Laserfiche WebLink
NNW <br />0 <br />Ln <br />N <br />N <br />0 <br />N <br />00 <br />0 <br />W <br />N <br />N_ <br />0 <br />N <br />PLUMB I N6 LEGEND <br />SANITARY, WASTE BELOW FLOOR - 5, W, 5AN, 55 <br />SANITARY, WASTE ABOVE FLOOR -5, W, SAN, 55 <br />STORM BELOW FLOOR - ST <br />STORM ABOVE FLOOR - ST <br />- - - - - VENT PIPING - V <br />- GOLD WATER PIPING - CW <br />- - - HOT WATER PIPING - HW <br />- - - - - HOT WATER RETURN PIPING - HWR <br />-� <br />PIPING BELOW FLOOR - B/F <br />- <br />EXISTING GW <br />- - - <br />EXISTING HW <br />- - - - - <br />EXISTING HWR <br />EXISTING PIPING <br />PIPING TO BE REMOVED OR ABANDONED <br />GLEANOUT5 - CO, WOO, FGO, GGO <br />- 4- - <br />GATE VALVE - GV <br />r <br />BALL VALVE - BV <br />PRESSURE REDUCING VALVE - PRV <br />CHECK VALVE <br />CIRCUIT SETTER <br />s i <br />CIRCUIT SETTER A55EMBLY <br />® a <br />FLOOR DRAIN - FD, FD-* <br />® a <br />AREA DRAIN - AD, AD-* <br />® <br />ROOF DRAIN - RD, RD-* <br />WHA <br />WATER HAMMER ARRESTOR <br />VTR <br />VENT THRU ROOF <br />MH± <br />WATER HEATER <br />-0-* <br />PLUMBING FIXTURE <br />-� <br />IN -LINE BAGKFLOW PREVENTER <br />2-a-- <br />TRAP PRIMER - TP <br />$ <br />AIR ADMITTANCE VALVE (AAV) <br />ADA GOMPLIANGE <br />I. VERIFY FIXTURE5 THAT ARE INTENDED FOR HANDICAP USE WITH <br />CURRENT ARCHITECTURAL DRAWIN65. <br />2. PLUMBING FIXTURES DESIGNATED FOR HANDICAP USE SHALL COMPLY <br />WITH ADA AND ALL STATE, CITY, AND LOCAL REQUIREMENTS <br />PERTAINING TO HANDICAP ACCESSIBILITY. <br />3. FIXTURE INSTALLATION SHALL COMPLY WITH ADA AND ANY STATE, <br />CITY, AND LOCAL REQUIREMENTS PERTAINING TO HANDICAP <br />ACCESSIBILITY. <br />4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH <br />ADA AND ALL STATE, CITY, AND LOCAL REQUIREMENTS PERTAINING TO <br />PLUMBING FIXTURES AND PLUMBING FIXTURE INSTALLATION FOR USE <br />BY THE HANDICAPPED. <br />SPRINKLER HEAD NOTES <br />I. LAY -IN TILE CEILINGS: <br />SMALL FRAME GLASS ELEMENT, 5EMI-REGE55ED QUICK RESPONSE <br />PENDENT SPRINKLERS. TEMPERATURE RATING SHALL BE 155°-1656. <br />SPRINKLER AND ESCUTCHEON 5HALL BE POLISHED CHROME. <br />2. GYP CEILINGS: <br />QUICK RESPONSE CONGEALED SPRINKLER. COORDINATE COVER <br />FINISH WITH ARCHITECT. TEMPERATURE RATING SHALL BE 1550-1650. <br />3. NO CEILING: <br />SMALL FRAME GLASS ELEMENT, UPRIGHT QUICK RESPONSE PENDENT <br />SPRINKLERS. TEMPERATURE RATING SHALL BE 1650 UNLE55 HIGHER 15 <br />REQUIRED. SPRINKLER SHALL BE ROUGH BRASS FINISH. <br />PLUMBIN6 FIXTURE 5GHEDULE <br />MARK <br />DESCRIPTION <br />FITTINGS/AGGE550RIE5 <br />REMARKS <br />FIXTURE CONNECTIONS <br />GW <br />HW <br />WASTE <br />VENT <br />P-3H <br />GOUNtTERTOP <br />�� <br />FAUCET: DELTA/GAMBRIDGE 27G4925 <br />P-TRAP, DRAIN RISER t WATER SUPPLY SHALL 8E PVC, <br />4" CENTERS, b' WRIST BLADES, 6" VIA. GOOSENECK BEND, <br />I/2" <br />I/2" <br />I-I/4" <br />1-I/2" <br />SINK <br />MODEL II <br />PLASTIC, STRAINER, TRUEBRO LAV GUARD <br />DINAR FLOW <br />LAVATORY <br />AMERIGAN STANDARD <br />FAUCET: SLOAN ETF-T10-4 SENSOR -CONTROLLED <br />WALL HUNG, LAMINAR FLOW, ADA, JAY R SMITH 0723 LAVATORY <br />P-3J <br />WALL HUNG <br />0355AI2 <br />P-TRAP, DRAIN RISER #WATER SUPPLY SHALL BE PVC, <br />SUPPORT, IRON HARD WIRED KIT W/ TRANSFORMER, WIRE AND TMV <br />I/2" <br />I/2' <br />I-I/4" <br />I-I/2" <br />ADA <br />LUCERNE <br />GRID DRAIN, TRUEBRO LAV GUARD OR LAV SHIELD <br />INSTALLED OUT OF SIGHT WITH MEANS OF ACCESS. WATER TEMP 105°F. <br />FIRE SPRINKLER SYSTEM <br />AUTOMATIC SPRINKLER PROTEG nON IS GURREMI.Y PROVIDED THIRO6HOUT THE BUILDING. <br />THE DE516N INTENT 15 TO MODIFY THE EXISTING SYSTEM A5 REQUIRED FOR NEW <br />ARCHITECTURAL LAYOUT. PROVIDE NEW HEADS. AUTOMATIC, SPRINKLER SYSTEMS SHOULD BE <br />DE516NED TO THE M05T CURRENT EDITION OF NFPA 13, THE OWNER'S INSURANCE <br />UNDERWRITER 60IDELINES, AND LOCAL AND STATE FIRE MARSHAL REQUIREMENTS. THE <br />AUTOMATIC, SPRINKLER AND FIRE DETECTION SYSTEMS SHOULD BE MONITORED BY A UL <br />APPROVED FIRE ALARM SYSTEM. <br />CONTRACTOR SHALL PROVIDE DETAILED FIRE SPRINKLER DE516N FOR REVIEW. WORKIN6 <br />PLANS SHALL BE DRAWN TO SCALE (1/8A MINIMUM), WITH A PLAN OF EACH FLOOR, AND <br />SHALL SHOW THOSE ITEMS FROM THE NFPA L15T THAT PERTAINS TO THE DE516N AND <br />HYDRAULIC GALGUI.ATION OF THE SYSTEM. SHOP DRAWIN65 WITH GEILIN6 PLANS SHALL <br />INDICATE ALL L16HT5, 6RILLE5, SPEAKERS AND OTHER GEILIN6 COMPONENTS, TO INSURE <br />PROPER COORDINATION WITH SUCH GEILIN6 ITEMS. <br />THE CONTRACTOR SHALL SUBMIT AND SECURE APPROVAL OF THE SHOP DRANN66 WITH <br />HYDRAULIC, CALCULATIONS TO THE OWNER'S INSURANCE UNDERWRITER AND LOCAL AND <br />STATE A THORITIE5 PRIOR TO 5UBMIS510N TO THE ENGINEER. ALL SHOP DRAWINGS AND <br />CALCULATIONS SHALL BEAR THE SEAL OF A RE615TERED PROFESSIONAL ENGINEER OR AN <br />EQUIVALENT FIRE SPRINKLER CONTRACTORS CERTIFICATE SEAT_ LICENSED IN THE STATE OF <br />THE PROJECT. <br />IN ADDITION TO SHOP DRAWIN6 SUBMITTALS INCLUDE PRINTED EQUIPMENT BROCHURES <br />AND/OR GATALO6 CUTS TO PROVIDE COMPLETE SPEGIFIGA1ION5 FOR ALL OF THE ITEMS TO <br />BE FURNISHED FOR THE COMPl.E1E SYSTEM(5) INGLUDIN6 BUT NOT LIMITED TO 5PRINKL.ER <br />HEADS, ALL PIPE AND FITTIN65, FIRE R15ER APPURTENANCES, BAGKFLOW PREVENTION, <br />HANGER5 AND SUPPORTS, TEST C00EGTION5 AND FLOW/TAMPER SWITGHE5. <br />A WATER FLOW TEST FROM THE HYDRANT NEAREST THE 51TE SERVICE CONNECTION OR <br />FROM THE 56WGE PIPIN6 ON THE 517E 15 TO BE PERFORMED BY THE FIRE PROTECTION <br />CONTRACTOR IN ACCORDANCE WITH NFPA 241. THIS TEST MAY BE PROVIDED TO THE FIRE <br />PROTECTION CONTRACTOR BY THE INSURANCE UNDERNRITER OR LOCAL WATER AUTHORITY. <br />THE COMPLETED FLOW TEST DATA 15 TO BE FORWARDED TO THE ENGINEER <br />AUTOMATIC SPRINKLER SYSTEMS 94ALL BE HYDRALLICALLY CALCALATED FOR THE <br />NFPA DB16N STANDARDS: <br />LOBBIES. PUBLIG SPACE5,51MILAR AREAS 11 I 6PM OVER 1500 <br />Ili! t".i\ i ELECTRICAL. Ii►A6AREAS ORDINARYKAZARD 6ROUP 1,.15 6PMISF <br />1500 S.F. <br />�U1� 6jar � �. �+ � M _ .d►. \�� E► MjfHAZARD, I � ' OVER <br />SPRINKLER PIPIN6 1-1/4' IN DIAMETER OR LARGER, CONNECTED BY NBDED, FLANGED <br />FITTINGS OR ROLL GROOVED FITTIN65, SHALL BE SCHEDULE 40 OR SCHEDULE 10 A5 <br />PERMITTED BY NFPA 13. GUT GROOVES ARE aQj PERMITTED. <br />DRY 5PRINKLER ASSEMBLIES SHALL BE FURNISHED COMPLETE WITH ALL SPECIALTY <br />VALVE5, PIPE AND EQUIPMENT A5 REQUIRED FOR THE SYSTEMS. THE SYSTEMS SHALL <br />BE COMPLETE WITH DRY PIPE VALVE, AIR COMPRE5SOR AGGELERATOR, <br />MAINTENANCE PRE55URE COMPRE55OR AND A550GIATED TRIM AND WIRED FOR <br />INTERGONNEGTION TO ALL REQUIRED ACGE55ORIE5, DETECTION DEVICES, PRE55M <br />SWITCHES, ETC. AS REQUIRED. AIR GOMPRE550R5 FOR DRY PIPE SYSTEMS SHALL BE <br />CALCULATED AND 51ZED, FURNISHED AND INSTALLED ON THE RISER AS AN INTEGRAL <br />PART OF THE DRY PIPE SPRINKLER SYSTEM, AND SHALL MEET ALL REQUIREMENTS OF <br />NFPA 13. COORDINATE ELECTRICAL REQUIREMENT5 OF AIR COMPRESSOR WITH <br />ELECTRICAL CONTRACTOR PRIOR TO BID. <br />THE CONTRACTOR SHALL FURNISH AND INSTALL A CABINET LOCATED IN THE FIRE <br />SERVICE ROOM WITH SPARE NIMBER OF EACH TYPE SPRINKLER HEAD AND RELATED <br />WRENCH AS REQUIRED BY NFPA 13. <br />THE SPRINKLER CONTRACTOR SHALL VERIFY THE 5EI5MIG CONDITIONS, FURNISH AND <br />INSTALL ALL EQUIPMENT AND APPURTENANGE5 REQUIRED. <br />PLUMBII�C� SPEGIFIGATIO�Is <br />AND NOTES <br />I. ALL PLUMBING WORK SHALL COMPLY WITH THE 2020 FLORIDA PLUMBING GODS WITH ALL APPLICABLE LOCAL <br />AMENDMENTS. <br />2. PRIOR TO PURCHASING ANY MATERIALS OR STARTING ANY WORK, CONTRACTOR SHALL FIELD VERIFY ALL EXISTING <br />CONDITIONS, PIPING SIZES AND LOCATIONS, EQUIPMENT, ETC., SHOWN ON THE DRAWINGS OR AFFECTING THIS WORK <br />AND SHALL REPORT ANY DEVIATIONS TO THE ARCHITECT. <br />3. FIELD VERIFY LOCATION OF EXISTING SERVICES TO BE REUSED OR CONNECTED TO AND REPORT TO <br />ARGHITEGT/ENGINEER IF OTHER THAN THAT WHICH 15 INDICATED ON DRAWINGS. <br />4. WHEN RENOVATING OR MAKING AN ADDITION TO AN EXISTING FACILITY, CONTRACTOR SHALL FIELD VERIFY <br />EXISTING EQUIPMENT (FIXTURES, TRIM, PUMPS, ETC) MANUFACTURERS AND USE SAME MANUFACTURERS FOR NEW <br />EQUIPMENT. CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL OF OWNER/OWNER REPRESENTATIVE FOR USE OF <br />DIFFERENT MANUFACTURERS. <br />5. ANY EXISTING WALL, FLOOR, OR CEILING SURFACE THAT 15 DISTURBED DURING THE COURSE OF THE WORK SHALL <br />BE REPAIRED. WHEREVER FOUNDATION WALLS, OUTSIDE WALLS, ROOFS, ETC., ARE PENETRATED FOR INSTALLATION <br />OF SYSTEMS, THEY SHALL BE PATCHED TO MATCH EXISTING CONSTRUCTION AND SEALED WEATHER TIGHT. <br />­1 cis <br />6. ALL OPENINGS IN DRAINAGE AND/OR VENT SYSTEMS A5 A RESULT OF INSTALLATION ROUGHi-IN SHALL BE <br />PROTECTED WITH A TEST PLUG THAT 15 SECURELY LOCKED IN PLACE UNTIL FINAL FINISHED CONNECTIONS ARE <br />INSTALLED. <br />7. ALL PIPING SHALL BE RUN PARALLEL TO BUILDING LINES AND SUPPORTED AND ANCHORED AS REQUIRED TO <br />FACILITATE EXPANSION AND CONTRACTION. INSTALL ALL PIPING AS REQUIRED TO MEET CONSTRUCTION CONDITIONS <br />AND TO ALLOW FOR INSTALLATION OF OTHER WORK, INCLUDING DUCTWORK AND ELECTRICAL CONDUIT. <br />8. ALL PIPING SHALL BE ROUTED ABOVE CEILING, CONGEALED IN WALLS, AND BEHIND FURNISHINGS UNLESS OTHERWISE <br />INDICATED. ALL OVERHEAD PIPING EXPOSED TO VIEW SHALL BE ROUTED AS HIGH AS POSSIBLE AND TIGHT TO THE <br />UNDERSIDE OF STRUCTURE. <br />q. WATER PIPING ROUTED ABOVE CEILINGS AND IN EXTERIOR WALLS SHALL BE ROUTED ON HEATED SIDE OF CEILING <br />INSULATION AND WALL INSULATION, UNLESS OTHER FREEZE PROTECTION 15 INDICATED. <br />10. SANITARY WASTE d VENT, AND STORM DRAIN PIPING ABOVE GROUND SHALL BE PVC, WITH SOLVENT JOINTS. <br />II. SANITARY WASTE 4 STORM DRAIN PIPING BELOW GROUND SHALL BE SCHEDULE 40 DWV PVC, WITH SOLVENT JOINTS. <br />12. PROVIDE GLEANOUTS AT THE END OF EACH HORIZONTAL SANITARY RUN AND AT THE BASE OF ALL SANITARY <br />STACKS. GLEANOUTS SHALL BE OF THE SAME SIZE AS THE PIPES THEY SERVE. <br />13. TOPS OF ALL FLOOR DRAINS AND GLEANOUTS SHALL BE SET FLUSH WITH AJDAGENT FINISHED FLOOR. COORDINATE <br />FLOOR SLOPES AND DRAIN LEVELS WITH ARCHITECTURAL. CAULK WITH GONTINUOU�' CLEAR SEALANT BAND. <br />14. AIR ADMITTANCE VALVES SHALL BE INSTALLED ONLY WHERE SHOWN ON PLANS AND SHALL BE STUDOR GHEM-VENT <br />OR APPROVED EQUAL. <br />15. ALL SANITARY WASTE, VENT, AND DOMESTIC WATER PIPING SYSTEMS SHALL BE TESTED IN ACCORDANCE WITH <br />SECTION 312 OF THE CURRENTLY ACCEPTED INTERNATIONAL PLUMBING GORE, OR OTHER APPLICABLE LOCALLY <br />ACCEPTED GORE. <br />Ib. GOLD AND HOT WATER PIPING ABOVE GRADE SHALL BE TYPE L HARD DRAWN COPPER TUBING CONFORMING TO <br />ASTM 8-88 WITH SWEAT JOINTS AND CAST OR V��?OUGHT FITTINGS. JOINTS SHALL BE MADE WITH LEAD FREE <br />SOLDER. GOLD WATER PIPING BELOW GRADE SHALL BE TYPE K COPPER TUBING WITH CAST OR V�2000HT FITTINGS <br />AND JOINTS AS DESCRIBED ABOVE. JOINTS SHALL NOT BE PERMITTED UNDER FLOOR SLABS. WATER PIPING <br />BELOW GRADE THROUGH CONCRETE SHALL BE PROTECTED WITH PLASTIC SLEEVES. <br />I -I. ALL HOT, GOLD, AND HOT WATER RETURN WATER PIPING ABOVE GRADE SHALL BE INSULATED WITH ONE INCH <br />NOMINAL THICKNESS FIBERGLASS PIPE INSULATION WITH VAPOR BARRIER JACKET, OWENS-CORNING A5,V55LI1 OR <br />EQUAL. ENDS OF INSULATION SHALL BE TAPED AT ALL FITTINGS. INSULATION SHALL BE GONTIi�JOU�' THROUGHOUT <br />EXCEPT WHERE PENETRATING A FIRE BARRIER. <br />18. WASTE, GOLD WATER PIPING AND HOT WATER PIPING AT HANDICAPPED LAVATORIES SHALL BE INSULATED WITH <br />TRUEBRO LAV GUARD, LAY SHIELD, OR BASIN SHIELD ENGL05URE5/PIPE GONERS OR APPROVED EQUAL. <br />Iq. EXPOSED TRIM PIPING TO ALL SINKS AND LAVATORIES, INCLUDING ON, HW, DRAIN, AND DRAIN TRAPS, SHALL BE <br />PVC, WITH PVC, ESCUTCHEONS AT WALL PENETRATION. ALL EXPOSED PIPING TO OTHER FIXTURES SHALL BE <br />INSTALLED PER SPECIFICATIONS WITH ESCUTCHEONS. ALL OTHER PIPING PENETRATING CEILINGS, WALLS, AND <br />CASEWORK SHALL BE INSTALLED WITH MATCHING ESCUTCHEONS AT THE PENETRATION. ALL PIPING PENETRATING <br />EXTERIOR WALLS AND ROOFS SHALL BE FLASHED AND SEALED IN AN APPROVED WEATHER TIGHT MANNER AND <br />SHALL BE PROTECTED AS REQUIRED BY THE ARCHITECT. <br />20. SLEEVE OR GORE -DRILL FLOOR SLABS, WALLS, ETC., AS REQUIRED FOR PIPING AND FIRE -STOP MATERIAL AROUND <br />PIPE. VERIFY LOCATION OF STRUCTURAL BEAMS, JOISTS, ETC. BEFORE DRILLING. <br />21. ALL PIPING TO HAVE IDENTITY MARKERS/LABELS LOCATED EVERY 15 FIST ON LONG RUNS, AT EVERY CHANGE OF <br />DIRECTION AND AT ALL WALL PENETRATIONS. <br />22. PROVIDE AN ISOLATING, DIELECTRIC, UNION AT ALL CONNECTIONS BETWEEN FERROUS AND NONFERROUS PIPING. <br />23. COORDINATE LOCATIONS OF FLOOR DRAINS IN MECHANICAL ROOMS WITH MECHANICAL EQUIPMENT. <br />24. COORDINATE FIXTURE TYPES WITH THE ARCHITECTURAL DRAWINGS. AREAS DESIGNATI=D FOR USE BY THE <br />HANDICAPPED SHALL BE SUPPLIED WITH FIXTURES AND TRIM ASSET FORTH IN THE "AMERICANS WITH DISABILITIES <br />AGT"(ADP). <br />25. ROUTE RELIEF VALVE DISCHARGE FROM WATER HEATER TO NEAREST AVAILABLE DRAIN OR TO GRADE OUTDOORS. <br />26. WHEN WATER HEATERS ARE PLACED ABOVE THE CEILING, THE CONTRACTOR SHALL PROVIDE A I-I/2" P TRAP WITH <br />A TRAP PRIMER AT THE NEAREST WASTE OR VENT LINE ABOVE THE CEILING FOR PdT DISCHARGE. <br />27. FLOOR MOUNTED ELECTRIC AND SEALED COMBUSTION WATER HEATERS SHALL BE ELEVATED ON HIGH -IMPACT <br />PLASTIC EQUIPMENT PADS. <br />28. ROUTE RELIEF VENTS ON ALL BAGKFLOW PREVENTERS TO NEAREST FLOOR DRAIN OR GODS APPROVED DRAINAGE <br />RECEPTACLE. <br />29. ACCESS PANELS SHALL BE PROVIDED WHERE CONGEALED CONTROL DEVICES, VALVES, ETC. ARE CONGEALED <br />WITHIN WALLS. WHERE ACCESS FOR ADJUSTMENT AND MAINTENANCE 15 POSSIBLE THROUGH LAY -IN SUSi'ENDED <br />CEILINGS, ACCESS PANELS ARE NOT REQUIRED. <br />30. PROVIDE ALL FITTINGS, ACCESSORIES, OFFSETS, AND MATERIALS NECESSARY TO FACILITATE FUNCTIONING OF THE <br />COMPLETE PLUMBING SYSTEM AS INDICATED BY THE DESIGN AND THE EQUIPMENT INDICATED. <br />31. CONTRACTOR SHALL COORDINATE ELECTRICAL GHARAGTERI5TIG5 OF ALL PLUMBING EQUIPMENT WITH THE <br />ELEGTRIGAL DRAWINGS PRIOR TO ORDERING ANY EQUIPMENT. ALL PLUMBING EQUIPMENT REQUIRING ELECTRICAL <br />POWER SHALL BE INSTALLED WITH DISC.ONNEGT SWITCHES AT EACH PIECE OF EQUIPMENT. COORDINATE WITH THE <br />ELECTRICAL CONTRACTOR. <br />32. ALL PLUMBING EQUIPMENT SHALL BE INSTALLED ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. <br />33. ALL PLUMBING EQUIPMENT AND SYSTEMS SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR AFTER <br />SUBSTANTIAL COMPLETION. <br />34. SHOP DRAWINGS SHALL BE SUBMITTED TO AND REVIEWED BY THE ARCHITECT PRIOR TO ORDERING EQUIPMENT OR <br />INSTALLING ANY PIPING FOR ALL EQUIPMENT, FIXTURES, AND PIPING. <br />35. APPROVED MANUFACTURERS: <br />VITREOUS FIXTURES: AMERIGAN STANDARD, KOHL)=R, ZURN <br />SOLID SURFACE SINKS (OTHER THAN REUSE): MUSTI=E <br />STAINLESS STEEL SINKS: JUST, ELKAY, STERLING <br />FAUCETS: DELTA, ZURN, SYMMONS, GHI GAGO FAUCET, FIAT <br />TUB/SHOWER VALVES= SYMMONS <br />TRIM: JAMEGO, E�zA55GRAFT, McGUIRE <br />FLUSH VALVES: SLOAN, DELANEY, ZURN <br />SEATS= SEMIS, BENEKE, CHURCH, OL50NITE (HEAVY DUTY ONLY) <br />DRINKING FOUNTAINS: OASIS, ELKAY, HALSEY TAYLOR <br />TUB/SHOWER ENCLOSURES: LASGO, AQUAGLA55, AQUARIUS, AQUA BATH <br />EMERGENCY FIXTURES= GUARDIAN, ADORN SAFETY, BRADLEY <br />ADA INSULATION= TRUEBRO <br />WATER HEATERS: A.O. SMITH, STATE, LOGHINVAR <br />FLOOR DRAINS: JAY R. SMITH, ZURN, YVADE, J05AM, WATTS <br />ROOF DRAINS: JAY R. SMITH, ZURN, WADE, J05AM, WATTS <br />GLEANOUTS= JAY R. SMITH, ZURN, WADE, J05AM <br />PRESSURE REDUCING VALVE: WATTS, FEBGO, APOLLO <br />BAGKFLOW PREVENTER: WATTS, FEBGO, APOLLO <br />WALL HYDRANTS= WOODFORD, JAY R. SMITH, ZURN <br />Shepherd, Harvey & Associates, Inc. <br />4855 River Green Parkway, Suite 400 <br />Duluth, Georgia 30096-2569 Fla. Cert. of Auth. No. 28961 <br />770-495-4007 FAX 770-495-7112 Project Number: 22-170 <br />O N <br />C <br />T O <br />O U <br />v <br />N C <br />o c <br />U <br />co C <br />o <br />U 'Ccli <br />Y <br />L <br />O <br />3 <br />c <br />c <br />U <br />a: <br />x <br />N <br />N <br />L <br />0 <br />as <br />m17 (0 <br />W <br />U <br />U <br />U <br />� <br />M <br />Q� <br />a <br />a <br />� <br />o <br />H <br />co <br />Q <br />� <br />ao <br />� <br />o <br />w <br />� <br />aJc <br />o <br />O <br />N <br />H <br />C=� <br />M <br />CM <br />^X, <br />W <br />� <br />o <br />Q <br />o <br />N <br />XM <br />N <br />m <br />Q <br />� <br />LL <br />It <br />Z <br />0 <br />v) <br />Z <br />Q <br />X <br />N <br />W <br />Z <br />� <br />Q <br />J <br />m <br />Q <br />z <br />J <br />U <br />Z <br />RAWN BY: <br />RPS <br />M <br />CO <br />J <br />LL <br />J <br />J <br />W <br />N <br />DATE: 10/ 11 /2022 <br />R OJ ECT N 0.2022.121 <br />REV. <br />REV. <br />REV. <br />REVISIONS <br />Sheet No. <br />P-001 <br />