NATIONAL tLFLCI sg"- 64" 3 O 0" ROUND VALVE BOX
<br />3
<br />SECURE TO WALL WITH APPROPRIATE
<br />PIPE CLAMPS O c COPPER C f aD GROUND :ROD
<br />1! CONDUIT � R.A FfvSCR 'I;ec 4 5 50 UI1N10 OF I_E55
<br />SECURE. 10'Ai/ ,t L V,'i1 pi PFP'r GPFJA.TE
<br />PIPE Cis P,?PS 2 4 0 CONNECTION
<br />4CUM)LIT 'OK K '
<br />NT Cll WIRE E E F 4O #G to # 10 BARE COPPER
<br />%,VA � T` a FrRr P KIr 'E GROUNDING CONDUCTOR
<br />cl�r,'Ps
<br />P. FINIS 11D C,R,".Dt OCONDUIT TO CON FROLLER
<br />FRONT RiGMT-SIDE
<br />5EC ION/ELL\A ON iECTIONrLLEVATIO`J
<br />'rJC?TF=' • .
<br />• NlO J:`1 L COP. ROLLER' • CL SC:KEEN AT tYt LEVEL L CONTROL LfR 511ALL BE HARD WIRED TO
<br />GROUNDED i 10 c: 22(' VAC SGJRCE.
<br />• U5E OP PLUG-1"T REC.EP-"A , If PGMA`EF. CONNECTION 15 NOT PERMITTED.
<br />CONTROLLER GROUNDING
<br />CONTROLLER OUTDOOR / INDOOR MODEL GROUND FER NJ' C.
<br />EXTERIOR WALL -MOUNT CONTROLLER
<br />FINISH GF'AnF
<br />G" ROUND
<br />VALVE BO;
<br />AIR / VACL
<br />RELIEF VAI
<br />3/4"M x 1/2"
<br />BU5HING
<br />180 2 -W/
<br />ADAPTER 7
<br />BRICK 5UF
<br />(THREE)
<br />3/4" CRUE
<br />GRAVEL 5
<br />Techllne T
<br />AIR/VACUUM RELI EI=
<br />SFC- CUN - NO 5C:A7 `
<br />MAINLINE REMOTE CONTROL 5CH 80
<br />VALVE UNION
<br />FINISH
<br />VALVE BOX
<br />SEE SPECS.
<br />LINE FLUSHING
<br />VALVEETL50TLSOV
<br />TUBING
<br />BRICK SUPPORTS -
<br />(TH KEE)
<br />3/4" GRAVEL SUMP -
<br />(I CUBIC FOOT)
<br />MANUAL LINE FLUSHING VALVE
<br />5 E,;TION - N,; � _
<br />REMOTE CONTROL
<br />VALVE WITH DISC
<br />FILTER AND PKV
<br />PVC OR BLANK TECHUNE
<br />CV SUPPLY HEADER
<br />START
<br />CONNECTION
<br />MALE ADAPTER
<br />TUBING LATERAL
<br />AREA PERIMETER
<br />OPTIONAL) AIK/VACUUM
<br />ELIEF VALVE (PLUMBED TO
<br />Techllne AT EACH
<br />HIGH POINT
<br />BLANK TUBING
<br />ERMj RED ON MOUND OR
<br />PVC OR POLY EXHAUST HEADER
<br />PERIMETER LATERALS
<br />2" TO 4" FROM EDGE
<br />PLUMBED TO PVC OR
<br />CV LINE FLUSHING VALVE
<br />"END FEED" LAYOUT
<br />END FEED LAYOUT
<br />DPL','L - NO KALL
<br />z
<br />O
<br />F_
<br />a
<br />U
<br />LLI
<br />ol
<br />Q
<br />0
<br />DCladD
<br />h
<br />CO
<br />Li)
<br />d
<br />H
<br />N
<br />O
<br />cr W>-0—Ozw
<br />z
<br />Q
<br />w =
<br />CVco
<br />z cr
<br />o
<br />c0
<br />< O
<br />M
<br />N
<br />Lo
<br />�
<br />-iN
<br />IliO
<br />U
<br />o
<br />E
<br />a
<br />UC101559rn
<br />� —fir-
<br />05/21 /2018 Z x
<br />*, ATE '.
<br />a
<br />M
<br />O
<br />cr
<br />0
<br />0
<br />CC
<br />w
<br />ZJ
<br />W J
<br />J �
<br />a �-
<br />0
<br />Q W
<br />WN
<br />U.
<br />20
<br />a
<br />U.
<br />IDN
<br />ki
<br />E
<br />Z
<br />Q
<br />CC
<br />0
<br />G
<br />z
<br />Ir
<br />W
<br />r
<br />F_
<br />Q
<br />U
<br />C'7
<br />�(o
<br />� co �
<br />O Q co
<br />U o c?
<br />W (�
<br />O O r-
<br />WLL
<br />GV
<br />� W
<br />z
<br />cr-, O
<br />_(o d d
<br />N J
<br />U
<br />a
<br />F_
<br />W
<br />Q
<br />z
<br />0
<br />
|