Laserfiche WebLink
PASCO COUNTY NOTES: <br />1. AT COMPLETION SUBMIT RECORD DRAWING/ASBUILTS OF OFFSITE IMPROVEMENTS IN .PDF DISK FORMAT TO <br />STORMWATER MANAGEMENT, 4454 GRAND BLVD, NEW PORT RICHEY, FLORIDA. 1 <br />2. SIDEWALKS SHALL BE CONSTRUCTED OF NATURAL COLORED CONCRETE AT LEAST 3000 PSI IN STRENGTH, <br />FIBER REINFORCED, AND FOUR (4) INCHES IN THICKNESS EXCEPT FOR DRIVEWAYS APPROACHES WHICH <br />REQUIRE A MINIMUM OF SIX (6) INCHES. <br />1 NO DEWATERING SHALL OCCUR WITHOUT WRITTEN APPROVAL BY THE PUBLIC WORKS DIRECTOR. WHERE <br />DEWATERING IN THE RIGHT OF WAY IS PROPOSED, IT MUST BE ACCOMPANIED BY A PLAN TO INSURE THERE IS <br />NO SEDIMENT TRANSFER, PUMPED WATER IS UNCONTAMINATED. <br />4. NO TRACK TYPE EQUIPMENT WILL BE ALLOWED ON ANY ASPHALTIC OR CONCRETE SURFACES. <br />5. NO ILLICIT DISCHARGE SHALL OCCUR AS A RESULT OF ACTIVITY PERFORMED PURSUANT TO THIS PERMIT. <br />6. NO OPEN CUTS WITHOUT SPECIFIC APPROVAL FROM THE PUBLIC WORKS DIRECTOR. <br />7, ALL UTILITY LINES WITHIN THE RIGHT-OF-WAY SHALL BE PLACED A MINIMUM OF 36" UNDER THE ROADWAY AND <br />A MINIMUM OF 30" UNDER NON -TRAFFIC BEARING SURFACES, <br />8. ALL UTILITY LINES WITHIN THE RIGHTS -OF -WAY SHALL BE CLEARLY IDENTIFIED AT REGULAR INTERVALS. <br />9. UNLESS THE UTILITY GOVERNING REGULATION DIRECTS FURTHER, A MINIMUM TWELVE INCH SEPARATION <br />FROM ANY STORMWATER STRUCTURE OR PIPE SHALL BE REQUIRED. <br />10. ALL TRAFFIC CONTROL DEVICES, I.E.: WARNING/CONSTRUCTION TYPE SIGNS WILL COMPLY WITH F.D.O.T. 600 <br />STANDARD INDEX DURING THE CONSTRUCTION PHASE. <br />11. ALL DISTURBED AREAS OUTSIDE THE 2:1 ROADWAY CONTROL LINE (SHOULDER) SHALL BE COMPACTED TO <br />FIRMNESS EQUAL TO THAT OF THE SOIL ADJACENT TO THE TRENCH AND REPLACED WITH SOD. AREAS WITHIN <br />THREE (3) FEET OF EDGE OF PAVEMENT SHALL BE COMPACTED TO PASCO COUNTY TESTING SPECIFICATIONS. <br />12. ALL BACKFILL SUB -BASE, BASE AND ASPHALT SURFACE RESTORATION SHALL COMPLY WITH THE LATEST PASCO <br />COUNTY SPECIFICATIONS OR AS OTHERWISE APPROVED BY THE COUNTY ENGINEER OR HIS DESIGNEE, <br />13. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO REMOVE AND RELOCATE ALL TRAFFIC CONTROL <br />DEVICES DURING THE CONSTRUCTION PHASE. AFTER CONSTRUCTION IS COMPLETE THE DEVICES WILL BE <br />REINSTALLED TO THE ORIGINAL LOCATION. ANY DAMAGED DEVICES WILL BE THE RESPONSIBILITY OF THE <br />CONTRACTOR TO REPLACE. <br />14. SIDEWALKS WILL BE CONSTRUCTED WITHIN THREE (3) DAYS AFTER REMOVAL AND SAFE PEDESTRIAN TRAFFIC <br />WILL BE MAINTAINED AT ALL TIMES. IF SIDEWALK IS REMOVED, IT WILL BE REMOVED TO THE NEAREST <br />EXPANSION JOINT AND REPLACED PER FOOT INDEX 310. ANY SIDEWALK, WHICH BECOMES UNDERMINED, MUST <br />BE REMOVED AND REPLACED. ROADWAY/SIDEWALK CONNECTIONS REPLACEMENTS MUST MEET CURRENT <br />ADA STANDARDS AND F,D.O.T. INDEX 304. <br />15. ALL EXISTING DRAINAGE TO BE MAINTAINED AND RESTORED TO DESIGN FLOW LINES. <br />16. NO WORK, EXCEPT FOR EMERGENCY TYPE, WILL BE PERFORMED AFTER SUNDOWN AND BEFORE SUNRISE. <br />17. ALL LINES LOCATED WITHIN ROADSIDE DRAINAGE DITCHES SHALL BE A MINIMUM OF 30 INCHES BELOW THE <br />LOWEST POINT OF THE DITCH OR THE INVERT OF ANY CULVERTS WITHIN RIGHT-OF-WAY WHICHEVER IS LOWER. <br />18. FRICTION COURSE TO BE FC-3, IF REQUIRED. <br />19, ANY LINES CROSSING CULVERTS SHALL BE AT LEAST 30 INCHES BELOW THE BOTTOM OF THE CULVERT. <br />20. STRUCTURAL COURSE TO BE S-3, IF REQUIRED. <br />21, ALL PEDESTALS AND BOXES LOCATED WITHIN THE ROADSIDE DITCHES SHALL BE APPROPRIATELY MARKED <br />AND/OR IDENTIFIED, AND LOCATED WITHIN 12 INCHES OF THE BACK OF THE RIGHT-OF-WAY. <br />22.AT ALL TIMES DURING CONSTRUCTION APPLY PERIMETER CONTROL (BMP'S) SOURCE MANAGEMENT AND <br />PRACTICES TO PROTECT THE DISTURBED AREA FROM OFFSITE RUNOFF AND TO PREVENT SEDIMENTATION <br />DAMAGE TO AREAS BELOW ACTIVITY. <br />23.MINIMIZE THE EXTENT OF AREA EXPOSED OF NATURAL VEGETATION AT ONE TIME AND THE DURATION OF <br />EXPOSURE TO ELEVATE EROSION POTENTIAL. <br />24.INLETS TO STORM SEWERS SHALL BE PROTECTED BY SUITABLE FILTERING DEVICES DURING CONSTRUCTION <br />TO KEEP POLLUTANTS FROM ENTERING CONVEYANCE SYSTEMS. <br />25.REQUIRED EROSION AND SEDIMENT CONTROL DEVICES SHALL BE IN PLACE AT ALL TIMES DURING <br />CONSTRUCTION AND SHALL BE REMOVED ONLY AFTER STABILIZATION HAS BEEN ESTABLISHED. <br />26.ANY FIELD CHANGES THAT MAY OCCUR CONTRARY TO THE PROPOSED RIGHT OF WAY USE PERMIT PLAN SHALL <br />REQUIRE AN ASBUILT AMENDMENT SUBMITTAL FOR REVIEW AND ACCEPTANCE. <br />GENERAL CONSTRUCTION NOTES (11 /29/12) <br />1. SEE SURVEY FOR SITE SPECIFIC BENCH MARK AND ELEVATION DATUM. USE DATUM NOTES THIS SHEET FOR CONVERSION. <br />2. LOCATIONS, DIMENSIONS AND ELEVATIONS OF EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES ARE SHOWN ACCORDING TO <br />STANDARD UTILITY ATLAS SHEETS OR OTHER INFORMATION OBTAINED AT THE TIME OF PREPARATION OF THESE PLANS. PRIOR TO <br />CONSTRUCTION, THE CONTRACTOR SHALL FIELD VERIFY THE LOCATION, DIMENSIONS, AND ELEVATION OF ALL EXISTING UTILITIES, <br />STRUCTURES AND OTHER FEATURES AFFECTING THE WORK AND MAKE ARRANGEMENTS FOR REQUIRED RELOCATIONS WITH THE <br />AFFECTED UTILITY. THE CONTRACTOR SHALL COOPERATE WITH THE UTILITY DURING RELOCATION OPERATIONS. <br />3. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN AREAS OF BURIED UTILITIES AND SHALL PROVIDE AT LEAST 48 HOURS <br />NOTICE TO ALL UTILITY COMPANIES BEFORE PERFORMING ANY EXCAVATION. THE CONTRACTOR SHALL HAVE UTILITY LOCATIONS <br />MARKED BY CALLING "SUNSHINE 811"AT 1-800-432-4770 OR 811 AT LEAST 48 HOURS PRIOR TO THE START OF ANY EXCAVATION. <br />CONTRACTOR IS RESPONSIBLE FOR CONTACTING ALL UTILITIES NOT INCLUDED IN THE "SUNSHINE 811" PROGRAM. <br />4. CHAPTER 77 153 OF THE FLORIDA STATUTES REQUIRES THAT AN EXCAVATOR NOTIFY ALL GAS UTILITIES A MINIMUM OF TWO (2) <br />WORKING DAYS PRIOR TO EXCAVATING. THESE PLANS SHOW ONLY THE APPROXIMATE LOCATION OF GAS MAINS AND THE GAS MAINS <br />MUST BE FIELD VERIFIED BY ON SITE INSPECTION BY GAS COMPANY PERSONNEL. EXCAVATORS ARE INSTRUCTED TO TELEPHONE THE <br />GAS COMPANY A MINIMUM OF TWO (2) WORKING DAYS BEFORE ENTERING A CONSTRUCTION AREA. <br />5. THE CONTRACTOR SHALL REVIEW THE PLANS FOR CONFLICTS OR OTHER DISCREPANCIES PRIOR TO CONSTRUCTION. THE <br />CONTRACTOR SHALL NOTIFY THE ENGINEER AND OWNER OF ANY CONFLICTS OR DISCREPANCIES BEFORE PERFORMING ANY WORK. <br />6. ALL PROPOSED UNDERGROUND UTILITIES MUST BE IN PLACE, TESTED AND INSPECTED PRIOR TO PAVEMENT SURFACE COURSE <br />CONSTRUCTION. <br />7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE CONDITIONS AND INSPECTION REQUIREMENTS OF ALL <br />PERMITS ISSUED FOR THE PROJECT. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION AND <br />SHALL SCHEDULE ALL INSPECTIONS IN ACCORDANCE WITH AGENCY REQUIREMENTS. <br />8. ALL SPECIFICATIONS AND DOCUMENTS REFERRED TO SHALL BE OF LATEST REVISIONS AND/OR LATEST EDITION. <br />9. THE CONTRACTOR SHALL COMPLETE THE WORK IN ACCORDANCE WITH ALL APPLICABLE STATUTES, RULES, REGULATIONS AND <br />PERMIT CONDITIONS. <br />10. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE ENGINEER FOR ALL PRECAST AND MANUFACTURED ITEMS TO BE USED ON <br />THE PROJECT. ALL SHOP DRAWINGS ARE TO BE REVIEWED AND APPROVED BY THE CONTRACTOR PRIOR TO SUBMITTAL TO THE <br />ENGINEER. <br />11. AT LEAST THREE (3) WORKING DAYS PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE ENGINEER, OWNER, AND <br />APPROPRIATE PERMITTING AGENCIES OF THE CONTRACTOR'S NAME, STARTING DATE, PROJECTED SCHEDULE, AND OTHER <br />INFORMATION AS REQUIRED. <br />12. WORK PERFORMED UNDER THIS CONTRACT SHALL INTERFACE SMOOTHLY WITH OTHER WORK BEING PERFORMED ON SITE BY <br />OTHERS. IT WILL BE NECESSARY FOR THE CONTRACTOR TO COORDINATE AND SCHEDULE HIS ACTIVITIES WITH OTHERS WHERE <br />NECESSARY. <br />13. SITE WORK CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH OF AT LEAST 3,000 PSI. AT 28 DAYS UNLESS OTHERWISE NOTED. <br />14. ALL PRIVATE AND PUBLIC PROPERTY AFFECTED BY THIS WORK SHALL BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN <br />EXISTING CONDITIONS UNLESS SPECIFICALLY EXEMPTED BY THE PLANS, <br />15. ALL DISTURBED AREAS THAT ARE NOT TO BE SODDED, ARE TO BE SEEDED AND MULCHED IN ACCORDANCE WITH FDOT STANDARDS. <br />THE CONTRACTOR SHALL MAINTAIN ALL GRASSED AREAS UNTIL A SATISFACTORY STAND OF GRASS, ACCEPTABLE TO THE APPLICABLE <br />REGULATORY AGENCIES, OWNER, AND ENGINEER, HAS BEEN ACHIEVED. THE CONTRACTOR SHALL BEAR THE RESPONSIBILITY OF ALL <br />REMEDIAL WORK REQUIRED UNTIL THE SYSTEM HAS BEEN ACCEPTED. <br />16. ALL SODDED AND SEEDED AREAS BE WATERED AND FERTILIZED UNTIL THE PROJECT IS COMPLETED AND ACCEPTED BY THE OWNER. <br />17. THE CONTRACTOR SHALL LOCATE AND FLAG ALL PROPERTY CORNERS PRIOR TO FINAL ENGINEERING INSPECTION AND <br />CERTIFICATION. THE CONTRACTOR SHALL BEAR ALL COSTS INCURRED AS A CONSEQUENCE OF LOST OR DISTURBED PROPERTY <br />CORNERS. LOST OR DISTURBED PROPERTY CORNERS SHALL BE REESTABLISHED BY A PROFESSIONAL LAND SURVEYOR. <br />18. THE GEOTECHNICAL ENGINEER SHALL SUPPLY THE ENGINEER AND OWNER WITH A PHOTOCOPY OF ALL COMPACTION TESTS AND <br />OTHER REQUIRED MATERIALS TESTS UNDER THIS CONTRACT. THE GEOTECHNICAL ENGINEER SHALL CERTIFY, IN WRITING, TO THE <br />ENGINEER AND OWNER, THAT ALL TESTING REQUIREMENTS HAVE BEEN SATISFIED. <br />19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL REQUIRED TESTING WITH THE GEOTECHNICAL ENGINEER. <br />TESTING IS REQUIRED AS DICTATED BY THE CONTRACT DOCUMENTS, CONSTRUCTION PLANS AND SPECIFICATIONS. UPON <br />COMPLETION OF THE WORK, THE GEOTECHNICAL ENGINEER SHALL SUBMIT CERTIFICATIONS TO THE ENGINEER AND OWNER THAT <br />STATE THAT ALL REQUIREMENTS HAVE BEEN MET, <br />20. THE CONTRACTOR SHALL REVIEW ALL PROJECT GEOTECHNICAL REPORTS PRIOR TO BIDDING AND THE START OF CONSTRUCTION. <br />21. THE CONTRACTOR SHALL MAINTAIN A COPY OF THE APPROVED CONSTRUCTION DRAWINGS AND ALL PERMITS AT THE CONSTRUCTION <br />SITE, <br />22, THE CONSTRUCTION DRAWINGS DO NOT INCLUDE SPECIFICATION FOR CONSTRUCTION SAFETY. THE CONTRACTOR SHALL BE <br />RESPONSIBLE FOR ALL MEANS AND METHODS OF CONSTRUCTION SITE SAFETY. <br />TESTING SCHEDULE GUIDE (12/11/09) <br />ITEM <br />TEST TYPE <br />TEST I.D. <br />REQUIREMENT <br />FREQUENCY <br />EMBANKMENT <br />MAXIMUM DENSITY <br />AASHTO T180 <br />N/A <br />PER SOIL TYPE <br />OPTIMUM MOISTURE <br />ASTM D1557 <br />FIELD DENSITY <br />AASHTO T191, T204 <br />95% OF MAXIMUM <br />ONE PER 2,500 S.F. <br />T238 <br />DENSITY <br />HORIZONTALLY; <br />ASTM D1556, D2937 <br />ALTERNATING LIFTS (12 INCHES) <br />D2922 <br />UTILITY <br />MAXIMUM DENSITY <br />AASHTO T180 <br />N/A <br />PER SOIL TYPE <br />TRENCH BACKFILL <br />OPTIMUM MOISTURE <br />ASTM D1557 <br />UNDER ROADWAYS <br />FIELD DENSITY <br />AASHTO T191, T204 <br />95% OF MAXIMUM <br />ONE PER 2,500 S.F. <br />AND STRUCTURES <br />T238 <br />DENSITY <br />HORIZONTALLY; <br />ASTM D1556, D2937 <br />EVERY 12" VERTICALLY <br />D2922 <br />D2922 <br />AT LEAST ONE FOR EACH PIPE RUN <br />BACKFILL OF <br />MAXIMUM DENSITY <br />AASHTO T180 <br />N/A <br />PER SOIL TYPE <br />STRUCTURES <br />OPTIMUM MOISTURE <br />ASTM D1557 <br />FIELD DENSITY <br />AASHTO T191, T204 <br />95% OF MAXIMUM <br />EVERY 12" VERTICALLY <br />T238 <br />DENSITY <br />ASTM D1556, D2937 <br />D2922 <br />SUBGRADE BEARING VALUES LBR - FLA. D.O.T. <br />MAXIMUM DENSITY AASHTO T180 <br />OPTIMUM MOISTURE ASTM D1557 <br />FIELD DENSITY & AASHTO T191, T238 <br />THICKNESS ASTM D1556, D2922 <br />BASE <br />BEARING VALUES <br />LBR - FLA. D.O.T. <br />MAXIMUM DENSITY <br />AASHTO T180 <br />OPTIMUM MOISTURE <br />ASTM D1557 <br />THICKNESS <br />AASHTO T191, T238 <br />FIELD DENSITY <br />ASTM D1556, D2922 <br />GRADATION <br />AASHTO T27, T98 <br />AASHTO T90 <br />ATTERBERG LIMITS <br />ASTM C136, D423, D424 <br />SOIL CEMENT BASE MIX DESIGN <br />PORTLAND CEMENT <br />ASSOC. SPECIFICATIONS <br />(TO BE USED IF <br />MAXIMUM DENSITY <br />AASHTO T134 <br />SEPARATION BETWEEN <br />SHWT & BOTTOM OF <br />OPTIMUM MOISTURE <br />(STANDARD) <br />BASE IS <1.5') <br />COMPRESSIVE <br />PORTLAND CEMENT <br />STRENGTH SPECIMENS <br />ASSOC. SPECIFICATIONS <br />TEST CORES <br />PORTLAND CEMENT <br />ASSOC. SPECIFICATIONS <br />FIELD DENSITY & <br />AASHTO T191, T238 <br />THICKNESS <br />ASTM D1556, D2922 <br />ASPHALTIC CONCRETE <br />MATERIALS QUALITY <br />AASHTO T164 <br />BITUMEN CONTENT, <br />ASTM D2172 <br />GRADATION <br />FIELD DENSITY <br />ASTM 02950-81 <br />LOS ANGELES <br />AASHTO T96-77 <br />ABRASION <br />ASTM C131-81 <br />THICKNESS <br />N/A <br />ONE PER SOIL TYPE <br />CHECK POINT LBR AT <br />SEE TYPICAL 500 L.F. HORIZONTALLY <br />PAVEMENT SECTION ONE PER SOIL TYPE <br />ONE PER 2,500 S.F. <br />HORIZONTALLY <br />ONE PER SOURCE OR AS MTL. CHANGES <br />CHECK POINT LBR AT 500 L.F. HORIZ. <br />SEE TYPICAL ONE PER SOURCE <br />PAVEMENT SECTION <br />ONE PER 2,500 S.F. <br />HORIZONTALLY <br />ONE PER SOURCE <br />SEE TYPICAL <br />PAVEMENT SECTION <br />ONE PER SOIL TYPE <br />ONE PER SOIL TYPE DAILY <br />ONE SET OF 3 PER SOIL <br />ONE SET OF 3 PER SOIL <br />ONE PER 2,500 S.F. <br />HORIZONTAL <br />PER SPECIFICATIONS <br />ONE PER DAY <br />95% OF LAB DENSITY <br />ONE PER 2,500 S.F. <br />HORIZONTAL <br />PER SPECIFICATIONS <br />ONE PER SOURCE <br />PER SPECIFICATIONS <br />ONE PER 2,500 S.F. <br />CLEARING AND EROSION CONTROL NOTES (4/30/04) <br />1. ALL TREES TO REMAIN SHALL BE PROTECTED IN ACCORDANCE WITH LOCAL REGULATIONS PRIOR TO THE START OF ANY <br />CONSTRUCTION ACTIVITIES. <br />2, THE CONTRACTOR SHALL PREPARE THE SITE AS DIRECTED BY THE GEOTECHNICAL ENGINEER PRIOR TO STARTING ACTUAL <br />CONSTRUCTION. COPIES OF THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS AND REPORT ARE AVAILABLE THROUGH <br />THE OWNER OR THE GEOTECHNICAL ENGINEER. QUESTIONS REGARDING SITE PREPARATION REQUIREMENTS SHALL BE <br />DIRECTED TO THE GEOTECHNICAL ENGINEER AND OWNER. <br />T 3, THE CONTRACTOR SHALL CLEAR AND GRUB ONLY THOSE PORTIONS POR 0F THE SITE NECESSARY FOR CONSTRUCTION. ALL <br />DISTURBED OPEN AREAS SHALL BE SEEDED, MULCHED, OR PLANTED WITH OTHER APPROVED LANDSCAPE MATERIAL <br />IMMEDIATELY FOLLOWING CONSTRUCTION. <br />4. THE TOP SOIL REMOVED DURING CLEARING AND GRUBBING SHALL BE STOCKPILED AT A SITE DESIGNATED BY THE OWNER <br />AND SHALL BE USED FOR LANDSCAPING PURPOSES UNLESS OTHERWISE DIRECTED BY THE OWNER. <br />5. ALL CONSTRUCTION DEBRIS AND OTHER WASTE MATERIAL SHALL BE DISPOSED OF OFF -SITE IN ACCORDANCE WITH ALL <br />APPLICABLE REGULATIONS. <br />6. THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED FOR REMOVAL OF EXISTING STRUCTURES, <br />7. THE CONTRACTOR SHALL NOTIFY ALL UTILITIES TO DISCONNECT OR REMOVE THEIR FACILITIES PRIOR TO REMOVAL OR <br />DEMOLITION OF EXISTING STRUCTURES. <br />8, THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING A VISUAL INSPECTION OF THE SITE AND SHALL BE RESPONSIBLE <br />FOR DEMOLITION AND REMOVAL OF ALL UNDERGROUND AND ABOVE GROUND STRUCTURES THAT WILL NOT BE <br />INCORPORATED WITH THE NEW FACILITIES. SHOULD ANY DISCREPANCY EXIST, THE CONTRACTOR SHALL CONTACT THE <br />OWNER FOR CLARIFICATION PRIOR TO DEMOLITION. <br />9. PRIOR TO THE COMPLETION OF CONSTRUCTION, THE RETENTION/DETENTION AREAS SHALL BE RESHAPED, CLEARED OF <br />SILT, MUD AND DEBRIS, AND GRASSED IN ACCORDANCE WITH THE CONSTRUCTION DRAWINGS. <br />PAVING, GRADING AND DRAINAGE NOTES (4/30/04) <br />1. ALL DELETERIOUS SUBSTANCES (I.E. MUCK, PEAT, BURIED DEBRIS) SHALL BE EXCAVATED IN ACCORDANCE WITH THE PLANS <br />AND SPECIFICATIONS, OR AS DIRECTED BY THE GEOTECHNICAL ENGINEER OR OWNER. DELETERIOUS MATERIAL IS TO BE <br />STOCKPILED OR REMOVED FROM THE SITE AS DIRECTED BY THE OWNER. EXCAVATED AREAS SHALL BE BACKFILLED WITH <br />APPROVED MATERIALS AND COMPACTED AS SPECIFIED BY THE GEOTECHNICAL ENGINEER OR OWNER. <br />2. IT MAY BE NECESSARY TO FIELD ADJUST PAVEMENT ELEVATIONS TO PRESERVE THE ROOT SYSTEMS OF TREES TO BE <br />SAVED. THE CONTRACTOR SHALL COORDINATE WITH OWNER'S ENGINEER PRIOR TO ANY GRADE CHANGE, <br />3. THE CONTRACTOR IS TO SUBMIT A PROPOSED JOINTING PATTERN TO THE OWNER FOR APPROVAL PRIOR TO CONSTRUCTING <br />CONCRETE PAVEMENT. <br />4. THE CONTRACTOR SHALL PROVIDE AN EXPANSION JOINT AT ABUTMENT OF CONCRETE AND ANY STRUCTURE. <br />5. ALL PAVEMENT MARKINGS IN PUBLIC RIGHTS OF WAY SHALL BE MADE WITH PERMANENT THERMOPLASTIC, AND SHALL <br />CONFORM TO FDOT STANDARD INDEX NO. 17346 UNLESS INDICATED OTHERWISE ON THE DRAWINGS. PARKING STALL <br />STRIPING SHALL BE 6" WIDE PAINTED WHITE STRIPES UNLESS INDICATED OTHERWISE ON THE DRAWINGS. <br />6. THE CONTRACTOR SHALL INSTALL EXTRA BASE MATERIAL WHEN THE DISTANCE BETWEEN THE PAVEMENT ELEVATION AND <br />THE TOP OF THE PIPE EXCEEDS THE MINIMUM DIMENSIONS SHOWN IN FDOT INDEX 205. <br />T STANDARD INDICES REFER TO THE LATEST EDITION OF FDOT "ROADWAY AND TRAFFIC DESIGN STANDARDS". <br />8. ALL STORM SEWER PIPE SHALL BE REINFORCED CONCRETE CLASS III (ASTM C-76) UNLESS OTHERWISE INDICATED IN THE <br />DRAWINGS AND SPECIFICATIONS. <br />9. PVC STORM PIPE, 12" AND SMALLER, SHALL CONFORM TO AWWA C-900, SDR-18, CLASS 150; UNLESS OTHERWISE INDICATED <br />IN THE DRAWINGS AND SPECIFICATIONS. <br />10. PIPE LENGTHS SHOWN ARE APPROXIMATE. <br />11. ALL DRAINAGE STRUCTURE FRAMES, GRATES AND COVERS WITHIN TRAFFIC AREAS SHALL BE TRAFFIC RATED FOR H-20 <br />LOADINGS. <br />12, THE CONTRACTOR IS TO GRASS THE RETENTION/DETENTION POND AS INDICATED ON PLANS WITHIN ONE -WEEK FOLLOWING <br />CONSTRUCTION OF THE POND. <br />13. MATERIALS AND CONSTRUCTION METHODS FOR STREETS AND STORM DRAINAGE CONSTRUCTION SHALL BE IN <br />ACCORDANCE WITH LOCAL REGULATIONS AND THE FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD <br />SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, LATEST REVISION THEREOF AND SUPPLEMENTAL SPECIFICATIONS <br />THERETO. <br />14. THE CONTRACTOR SHALL PROVIDE CERTIFIED RECORD DRAWINGS, SIGNED AND SEALED BY A PROFESSIONAL LAND <br />SURVEYOR. THE RECORD DRAWINGS SHALL SHOW FINAL GRADES, INVERTS, AND LOCATIONS OF ALL STORMWATER <br />FACILITIES INCLUDING THE STORMWATER POND, DRAINAGE STRUCTURES, BERMS & SWALES. THE CONTRACTOR SHALL <br />PROVIDE TEN COPIES OF THE CERTIFIED RECORD DRAWINGS TO THE ENGINEER FOR THE PURPOSE OF CERTIFYING THE <br />STORMWATER MANAGEMENT SYSTEM. <br />PAVING, GRADING & DRAINAGE TESTING AND INSPECTION <br />REQUIREMENTS (4/30/04) <br />1. THE STORM DRAINAGE PIPING AND FILTRATION SYSTEM SHALL BE SUBJECT TO A VISUAL INSPECTION BY THE ENGINEER <br />PRIOR TO THE PLACEMENT OF BACKFILL. THE CONTRACTOR SHALL NOTIFY THE ENGINEER 48 HOURS IN ADVANCE TO <br />SCHEDULE AN INSPECTION. <br />2. THE CONTRACTOR SHALL MAINTAIN THE STORM DRAINAGE SYSTEMS UNTIL FINAL ACCEPTANCE OF THE PROJECT BY THE <br />OWNER. <br />3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE REQUIRED TESTING WITH THE GEOTECHNICAL <br />ENGINEER. TESTING IS REQUIRED IN ACCORDANCE WITH THE TESTING SCHEDULE FOUND IN THE CONSTRUCTION <br />DRAWINGS AND SPECIFICATIONS. UPON COMPLETION OF THE WORK, THE GEOTECHNICAL ENGINEER SHALL SUBMIT <br />CERTIFICATIONS TO THE ENGINEER AND OWNER STATING THAT ALL REQUIREMENTS HAVE BEEN MET. <br />SANITARY SEWER NOTES (12/24/09) <br />1. ALL SANITARY SEWER MAINS AND LATERALS SHALL HAVE A MINIMUM OF 36 INCHES OF COVER. <br />2. ALL SANITARY SEWER WORK SHALL CONFORM TO LOCAL REGULATORY STANDARDS AND SPECIFICATIONS, <br />3. PRIOR TO COMMENCING WORK WHICH REQUIRES CONNECTING NEW WORK TO EXISTING LINES OR APPURTENANCES, THE <br />CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF EXISTING CONNECTION POINT AND NOTIFY ENGINEER OF ANY <br />CONFLICTS OR DISCREPANCIES, <br />4. SANITARY SEWER PIPES SHALL MEET THE FOLLOWING MINIMUM CRITERIA; <br />3- 12' DEPTH SDR-35 <br />12'- 18' DEPTH SDR-26 <br />> 18' DEPTH DIP <br />5. ALL SANITARY SEWER PIPELINES SHALL BE SOLID GREEN IN COLOR. <br />6. ALL PVC FORCE MAINS SHALL BE PRESSURE CLASS 200, SDR 21, COLOR GREEN, WITH A GREEN MAGNETIC TAPE A MINIMUM <br />OF 2" WIDE PLACED 1 FOOT BELOW THE PROPOSED GRADE. THE PRINTING ON THE MAGNETIC TAPE SHALL READ "FORCE <br />MAIN" <br />7. ALL DUCTILE IRON PIPE SHALL BE PRESSURE CLASS 350 IN ACCORDANCE WITH ANSI A 21.51-91 (AWWA C151) AND PIPE <br />SHALL RECEIVE EXTERIOR BITUMINOUS COATING IN ACCORDANCE WITH ANSI A 21.51 (AWWA C151) AND SHALL BE CEMENT <br />MORTAR LINED, STANDARD THICKNESS IN ACCORDANCE WITH ANSI A 21.4 (AWWA C104). <br />8. ALL SANITARY SEWER GRAVITY MAINS OR SANITARY SEWER FORCE MAINS THAT REQUIRE DIP ARE TO BE POLYLINED OR <br />EPDXY LINED. <br />9, ALL SANITARY SEWER RIMS AND COVERS SHALL BE TRAFFIC RATED FOR H-20 LOADING. <br />10. THE CONTRACTOR SHALL PROVIDE CERTIFIED UTILITY RECORD DRAWINGS, SIGNED AND SEALED BY A PROFESSIONAL LAND <br />SURVEYOR. THE RECORD DRAWINGS SHALL SHOW FINAL GRADES AND LOCATIONS ON ALL SANITARY SEWER MAINS, <br />STRUCTURES AND SERVICES. ALL RESTRAINED JOINTS SHALL BE SHOWN ON THE RECORD DRAWINGS. THE CONTRACTOR <br />SHALL PROVIDE TEN COPIES OF THE CERTIFIED RECORD DRAWINGS TO THE ENGINEER. <br />SANITARY SEWER TESTING AND INSPECTION REQUIREMENTS <br />(12/24/09) <br />1. ALL GRAVITY SEWER PIPING SHALL BE SUBJECT TO A VISUAL INSPECTION BY THE ENGINEER. CONTRACTOR SHALL NOTIFY <br />THE ENGINEER 48 HOURS IN ADVANCE TO SCHEDULE INSPECTION. <br />2. ALL GRAVITY SEWER PIPING SHALL BE VIDEO TAPED AND RESULTS FURNISHED TO THE LOCAL UTILITY AND THE ENGINEER. <br />3, THE GRAVITY SANITARY SEWER AND ALL SERVICE LATERALS SHALL BE SUBJECT TO ADDITIONAL TESTING AS REQUIRED BY <br />LOCAL REGULATIONS. TESTS ARE TO BE CERTIFIED BY THE ENGINEER OF RECORD AND SHALL BE SUBMITTED TO THE <br />LOCAL AUTHORITIES FOR APPROVAL. COORDINATION AND NOTIFICATION OF ALL PARTIES SHALL BE THE CONTRACTOR'S <br />RESPONSIBILITY. <br />4. ALL FORCE MAINS SHALL BE SUBJECT TO A HYDROSTATIC PRESSURE TEST IN ACCORDANCE WITH LOCAL REGULATIONS. <br />TESTS SHALL BE CERTIFIED BY THE ENGINEER OF RECORD AND SUBMITTED TO THE LOCAL AUTHORITIES FOR APPROVAL. <br />COORDINATION AND NOTIFICATION OF ALL PARTIES SHALL BE THE CONTRACTOR'S RESPONSIBILITY. <br />WATER SYSTEM NOTES (12/24/09) <br />1. ALL WATER MAINS SHALL HAVE A MINIMUM OF 36 INCHES OF COVER. <br />2. ALL WATER SYSTEM WORK SHALL CONFORM TO LOCAL REGULATORY STANDARDS AND SPECIFICATIONS. <br />3. CONFLICTS BETWEEN WATER AND STORM OR SANITARY SEWER SHALL BE RESOLVED BY ADJUSTING THE WATER LINES AS <br />REQUIRED. <br />4. ALL DUCTILE IRON PIPE SHALL BE PRESSURE CLASS 50 IN ACCORDANCE WITH AN I A 21.51 AWWACl <br />C S 3S ( C 51) AND PIPE SHALL <br />RECEIVE EXTERIOR BITUMINOUS COATING IN ACCORDANCE WITH ANSI A 21.51 (AWWA C151) AND SHALL BE CEMENT MORTAR <br />LINED, STANDARD THICKNESS IN ACCORDANCE WITH ANSI A 21.4 (AWWA C104). <br />5, ALL FITTINGS 3" OR LARGER SHALL BE MECHANICAL JOINT, DUCTILE IRON PRESSURE CLASS 350 IN ACCORDANCE WITH ANSI A <br />21.10 AND A 21.11 (AWWA Cl 10 AND AWWA Cl 11 RESPECTIVELY). FITTINGS SHALL BE CEMENT MORTAR LINED AND BITUMINOUS <br />COATED IN ACCORDANCE WITH AWWA C104 AND AWWA C151 RESPECTIVELY. <br />6. THE CONTRACTOR SHALL INSTALL TEMPORARY BLOW -OFFS AT THE END OF WATER SERVICE LATERALS TO ASSURE ADEQUATE <br />FLUSHING AND DISINFECT ION. <br />7. ALL PVC WATER MAINS 4" THROUGH 12" SHALL BE IN ACCORDANCE WITH AWWA C900. PIPE SHALL BE CLASS 150 AND MEET <br />THE REQUIREMENTS OF SDR 18 IN ACCORDANCE WITH ASTM D-2241. <br />8. WATER MAIN PIPING LARGER THAN 2" AND SMALLER THAN 4" SHALL BE PRESSURE CLASS 200 AND MEET THE REQUIREMENTS <br />OF SDR 21 IN ACCORDANCE WITH ASTM D2241 UNLESS SPECIFIED OTHERWISE. <br />9. ALL PIPE AND FITTINGS 2" AND SMALLER SHALL BE POLYETHYLENE TUBING WITH COMPRESSION FITTINGS. <br />10. ALL GATE VALVES 2" OR LARGER SHALL BE RESILIENT SEAT OR RESILIENT WEDGE MEETING THE REQUIREMENTS OF AWWA <br />C509 <br />11, ALL FIRE HYDRANTS SHALL MEET THE REQUIREMENTS OF AWWA C502 AND SHALL BE APPROVED BY THE LOCAL UTILITY AND <br />FIRE MARSHAL. <br />12. MATERIALS AND CONSTRUCTION METHODS FOR WATER DISTRIBUTION SYSTEMS SHALL BE IN ACCORDANCE WITH ALL LOCAL <br />REGULATIONS, PLANS, AND SPECIFICATIONS FOR CONSTRUCTION, LATEST REVISION THEREOF, AND SUPPLEMENTAL <br />SPECIFICATIONS THERETO. APPROVAL AND CONSTRUCTION OF ALL POTABLE WATER SERVICE MAIN EXTENSIONS AND <br />CONNECTIONS MUST BE COORDINATED THROUGH THE LOCAL REGULATORY AGENCY. <br />13. THE CONTRACTOR SHALL PROVIDE CERTIFIED UTILITY RECORD DRAWINGS, SIGNED AND SEALED BY A PROFESSIONAL LAND <br />SURVEYOR. THE RECORD DRAWINGS SHALL SHOW THE LOCATIONS, DIMENSIONS AND ELEVATIONS OF ALL WATER MAINS, <br />SERVICES, MANHOLES, GRAVITY SEWER MAINS, SERVICE LATERALS, PUMP STATIONS AND FORCE MAINS. ALL RESTRAINED <br />JOINTS SHALL BE SHOWN ON THE RECORD DRAWINGS. THE CONTRACTOR SHALL PROVIDE TEN COPIES OF THE CERTIFIED <br />RECORD DRAWINGS TO THE ENGINEER. <br />FDEP NOTES (04/02/04) <br />1. ALL PIPE, PIPE FITTINGS, PIPE JOINT PACKING AND JOINTING MATERIALS, VALVES, FIRE HYDRANTS, AND METERS INSTALLED <br />UNDER THIS PROJECT WILL CONFORM TO APPLICABLE AMERICAN WATER WORKS ASSOCIATION (AWWA) STANDARDS. <br />2. ALL PUBLIC WATER SYSTEM COMPONENTS, EXCLUDING FIRE HYDRANTS, THAT WILL BE INSTALLED UNDER THIS PROJECT AND <br />THAT WILL COME INTO CONTACT WITH DRINKING WATER WILL CONFORM TO NSF INTERNATIONAL STANDARD 61. <br />3. ALL PIPE AND PIPE FITTINGS INSTALLED UNDER THIS PROJECT WILL CONTAIN NO MORE THAN 8.0% LEAD, AND ANY SOLDER OR <br />FLUX USED IN THIS PROJECT WILL CONTAIN NO MORE THAN 0.2% LEAD. <br />4, ALL PIPE AND PIPE FITTINGS INSTALLED UNDER THIS PROJECT WILL BE COLOR CODED OR MARKED IN ACCORDANCE WITH <br />SUBPARAGRAPH 62-555.320(21)(B)3, F.A.C., USING BLUE AS A PREDOMINANT COLOR, (UNDERGROUND PLASTIC PIPE WILL BE <br />SOLID -WALL BLUE PIPE, WILL HAVE A CO -EXTRUDED BLUE EXTERNAL SKIN, OR WILL BE WHITE OR BLACK PIPE WITH BLUE <br />STRIPES INCORPORATED INTO, OR APPLIED TO, THE PIPE WALL; AND UNDERGROUND METAL OR CONCRETE PIPE WILL HAVE <br />BLUE STRIPES APPLIED TO THE PIPE WALL. PIPE STRIPED DURING MANUFACTURING OF THE PIPE WILL HAVE CONTINUOUS <br />STRIPES THAT RUN PARALLEL TO THE AXIS OF THE PIPE, THAT ARE LOCATED AT NO GREATER THAN 90-DEGREE INTERVALS <br />AROUND THE PIPE, AND THAT WILL REMAIN INTACT DURING AND AFTER INSTALLATION OF THE PIPE. IF TAPE OR PAINT IS USED <br />TO STRIPE PIPE DURING INSTALLATION OF THE PIPE, THE TAPE OR PAINT WILL BE APPLIED IN A CONTINUOUS LINE THAT RUNS <br />PARALLEL TO THE AXIS OF THE PIPE AND THAT IS LOCATED ALONG THE TOP OF THE PIPE; FOR PIPE WITH AN INTERNAL <br />DIAMETER OF 24 INCHES OR GREATER, TAPE OR PAINT WILL BE APPLIED IN CONTINUOUS LINES ALONG EACH SIDE OF THE PIPE <br />AS WELL AS ALONG THE TOP OF THE PIPE, ABOVEGROUND PIPE WILL BE PAINTED BLUE OR WILL BE COLOR CODED OR <br />MARKED LIKE UNDERGROUND PIPE.) <br />5. THE OPEN END OF THE AIR RELIEF PIPE FROM ALL AUTOMATIC AIR RELIEF VALVES INSTALLED UNDER THIS PROJECT WILL BE <br />EXTENDED TO AT LEAST ONE FOOT ABOVE GRADE AND WILL BE PROVIDED WITH A SCREENED, DOWNWARD -FACING ELBOW, <br />6. NEW OR ALTERED WATER MAINS INCLUDED IN THIS PROJECT WILL BE INSTALLED IN ACCORDANCE WITH APPLICABLE AWWA <br />STANDARDS OR IN ACCORDANCE WITH MANUFACTURERS' RECOMMENDED PROCEDURES. <br />7, A CONTINUOUS AND UNIFORM BEDDING WILL BE PROVIDED IN TRENCHES FOR UNDERGROUND PIPE INSTALLED UNDER THIS <br />PROJECT; BACKFILL MATERIAL WILL BE TAMPED IN LAYERS AROUND UNDERGROUND PIPE INSTALLED UNDER THIS PROJECT <br />AND TO A SUFFICIENT HEIGHT ABOVE THE PIPE TO ADEQUATELY SUPPORT AND PROTECT THE PIPE; AND UNSUITABLY SIZED <br />STONES (AS DESCRIBED IN APPLICABLE AWWA STANDARDS OR MANUFACTURERS' RECOMMENDED INSTALLATION <br />PROCEDURES) FOUND IN TRENCHES WILL BE REMOVED FOR A DEPTH OF AT LEAST SIX INCHES BELOW THE BOTTOM OF <br />UNDERGROUND PIPE INSTALLED UNDER THIS PROJECT. <br />8. ALL WATER MAIN TEES, BENDS, PLUGS, AND HYDRANTS INSTALLED UNDER THIS PROJECT WILL BE PROVIDED WITH THRUST <br />BLOCKS OR RESTRAINED JOINTS TO PREVENT MOVEMENT. <br />9. NEW OR ALTERED WATER MAINS THAT ARE INCLUDED IN THIS PROJECT AND THAT WILL BE CONSTRUCTED OF <br />ASBESTOS -CEMENT OR POLYVINYL CHLORIDE PIPE WILL BE PRESSURE AND LEAKAGE TESTED IN ACCORDANCE WITH AWWA <br />STANDARD C603 OR C605, RESPECTIVELY, AND ALL OTHER NEW OR ALTERED WATER MAINS INCLUDED IN THIS PROJECT WILL <br />BE PRESSURE AND LEAKAGE TESTED IN ACCORDANCE WITH AWWA STANDARD C600. <br />10. NEW OR ALTERED WATER MAINS, INCLUDING FIRE HYDRANT LEADS AND INCLUDING SERVICE LINES THAT WILL BE UNDER THE <br />CONTROL OF A PUBLIC WATER SYSTEM AND THAT HAVE AN INSIDE DIAMETER OF THREE INCHES OR GREATER, WILL BE <br />DISINFECTED AND BACTERIOLOGICALLY EVALUATED IN ACCORDANCE WITH RULE 62-555.340, F.R.C. <br />11. NEW OR ALTERED WATER MAINS THAT ARE INCLUDED IN THIS PROJECT AND THAT WILL CROSS UNDER SURFACE WATER WILL <br />HAVE A MINIMUM COVER OF TWO FEET. <br />WATER SYSTEM TESTING AND INSPECTION REQUIREMENTS (04/02/04) <br />1, ALL COMPONENTS OF THE WATER SYSTEM, INCLUDING FITTINGS, HYDRANTS, CONNECTIONS, AND VALVES SHALL REMAIN <br />UNCOVERED UNTIL PROPERLY PRESSURE TESTED AND ACCEPTED BY THE ENGINEER AND LOCAL AUTHORITIES. PRESSURE <br />TESTS SHALL BE IN ACCORDANCE WITH LOCAL WATER DEPARTMENT & FDEP SPECIFICATIONS. CONTRACTOR SHALL NOTIFY <br />OWNER'S ENGINEER AND WATER DEPARTMENT INSPECTORS 48 HOURS IN ADVANCE OF PERFORMING TESTS. <br />2. CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED CHLORINATION/DISINFECTION AND BACTERIOLOGICAL SAMPLING IN <br />ACCORDANCE TO ITEM "U" ABOVE. CONTRACTOR SHALL OBTAIN CLEARANCE OF DOMESTIC WATER SYSTEM, COPIES OF ALL <br />BACTERIOLOGICAL TESTS (WHICH SHALL ALSO INDICATE THE CHLORINE RESIDUAL) SHALL BE SUBMITTED TO ENGINEER. <br />WATER CLEARANCE REQUIREMENTS (04/02/04) <br />1. NEW OR RELOCATED, UNDERGROUND WATER MAINS INCLUDED IN THIS PROJECT WILL BE LAID TO PROVIDE A HORIZONTAL <br />DISTANCE OF AT LEAST THREE FEET BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF ANY EXISTING OR <br />PROPOSED VACUUM -TYPE SANITARY SEWER, STORM SEWER, STORMWATER FORCE MAIN, OR PIPELINE CONVEYING RECLAIMED <br />WATER REGULATED UNDER PART III OF CHAPTER 62-610, F.A.C.; A HORIZONTAL DISTANCE OF AT LEAST SIX FEET BETWEEN THE <br />OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF ANY EXISTING OR PROPOSED GRAVITY -TYPE SANITARY SEWER (OR A <br />HORIZONTAL DISTANCE OF AT LEAST THREE FEET BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF ANY <br />EXISTING OR PROPOSED GRAVITY -TYPE SANITARY SEWER IF THE BOTTOM OF THE WATER MAIN WILL BE LAID AT LEAST SIX <br />INCHES ABOVE THE TOP OF THE SEWER); A HORIZONTAL DISTANCE OF AT LEAST SIX FEET BETWEEN THE OUTSIDE OF THE <br />WATER MAIN AND THE OUTSIDE OF ANY EXISTING OR PROPOSED PRESSURE -TYPE SANITARY SEWER, WASTEWATER FORCE <br />MAIN, OR PIPELINE CONVEYING RECLAIMED WATER NOT REGULATED UNDER PART III OF CHAPTER 62-610, F.A.G.; AND A <br />HORIZONTAL DISTANCE OF AT LEAST TEN FEET BETWEEN THE OUTSIDE OF THE WATER MAIN AND ALL PARTS OF ANY EXISTING <br />OR PROPOSED "ON -SITE SEWAGE TREATMENT AND DISPOSAL SYSTEM." <br />2. NEW OR RELOCATED, UNDERGROUND WATER MAINS THAT ARE INCLUDED IN THIS PROJECT AND THAT WILL CROSS ANY <br />EXISTING OR PROPOSED GRAVITY- OR VACUUM -TYPE SANITARY SEWER OR STORM SEWER WILL BE LAID SO THE OUTSIDE OF <br />THE WATER MAIN IS AT LEAST SIX INCHES ABOVE THE OTHER PIPELINE OR AT LEAST 12 INCHES BELOW THE OTHER PIPELINE; <br />AND NEW OR RELOCATED, UNDERGROUND WATER MAINS THAT ARE INCLUDED IN THIS PROJECT AND THAT WILL CROSS ANY <br />EXISTING OR PROPOSED PRESSURE -TYPE SANITARY SEWER, WASTEWATER OR STORMWATER FORCE MAIN, OR PIPELINE <br />CONVEYING RECLAIMED WATER WILL BE LAID SO THE OUTSIDE OF THE WATER MAIN IS AT LEAST 12 INCHES ABOVE OR BELOW <br />THE OTHER PIPELINE. <br />3. AT THE UTILITY CROSSINGS DESCRIBED IN PART II.C.1.W ABOVE, ONE FULL LENGTH OF WATER MAIN PIPE WILL BE CENTERED <br />ABOVE OR BELOW THE OTHER PIPELINE SO THE WATER MAIN JOINTS WILL BE AS FAR AS POSSIBLE FROM THE OTHER PIPELINE <br />OR THE PIPES WILL BE ARRANGED SO THAT ALL WATER MAIN JOINTS ARE AT LEAST THREE FEET FROM ALL JOINTS IN <br />VACUUM -TYPE SANITARY SEWERS, STORM SEWERS, STORMWATER FORCE MAINS, OR PIPELINES CONVEYING RECLAIMED <br />WATER REGULATED UNDER PART III OF CHAPTER 62-610, F.A.C., AND AT LEAST SIX FEET FROM ALL JOINTS IN GRAVITY- OR <br />PRESSURE -TYPE SANITARY SEWERS, WASTEWATER FORCE MAINS, OR PIPELINES CONVEYING RECLAIMED WATER NOT <br />REGULATED UNDER PART III OF CHAPTER 62-610, F.A.C. <br />oIQ < << Q M <br />z <br />O <br />r= <br />> <br />O <br />m <br />z <br />aa0 <br />ww <br />ZO <br />z <br />-5 <br />o <br />0 <br />o <br />a <br />a <br />C) <br />U <br />U <br />o <br />m <br />} <br />r <br />U <br />H(D <br />o <br />U <br />U <br />W <br />LL <br />= <br />z <br />O <br />o <br />Z <br />o <br />Z <br />p <br />z <br />z <br />U <br />¢ <br />¢ <br />¢ <br />m <br />m <br />o <br />z <br />z <br />o <br />mw <br />O <br />O <br />co <br />u) <br />U <br />U <br />O <br />w <br />m <br />m <br />a <br />m <br />m <br />a <br />r <br />r <br />T <br />W <br />o <br />r <br />r <br />F- <br />N <br />0 <br />C."N <br />N <br />O <br />Q <br />'n o) Cfl Ln C`7 CV ,- 0 <br />mw>-cn-Ozw <br />J L, <br />cc <br />z> O Q® 1 W (D <br />o(0mwza" w W 1\ T <br />_jmwm0=m c7 O O <br /><0CCLUFOmoS z O <br />U)w0r ¢ <br />0Dt (0LL0co 2i C � co <br />z0zwo- <br />t(') <br />Z-0 a¢0 O d 0,W O <br />3: U a a Q <br />NO, 84516 <br />h � <br />D STATE OF <br />? <br />05/2 1� p � 1,�018 <br />., OR P•. <br />h/r,,.... NA L. <br />I. <br />\, <br />oR7 <br />0 <br />N <br />ui Q <br />U) <br />cn � o <br />C] o <br />2 O rn N <br />O u- o6 ( _!�i <br />fr 00 m O <br />N Cl <br />cc ¢ v ti 0 <br />Z _ Ltd N CL <br />U ce) Z C`3 <br />oc �00o Ox� <br />co¢a =<� <br />N d cM CL LL. Q <br />o071 cn <br />z z O z <br />ui < Lu <br />Z J c <br />O <br />z Q a. cn <br />LLI 'Z Z <br />-j J < <br />w <br />LL <br />O` <br />V <br />7 <br />z <br />D <br />0 <br />U <br />0 <br />♦0 <br />V <br />a <br />a <br />L) <br />LIL <br />Lu <br />M <br />0 <br />z <br />a <br />cn <br />W <br />O <br />z <br />NOTES: <br />1. THE CONTRACTOR SHALL NOT PAVE OVER SOIL CEMENT BASE UNTIL A 30 DAY CURING TIME HAS ELAPSED <br />2. SHOULD ANY OF THE INFORMATION PROVIDED HEREIN CONFLICT WITH EITHER THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER, <br />AND/OR THE GEOTECHNICAL REPORT, THEN THE AFOREMENTIONED RECOMMENDATIONS WILL SUPERSEDE THIS "TESTING SCHEDULE GUIDE" <br />S <br />H <br />E <br />E <br />T <br />N <br />0 <br />