NNW
<br />0
<br />Ln
<br />N
<br />N
<br />0
<br />N
<br />00
<br />0
<br />W
<br />N
<br />N_
<br />0
<br />N
<br />PLUMB I N6 LEGEND
<br />SANITARY, WASTE BELOW FLOOR - 5, W, 5AN, 55
<br />SANITARY, WASTE ABOVE FLOOR -5, W, SAN, 55
<br />STORM BELOW FLOOR - ST
<br />STORM ABOVE FLOOR - ST
<br />- - - - - VENT PIPING - V
<br />- GOLD WATER PIPING - CW
<br />- - - HOT WATER PIPING - HW
<br />- - - - - HOT WATER RETURN PIPING - HWR
<br />-�
<br />PIPING BELOW FLOOR - B/F
<br />-
<br />EXISTING GW
<br />- - -
<br />EXISTING HW
<br />- - - - -
<br />EXISTING HWR
<br />EXISTING PIPING
<br />PIPING TO BE REMOVED OR ABANDONED
<br />GLEANOUT5 - CO, WOO, FGO, GGO
<br />- 4- -
<br />GATE VALVE - GV
<br />r
<br />BALL VALVE - BV
<br />PRESSURE REDUCING VALVE - PRV
<br />CHECK VALVE
<br />CIRCUIT SETTER
<br />s i
<br />CIRCUIT SETTER A55EMBLY
<br />® a
<br />FLOOR DRAIN - FD, FD-*
<br />® a
<br />AREA DRAIN - AD, AD-*
<br />®
<br />ROOF DRAIN - RD, RD-*
<br />WHA
<br />WATER HAMMER ARRESTOR
<br />VTR
<br />VENT THRU ROOF
<br />MH±
<br />WATER HEATER
<br />-0-*
<br />PLUMBING FIXTURE
<br />-�
<br />IN -LINE BAGKFLOW PREVENTER
<br />2-a--
<br />TRAP PRIMER - TP
<br />$
<br />AIR ADMITTANCE VALVE (AAV)
<br />ADA GOMPLIANGE
<br />I. VERIFY FIXTURE5 THAT ARE INTENDED FOR HANDICAP USE WITH
<br />CURRENT ARCHITECTURAL DRAWIN65.
<br />2. PLUMBING FIXTURES DESIGNATED FOR HANDICAP USE SHALL COMPLY
<br />WITH ADA AND ALL STATE, CITY, AND LOCAL REQUIREMENTS
<br />PERTAINING TO HANDICAP ACCESSIBILITY.
<br />3. FIXTURE INSTALLATION SHALL COMPLY WITH ADA AND ANY STATE,
<br />CITY, AND LOCAL REQUIREMENTS PERTAINING TO HANDICAP
<br />ACCESSIBILITY.
<br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH
<br />ADA AND ALL STATE, CITY, AND LOCAL REQUIREMENTS PERTAINING TO
<br />PLUMBING FIXTURES AND PLUMBING FIXTURE INSTALLATION FOR USE
<br />BY THE HANDICAPPED.
<br />SPRINKLER HEAD NOTES
<br />I. LAY -IN TILE CEILINGS:
<br />SMALL FRAME GLASS ELEMENT, 5EMI-REGE55ED QUICK RESPONSE
<br />PENDENT SPRINKLERS. TEMPERATURE RATING SHALL BE 155°-1656.
<br />SPRINKLER AND ESCUTCHEON 5HALL BE POLISHED CHROME.
<br />2. GYP CEILINGS:
<br />QUICK RESPONSE CONGEALED SPRINKLER. COORDINATE COVER
<br />FINISH WITH ARCHITECT. TEMPERATURE RATING SHALL BE 1550-1650.
<br />3. NO CEILING:
<br />SMALL FRAME GLASS ELEMENT, UPRIGHT QUICK RESPONSE PENDENT
<br />SPRINKLERS. TEMPERATURE RATING SHALL BE 1650 UNLE55 HIGHER 15
<br />REQUIRED. SPRINKLER SHALL BE ROUGH BRASS FINISH.
<br />PLUMBIN6 FIXTURE 5GHEDULE
<br />MARK
<br />DESCRIPTION
<br />FITTINGS/AGGE550RIE5
<br />REMARKS
<br />FIXTURE CONNECTIONS
<br />GW
<br />HW
<br />WASTE
<br />VENT
<br />P-3H
<br />GOUNtTERTOP
<br />��
<br />FAUCET: DELTA/GAMBRIDGE 27G4925
<br />P-TRAP, DRAIN RISER t WATER SUPPLY SHALL 8E PVC,
<br />4" CENTERS, b' WRIST BLADES, 6" VIA. GOOSENECK BEND,
<br />I/2"
<br />I/2"
<br />I-I/4"
<br />1-I/2"
<br />SINK
<br />MODEL II
<br />PLASTIC, STRAINER, TRUEBRO LAV GUARD
<br />DINAR FLOW
<br />LAVATORY
<br />AMERIGAN STANDARD
<br />FAUCET: SLOAN ETF-T10-4 SENSOR -CONTROLLED
<br />WALL HUNG, LAMINAR FLOW, ADA, JAY R SMITH 0723 LAVATORY
<br />P-3J
<br />WALL HUNG
<br />0355AI2
<br />P-TRAP, DRAIN RISER #WATER SUPPLY SHALL BE PVC,
<br />SUPPORT, IRON HARD WIRED KIT W/ TRANSFORMER, WIRE AND TMV
<br />I/2"
<br />I/2'
<br />I-I/4"
<br />I-I/2"
<br />ADA
<br />LUCERNE
<br />GRID DRAIN, TRUEBRO LAV GUARD OR LAV SHIELD
<br />INSTALLED OUT OF SIGHT WITH MEANS OF ACCESS. WATER TEMP 105°F.
<br />FIRE SPRINKLER SYSTEM
<br />AUTOMATIC SPRINKLER PROTEG nON IS GURREMI.Y PROVIDED THIRO6HOUT THE BUILDING.
<br />THE DE516N INTENT 15 TO MODIFY THE EXISTING SYSTEM A5 REQUIRED FOR NEW
<br />ARCHITECTURAL LAYOUT. PROVIDE NEW HEADS. AUTOMATIC, SPRINKLER SYSTEMS SHOULD BE
<br />DE516NED TO THE M05T CURRENT EDITION OF NFPA 13, THE OWNER'S INSURANCE
<br />UNDERWRITER 60IDELINES, AND LOCAL AND STATE FIRE MARSHAL REQUIREMENTS. THE
<br />AUTOMATIC, SPRINKLER AND FIRE DETECTION SYSTEMS SHOULD BE MONITORED BY A UL
<br />APPROVED FIRE ALARM SYSTEM.
<br />CONTRACTOR SHALL PROVIDE DETAILED FIRE SPRINKLER DE516N FOR REVIEW. WORKIN6
<br />PLANS SHALL BE DRAWN TO SCALE (1/8A MINIMUM), WITH A PLAN OF EACH FLOOR, AND
<br />SHALL SHOW THOSE ITEMS FROM THE NFPA L15T THAT PERTAINS TO THE DE516N AND
<br />HYDRAULIC GALGUI.ATION OF THE SYSTEM. SHOP DRAWIN65 WITH GEILIN6 PLANS SHALL
<br />INDICATE ALL L16HT5, 6RILLE5, SPEAKERS AND OTHER GEILIN6 COMPONENTS, TO INSURE
<br />PROPER COORDINATION WITH SUCH GEILIN6 ITEMS.
<br />THE CONTRACTOR SHALL SUBMIT AND SECURE APPROVAL OF THE SHOP DRANN66 WITH
<br />HYDRAULIC, CALCULATIONS TO THE OWNER'S INSURANCE UNDERWRITER AND LOCAL AND
<br />STATE A THORITIE5 PRIOR TO 5UBMIS510N TO THE ENGINEER. ALL SHOP DRAWINGS AND
<br />CALCULATIONS SHALL BEAR THE SEAL OF A RE615TERED PROFESSIONAL ENGINEER OR AN
<br />EQUIVALENT FIRE SPRINKLER CONTRACTORS CERTIFICATE SEAT_ LICENSED IN THE STATE OF
<br />THE PROJECT.
<br />IN ADDITION TO SHOP DRAWIN6 SUBMITTALS INCLUDE PRINTED EQUIPMENT BROCHURES
<br />AND/OR GATALO6 CUTS TO PROVIDE COMPLETE SPEGIFIGA1ION5 FOR ALL OF THE ITEMS TO
<br />BE FURNISHED FOR THE COMPl.E1E SYSTEM(5) INGLUDIN6 BUT NOT LIMITED TO 5PRINKL.ER
<br />HEADS, ALL PIPE AND FITTIN65, FIRE R15ER APPURTENANCES, BAGKFLOW PREVENTION,
<br />HANGER5 AND SUPPORTS, TEST C00EGTION5 AND FLOW/TAMPER SWITGHE5.
<br />A WATER FLOW TEST FROM THE HYDRANT NEAREST THE 51TE SERVICE CONNECTION OR
<br />FROM THE 56WGE PIPIN6 ON THE 517E 15 TO BE PERFORMED BY THE FIRE PROTECTION
<br />CONTRACTOR IN ACCORDANCE WITH NFPA 241. THIS TEST MAY BE PROVIDED TO THE FIRE
<br />PROTECTION CONTRACTOR BY THE INSURANCE UNDERNRITER OR LOCAL WATER AUTHORITY.
<br />THE COMPLETED FLOW TEST DATA 15 TO BE FORWARDED TO THE ENGINEER
<br />AUTOMATIC SPRINKLER SYSTEMS 94ALL BE HYDRALLICALLY CALCALATED FOR THE
<br />NFPA DB16N STANDARDS:
<br />LOBBIES. PUBLIG SPACE5,51MILAR AREAS 11 I 6PM OVER 1500
<br />Ili! t".i\ i ELECTRICAL. Ii►A6AREAS ORDINARYKAZARD 6ROUP 1,.15 6PMISF
<br />1500 S.F.
<br />�U1� 6jar � �. �+ � M _ .d►. \�� E► MjfHAZARD, I � ' OVER
<br />SPRINKLER PIPIN6 1-1/4' IN DIAMETER OR LARGER, CONNECTED BY NBDED, FLANGED
<br />FITTINGS OR ROLL GROOVED FITTIN65, SHALL BE SCHEDULE 40 OR SCHEDULE 10 A5
<br />PERMITTED BY NFPA 13. GUT GROOVES ARE aQj PERMITTED.
<br />DRY 5PRINKLER ASSEMBLIES SHALL BE FURNISHED COMPLETE WITH ALL SPECIALTY
<br />VALVE5, PIPE AND EQUIPMENT A5 REQUIRED FOR THE SYSTEMS. THE SYSTEMS SHALL
<br />BE COMPLETE WITH DRY PIPE VALVE, AIR COMPRE5SOR AGGELERATOR,
<br />MAINTENANCE PRE55URE COMPRE55OR AND A550GIATED TRIM AND WIRED FOR
<br />INTERGONNEGTION TO ALL REQUIRED ACGE55ORIE5, DETECTION DEVICES, PRE55M
<br />SWITCHES, ETC. AS REQUIRED. AIR GOMPRE550R5 FOR DRY PIPE SYSTEMS SHALL BE
<br />CALCULATED AND 51ZED, FURNISHED AND INSTALLED ON THE RISER AS AN INTEGRAL
<br />PART OF THE DRY PIPE SPRINKLER SYSTEM, AND SHALL MEET ALL REQUIREMENTS OF
<br />NFPA 13. COORDINATE ELECTRICAL REQUIREMENT5 OF AIR COMPRESSOR WITH
<br />ELECTRICAL CONTRACTOR PRIOR TO BID.
<br />THE CONTRACTOR SHALL FURNISH AND INSTALL A CABINET LOCATED IN THE FIRE
<br />SERVICE ROOM WITH SPARE NIMBER OF EACH TYPE SPRINKLER HEAD AND RELATED
<br />WRENCH AS REQUIRED BY NFPA 13.
<br />THE SPRINKLER CONTRACTOR SHALL VERIFY THE 5EI5MIG CONDITIONS, FURNISH AND
<br />INSTALL ALL EQUIPMENT AND APPURTENANGE5 REQUIRED.
<br />PLUMBII�C� SPEGIFIGATIO�Is
<br />AND NOTES
<br />I. ALL PLUMBING WORK SHALL COMPLY WITH THE 2020 FLORIDA PLUMBING GODS WITH ALL APPLICABLE LOCAL
<br />AMENDMENTS.
<br />2. PRIOR TO PURCHASING ANY MATERIALS OR STARTING ANY WORK, CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
<br />CONDITIONS, PIPING SIZES AND LOCATIONS, EQUIPMENT, ETC., SHOWN ON THE DRAWINGS OR AFFECTING THIS WORK
<br />AND SHALL REPORT ANY DEVIATIONS TO THE ARCHITECT.
<br />3. FIELD VERIFY LOCATION OF EXISTING SERVICES TO BE REUSED OR CONNECTED TO AND REPORT TO
<br />ARGHITEGT/ENGINEER IF OTHER THAN THAT WHICH 15 INDICATED ON DRAWINGS.
<br />4. WHEN RENOVATING OR MAKING AN ADDITION TO AN EXISTING FACILITY, CONTRACTOR SHALL FIELD VERIFY
<br />EXISTING EQUIPMENT (FIXTURES, TRIM, PUMPS, ETC) MANUFACTURERS AND USE SAME MANUFACTURERS FOR NEW
<br />EQUIPMENT. CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL OF OWNER/OWNER REPRESENTATIVE FOR USE OF
<br />DIFFERENT MANUFACTURERS.
<br />5. ANY EXISTING WALL, FLOOR, OR CEILING SURFACE THAT 15 DISTURBED DURING THE COURSE OF THE WORK SHALL
<br />BE REPAIRED. WHEREVER FOUNDATION WALLS, OUTSIDE WALLS, ROOFS, ETC., ARE PENETRATED FOR INSTALLATION
<br />OF SYSTEMS, THEY SHALL BE PATCHED TO MATCH EXISTING CONSTRUCTION AND SEALED WEATHER TIGHT.
<br />1 cis
<br />6. ALL OPENINGS IN DRAINAGE AND/OR VENT SYSTEMS A5 A RESULT OF INSTALLATION ROUGHi-IN SHALL BE
<br />PROTECTED WITH A TEST PLUG THAT 15 SECURELY LOCKED IN PLACE UNTIL FINAL FINISHED CONNECTIONS ARE
<br />INSTALLED.
<br />7. ALL PIPING SHALL BE RUN PARALLEL TO BUILDING LINES AND SUPPORTED AND ANCHORED AS REQUIRED TO
<br />FACILITATE EXPANSION AND CONTRACTION. INSTALL ALL PIPING AS REQUIRED TO MEET CONSTRUCTION CONDITIONS
<br />AND TO ALLOW FOR INSTALLATION OF OTHER WORK, INCLUDING DUCTWORK AND ELECTRICAL CONDUIT.
<br />8. ALL PIPING SHALL BE ROUTED ABOVE CEILING, CONGEALED IN WALLS, AND BEHIND FURNISHINGS UNLESS OTHERWISE
<br />INDICATED. ALL OVERHEAD PIPING EXPOSED TO VIEW SHALL BE ROUTED AS HIGH AS POSSIBLE AND TIGHT TO THE
<br />UNDERSIDE OF STRUCTURE.
<br />q. WATER PIPING ROUTED ABOVE CEILINGS AND IN EXTERIOR WALLS SHALL BE ROUTED ON HEATED SIDE OF CEILING
<br />INSULATION AND WALL INSULATION, UNLESS OTHER FREEZE PROTECTION 15 INDICATED.
<br />10. SANITARY WASTE d VENT, AND STORM DRAIN PIPING ABOVE GROUND SHALL BE PVC, WITH SOLVENT JOINTS.
<br />II. SANITARY WASTE 4 STORM DRAIN PIPING BELOW GROUND SHALL BE SCHEDULE 40 DWV PVC, WITH SOLVENT JOINTS.
<br />12. PROVIDE GLEANOUTS AT THE END OF EACH HORIZONTAL SANITARY RUN AND AT THE BASE OF ALL SANITARY
<br />STACKS. GLEANOUTS SHALL BE OF THE SAME SIZE AS THE PIPES THEY SERVE.
<br />13. TOPS OF ALL FLOOR DRAINS AND GLEANOUTS SHALL BE SET FLUSH WITH AJDAGENT FINISHED FLOOR. COORDINATE
<br />FLOOR SLOPES AND DRAIN LEVELS WITH ARCHITECTURAL. CAULK WITH GONTINUOU�' CLEAR SEALANT BAND.
<br />14. AIR ADMITTANCE VALVES SHALL BE INSTALLED ONLY WHERE SHOWN ON PLANS AND SHALL BE STUDOR GHEM-VENT
<br />OR APPROVED EQUAL.
<br />15. ALL SANITARY WASTE, VENT, AND DOMESTIC WATER PIPING SYSTEMS SHALL BE TESTED IN ACCORDANCE WITH
<br />SECTION 312 OF THE CURRENTLY ACCEPTED INTERNATIONAL PLUMBING GORE, OR OTHER APPLICABLE LOCALLY
<br />ACCEPTED GORE.
<br />Ib. GOLD AND HOT WATER PIPING ABOVE GRADE SHALL BE TYPE L HARD DRAWN COPPER TUBING CONFORMING TO
<br />ASTM 8-88 WITH SWEAT JOINTS AND CAST OR V��?OUGHT FITTINGS. JOINTS SHALL BE MADE WITH LEAD FREE
<br />SOLDER. GOLD WATER PIPING BELOW GRADE SHALL BE TYPE K COPPER TUBING WITH CAST OR V�2000HT FITTINGS
<br />AND JOINTS AS DESCRIBED ABOVE. JOINTS SHALL NOT BE PERMITTED UNDER FLOOR SLABS. WATER PIPING
<br />BELOW GRADE THROUGH CONCRETE SHALL BE PROTECTED WITH PLASTIC SLEEVES.
<br />I -I. ALL HOT, GOLD, AND HOT WATER RETURN WATER PIPING ABOVE GRADE SHALL BE INSULATED WITH ONE INCH
<br />NOMINAL THICKNESS FIBERGLASS PIPE INSULATION WITH VAPOR BARRIER JACKET, OWENS-CORNING A5,V55LI1 OR
<br />EQUAL. ENDS OF INSULATION SHALL BE TAPED AT ALL FITTINGS. INSULATION SHALL BE GONTIi�JOU�' THROUGHOUT
<br />EXCEPT WHERE PENETRATING A FIRE BARRIER.
<br />18. WASTE, GOLD WATER PIPING AND HOT WATER PIPING AT HANDICAPPED LAVATORIES SHALL BE INSULATED WITH
<br />TRUEBRO LAV GUARD, LAY SHIELD, OR BASIN SHIELD ENGL05URE5/PIPE GONERS OR APPROVED EQUAL.
<br />Iq. EXPOSED TRIM PIPING TO ALL SINKS AND LAVATORIES, INCLUDING ON, HW, DRAIN, AND DRAIN TRAPS, SHALL BE
<br />PVC, WITH PVC, ESCUTCHEONS AT WALL PENETRATION. ALL EXPOSED PIPING TO OTHER FIXTURES SHALL BE
<br />INSTALLED PER SPECIFICATIONS WITH ESCUTCHEONS. ALL OTHER PIPING PENETRATING CEILINGS, WALLS, AND
<br />CASEWORK SHALL BE INSTALLED WITH MATCHING ESCUTCHEONS AT THE PENETRATION. ALL PIPING PENETRATING
<br />EXTERIOR WALLS AND ROOFS SHALL BE FLASHED AND SEALED IN AN APPROVED WEATHER TIGHT MANNER AND
<br />SHALL BE PROTECTED AS REQUIRED BY THE ARCHITECT.
<br />20. SLEEVE OR GORE -DRILL FLOOR SLABS, WALLS, ETC., AS REQUIRED FOR PIPING AND FIRE -STOP MATERIAL AROUND
<br />PIPE. VERIFY LOCATION OF STRUCTURAL BEAMS, JOISTS, ETC. BEFORE DRILLING.
<br />21. ALL PIPING TO HAVE IDENTITY MARKERS/LABELS LOCATED EVERY 15 FIST ON LONG RUNS, AT EVERY CHANGE OF
<br />DIRECTION AND AT ALL WALL PENETRATIONS.
<br />22. PROVIDE AN ISOLATING, DIELECTRIC, UNION AT ALL CONNECTIONS BETWEEN FERROUS AND NONFERROUS PIPING.
<br />23. COORDINATE LOCATIONS OF FLOOR DRAINS IN MECHANICAL ROOMS WITH MECHANICAL EQUIPMENT.
<br />24. COORDINATE FIXTURE TYPES WITH THE ARCHITECTURAL DRAWINGS. AREAS DESIGNATI=D FOR USE BY THE
<br />HANDICAPPED SHALL BE SUPPLIED WITH FIXTURES AND TRIM ASSET FORTH IN THE "AMERICANS WITH DISABILITIES
<br />AGT"(ADP).
<br />25. ROUTE RELIEF VALVE DISCHARGE FROM WATER HEATER TO NEAREST AVAILABLE DRAIN OR TO GRADE OUTDOORS.
<br />26. WHEN WATER HEATERS ARE PLACED ABOVE THE CEILING, THE CONTRACTOR SHALL PROVIDE A I-I/2" P TRAP WITH
<br />A TRAP PRIMER AT THE NEAREST WASTE OR VENT LINE ABOVE THE CEILING FOR PdT DISCHARGE.
<br />27. FLOOR MOUNTED ELECTRIC AND SEALED COMBUSTION WATER HEATERS SHALL BE ELEVATED ON HIGH -IMPACT
<br />PLASTIC EQUIPMENT PADS.
<br />28. ROUTE RELIEF VENTS ON ALL BAGKFLOW PREVENTERS TO NEAREST FLOOR DRAIN OR GODS APPROVED DRAINAGE
<br />RECEPTACLE.
<br />29. ACCESS PANELS SHALL BE PROVIDED WHERE CONGEALED CONTROL DEVICES, VALVES, ETC. ARE CONGEALED
<br />WITHIN WALLS. WHERE ACCESS FOR ADJUSTMENT AND MAINTENANCE 15 POSSIBLE THROUGH LAY -IN SUSi'ENDED
<br />CEILINGS, ACCESS PANELS ARE NOT REQUIRED.
<br />30. PROVIDE ALL FITTINGS, ACCESSORIES, OFFSETS, AND MATERIALS NECESSARY TO FACILITATE FUNCTIONING OF THE
<br />COMPLETE PLUMBING SYSTEM AS INDICATED BY THE DESIGN AND THE EQUIPMENT INDICATED.
<br />31. CONTRACTOR SHALL COORDINATE ELECTRICAL GHARAGTERI5TIG5 OF ALL PLUMBING EQUIPMENT WITH THE
<br />ELEGTRIGAL DRAWINGS PRIOR TO ORDERING ANY EQUIPMENT. ALL PLUMBING EQUIPMENT REQUIRING ELECTRICAL
<br />POWER SHALL BE INSTALLED WITH DISC.ONNEGT SWITCHES AT EACH PIECE OF EQUIPMENT. COORDINATE WITH THE
<br />ELECTRICAL CONTRACTOR.
<br />32. ALL PLUMBING EQUIPMENT SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS.
<br />33. ALL PLUMBING EQUIPMENT AND SYSTEMS SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR AFTER
<br />SUBSTANTIAL COMPLETION.
<br />34. SHOP DRAWINGS SHALL BE SUBMITTED TO AND REVIEWED BY THE ARCHITECT PRIOR TO ORDERING EQUIPMENT OR
<br />INSTALLING ANY PIPING FOR ALL EQUIPMENT, FIXTURES, AND PIPING.
<br />35. APPROVED MANUFACTURERS:
<br />VITREOUS FIXTURES: AMERIGAN STANDARD, KOHL)=R, ZURN
<br />SOLID SURFACE SINKS (OTHER THAN REUSE): MUSTI=E
<br />STAINLESS STEEL SINKS: JUST, ELKAY, STERLING
<br />FAUCETS: DELTA, ZURN, SYMMONS, GHI GAGO FAUCET, FIAT
<br />TUB/SHOWER VALVES= SYMMONS
<br />TRIM: JAMEGO, E�zA55GRAFT, McGUIRE
<br />FLUSH VALVES: SLOAN, DELANEY, ZURN
<br />SEATS= SEMIS, BENEKE, CHURCH, OL50NITE (HEAVY DUTY ONLY)
<br />DRINKING FOUNTAINS: OASIS, ELKAY, HALSEY TAYLOR
<br />TUB/SHOWER ENCLOSURES: LASGO, AQUAGLA55, AQUARIUS, AQUA BATH
<br />EMERGENCY FIXTURES= GUARDIAN, ADORN SAFETY, BRADLEY
<br />ADA INSULATION= TRUEBRO
<br />WATER HEATERS: A.O. SMITH, STATE, LOGHINVAR
<br />FLOOR DRAINS: JAY R. SMITH, ZURN, YVADE, J05AM, WATTS
<br />ROOF DRAINS: JAY R. SMITH, ZURN, WADE, J05AM, WATTS
<br />GLEANOUTS= JAY R. SMITH, ZURN, WADE, J05AM
<br />PRESSURE REDUCING VALVE: WATTS, FEBGO, APOLLO
<br />BAGKFLOW PREVENTER: WATTS, FEBGO, APOLLO
<br />WALL HYDRANTS= WOODFORD, JAY R. SMITH, ZURN
<br />Shepherd, Harvey & Associates, Inc.
<br />4855 River Green Parkway, Suite 400
<br />Duluth, Georgia 30096-2569 Fla. Cert. of Auth. No. 28961
<br />770-495-4007 FAX 770-495-7112 Project Number: 22-170
<br />O N
<br />C
<br />T O
<br />O U
<br />v
<br />N C
<br />o c
<br />U
<br />co C
<br />o
<br />U 'Ccli
<br />Y
<br />L
<br />O
<br />3
<br />c
<br />c
<br />U
<br />a:
<br />x
<br />N
<br />N
<br />L
<br />0
<br />as
<br />m17 (0
<br />W
<br />U
<br />U
<br />U
<br />�
<br />M
<br />Q�
<br />a
<br />a
<br />�
<br />o
<br />H
<br />co
<br />Q
<br />�
<br />ao
<br />�
<br />o
<br />w
<br />�
<br />aJc
<br />o
<br />O
<br />N
<br />H
<br />C=�
<br />M
<br />CM
<br />^X,
<br />W
<br />�
<br />o
<br />Q
<br />o
<br />N
<br />XM
<br />N
<br />m
<br />Q
<br />�
<br />LL
<br />It
<br />Z
<br />0
<br />v)
<br />Z
<br />Q
<br />X
<br />N
<br />W
<br />Z
<br />�
<br />Q
<br />J
<br />m
<br />Q
<br />z
<br />J
<br />U
<br />Z
<br />RAWN BY:
<br />RPS
<br />M
<br />CO
<br />J
<br />LL
<br />J
<br />J
<br />W
<br />N
<br />DATE: 10/ 11 /2022
<br />R OJ ECT N 0.2022.121
<br />REV.
<br />REV.
<br />REV.
<br />REVISIONS
<br />Sheet No.
<br />P-001
<br />
|