PASCO COUNTY NOTES:
<br />1. AT COMPLETION SUBMIT RECORD DRAWING/ASBUILTS OF OFFSITE IMPROVEMENTS IN .PDF DISK FORMAT TO
<br />STORMWATER MANAGEMENT, 4454 GRAND BLVD, NEW PORT RICHEY, FLORIDA. 1
<br />2. SIDEWALKS SHALL BE CONSTRUCTED OF NATURAL COLORED CONCRETE AT LEAST 3000 PSI IN STRENGTH,
<br />FIBER REINFORCED, AND FOUR (4) INCHES IN THICKNESS EXCEPT FOR DRIVEWAYS APPROACHES WHICH
<br />REQUIRE A MINIMUM OF SIX (6) INCHES.
<br />1 NO DEWATERING SHALL OCCUR WITHOUT WRITTEN APPROVAL BY THE PUBLIC WORKS DIRECTOR. WHERE
<br />DEWATERING IN THE RIGHT OF WAY IS PROPOSED, IT MUST BE ACCOMPANIED BY A PLAN TO INSURE THERE IS
<br />NO SEDIMENT TRANSFER, PUMPED WATER IS UNCONTAMINATED.
<br />4. NO TRACK TYPE EQUIPMENT WILL BE ALLOWED ON ANY ASPHALTIC OR CONCRETE SURFACES.
<br />5. NO ILLICIT DISCHARGE SHALL OCCUR AS A RESULT OF ACTIVITY PERFORMED PURSUANT TO THIS PERMIT.
<br />6. NO OPEN CUTS WITHOUT SPECIFIC APPROVAL FROM THE PUBLIC WORKS DIRECTOR.
<br />7, ALL UTILITY LINES WITHIN THE RIGHT-OF-WAY SHALL BE PLACED A MINIMUM OF 36" UNDER THE ROADWAY AND
<br />A MINIMUM OF 30" UNDER NON -TRAFFIC BEARING SURFACES,
<br />8. ALL UTILITY LINES WITHIN THE RIGHTS -OF -WAY SHALL BE CLEARLY IDENTIFIED AT REGULAR INTERVALS.
<br />9. UNLESS THE UTILITY GOVERNING REGULATION DIRECTS FURTHER, A MINIMUM TWELVE INCH SEPARATION
<br />FROM ANY STORMWATER STRUCTURE OR PIPE SHALL BE REQUIRED.
<br />10. ALL TRAFFIC CONTROL DEVICES, I.E.: WARNING/CONSTRUCTION TYPE SIGNS WILL COMPLY WITH F.D.O.T. 600
<br />STANDARD INDEX DURING THE CONSTRUCTION PHASE.
<br />11. ALL DISTURBED AREAS OUTSIDE THE 2:1 ROADWAY CONTROL LINE (SHOULDER) SHALL BE COMPACTED TO
<br />FIRMNESS EQUAL TO THAT OF THE SOIL ADJACENT TO THE TRENCH AND REPLACED WITH SOD. AREAS WITHIN
<br />THREE (3) FEET OF EDGE OF PAVEMENT SHALL BE COMPACTED TO PASCO COUNTY TESTING SPECIFICATIONS.
<br />12. ALL BACKFILL SUB -BASE, BASE AND ASPHALT SURFACE RESTORATION SHALL COMPLY WITH THE LATEST PASCO
<br />COUNTY SPECIFICATIONS OR AS OTHERWISE APPROVED BY THE COUNTY ENGINEER OR HIS DESIGNEE,
<br />13. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE AND RELOCATE ALL TRAFFIC CONTROL
<br />DEVICES DURING THE CONSTRUCTION PHASE. AFTER CONSTRUCTION IS COMPLETE THE DEVICES WILL BE
<br />REINSTALLED TO THE ORIGINAL LOCATION. ANY DAMAGED DEVICES WILL BE THE RESPONSIBILITY OF THE
<br />CONTRACTOR TO REPLACE.
<br />14. SIDEWALKS WILL BE CONSTRUCTED WITHIN THREE (3) DAYS AFTER REMOVAL AND SAFE PEDESTRIAN TRAFFIC
<br />WILL BE MAINTAINED AT ALL TIMES. IF SIDEWALK IS REMOVED, IT WILL BE REMOVED TO THE NEAREST
<br />EXPANSION JOINT AND REPLACED PER FOOT INDEX 310. ANY SIDEWALK, WHICH BECOMES UNDERMINED, MUST
<br />BE REMOVED AND REPLACED. ROADWAY/SIDEWALK CONNECTIONS REPLACEMENTS MUST MEET CURRENT
<br />ADA STANDARDS AND F,D.O.T. INDEX 304.
<br />15. ALL EXISTING DRAINAGE TO BE MAINTAINED AND RESTORED TO DESIGN FLOW LINES.
<br />16. NO WORK, EXCEPT FOR EMERGENCY TYPE, WILL BE PERFORMED AFTER SUNDOWN AND BEFORE SUNRISE.
<br />17. ALL LINES LOCATED WITHIN ROADSIDE DRAINAGE DITCHES SHALL BE A MINIMUM OF 30 INCHES BELOW THE
<br />LOWEST POINT OF THE DITCH OR THE INVERT OF ANY CULVERTS WITHIN RIGHT-OF-WAY WHICHEVER IS LOWER.
<br />18. FRICTION COURSE TO BE FC-3, IF REQUIRED.
<br />19, ANY LINES CROSSING CULVERTS SHALL BE AT LEAST 30 INCHES BELOW THE BOTTOM OF THE CULVERT.
<br />20. STRUCTURAL COURSE TO BE S-3, IF REQUIRED.
<br />21, ALL PEDESTALS AND BOXES LOCATED WITHIN THE ROADSIDE DITCHES SHALL BE APPROPRIATELY MARKED
<br />AND/OR IDENTIFIED, AND LOCATED WITHIN 12 INCHES OF THE BACK OF THE RIGHT-OF-WAY.
<br />22.AT ALL TIMES DURING CONSTRUCTION APPLY PERIMETER CONTROL (BMP'S) SOURCE MANAGEMENT AND
<br />PRACTICES TO PROTECT THE DISTURBED AREA FROM OFFSITE RUNOFF AND TO PREVENT SEDIMENTATION
<br />DAMAGE TO AREAS BELOW ACTIVITY.
<br />23.MINIMIZE THE EXTENT OF AREA EXPOSED OF NATURAL VEGETATION AT ONE TIME AND THE DURATION OF
<br />EXPOSURE TO ELEVATE EROSION POTENTIAL.
<br />24.INLETS TO STORM SEWERS SHALL BE PROTECTED BY SUITABLE FILTERING DEVICES DURING CONSTRUCTION
<br />TO KEEP POLLUTANTS FROM ENTERING CONVEYANCE SYSTEMS.
<br />25.REQUIRED EROSION AND SEDIMENT CONTROL DEVICES SHALL BE IN PLACE AT ALL TIMES DURING
<br />CONSTRUCTION AND SHALL BE REMOVED ONLY AFTER STABILIZATION HAS BEEN ESTABLISHED.
<br />26.ANY FIELD CHANGES THAT MAY OCCUR CONTRARY TO THE PROPOSED RIGHT OF WAY USE PERMIT PLAN SHALL
<br />REQUIRE AN ASBUILT AMENDMENT SUBMITTAL FOR REVIEW AND ACCEPTANCE.
<br />GENERAL CONSTRUCTION NOTES (11 /29/12)
<br />1. SEE SURVEY FOR SITE SPECIFIC BENCH MARK AND ELEVATION DATUM. USE DATUM NOTES THIS SHEET FOR CONVERSION.
<br />2. LOCATIONS, DIMENSIONS AND ELEVATIONS OF EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES ARE SHOWN ACCORDING TO
<br />STANDARD UTILITY ATLAS SHEETS OR OTHER INFORMATION OBTAINED AT THE TIME OF PREPARATION OF THESE PLANS. PRIOR TO
<br />CONSTRUCTION, THE CONTRACTOR SHALL FIELD VERIFY THE LOCATION, DIMENSIONS, AND ELEVATION OF ALL EXISTING UTILITIES,
<br />STRUCTURES AND OTHER FEATURES AFFECTING THE WORK AND MAKE ARRANGEMENTS FOR REQUIRED RELOCATIONS WITH THE
<br />AFFECTED UTILITY. THE CONTRACTOR SHALL COOPERATE WITH THE UTILITY DURING RELOCATION OPERATIONS.
<br />3. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN AREAS OF BURIED UTILITIES AND SHALL PROVIDE AT LEAST 48 HOURS
<br />NOTICE TO ALL UTILITY COMPANIES BEFORE PERFORMING ANY EXCAVATION. THE CONTRACTOR SHALL HAVE UTILITY LOCATIONS
<br />MARKED BY CALLING "SUNSHINE 811"AT 1-800-432-4770 OR 811 AT LEAST 48 HOURS PRIOR TO THE START OF ANY EXCAVATION.
<br />CONTRACTOR IS RESPONSIBLE FOR CONTACTING ALL UTILITIES NOT INCLUDED IN THE "SUNSHINE 811" PROGRAM.
<br />4. CHAPTER 77 153 OF THE FLORIDA STATUTES REQUIRES THAT AN EXCAVATOR NOTIFY ALL GAS UTILITIES A MINIMUM OF TWO (2)
<br />WORKING DAYS PRIOR TO EXCAVATING. THESE PLANS SHOW ONLY THE APPROXIMATE LOCATION OF GAS MAINS AND THE GAS MAINS
<br />MUST BE FIELD VERIFIED BY ON SITE INSPECTION BY GAS COMPANY PERSONNEL. EXCAVATORS ARE INSTRUCTED TO TELEPHONE THE
<br />GAS COMPANY A MINIMUM OF TWO (2) WORKING DAYS BEFORE ENTERING A CONSTRUCTION AREA.
<br />5. THE CONTRACTOR SHALL REVIEW THE PLANS FOR CONFLICTS OR OTHER DISCREPANCIES PRIOR TO CONSTRUCTION. THE
<br />CONTRACTOR SHALL NOTIFY THE ENGINEER AND OWNER OF ANY CONFLICTS OR DISCREPANCIES BEFORE PERFORMING ANY WORK.
<br />6. ALL PROPOSED UNDERGROUND UTILITIES MUST BE IN PLACE, TESTED AND INSPECTED PRIOR TO PAVEMENT SURFACE COURSE
<br />CONSTRUCTION.
<br />7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE CONDITIONS AND INSPECTION REQUIREMENTS OF ALL
<br />PERMITS ISSUED FOR THE PROJECT. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION AND
<br />SHALL SCHEDULE ALL INSPECTIONS IN ACCORDANCE WITH AGENCY REQUIREMENTS.
<br />8. ALL SPECIFICATIONS AND DOCUMENTS REFERRED TO SHALL BE OF LATEST REVISIONS AND/OR LATEST EDITION.
<br />9. THE CONTRACTOR SHALL COMPLETE THE WORK IN ACCORDANCE WITH ALL APPLICABLE STATUTES, RULES, REGULATIONS AND
<br />PERMIT CONDITIONS.
<br />10. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE ENGINEER FOR ALL PRECAST AND MANUFACTURED ITEMS TO BE USED ON
<br />THE PROJECT. ALL SHOP DRAWINGS ARE TO BE REVIEWED AND APPROVED BY THE CONTRACTOR PRIOR TO SUBMITTAL TO THE
<br />ENGINEER.
<br />11. AT LEAST THREE (3) WORKING DAYS PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE ENGINEER, OWNER, AND
<br />APPROPRIATE PERMITTING AGENCIES OF THE CONTRACTOR'S NAME, STARTING DATE, PROJECTED SCHEDULE, AND OTHER
<br />INFORMATION AS REQUIRED.
<br />12. WORK PERFORMED UNDER THIS CONTRACT SHALL INTERFACE SMOOTHLY WITH OTHER WORK BEING PERFORMED ON SITE BY
<br />OTHERS. IT WILL BE NECESSARY FOR THE CONTRACTOR TO COORDINATE AND SCHEDULE HIS ACTIVITIES WITH OTHERS WHERE
<br />NECESSARY.
<br />13. SITE WORK CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH OF AT LEAST 3,000 PSI. AT 28 DAYS UNLESS OTHERWISE NOTED.
<br />14. ALL PRIVATE AND PUBLIC PROPERTY AFFECTED BY THIS WORK SHALL BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN
<br />EXISTING CONDITIONS UNLESS SPECIFICALLY EXEMPTED BY THE PLANS,
<br />15. ALL DISTURBED AREAS THAT ARE NOT TO BE SODDED, ARE TO BE SEEDED AND MULCHED IN ACCORDANCE WITH FDOT STANDARDS.
<br />THE CONTRACTOR SHALL MAINTAIN ALL GRASSED AREAS UNTIL A SATISFACTORY STAND OF GRASS, ACCEPTABLE TO THE APPLICABLE
<br />REGULATORY AGENCIES, OWNER, AND ENGINEER, HAS BEEN ACHIEVED. THE CONTRACTOR SHALL BEAR THE RESPONSIBILITY OF ALL
<br />REMEDIAL WORK REQUIRED UNTIL THE SYSTEM HAS BEEN ACCEPTED.
<br />16. ALL SODDED AND SEEDED AREAS BE WATERED AND FERTILIZED UNTIL THE PROJECT IS COMPLETED AND ACCEPTED BY THE OWNER.
<br />17. THE CONTRACTOR SHALL LOCATE AND FLAG ALL PROPERTY CORNERS PRIOR TO FINAL ENGINEERING INSPECTION AND
<br />CERTIFICATION. THE CONTRACTOR SHALL BEAR ALL COSTS INCURRED AS A CONSEQUENCE OF LOST OR DISTURBED PROPERTY
<br />CORNERS. LOST OR DISTURBED PROPERTY CORNERS SHALL BE REESTABLISHED BY A PROFESSIONAL LAND SURVEYOR.
<br />18. THE GEOTECHNICAL ENGINEER SHALL SUPPLY THE ENGINEER AND OWNER WITH A PHOTOCOPY OF ALL COMPACTION TESTS AND
<br />OTHER REQUIRED MATERIALS TESTS UNDER THIS CONTRACT. THE GEOTECHNICAL ENGINEER SHALL CERTIFY, IN WRITING, TO THE
<br />ENGINEER AND OWNER, THAT ALL TESTING REQUIREMENTS HAVE BEEN SATISFIED.
<br />19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL REQUIRED TESTING WITH THE GEOTECHNICAL ENGINEER.
<br />TESTING IS REQUIRED AS DICTATED BY THE CONTRACT DOCUMENTS, CONSTRUCTION PLANS AND SPECIFICATIONS. UPON
<br />COMPLETION OF THE WORK, THE GEOTECHNICAL ENGINEER SHALL SUBMIT CERTIFICATIONS TO THE ENGINEER AND OWNER THAT
<br />STATE THAT ALL REQUIREMENTS HAVE BEEN MET,
<br />20. THE CONTRACTOR SHALL REVIEW ALL PROJECT GEOTECHNICAL REPORTS PRIOR TO BIDDING AND THE START OF CONSTRUCTION.
<br />21. THE CONTRACTOR SHALL MAINTAIN A COPY OF THE APPROVED CONSTRUCTION DRAWINGS AND ALL PERMITS AT THE CONSTRUCTION
<br />SITE,
<br />22, THE CONSTRUCTION DRAWINGS DO NOT INCLUDE SPECIFICATION FOR CONSTRUCTION SAFETY. THE CONTRACTOR SHALL BE
<br />RESPONSIBLE FOR ALL MEANS AND METHODS OF CONSTRUCTION SITE SAFETY.
<br />TESTING SCHEDULE GUIDE (12/11/09)
<br />ITEM
<br />TEST TYPE
<br />TEST I.D.
<br />REQUIREMENT
<br />FREQUENCY
<br />EMBANKMENT
<br />MAXIMUM DENSITY
<br />AASHTO T180
<br />N/A
<br />PER SOIL TYPE
<br />OPTIMUM MOISTURE
<br />ASTM D1557
<br />FIELD DENSITY
<br />AASHTO T191, T204
<br />95% OF MAXIMUM
<br />ONE PER 2,500 S.F.
<br />T238
<br />DENSITY
<br />HORIZONTALLY;
<br />ASTM D1556, D2937
<br />ALTERNATING LIFTS (12 INCHES)
<br />D2922
<br />UTILITY
<br />MAXIMUM DENSITY
<br />AASHTO T180
<br />N/A
<br />PER SOIL TYPE
<br />TRENCH BACKFILL
<br />OPTIMUM MOISTURE
<br />ASTM D1557
<br />UNDER ROADWAYS
<br />FIELD DENSITY
<br />AASHTO T191, T204
<br />95% OF MAXIMUM
<br />ONE PER 2,500 S.F.
<br />AND STRUCTURES
<br />T238
<br />DENSITY
<br />HORIZONTALLY;
<br />ASTM D1556, D2937
<br />EVERY 12" VERTICALLY
<br />D2922
<br />D2922
<br />AT LEAST ONE FOR EACH PIPE RUN
<br />BACKFILL OF
<br />MAXIMUM DENSITY
<br />AASHTO T180
<br />N/A
<br />PER SOIL TYPE
<br />STRUCTURES
<br />OPTIMUM MOISTURE
<br />ASTM D1557
<br />FIELD DENSITY
<br />AASHTO T191, T204
<br />95% OF MAXIMUM
<br />EVERY 12" VERTICALLY
<br />T238
<br />DENSITY
<br />ASTM D1556, D2937
<br />D2922
<br />SUBGRADE BEARING VALUES LBR - FLA. D.O.T.
<br />MAXIMUM DENSITY AASHTO T180
<br />OPTIMUM MOISTURE ASTM D1557
<br />FIELD DENSITY & AASHTO T191, T238
<br />THICKNESS ASTM D1556, D2922
<br />BASE
<br />BEARING VALUES
<br />LBR - FLA. D.O.T.
<br />MAXIMUM DENSITY
<br />AASHTO T180
<br />OPTIMUM MOISTURE
<br />ASTM D1557
<br />THICKNESS
<br />AASHTO T191, T238
<br />FIELD DENSITY
<br />ASTM D1556, D2922
<br />GRADATION
<br />AASHTO T27, T98
<br />AASHTO T90
<br />ATTERBERG LIMITS
<br />ASTM C136, D423, D424
<br />SOIL CEMENT BASE MIX DESIGN
<br />PORTLAND CEMENT
<br />ASSOC. SPECIFICATIONS
<br />(TO BE USED IF
<br />MAXIMUM DENSITY
<br />AASHTO T134
<br />SEPARATION BETWEEN
<br />SHWT & BOTTOM OF
<br />OPTIMUM MOISTURE
<br />(STANDARD)
<br />BASE IS <1.5')
<br />COMPRESSIVE
<br />PORTLAND CEMENT
<br />STRENGTH SPECIMENS
<br />ASSOC. SPECIFICATIONS
<br />TEST CORES
<br />PORTLAND CEMENT
<br />ASSOC. SPECIFICATIONS
<br />FIELD DENSITY &
<br />AASHTO T191, T238
<br />THICKNESS
<br />ASTM D1556, D2922
<br />ASPHALTIC CONCRETE
<br />MATERIALS QUALITY
<br />AASHTO T164
<br />BITUMEN CONTENT,
<br />ASTM D2172
<br />GRADATION
<br />FIELD DENSITY
<br />ASTM 02950-81
<br />LOS ANGELES
<br />AASHTO T96-77
<br />ABRASION
<br />ASTM C131-81
<br />THICKNESS
<br />N/A
<br />ONE PER SOIL TYPE
<br />CHECK POINT LBR AT
<br />SEE TYPICAL 500 L.F. HORIZONTALLY
<br />PAVEMENT SECTION ONE PER SOIL TYPE
<br />ONE PER 2,500 S.F.
<br />HORIZONTALLY
<br />ONE PER SOURCE OR AS MTL. CHANGES
<br />CHECK POINT LBR AT 500 L.F. HORIZ.
<br />SEE TYPICAL ONE PER SOURCE
<br />PAVEMENT SECTION
<br />ONE PER 2,500 S.F.
<br />HORIZONTALLY
<br />ONE PER SOURCE
<br />SEE TYPICAL
<br />PAVEMENT SECTION
<br />ONE PER SOIL TYPE
<br />ONE PER SOIL TYPE DAILY
<br />ONE SET OF 3 PER SOIL
<br />ONE SET OF 3 PER SOIL
<br />ONE PER 2,500 S.F.
<br />HORIZONTAL
<br />PER SPECIFICATIONS
<br />ONE PER DAY
<br />95% OF LAB DENSITY
<br />ONE PER 2,500 S.F.
<br />HORIZONTAL
<br />PER SPECIFICATIONS
<br />ONE PER SOURCE
<br />PER SPECIFICATIONS
<br />ONE PER 2,500 S.F.
<br />CLEARING AND EROSION CONTROL NOTES (4/30/04)
<br />1. ALL TREES TO REMAIN SHALL BE PROTECTED IN ACCORDANCE WITH LOCAL REGULATIONS PRIOR TO THE START OF ANY
<br />CONSTRUCTION ACTIVITIES.
<br />2, THE CONTRACTOR SHALL PREPARE THE SITE AS DIRECTED BY THE GEOTECHNICAL ENGINEER PRIOR TO STARTING ACTUAL
<br />CONSTRUCTION. COPIES OF THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS AND REPORT ARE AVAILABLE THROUGH
<br />THE OWNER OR THE GEOTECHNICAL ENGINEER. QUESTIONS REGARDING SITE PREPARATION REQUIREMENTS SHALL BE
<br />DIRECTED TO THE GEOTECHNICAL ENGINEER AND OWNER.
<br />T 3, THE CONTRACTOR SHALL CLEAR AND GRUB ONLY THOSE PORTIONS POR 0F THE SITE NECESSARY FOR CONSTRUCTION. ALL
<br />DISTURBED OPEN AREAS SHALL BE SEEDED, MULCHED, OR PLANTED WITH OTHER APPROVED LANDSCAPE MATERIAL
<br />IMMEDIATELY FOLLOWING CONSTRUCTION.
<br />4. THE TOP SOIL REMOVED DURING CLEARING AND GRUBBING SHALL BE STOCKPILED AT A SITE DESIGNATED BY THE OWNER
<br />AND SHALL BE USED FOR LANDSCAPING PURPOSES UNLESS OTHERWISE DIRECTED BY THE OWNER.
<br />5. ALL CONSTRUCTION DEBRIS AND OTHER WASTE MATERIAL SHALL BE DISPOSED OF OFF -SITE IN ACCORDANCE WITH ALL
<br />APPLICABLE REGULATIONS.
<br />6. THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED FOR REMOVAL OF EXISTING STRUCTURES,
<br />7. THE CONTRACTOR SHALL NOTIFY ALL UTILITIES TO DISCONNECT OR REMOVE THEIR FACILITIES PRIOR TO REMOVAL OR
<br />DEMOLITION OF EXISTING STRUCTURES.
<br />8, THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING A VISUAL INSPECTION OF THE SITE AND SHALL BE RESPONSIBLE
<br />FOR DEMOLITION AND REMOVAL OF ALL UNDERGROUND AND ABOVE GROUND STRUCTURES THAT WILL NOT BE
<br />INCORPORATED WITH THE NEW FACILITIES. SHOULD ANY DISCREPANCY EXIST, THE CONTRACTOR SHALL CONTACT THE
<br />OWNER FOR CLARIFICATION PRIOR TO DEMOLITION.
<br />9. PRIOR TO THE COMPLETION OF CONSTRUCTION, THE RETENTION/DETENTION AREAS SHALL BE RESHAPED, CLEARED OF
<br />SILT, MUD AND DEBRIS, AND GRASSED IN ACCORDANCE WITH THE CONSTRUCTION DRAWINGS.
<br />PAVING, GRADING AND DRAINAGE NOTES (4/30/04)
<br />1. ALL DELETERIOUS SUBSTANCES (I.E. MUCK, PEAT, BURIED DEBRIS) SHALL BE EXCAVATED IN ACCORDANCE WITH THE PLANS
<br />AND SPECIFICATIONS, OR AS DIRECTED BY THE GEOTECHNICAL ENGINEER OR OWNER. DELETERIOUS MATERIAL IS TO BE
<br />STOCKPILED OR REMOVED FROM THE SITE AS DIRECTED BY THE OWNER. EXCAVATED AREAS SHALL BE BACKFILLED WITH
<br />APPROVED MATERIALS AND COMPACTED AS SPECIFIED BY THE GEOTECHNICAL ENGINEER OR OWNER.
<br />2. IT MAY BE NECESSARY TO FIELD ADJUST PAVEMENT ELEVATIONS TO PRESERVE THE ROOT SYSTEMS OF TREES TO BE
<br />SAVED. THE CONTRACTOR SHALL COORDINATE WITH OWNER'S ENGINEER PRIOR TO ANY GRADE CHANGE,
<br />3. THE CONTRACTOR IS TO SUBMIT A PROPOSED JOINTING PATTERN TO THE OWNER FOR APPROVAL PRIOR TO CONSTRUCTING
<br />CONCRETE PAVEMENT.
<br />4. THE CONTRACTOR SHALL PROVIDE AN EXPANSION JOINT AT ABUTMENT OF CONCRETE AND ANY STRUCTURE.
<br />5. ALL PAVEMENT MARKINGS IN PUBLIC RIGHTS OF WAY SHALL BE MADE WITH PERMANENT THERMOPLASTIC, AND SHALL
<br />CONFORM TO FDOT STANDARD INDEX NO. 17346 UNLESS INDICATED OTHERWISE ON THE DRAWINGS. PARKING STALL
<br />STRIPING SHALL BE 6" WIDE PAINTED WHITE STRIPES UNLESS INDICATED OTHERWISE ON THE DRAWINGS.
<br />6. THE CONTRACTOR SHALL INSTALL EXTRA BASE MATERIAL WHEN THE DISTANCE BETWEEN THE PAVEMENT ELEVATION AND
<br />THE TOP OF THE PIPE EXCEEDS THE MINIMUM DIMENSIONS SHOWN IN FDOT INDEX 205.
<br />T STANDARD INDICES REFER TO THE LATEST EDITION OF FDOT "ROADWAY AND TRAFFIC DESIGN STANDARDS".
<br />8. ALL STORM SEWER PIPE SHALL BE REINFORCED CONCRETE CLASS III (ASTM C-76) UNLESS OTHERWISE INDICATED IN THE
<br />DRAWINGS AND SPECIFICATIONS.
<br />9. PVC STORM PIPE, 12" AND SMALLER, SHALL CONFORM TO AWWA C-900, SDR-18, CLASS 150; UNLESS OTHERWISE INDICATED
<br />IN THE DRAWINGS AND SPECIFICATIONS.
<br />10. PIPE LENGTHS SHOWN ARE APPROXIMATE.
<br />11. ALL DRAINAGE STRUCTURE FRAMES, GRATES AND COVERS WITHIN TRAFFIC AREAS SHALL BE TRAFFIC RATED FOR H-20
<br />LOADINGS.
<br />12, THE CONTRACTOR IS TO GRASS THE RETENTION/DETENTION POND AS INDICATED ON PLANS WITHIN ONE -WEEK FOLLOWING
<br />CONSTRUCTION OF THE POND.
<br />13. MATERIALS AND CONSTRUCTION METHODS FOR STREETS AND STORM DRAINAGE CONSTRUCTION SHALL BE IN
<br />ACCORDANCE WITH LOCAL REGULATIONS AND THE FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD
<br />SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, LATEST REVISION THEREOF AND SUPPLEMENTAL SPECIFICATIONS
<br />THERETO.
<br />14. THE CONTRACTOR SHALL PROVIDE CERTIFIED RECORD DRAWINGS, SIGNED AND SEALED BY A PROFESSIONAL LAND
<br />SURVEYOR. THE RECORD DRAWINGS SHALL SHOW FINAL GRADES, INVERTS, AND LOCATIONS OF ALL STORMWATER
<br />FACILITIES INCLUDING THE STORMWATER POND, DRAINAGE STRUCTURES, BERMS & SWALES. THE CONTRACTOR SHALL
<br />PROVIDE TEN COPIES OF THE CERTIFIED RECORD DRAWINGS TO THE ENGINEER FOR THE PURPOSE OF CERTIFYING THE
<br />STORMWATER MANAGEMENT SYSTEM.
<br />PAVING, GRADING & DRAINAGE TESTING AND INSPECTION
<br />REQUIREMENTS (4/30/04)
<br />1. THE STORM DRAINAGE PIPING AND FILTRATION SYSTEM SHALL BE SUBJECT TO A VISUAL INSPECTION BY THE ENGINEER
<br />PRIOR TO THE PLACEMENT OF BACKFILL. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 48 HOURS IN ADVANCE TO
<br />SCHEDULE AN INSPECTION.
<br />2. THE CONTRACTOR SHALL MAINTAIN THE STORM DRAINAGE SYSTEMS UNTIL FINAL ACCEPTANCE OF THE PROJECT BY THE
<br />OWNER.
<br />3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE REQUIRED TESTING WITH THE GEOTECHNICAL
<br />ENGINEER. TESTING IS REQUIRED IN ACCORDANCE WITH THE TESTING SCHEDULE FOUND IN THE CONSTRUCTION
<br />DRAWINGS AND SPECIFICATIONS. UPON COMPLETION OF THE WORK, THE GEOTECHNICAL ENGINEER SHALL SUBMIT
<br />CERTIFICATIONS TO THE ENGINEER AND OWNER STATING THAT ALL REQUIREMENTS HAVE BEEN MET.
<br />SANITARY SEWER NOTES (12/24/09)
<br />1. ALL SANITARY SEWER MAINS AND LATERALS SHALL HAVE A MINIMUM OF 36 INCHES OF COVER.
<br />2. ALL SANITARY SEWER WORK SHALL CONFORM TO LOCAL REGULATORY STANDARDS AND SPECIFICATIONS,
<br />3. PRIOR TO COMMENCING WORK WHICH REQUIRES CONNECTING NEW WORK TO EXISTING LINES OR APPURTENANCES, THE
<br />CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF EXISTING CONNECTION POINT AND NOTIFY ENGINEER OF ANY
<br />CONFLICTS OR DISCREPANCIES,
<br />4. SANITARY SEWER PIPES SHALL MEET THE FOLLOWING MINIMUM CRITERIA;
<br />3- 12' DEPTH SDR-35
<br />12'- 18' DEPTH SDR-26
<br />> 18' DEPTH DIP
<br />5. ALL SANITARY SEWER PIPELINES SHALL BE SOLID GREEN IN COLOR.
<br />6. ALL PVC FORCE MAINS SHALL BE PRESSURE CLASS 200, SDR 21, COLOR GREEN, WITH A GREEN MAGNETIC TAPE A MINIMUM
<br />OF 2" WIDE PLACED 1 FOOT BELOW THE PROPOSED GRADE. THE PRINTING ON THE MAGNETIC TAPE SHALL READ "FORCE
<br />MAIN"
<br />7. ALL DUCTILE IRON PIPE SHALL BE PRESSURE CLASS 350 IN ACCORDANCE WITH ANSI A 21.51-91 (AWWA C151) AND PIPE
<br />SHALL RECEIVE EXTERIOR BITUMINOUS COATING IN ACCORDANCE WITH ANSI A 21.51 (AWWA C151) AND SHALL BE CEMENT
<br />MORTAR LINED, STANDARD THICKNESS IN ACCORDANCE WITH ANSI A 21.4 (AWWA C104).
<br />8. ALL SANITARY SEWER GRAVITY MAINS OR SANITARY SEWER FORCE MAINS THAT REQUIRE DIP ARE TO BE POLYLINED OR
<br />EPDXY LINED.
<br />9, ALL SANITARY SEWER RIMS AND COVERS SHALL BE TRAFFIC RATED FOR H-20 LOADING.
<br />10. THE CONTRACTOR SHALL PROVIDE CERTIFIED UTILITY RECORD DRAWINGS, SIGNED AND SEALED BY A PROFESSIONAL LAND
<br />SURVEYOR. THE RECORD DRAWINGS SHALL SHOW FINAL GRADES AND LOCATIONS ON ALL SANITARY SEWER MAINS,
<br />STRUCTURES AND SERVICES. ALL RESTRAINED JOINTS SHALL BE SHOWN ON THE RECORD DRAWINGS. THE CONTRACTOR
<br />SHALL PROVIDE TEN COPIES OF THE CERTIFIED RECORD DRAWINGS TO THE ENGINEER.
<br />SANITARY SEWER TESTING AND INSPECTION REQUIREMENTS
<br />(12/24/09)
<br />1. ALL GRAVITY SEWER PIPING SHALL BE SUBJECT TO A VISUAL INSPECTION BY THE ENGINEER. CONTRACTOR SHALL NOTIFY
<br />THE ENGINEER 48 HOURS IN ADVANCE TO SCHEDULE INSPECTION.
<br />2. ALL GRAVITY SEWER PIPING SHALL BE VIDEO TAPED AND RESULTS FURNISHED TO THE LOCAL UTILITY AND THE ENGINEER.
<br />3, THE GRAVITY SANITARY SEWER AND ALL SERVICE LATERALS SHALL BE SUBJECT TO ADDITIONAL TESTING AS REQUIRED BY
<br />LOCAL REGULATIONS. TESTS ARE TO BE CERTIFIED BY THE ENGINEER OF RECORD AND SHALL BE SUBMITTED TO THE
<br />LOCAL AUTHORITIES FOR APPROVAL. COORDINATION AND NOTIFICATION OF ALL PARTIES SHALL BE THE CONTRACTOR'S
<br />RESPONSIBILITY.
<br />4. ALL FORCE MAINS SHALL BE SUBJECT TO A HYDROSTATIC PRESSURE TEST IN ACCORDANCE WITH LOCAL REGULATIONS.
<br />TESTS SHALL BE CERTIFIED BY THE ENGINEER OF RECORD AND SUBMITTED TO THE LOCAL AUTHORITIES FOR APPROVAL.
<br />COORDINATION AND NOTIFICATION OF ALL PARTIES SHALL BE THE CONTRACTOR'S RESPONSIBILITY.
<br />WATER SYSTEM NOTES (12/24/09)
<br />1. ALL WATER MAINS SHALL HAVE A MINIMUM OF 36 INCHES OF COVER.
<br />2. ALL WATER SYSTEM WORK SHALL CONFORM TO LOCAL REGULATORY STANDARDS AND SPECIFICATIONS.
<br />3. CONFLICTS BETWEEN WATER AND STORM OR SANITARY SEWER SHALL BE RESOLVED BY ADJUSTING THE WATER LINES AS
<br />REQUIRED.
<br />4. ALL DUCTILE IRON PIPE SHALL BE PRESSURE CLASS 50 IN ACCORDANCE WITH AN I A 21.51 AWWACl
<br />C S 3S ( C 51) AND PIPE SHALL
<br />RECEIVE EXTERIOR BITUMINOUS COATING IN ACCORDANCE WITH ANSI A 21.51 (AWWA C151) AND SHALL BE CEMENT MORTAR
<br />LINED, STANDARD THICKNESS IN ACCORDANCE WITH ANSI A 21.4 (AWWA C104).
<br />5, ALL FITTINGS 3" OR LARGER SHALL BE MECHANICAL JOINT, DUCTILE IRON PRESSURE CLASS 350 IN ACCORDANCE WITH ANSI A
<br />21.10 AND A 21.11 (AWWA Cl 10 AND AWWA Cl 11 RESPECTIVELY). FITTINGS SHALL BE CEMENT MORTAR LINED AND BITUMINOUS
<br />COATED IN ACCORDANCE WITH AWWA C104 AND AWWA C151 RESPECTIVELY.
<br />6. THE CONTRACTOR SHALL INSTALL TEMPORARY BLOW -OFFS AT THE END OF WATER SERVICE LATERALS TO ASSURE ADEQUATE
<br />FLUSHING AND DISINFECT ION.
<br />7. ALL PVC WATER MAINS 4" THROUGH 12" SHALL BE IN ACCORDANCE WITH AWWA C900. PIPE SHALL BE CLASS 150 AND MEET
<br />THE REQUIREMENTS OF SDR 18 IN ACCORDANCE WITH ASTM D-2241.
<br />8. WATER MAIN PIPING LARGER THAN 2" AND SMALLER THAN 4" SHALL BE PRESSURE CLASS 200 AND MEET THE REQUIREMENTS
<br />OF SDR 21 IN ACCORDANCE WITH ASTM D2241 UNLESS SPECIFIED OTHERWISE.
<br />9. ALL PIPE AND FITTINGS 2" AND SMALLER SHALL BE POLYETHYLENE TUBING WITH COMPRESSION FITTINGS.
<br />10. ALL GATE VALVES 2" OR LARGER SHALL BE RESILIENT SEAT OR RESILIENT WEDGE MEETING THE REQUIREMENTS OF AWWA
<br />C509
<br />11, ALL FIRE HYDRANTS SHALL MEET THE REQUIREMENTS OF AWWA C502 AND SHALL BE APPROVED BY THE LOCAL UTILITY AND
<br />FIRE MARSHAL.
<br />12. MATERIALS AND CONSTRUCTION METHODS FOR WATER DISTRIBUTION SYSTEMS SHALL BE IN ACCORDANCE WITH ALL LOCAL
<br />REGULATIONS, PLANS, AND SPECIFICATIONS FOR CONSTRUCTION, LATEST REVISION THEREOF, AND SUPPLEMENTAL
<br />SPECIFICATIONS THERETO. APPROVAL AND CONSTRUCTION OF ALL POTABLE WATER SERVICE MAIN EXTENSIONS AND
<br />CONNECTIONS MUST BE COORDINATED THROUGH THE LOCAL REGULATORY AGENCY.
<br />13. THE CONTRACTOR SHALL PROVIDE CERTIFIED UTILITY RECORD DRAWINGS, SIGNED AND SEALED BY A PROFESSIONAL LAND
<br />SURVEYOR. THE RECORD DRAWINGS SHALL SHOW THE LOCATIONS, DIMENSIONS AND ELEVATIONS OF ALL WATER MAINS,
<br />SERVICES, MANHOLES, GRAVITY SEWER MAINS, SERVICE LATERALS, PUMP STATIONS AND FORCE MAINS. ALL RESTRAINED
<br />JOINTS SHALL BE SHOWN ON THE RECORD DRAWINGS. THE CONTRACTOR SHALL PROVIDE TEN COPIES OF THE CERTIFIED
<br />RECORD DRAWINGS TO THE ENGINEER.
<br />FDEP NOTES (04/02/04)
<br />1. ALL PIPE, PIPE FITTINGS, PIPE JOINT PACKING AND JOINTING MATERIALS, VALVES, FIRE HYDRANTS, AND METERS INSTALLED
<br />UNDER THIS PROJECT WILL CONFORM TO APPLICABLE AMERICAN WATER WORKS ASSOCIATION (AWWA) STANDARDS.
<br />2. ALL PUBLIC WATER SYSTEM COMPONENTS, EXCLUDING FIRE HYDRANTS, THAT WILL BE INSTALLED UNDER THIS PROJECT AND
<br />THAT WILL COME INTO CONTACT WITH DRINKING WATER WILL CONFORM TO NSF INTERNATIONAL STANDARD 61.
<br />3. ALL PIPE AND PIPE FITTINGS INSTALLED UNDER THIS PROJECT WILL CONTAIN NO MORE THAN 8.0% LEAD, AND ANY SOLDER OR
<br />FLUX USED IN THIS PROJECT WILL CONTAIN NO MORE THAN 0.2% LEAD.
<br />4, ALL PIPE AND PIPE FITTINGS INSTALLED UNDER THIS PROJECT WILL BE COLOR CODED OR MARKED IN ACCORDANCE WITH
<br />SUBPARAGRAPH 62-555.320(21)(B)3, F.A.C., USING BLUE AS A PREDOMINANT COLOR, (UNDERGROUND PLASTIC PIPE WILL BE
<br />SOLID -WALL BLUE PIPE, WILL HAVE A CO -EXTRUDED BLUE EXTERNAL SKIN, OR WILL BE WHITE OR BLACK PIPE WITH BLUE
<br />STRIPES INCORPORATED INTO, OR APPLIED TO, THE PIPE WALL; AND UNDERGROUND METAL OR CONCRETE PIPE WILL HAVE
<br />BLUE STRIPES APPLIED TO THE PIPE WALL. PIPE STRIPED DURING MANUFACTURING OF THE PIPE WILL HAVE CONTINUOUS
<br />STRIPES THAT RUN PARALLEL TO THE AXIS OF THE PIPE, THAT ARE LOCATED AT NO GREATER THAN 90-DEGREE INTERVALS
<br />AROUND THE PIPE, AND THAT WILL REMAIN INTACT DURING AND AFTER INSTALLATION OF THE PIPE. IF TAPE OR PAINT IS USED
<br />TO STRIPE PIPE DURING INSTALLATION OF THE PIPE, THE TAPE OR PAINT WILL BE APPLIED IN A CONTINUOUS LINE THAT RUNS
<br />PARALLEL TO THE AXIS OF THE PIPE AND THAT IS LOCATED ALONG THE TOP OF THE PIPE; FOR PIPE WITH AN INTERNAL
<br />DIAMETER OF 24 INCHES OR GREATER, TAPE OR PAINT WILL BE APPLIED IN CONTINUOUS LINES ALONG EACH SIDE OF THE PIPE
<br />AS WELL AS ALONG THE TOP OF THE PIPE, ABOVEGROUND PIPE WILL BE PAINTED BLUE OR WILL BE COLOR CODED OR
<br />MARKED LIKE UNDERGROUND PIPE.)
<br />5. THE OPEN END OF THE AIR RELIEF PIPE FROM ALL AUTOMATIC AIR RELIEF VALVES INSTALLED UNDER THIS PROJECT WILL BE
<br />EXTENDED TO AT LEAST ONE FOOT ABOVE GRADE AND WILL BE PROVIDED WITH A SCREENED, DOWNWARD -FACING ELBOW,
<br />6. NEW OR ALTERED WATER MAINS INCLUDED IN THIS PROJECT WILL BE INSTALLED IN ACCORDANCE WITH APPLICABLE AWWA
<br />STANDARDS OR IN ACCORDANCE WITH MANUFACTURERS' RECOMMENDED PROCEDURES.
<br />7, A CONTINUOUS AND UNIFORM BEDDING WILL BE PROVIDED IN TRENCHES FOR UNDERGROUND PIPE INSTALLED UNDER THIS
<br />PROJECT; BACKFILL MATERIAL WILL BE TAMPED IN LAYERS AROUND UNDERGROUND PIPE INSTALLED UNDER THIS PROJECT
<br />AND TO A SUFFICIENT HEIGHT ABOVE THE PIPE TO ADEQUATELY SUPPORT AND PROTECT THE PIPE; AND UNSUITABLY SIZED
<br />STONES (AS DESCRIBED IN APPLICABLE AWWA STANDARDS OR MANUFACTURERS' RECOMMENDED INSTALLATION
<br />PROCEDURES) FOUND IN TRENCHES WILL BE REMOVED FOR A DEPTH OF AT LEAST SIX INCHES BELOW THE BOTTOM OF
<br />UNDERGROUND PIPE INSTALLED UNDER THIS PROJECT.
<br />8. ALL WATER MAIN TEES, BENDS, PLUGS, AND HYDRANTS INSTALLED UNDER THIS PROJECT WILL BE PROVIDED WITH THRUST
<br />BLOCKS OR RESTRAINED JOINTS TO PREVENT MOVEMENT.
<br />9. NEW OR ALTERED WATER MAINS THAT ARE INCLUDED IN THIS PROJECT AND THAT WILL BE CONSTRUCTED OF
<br />ASBESTOS -CEMENT OR POLYVINYL CHLORIDE PIPE WILL BE PRESSURE AND LEAKAGE TESTED IN ACCORDANCE WITH AWWA
<br />STANDARD C603 OR C605, RESPECTIVELY, AND ALL OTHER NEW OR ALTERED WATER MAINS INCLUDED IN THIS PROJECT WILL
<br />BE PRESSURE AND LEAKAGE TESTED IN ACCORDANCE WITH AWWA STANDARD C600.
<br />10. NEW OR ALTERED WATER MAINS, INCLUDING FIRE HYDRANT LEADS AND INCLUDING SERVICE LINES THAT WILL BE UNDER THE
<br />CONTROL OF A PUBLIC WATER SYSTEM AND THAT HAVE AN INSIDE DIAMETER OF THREE INCHES OR GREATER, WILL BE
<br />DISINFECTED AND BACTERIOLOGICALLY EVALUATED IN ACCORDANCE WITH RULE 62-555.340, F.R.C.
<br />11. NEW OR ALTERED WATER MAINS THAT ARE INCLUDED IN THIS PROJECT AND THAT WILL CROSS UNDER SURFACE WATER WILL
<br />HAVE A MINIMUM COVER OF TWO FEET.
<br />WATER SYSTEM TESTING AND INSPECTION REQUIREMENTS (04/02/04)
<br />1, ALL COMPONENTS OF THE WATER SYSTEM, INCLUDING FITTINGS, HYDRANTS, CONNECTIONS, AND VALVES SHALL REMAIN
<br />UNCOVERED UNTIL PROPERLY PRESSURE TESTED AND ACCEPTED BY THE ENGINEER AND LOCAL AUTHORITIES. PRESSURE
<br />TESTS SHALL BE IN ACCORDANCE WITH LOCAL WATER DEPARTMENT & FDEP SPECIFICATIONS. CONTRACTOR SHALL NOTIFY
<br />OWNER'S ENGINEER AND WATER DEPARTMENT INSPECTORS 48 HOURS IN ADVANCE OF PERFORMING TESTS.
<br />2. CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED CHLORINATION/DISINFECTION AND BACTERIOLOGICAL SAMPLING IN
<br />ACCORDANCE TO ITEM "U" ABOVE. CONTRACTOR SHALL OBTAIN CLEARANCE OF DOMESTIC WATER SYSTEM, COPIES OF ALL
<br />BACTERIOLOGICAL TESTS (WHICH SHALL ALSO INDICATE THE CHLORINE RESIDUAL) SHALL BE SUBMITTED TO ENGINEER.
<br />WATER CLEARANCE REQUIREMENTS (04/02/04)
<br />1. NEW OR RELOCATED, UNDERGROUND WATER MAINS INCLUDED IN THIS PROJECT WILL BE LAID TO PROVIDE A HORIZONTAL
<br />DISTANCE OF AT LEAST THREE FEET BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF ANY EXISTING OR
<br />PROPOSED VACUUM -TYPE SANITARY SEWER, STORM SEWER, STORMWATER FORCE MAIN, OR PIPELINE CONVEYING RECLAIMED
<br />WATER REGULATED UNDER PART III OF CHAPTER 62-610, F.A.C.; A HORIZONTAL DISTANCE OF AT LEAST SIX FEET BETWEEN THE
<br />OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF ANY EXISTING OR PROPOSED GRAVITY -TYPE SANITARY SEWER (OR A
<br />HORIZONTAL DISTANCE OF AT LEAST THREE FEET BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF ANY
<br />EXISTING OR PROPOSED GRAVITY -TYPE SANITARY SEWER IF THE BOTTOM OF THE WATER MAIN WILL BE LAID AT LEAST SIX
<br />INCHES ABOVE THE TOP OF THE SEWER); A HORIZONTAL DISTANCE OF AT LEAST SIX FEET BETWEEN THE OUTSIDE OF THE
<br />WATER MAIN AND THE OUTSIDE OF ANY EXISTING OR PROPOSED PRESSURE -TYPE SANITARY SEWER, WASTEWATER FORCE
<br />MAIN, OR PIPELINE CONVEYING RECLAIMED WATER NOT REGULATED UNDER PART III OF CHAPTER 62-610, F.A.G.; AND A
<br />HORIZONTAL DISTANCE OF AT LEAST TEN FEET BETWEEN THE OUTSIDE OF THE WATER MAIN AND ALL PARTS OF ANY EXISTING
<br />OR PROPOSED "ON -SITE SEWAGE TREATMENT AND DISPOSAL SYSTEM."
<br />2. NEW OR RELOCATED, UNDERGROUND WATER MAINS THAT ARE INCLUDED IN THIS PROJECT AND THAT WILL CROSS ANY
<br />EXISTING OR PROPOSED GRAVITY- OR VACUUM -TYPE SANITARY SEWER OR STORM SEWER WILL BE LAID SO THE OUTSIDE OF
<br />THE WATER MAIN IS AT LEAST SIX INCHES ABOVE THE OTHER PIPELINE OR AT LEAST 12 INCHES BELOW THE OTHER PIPELINE;
<br />AND NEW OR RELOCATED, UNDERGROUND WATER MAINS THAT ARE INCLUDED IN THIS PROJECT AND THAT WILL CROSS ANY
<br />EXISTING OR PROPOSED PRESSURE -TYPE SANITARY SEWER, WASTEWATER OR STORMWATER FORCE MAIN, OR PIPELINE
<br />CONVEYING RECLAIMED WATER WILL BE LAID SO THE OUTSIDE OF THE WATER MAIN IS AT LEAST 12 INCHES ABOVE OR BELOW
<br />THE OTHER PIPELINE.
<br />3. AT THE UTILITY CROSSINGS DESCRIBED IN PART II.C.1.W ABOVE, ONE FULL LENGTH OF WATER MAIN PIPE WILL BE CENTERED
<br />ABOVE OR BELOW THE OTHER PIPELINE SO THE WATER MAIN JOINTS WILL BE AS FAR AS POSSIBLE FROM THE OTHER PIPELINE
<br />OR THE PIPES WILL BE ARRANGED SO THAT ALL WATER MAIN JOINTS ARE AT LEAST THREE FEET FROM ALL JOINTS IN
<br />VACUUM -TYPE SANITARY SEWERS, STORM SEWERS, STORMWATER FORCE MAINS, OR PIPELINES CONVEYING RECLAIMED
<br />WATER REGULATED UNDER PART III OF CHAPTER 62-610, F.A.C., AND AT LEAST SIX FEET FROM ALL JOINTS IN GRAVITY- OR
<br />PRESSURE -TYPE SANITARY SEWERS, WASTEWATER FORCE MAINS, OR PIPELINES CONVEYING RECLAIMED WATER NOT
<br />REGULATED UNDER PART III OF CHAPTER 62-610, F.A.C.
<br />oIQ < << Q M
<br />z
<br />O
<br />r=
<br />>
<br />O
<br />m
<br />z
<br />aa0
<br />ww
<br />ZO
<br />z
<br />-5
<br />o
<br />0
<br />o
<br />a
<br />a
<br />C)
<br />U
<br />U
<br />o
<br />m
<br />}
<br />r
<br />U
<br />H(D
<br />o
<br />U
<br />U
<br />W
<br />LL
<br />=
<br />z
<br />O
<br />o
<br />Z
<br />o
<br />Z
<br />p
<br />z
<br />z
<br />U
<br />¢
<br />¢
<br />¢
<br />m
<br />m
<br />o
<br />z
<br />z
<br />o
<br />mw
<br />O
<br />O
<br />co
<br />u)
<br />U
<br />U
<br />O
<br />w
<br />m
<br />m
<br />a
<br />m
<br />m
<br />a
<br />r
<br />r
<br />T
<br />W
<br />o
<br />r
<br />r
<br />F-
<br />N
<br />0
<br />C."N
<br />N
<br />O
<br />Q
<br />'n o) Cfl Ln C`7 CV ,- 0
<br />mw>-cn-Ozw
<br />J L,
<br />cc
<br />z> O Q® 1 W (D
<br />o(0mwza" w W 1\ T
<br />_jmwm0=m c7 O O
<br /><0CCLUFOmoS z O
<br />U)w0r ¢
<br />0Dt (0LL0co 2i C � co
<br />z0zwo-
<br />t(')
<br />Z-0 a¢0 O d 0,W O
<br />3: U a a Q
<br />NO, 84516
<br />h �
<br />D STATE OF
<br />?
<br />05/2 1� p � 1,�018
<br />., OR P•.
<br />h/r,,.... NA L.
<br />I.
<br />\,
<br />oR7
<br />0
<br />N
<br />ui Q
<br />U)
<br />cn � o
<br />C] o
<br />2 O rn N
<br />O u- o6 ( _!�i
<br />fr 00 m O
<br />N Cl
<br />cc ¢ v ti 0
<br />Z _ Ltd N CL
<br />U ce) Z C`3
<br />oc �00o Ox�
<br />co¢a =<�
<br />N d cM CL LL. Q
<br />o071 cn
<br />z z O z
<br />ui < Lu
<br />Z J c
<br />O
<br />z Q a. cn
<br />LLI 'Z Z
<br />-j J <
<br />w
<br />LL
<br />O`
<br />V
<br />7
<br />z
<br />D
<br />0
<br />U
<br />0
<br />♦0
<br />V
<br />a
<br />a
<br />L)
<br />LIL
<br />Lu
<br />M
<br />0
<br />z
<br />a
<br />cn
<br />W
<br />O
<br />z
<br />NOTES:
<br />1. THE CONTRACTOR SHALL NOT PAVE OVER SOIL CEMENT BASE UNTIL A 30 DAY CURING TIME HAS ELAPSED
<br />2. SHOULD ANY OF THE INFORMATION PROVIDED HEREIN CONFLICT WITH EITHER THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER,