Laserfiche WebLink
W <br />0 <br />z <br />i <br />Q <br />U) <br />g <br />a <br />w <br />U) <br />uj <br />PC <br />SPILL CONTROL PRACTICES <br />IN ADDITION TO THE GOOD HOUSEKEEPING AND MATERIAL MANAGEMENT PRACTICES DISCUSSED IN THE PREVIOUS SECTIONS OF THIS PLAN, THE <br />FOLLOWING PRACTICES SHALL BE FOLLOWED FOR SPILL PREVENTION AND CLEANUP: <br />MANUFACTURER'S RECOMMENDED METHODS FOR SPILL CLEAN UP SHALL BE CLEARLY POSTED AND SITE PERSONNEL. SHALL BE MADE AWARE OF THE <br />PROCEDURES AND THE LOCATION OF THE INFORMATION AND CLEAN UP SUPPLIES. <br />MATERIALS AND EQUIPMENT NECESSARY FOR SPILL CLEAN UP SHALL BE KEPT IN THE MATERIAL STORAGE AREA ON SITE. EQUIPMENT AND MATERIALS <br />SHALL INCLUDE, BUT NOT BE LIMITED T0, BROOMS, DUST PANS, MOPS, RAGS> GLOVES, GOGGLES, KITTY LITTER, SAND, SAWDUST AND PLASTIC AND <br />METAL TRASH CONTAINERS. <br />ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY AFTER. DISCOVERY. <br />THE SPILL SHALL BE KEPT WELL VENTILATED AND PERSONNEL SHALL WEAR APPROPRIATE PROTECTIVE CLOTHING TO PREVENT INJURY FROM CONTACT <br />WITH HAZARDOUS SUBSTANCE. <br />SPILLS OF TOXIC OR HAZARDOUS MATERIAL SHALL BE REPORTED TO THE APPROPRIATE STATE OR LOCAL GOVERNMENT AGENCY, REGARDLESS OF THE <br />SLZE. <br />THE SPILL PREVENTION PLAN SHALL BE ADJUSTED TO INCLUDE MEASURES TO PREVENT THIS TYPE OF SPILL FROM REOCCURRING AND THE CLEAN UP <br />PROCEDURES FOR FUTURE USE. A DESCRIPTION OF THE SPILL, ITS CAUSE AND THE CLEAN UP MEASURES SHALL ALSO BE INCLUDED. <br />THE SITE SUPERINTENDENT RESPONSIBLE FOR THE DAY TO DAY SITE OPERATIONS SHALL BE THE. SPILL PREVENTION AND CLEAN UP COORDCNATOR. HE <br />OR SHE SHALL DESIGNATE OTHER SITE PERSONNEL WHO WILL RECEIVE SPILL PREVENTION AND CLEAN UP TRAINING. THESE INDIVIDUALS SHALL EACH <br />BEGOME RESPONSIBLE FOR A PARTICULAR PHASE OF PREVENTION AND CLEAN UP. THE NAMES OF THE RESPONSIBLE SPILL PERSONNEL SMALL BE <br />POSTED IN THE MATERIAL STORAGE AREA OR IN THE OFFICE TRAILER ON SITE,. IF APPLICABLE. <br />NOTICE OF TERMINATION <br />A NOTICE OF TERMINATION SHALL BE SUBMITTED TO THE FDEP AFTER THE CONSTRUCTION HAS BEEN COMPLETED AND THE SITE HAS UNDERGONE <br />FINAL STABILIZATION. <br />POLLUTION PREVENTION PLAN CERTIFICATION <br />TO THE BEST OF MY KNOWLEDGE,i CERTIFY UNDER PENALTY OF LAW THAT THIS DOCUMENT AND ALL ATTACHMENTS WERE PREPARED UNDER MY <br />DIRECTION OR SUPERVISION IN ACCORDANCE WITH A SYSTEM DESIGNED TO ASSURE THAT QUALIFIED PERSONNEL PROPERLY GATHER AND EVALUATE THE <br />INFORMATION SUBMITTED. BASED ON MY INQUIRY OF THE PERSON OR PERSONS MANAGE THE SYSTEM, OR THOSE PERSONS DIRECTLY RESPONSIBLE FOR <br />GATHERING THE INFORMATION SUBMITTED IS, TO THE BEST OF MY KNOWLEDGE AND BELIEF, TRUE, ACCURATE AND COMPLETE. I AM AWARE THAT THERE <br />ARE SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATION, INCLUDING THE POSSIBILITY OF FINES AND IMPRISONMENT FOR KNOWING VIOLATIONS. <br />OWNER: <br />NAME: TITLE: <br />SIGNATURE: DATE: <br />CONTRACTOR'S CERTIFICATION <br />I CERTIFY UNDER PENALTY OF LAW THAT I UNDERSTAND THE TERMS AND CONDITIONS OF THE GENERAL NATIONAL POLLUTANT DISCHARGE ELIMINATION <br />SYSTEM (NPDES) PERMIT THAT AUTHORIZES THE STORM WATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY FROM THE SITE IDENTIFIED AS <br />PART OF THIS CERTIFICATION. <br />SIGNATURE <br />COMPANY NAME AND ADDRESS <br />RESPONSIBLE FOR <br />COMPANY: <br />SIGNATURE: <br />ADDRESS: <br />NAME: <br />PHONE: <br />GENERAL CONTRACTOR <br />DATE: <br />COMPANY: <br />SIGNATURE: <br />ADDRESS: <br />TEMPORARY AND PERMANENT <br />NAME: <br />STABILIZATION <br />DATE: <br />PHONE: <br />COMPANY: <br />SIGNATURE: <br />NAME: <br />ADDRESS: <br />STABILIZED CONSTRUCTION ENTRANCE, <br />EARTH DIKES, SEDIMENT BASIN <br />DATE: <br />PHONE: <br />D Ia 1¢ F_ m <br />z <br />0 <br />Q D <br />DESCRIPTION OF PURPOSE AND TYPES OF SOIL DISTURBING ACTIVITIES: TIMING OF CONTROL MEASURES 0 <br />IL z !` i- <br />rl o z z Z <br />AS INDICATED IN THE SEQUENCE OF MAJOR ACTIVITIES, STAKED SILT FENCE, STABILIZED CONSTRUCTION ENTRANCES AND SEDIMENT BASINS SHALL BE cr o 2 2 <br />CONSTRUCTED PRIOR TO CLEARING OR GRADING OF ANY OTHER PORTIONS OF THE SITE. AREAS WHERE CONSTRUCTION ACTIVITY TEMPORARILY CEASES o r- a_ <br />SOIL DISTURBING ACTIVITIES WILL INCLUDE: CLEARING AND GRUBBING; INSTALLING A STABILIZED CONSTRUCTION ENTRANCE, PERIMETER AND OTHER EROSIO U 0 0 <br />AND SEDIMENT CONTROLS THROUGHOUT THE SITE; GRADING; STORM SEWER, UTILITIES AND BUILDING FOUNDATIONS; CONSTRUCTION OF CURB AND PARKING FOR MORE THAN 21 DAYS SHALL BE STABILIZED WITH A TEMPORARY GRASS AND MULCH WITHIN 14 DAYS OF THE LAST DISTURBANCE. ONCE cc v <br />LOT; PREPARATION FOR FINAL PLANTING AND SEEDING. CONSTRUCTION ACTIVITY CEASES PERMANENTLY THAT AREA SHALL BE STABILIZED WITH PERMANENT SOD. AFTER THE ENTIRE SITE IS STABILIZED, THE o = z o 0 0 <br />ACCUMULATED SEDIMENT SHALL BE REMOVED FROM THE TRAPS AND THE STAKED SILT FENCES SHALL BE REMOVED. o <br />`n cr U Q Q <br />O m 0 z z <br />Q > <br />SEQUENCE OF MAJOR EVENTS: CERTIFICATION OF COMPLIANCE WITH FEDERAL, STATE AND LOCAL REGULATIONS F) Q o 0 0 <br />0 cn � U U <br />> > x m <br />1. INSTALL STAKED SILT FENCE AS INDICATED ON THE CONSTRUCTION PLANS. o cc W a_ W <br />THE STORM WATER POLLUTION PREVENTION PLAN REFLECTS THE SOUTH WEST FLORIDA WATER MANAGEMENT DISTRICT (SWFWMD) REQUIREMENTS FOR � `c " °_ `� <br />2. EXCAVATE PONDS FOR SEDIMENT TRAPS FOR SITE RUNOFFS. STORM WATER MANAGEMENT AND EROSION AND SEDIMENT CONTROL AS ESTABLISHED BY SWFWMD STORM WATER MANAGEMENT PRACTICES MANUAL AND `° `° `° err,-f W <br />3. BEGIN BUILDING CONSTRUCTION. THE FLORIDA ADMINISTRATIVE CODE, CHAPTER 40D -4 AND 40D-40. TO ENSURE COMPLIANCE, THIS PLAN WAS PREPARED IN ACCORDANCE WITH o o r r <br />4. CONSTRUCT DIVERSION SWALES AROUND PERIMETER OF SITE TO PONDS, AS NECESSARY. N N N N o p <br />5. INSTALL STORM SEWER SYSTEM AND ITS SILTATION PROTECTION, UTILITIES AND OUT FALL STRUCTURES. SWFWMD S BASIS OF REVIEW FOR SURFACE WATER MANAGEMENT PERMIT APPLICATIONS WITHIN THE SOUTH WEST FLORIDA WATER MANAGEMENT r r r <br />6. STABILIZE PARKING LOT. DISTRICT". � N � 0 � � N � oz <br />7. CONSTRUCT CURB, BASE AND ASPHALT. <br />8. COMPLETE FINAL SITE GRADING. fr` > - Co - o z w <br />9. INSTALL PERMANENT LANDSCAPING ON SITE. REPAIR ANY WASHED OUT AREAS. MAINTENANCE INSPECTION PROCEDURES <br />10. WHEN CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED, REMOVE EROSION PROTECTION DEVICES AND PLACE SOD AS NECESSARY. o Z m z ° r W <br />EROSION AND SEDIMENT CONTROL INSPECTION AND MAINTENANCE PRACTICES D g W W, o aD m 0 o 0 <br />NAME OF RECEIVING WATERS: ? ° W �; z T <br />THESE ARE THE INSPECTION AND MAINTENANCE PRACTICES THAT SHALL BE USED TO MAINTAIN EROSION AND SEDIMENT CONTROL: z o z W o o `° 2E n- � � o <br />�F�aQ0 0 U 00 tW- O <br />1. ALL CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EACH WEEK AND FOLLOWING ANY STORM EVENT OF 0.5-INCHES OR GREATER BY a a o <br />A CONTRACTORS REPRESENTATIVE. <br />POLLUTION REDUCTION CONTROLS 2. ALL MEASURES SHALL BE MAINTAINED IN GOOD WORKING ORDER; IF A REPAIR IS NECESSARY, IT SHALL BE INITIATED WITHIN 24 HOURS OF <br />REPORT. <br />EROSION AND SEDIMENT CONTROLS 3. BUILT UP SEDIMENT SHALL BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE HEIGHT OF THE SILT FENCE. , •�•.,: <br />4. SILT FENCE SHALL BE INSPECTED REGULARLY FOR DEPTH OF SEDIMENT AND TEARS TO SEE IF THE FABRIC IS SECURELY ATTACHED TO THE FENCE <br />POSTS AND TO SEE THAT THE FENCE POSTS ARE FIRMLY IN THE GROUND. r* fNO.84516 ~= <br />STABILIZATION PRACTICES 5. THE SEDIMENT BASINS SHALL BE INSPECTED DEPTH OF SEDIMENT AND BUILD UP OF SEDIMENT SHALL BE REMOVED WHEN IT REACHES x <br />10% OF THE DESIGN CAPACITY OR AT THE END OF THE JOB. -5 STATE OF <br />+% 05/21i20]R <br />WIND EROSION STABILIZATION - THE CONTRACTOR SHALL DENUDE ONLY AREAS WHERE IT IS EXPECTED TO BE GRADED OR ALTERED WITHIN A 6. TEMPORARY AND PERMANENT GRASSING AND MULCHING AND SODDING SHALL BE INSPECTED FOR BARE SPOTS, WASHOUTS AND HEALTHY �k\ w <br />REASONABLE TIME FRAME. ALL PERVIOUS AREAS OF THE SITE INCLUDED IN GRADING THAT ARE DISTURBED DURING CONSTRUCTION SHALL BE GRADED GROWTH. '%r "•L�..4 <br />AND PREPARED WITH A COMBINATION OF SOD AND/OR SEEDING AND MULCHING. PAD AREAS WITHIN FUTURE UNITS WHERE EARTHWORK IS COMPLETED 7. A MAINTENANCE INSPECTION REPORT SHALL BE MADE AFTER EACH INSPECTION BY THE CONTRACTOR AND SHALL BE KEPT IN AN ACTIVE LOG spNA �•• <br />SHALL BE COMPLETELY SEEDED AND MULCHED. AREAS WHERE CONSTRUCTION OPERATIONS WILL BE CONTINUOUS, FUGITIVE DUST SHALL BE MANAGED BY READILY AVAILABLE AT THE JOB SITE. fr�fr„' <br />�+��nurrrnwmmm�+m <br />APPLYING A WATER SPRAY TO SATURATE THE SURFACE SOILS ON A DAILY BASIS (OR AS NEEDED) TO MAINTAIN MINIMAL DUST TRANSPORT. FUGITIVE 8. EITHER THE SITE SUPERINTENDENT OR HIS DESIGNEES SHALL BE RESPONSIBLE FOR INSPECTIONS, MAINTENANCE, REPAIR ACTIVITIES AND <br />DUST SHALL BE MONITORED CONTINUOUSLY AND ADDITIONAL MEASURES MAY NEED TO BE TAKEN TO CONTROL OFF SITE TRANSPORT OF UNACCEPTABLE COMPLETING THE INSPECTION AND MAINTENANCE REPORT. <br />LEVELS OF DUST. 9. PERSONNEL SELECTED FOR INSPECTION AND MAINTENANCE RESPONSIBILITIES SHALL RECEIVE TRAINING FROM THE SITE SUPERINTENDENT. THEY <br />SHALL BE TRAINED IN ALL THE INSPECTION AND MAINTENANCE PRACTICES NECESSARY FOR KEEPING THE EROSION AND SEDIMENT CONTROLS USED <br />TEMPORARY STABILIZATION - TOP OF SOIL STOCK PILES AND DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY TEMPORARILY CEASES ON SITE IN GOOD WORKING ORDER. <br />FOR AT LEAST 21 DAYS SHALL BE STABILIZED WITH TEMPORARY GRASS AND MULCH OR OTHER APPROVED MEANS, NO LATER THAN 14 DAYS FROM THE o <br />LAST CONSTRUCTION ACTIVITY. GRASS SEED SHALL BE A MIXTURE OF 20 PARTS OF BERMUDA AND 80 PARTS OF PENSACOLA BAHIA. THE SEPARATE ui <br />N <br />TYPES OF SEED USED SHALL BE THOROUGHLY DRY MIXED IMMEDIATELY BEFORE SOWING. SEED WHICH HAS BECOME WET SHALL NOT BE USED. THE � - 0 <br />MULCH MATERIAL USED SHALL NORMALLY BE DRY MULCH. DRY MULCH SHALL BE STRAW OR HAY CONSISTING OF OAT, RYE OR WHEAT STRAW, OR OF 0 o mo � <br />PANGOLA, PEANUT, COASTAL BERMUDA OR BAHIA GRASS HAY. ONLY UNDETERIORATED MULCH WHICH CAN BE READILY CUT INTO THE SOIL. SHALL BE NON -STORM WATER DISCHARGE a o � a, <br />USED. AREAS OF THE SITE WHICH ARE TO BE PAVED WILL BE TEMPORARILY STABILIZED BY APPLYING STABILIZATION AND BASE. °C m � 4 0 <br />4 0 <br />IT IS EXPECTED THAT THE FOLLOWING NON -STORM WATER DISCHARGES WILL OCCUR FROM THE SITE DURING THE CONSTRUCTION PERIOD: W m N co a- <br />PERMANENT STABILIZATION - DISTURBED PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITY PERMANENTLY CEASES SHALL BE STABILIZED WITH SOD U c Q ,, o <br />NO LATER THAN 14 DAYS AFTER LAST CONSTRUCTION ACTIVITY. 1. WATER FROM WATER LINE FLUSHING. _ co z � o <br />2. PAVEMENT WASH WATERS (WHERE NO SPILLS OR LEAKS OF TOXIC OR HAZARDOUS MATERIALS HAVE OCCURRED). o � o x o <br />M Q � _ ¢ > <br />3. UNCONTAMINATED GROUNDWATER (FROM DEWATERING EXCAVATION). ALL NON -STORM WATER DISCHARGES SHALL BE DIRECTED TO THE `" a_ " °- `- Q <br />SEDIMENT BASIN PRIOR TO DISCHARGE. <br />c�c�zc.�rn <br />zzCoz� <br />cc z f— 5- <br />STRUCTURAL PRACTICES W Q > <br />NON -STORM WATER DISCHARGE z r o � <br />EROSION PROTECTION - DURING THE CONSTRUCTION PHASES, APPROPRIATE PRACTICES INCLUDING, BUT NOT LIMITED TO SILT FENCE BARRIERS, HAY rz z �' <br />BALES AND WATERING OR OTHER METHODS NECESSARY WILL BE IMPLEMENTED TO CONTROL FUGITIVE DUST, SEDIMENT BASINS -THE STORM WATER IT IS EXPECTED THAT THE FOLLOWING NON -STORM WATER DISCHARGES SHALL OCCUR FROM THE SITE DURING THE CONSTRUCTION PERIOD: _ a <br />MANAGEMENT AREAS (RETENTION AREAS) WILL SERVE AS SEDIMENT BASINS DURING THE CONSTRUCTION PERIOD. AT THE CONTRACTOR' DISCRETION, THE U <br />SEDIMENT BASINS WILL BE CONSTRUCTED TO THE DESIGN CROSS-SECTION OR A MINIMUM OF 2-FEET BELOW EXISTING GROUND TO ALLOW THE SILT TO U' <br />BE COLLECTED AND REMOVED PRIOR TO COMPLETION OF THE GRADING. CONCRETE FERTILIZERS Q <br />DETERGENTS PETROLEUM BASED PRODUCTS AND cc <br />PAINTS (ENAMEL AND LATEX) FUELS `j <br />STORM WATER MANAGEMENT METAL STUDS CLEANING SOLVENTS <br />GLASS WOOD <br />TAR MASONRY BLOCK <br />STORM WATER DRAINAGE WILL BE PROVIDED BY A CURB, STORM WATER AND CATCH BASIN SYSTEM FOR THE DEVELOPED AREAS. THE AREAS NOT SAND ROOFING SHINGLES <br />DEVELOPED SHALL BE GRADED TO LESS THAN 2% SLOPES AND HAVE PERMANENT SEEDING OR PLANTINGS, WHEN CONSTRUCTION IS COMPLETE THE SITE STONE Q <br />WILL DRAIN TO STORM WATER PONDS THAT WERE UTILIZED AS THE TEMPORARY SEDIMENT BASINS DURING THE CONSTRUCTION PROCESS. ANY <br />ACCUMULATED SEDIMENT SHALL BE REMOVED FROM THE SEDIMENT BASINS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CONSTRUCT AL <br />RETENTION/DETENTION AREAS IN ACCORDANCE WITH THE APPROVED CONSTRUCTION PLANS. SPILL PREVENTIONy�� <br />MATERIAL MANAGEMENT PRACTICES <br />SPECIFIED OTHER CONTROLS J <br />THE FOLLOWING ARE THE MATERIAL MANAGEMENT PRACTICES THAT SHALL BE USED TO REDUCE THE RISK OF SPILLS OR OTHER ACCIDENTAL EXPOSUREU. <br />OF MATERIALS AND SUBSTANCES TO STORM WATER RUNOFF. <br />WASTE DISPOSAL <br />GOOD HOUSEKEEPING <br />WASTE MATERIALS - ALL WASTE MATERIAL SHALL BE COLLECTED AND CONTAINED IN A CONTROLLED AREA PURSUANT TO STATE AND LOCAL SOLID THE FOLLOWING GOOD HOUSEKEEPING PRACTICES SHALL BE FOLLOWED ON SITE DURING THE CONSTRUCTION PROJECT. AN EFFORT SHALL BE MADE TO <br />WASTE REGULATIONS. ALL TRASH AND CONSTRUCTION DEBRIS GENERATED FROM CONSTRUCTION IS TO BE REMOVED FROM THE SITE AND DISPOSED OF STORE ONLY ENOUGH PRODUCT REQUIRED TO COMPLETE THE PROJECT. ALL MATERIALS STORED ON SITE SHALL BE STORED IN A NEAT ORDERLY MANNER <br />APPROPRIATELY. NO CONSTRUCTION MATERIALS SHALL BE BURIED ON SITE. ALL PERSONNEL SHALL BE INSTRUCTED REGARDING THE CORRECT IN THEIR APPROPRIATE CONTAINERS AND IF POSSIBLE, UNDER A ROOF OR OTHER CONTAINED ENCLOSURE. PRODUCTS SHALL BE KEPT IN THEIR ORIGINAL <br />PROCEDURE FOR WASTE DISPOSAL. NOTICES STATING THESE PRACTICES SHALL BE POSTED IN THE ON SITE OFFICE TRAILER AND THE CONSTRUCTION MANUFACTURER'S LABELED CONTAINERS. SUBSTANCES SHALL NOT BE MIXED WITH ONE ANOTHER UNLESS RECOMMENDED BY THE MANUFACTURER. <br />M MANAGER RESPONSIBLE FOR THE DAY TO DAY SITE OPERATIONS SHALL BE RESPONSIBLE FOR SEEING THAT THESE PROCEDURES ARE FOLLOWED. WHENEVER POSSIBLE, ALL OF THE PRODUCT SHALL BE USED BEFORE DISPOSING OF THE CONTAINER. MANUFACTURER'S RECOMMENDATIONS FOR PROPER <br />USE AND DISPOSAL SHALL BE FOLLOWED. THE SITE SUPERINTENDENT SHALL INSPECT DAILY TO ENSURE PROPER USE AND DISPOSAL OF MATERIALS ON <br />HAZARDOUS WASTE - IF ENCOUNTERED, ALL WASTE MATERIALS SHALL BE DISPOSED OF IN THE MANNER SPECIFIED BY STATE AND/LOCAL SITE. O <br />REGULATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SEEING THAT THESE PRACTICES ARE FOLLOWED. <br />} HAZARDOUS PRODUCTS <br />o SANITARY WASTE - ALL SANITARY WASTE SHALL BE COLLECTED FROM PORTABLE UNITS BY A LICENSED SANITARY WASTE MANAGEMENT CONTRACTOR THESE PRACTICES ARE USED TO REDUCE THE RISKS ASSOCIATED WITH HAZARDOUS MATERIALS. PRODUCTS SHALL BE KEPT IN ORIGINAL CONTAINERS <br />AS REQUIRED BY STATE AND LOCAL CODES AND REGULATIONS. UNLESS THEY ARE NOT RESEALABLE. ORIGINAL LABELS AND MATERIAL SAFETY DATA SHALL BE RETAINED; THEY CONTAIN IMPORTANT PRODUCT <br />INFORMATION. IF SURPLUS PRODUCT MUST BE DISPOSED OF, MANUFACTURER'S OR LOCAL AND STATE RECOMMENDED METHODS OF PROPER DISPOSAL ♦/� <br />SHALL BE FOLLOWED. <br />PETROLEUM PRODUCTS Z W <br />OFF SITE VEHICLE TRACKING ALL ON SITE VEHICLES SHALL BE MONITORED FOR LEAKS AND RECEIVE REGULAR PREVENTATIVE MAINTENANCE TO REDUCE THE CHANCE OF LEAKAGE. F.. <br />PETROLEUM PRODUCTS SHALL BE STORED IN TIGHTLY SEALED CONTAINERS WHICH ARE CLEARLY LABELED. ANY ASPHALT SUBSTANCES USED ON SITE <br />STABILIZED CONSTRUCTION ENTRANCES SHALL BE PROVIDED TO HELP REDUCE OFF SITE VEHICLE TRACKING OF SEDIMENTS. THE PAVED STREETS SHALL SHALL BE APPLIED ACCORDINGLY TO THE MANUFACTURER'S RECOMMENDATIONS. Q O <br />BE CLEANED AS NEEDED TO REMOVE ANY EXCESS MUD, DIRT OR ROCK TRACKED FROM THE SITE. DUMP TRUCKS HAULING MATERIAL FROM THE SITE z <br />SHALL BE COVERED WITH A TARPAULIN AT ALL TIMES. FERTILIZERS Z V <br />FERTILIZERS USED SHALL BE APPLIED ONLY IN THE MINIMUM AMOUNT RECOMMENDED BY THE MANUFACTURER. ONCE APPLIED, FERTILIZER SHALL BE O (n <br />WORKED INTO THE SOIL TO LIMIT EXPOSURE TO STORM WATER. STORAGE SHALL BE IN A COVERED SHED. THE CONTENTS OF ANY PARTIALLY USED BAGS W <br />OF FERTILIZER SHALL BE TRANSFERRED TO A SEALABLE PLASTIC BIN TO AVOID SPILLS. / 1 <br />T PAINS 0. <br />ALL CONTAINERS SHALL BE TIGHTLY SEALED AND STORED WHEN NOT REQUIRED FOR USE. EXCESS PAINT SHALL NOT BE DISCHARGED TO THE STORM Q <br />SEWER SYSTEM BUT SHALL BE PROPERLY DISPOSED OF ACCORDING TO MANUFACTURER'S INSTRUCTIONS OR STATE AND LOCAL REGULATIONS. CONCRETE a <br />TRUCKS: CONTRACTOR SHALL DESIGNATE AN AREA FOR DISCHARGE OF SURPLUS CONCRETE OR DRUM WASH WATER AND SHALL INSTALL A <br />CONTAINMENT BERM AROUND THIS AREA TO PREVENT RUNOFF TO THE REMAINDER OF THE SITE. HARD DEBRIS SHALL BE DISPOSED OF BY CONTRACTOR <br />UPON COMPLETION OF THE PROJECT. <br />u <br />S <br />H <br />E <br />E <br />T <br />N <br />O <br />