L! I <br />H- 1 __ I I 1--- I - L -- - <br />� � <br />L Y <br />7 d <br />au <br />..} <br />> CO � <br />co a <br />Lu zo <br />]C <br />u <br />z <br />w x z <br />Dud <br />E. ENGINE STARTING SYSTEM: <br />1. SYSTEM TYPE: ELECTRIC, WITH DC SOLENOID -ACTIVATED STARTING MOTOR(S). <br />2. STARTER MOTORS: DUAL HEAVY DUTY STARTER MOTORS CONNECTED IN PARALLEL, EACH CAPABLE <br />OF CRANKING THE ENGINE FOR 45 SECONDS CONTINUOUS AND FOR 3 CYCLES FOR 75 SECONDS, (15 <br />SECONDS CRANKING, 15 SECONDS AT REST.), WITH THE OTHER STARTER OUT OF SERVICE <br />3. BATTERY(S): <br />A. BATTERY TYPE: LEAD -ACID. <br />B. BATTERY CAPACITY: SIZE ACCORDING TO MANUFACTURER'S RECOMMENDATIONS FOR ACHIEVING <br />STARTING AND LOAD ACCEPTANCE REQUIREMENTS UNDER WORST CASE AMBIENT TEMPERATURE; <br />CAPABLE OF PROVIDING CRANKING THROUGH TWO COMPLETE PERIODS OF CRANKING LIMITER <br />TIME-OUTS WITHOUT RECHARGING. <br />C. STARTING BATTERIES: PROVIDE BATTERIES CAPABLE OF STARTING UNIT IN TIME SPECIFIED UNDER <br />INSTALLED CONDITIONS AND CAPABLE OF 45 SECONDS OF CONTINUOUS ENGINE CRANKING AND 3 <br />SECONDS CRANKING, 15 SECONDS AT REST. INSTALL <br />CRANKING CYCLES FOR 75 SECONDS 15 SE KING N <br />V HEAVY-DUTY <br />BATTERIES IN STEEL, INSULATED RACK(S). PROVIDE HEAVY DU LONG LIFE LEAD -ACID HIGH <br />DISCHARGE RATE TYPE BATTERIES WITH PLASTIC CASE. ENGINE MANUFACTURER TO SIZE AND FURNISH <br />BATTERY CABLES. <br />D. EACH BATTERY CELL SHALL HAVE MINIMUM AND MAXIMUM ELECTROLYTE LEVEL INDICATORS AND A <br />FLIP -TOP FLAME ARRESTOR VENT CAP. <br />E. BATTERIES SHALL HAVE CONNECTOR COVERS FOR PROTECTION AGAINST EXTERNAL SHORT CIRCUITS. <br />F. WITH THE CHARGER DISCONNECTED, THE BATTERIES SHALL HAVE SUFFICIENT CAPACITY SO THAT THE <br />TOTAL SYSTEM VOLTAGE DOES NOT FALL BELOW 85% OF THE NOMINAL SYSTEM VOLTAGE WITH THE <br />FOLLOWING DEMANDS: <br />1) FIVE CONSECUTIVE STARTING ATTEMPTS OF 10 SECONDS CRANKING AT 10 SECOND INTERVALS <br />FOR A TOTAL OF 50 SECONDS OF ACTUAL CRANKING (THE FIFTH STARTING ATTEMPT WILL BE <br />MANUALLY INITIATED UPON FAILURE OF A COMPLETE ENGINE CRANKING CYCLE). <br />G. PROVIDE BATTERY RACK, CABLES, AND CONNECTORS SUITABLE FOR THE SUPPLIED BATTERY(S); SIZE <br />BATTERY CABLES ACCORDING TO MANUFACTURER'S RECOMMENDATIONS FOR CABLE LENGTH TO BE <br />INSTALLED. <br />4. BATTERY -CHARGING ALTERNATOR: ENGINE -DRIVEN, FACTORY MOUNTED ON ENGINE WITH <br />SOLID-STATE VOLTAGE REGULATION AND 35-A MINIMUM CONTINUOUS RATING. <br />5. BATTERY CHARGER: <br />CHARGER WITH AUTOMATIC FLOAT AND A. PROVIDE DUAL RATE BATTERY CHEQUALIZE CHARGING MODES AND E <br />MINIMUM RATING OF 10 AMPS; SUITABLE FOR MAINTAINING THE SUPPLIED BATTER <br />Y(S) S AT FULL CHARGE <br />WITHOUT MANUAL INTERVENTION. <br />B. CAPABLE OF RETURNING SUPPLIED BATTERY(S) FROM FULLY DISCHARGED TO FULLY CHARGED <br />CONDITION WITHIN 24 HOURS, AS REQUIRED BY NFPA 110 FOR LEVEL 1 APPLICATIONS WHILE CARRYING <br />NORMAL LOADS. <br />C. AUTOMATIC TEMPERATURE COMPENSATION: ADJUST FLOAT AND EQUALIZE VOLTAGES FOR VARIATIONS <br />IN AMBIENT TEMPERATURE FROM MINUS 40 DEG CTO PLUS 60 DEG CTO PREVENT OVERCHARGING AT <br />HIGH TEMPERATURES AND UNDERCHARGING AT LOW TEMPERATURES. <br />D. AUTOMATIC VOLTAGE REGULATION: MAINTAIN CONSTANT OUTPUT VO <br />LTAGE REGARDLESS OF INPUT <br />VOLTAGE VARIATIONS UP TO PLUS OR MINUS 10 PERCENT. <br />E. RECOGNIZED AS COMPLYING WITH UL 1236 . <br />F. FURNISHED WITH INTEGRAL OVERCURRENT PROTECTION; CURRENT LIMITED TO PROTECT CHARGER <br />DURING ENGINE CRANKING; REVERSE POLARITY PROTECTION. <br />G. PROVIDE INTEGRAL DC OUTPUT AMMETER AND VOLTMETER WITH FIVE PERCENT ACCURACY. <br />H. SAFETY FUNCTIONS: SENSE ABNORMALLY LOW BATTERY VOLTAGE AND CLOSE CONTACTS PROVIDING <br />LOW BATTERY VOLTAGE INDICATION ON CONTROL AND MONITORING PANEL. SENSE HIGH BATTERY <br />VOLTAGE AND LOSS OF AC INPUT OR DC OUTPUT OF BATTERY CHARGER. EITHER CONDITION SHALL <br />CLOSE CONTACTS THAT PROVIDE A BATTERY -CHARGER MALFUNCTION INDICATION AT SYSTEM CONTROL <br />AND MONITORING PANEL. <br />1. ENCLOSURE AND MOUNTING: NEMA 250, TYPE 1, WALL -MOUNTED CABINET. <br />6. BATTERY HEATER: PROVIDE THERMOSTATICALLY CONTROLLED BATTERY HEATER TO IMPROVE <br />STARTING UNDER COLD AMBIENT CONDITIONS. <br />F. ENGINE SPEED CONTROL SYSTEM (GOVERNOR): <br />1. SINGLE ENGINE GENERATOR SETS (NOT OPERATED IN PARALLEL): PROVIDE ELECTRONIC <br />ISOCHRONOUS GOVERNOR FOR CONTROLLING ENGINE SPEED/ALTERNATOR FREQUENCY. <br />2. FREQUENCY REGULATION, ELECTRONIC ISOCHRONOUS GOVERNORS: NO CHANGE IN FREQUENCY <br />FROM NO LOAD TO FULL LOAD; PLUS/MINUS 0.25 PERCENT AT STEADY STATE. <br />G.' ENGINE LUBRICATION SYSTEM: <br />1. SYSTEM TYPE: FULL PRESSURE, WITH ENGINE -DRIVEN, POSITIVE DISPLACEMENT LUBRICATION OIL <br />PUMP, REPLACEABLE FULL -FLOW OIL FILTER(S), AND DIP -STICK FOR OIL LEVEL INDICATION. PROVIDE <br />OIL COOLER WHERE RECOMMENDED BY MANUFACTURER. <br />2. FILTER & STRAINER: RATED TO REMOVE 90% OF PARTICLES, 5 MICROMETERS AND SMALLER WHILE <br />PASSING FULL FUEL FLOW <br />3. THERMOSTATIC CONTROL VALVE: CONTROLS FLOW IN SYSTEM TO MAINTAIN OPTIMUM OIL <br />TEMPERATURE. PROVIDE UNIT CAPABLE OF FULL FLOW, DESIGNED TO BE FAIL-SAFE <br />4. CRANKCASE DRAIN: ARRANGED FOR COMPLETE GRAVITY DRAINAGE TO AN EASY REMOVABLE <br />CONTAINER WITHOUT ANY DISASSEMBLY AND WITHOUT USE OF PUMPS OR SIPHONS OR SPECIAL <br />TOOLS <br />H. ENGINE COOLING SYSTEM: <br />1. SYSTEM TYPE: CLOSED -LOOP, LIQUID -COOLED, WITH UNIT -MOUNTED RADIATOR/FAN AND <br />ENGINE -DRIVEN COOLANT PUMP; SUITABLE FOR PROVIDING ADEQUATE COOLING WHILE OPERATING <br />AT FULL LOAD UNDER WORST CASE AMBIENT TEMPERATURE. <br />2. FAN GUARD: PROVIDE SUITABLE GUARD TO PROTECT PERSONNEL FROM ACCIDENTAL CONTACT WITH <br />FAN. <br />3. COOLANT HEATER: PROVIDE THERMOSTATICALLY CONTROLLED COOLANT HEATER TO IMPROVE <br />STARTING UNDER COLD AMBIENT CONDITIONS; SIZE ACCORDING TO MANUFACTURER'S <br />RECOMMENDATIONS FOR ACHIEVING STARTING AND LOAD ACCEPTANCE REQUIREMENTS UNDER <br />WORST CASE AMBIENT TEMPERATURE. <br />4. COOLANT: ANTI -FREEZE COOLANT, 50% ETHYLENE -GLYCOL AND 50% WATER MIXTURE, WITH <br />ANTICORROSION ADDITIVES AS RECOMMENDED BY ENGINE MANUFACTURER, SUPPLIED BY THE <br />CONTRACTOR AT START-UP. <br />5. EXPANSION TANK: CONSTRUCTED OF WELDED STEEL PLATE AND RATED TO WITHSTAND MAXIMUM <br />E <br />CLOSED LOOP COOLANT SYSTEM PRESSURE FOR ENGINE USED. QUIP WITH GAUGE GLASS AND <br />PETCOCK. <br />6. FUEL OIL COOLER: EQUIP RADIATOR WITH A FACTORY INSTALLED, RADIATOR MOUNTED FUEL OIL <br />COOLER SIZED PER MANUFACTURER'S RECOMMENDATION. <br />I. ENGINE AIR INTAKE AND EXHAUST SYSTEM: <br />- ABLE DRY ELEMENT FILTER <br />1. AIR INTAKE FILTRATION: PROVIDE ENGINE MOUNTED, REPLACE , <br />PRE -FILTER, AND A "BLOCKED FILTER INDICATOR.. <br />2. ENGINE EXHAUST CONNECTION: PROVIDE SUITABLE, APPROVED FLEXIBLE CONNECTOR FOR <br />COUPLING ENGINE TO EXHAUST SYSTEM. <br />3. EXHAUST SILENCER: PROVIDE CRITICAL GRADE OR BETTER EXHAUST SILENCER WITH SOUND <br />ATTENUATION NOT LESS THAN BASIS OF DESIGN; SELECT ACCORDING TO MANUFACTURER'S <br />RECOMMENDATIONS TO MEET SOUND PERFORMANCE REQUIREMENTS, WHERE SPECIFIED. <br />4. VERTICAL EXHAUST PIPING SHALL BE PROVIDED WITH A HINGED, GRAVITY -OPERATED, SELF -CLOSING <br />RAIN COVER. <br />5. SILENCER MOUNTING: EQUIP SILENCER WITH MOUNTING BRACKETS FOR HORIZONTAL MOUNTING <br />FROM THE STRUCTURE ABOVE. <br />6. CONDENSATE DRAIN: INSTALL CONDENSATE TRAP AND PETCOCK DRAIN IN SILENCER AND CONNECT <br />WITH SCHEDULE 40, BLACK STEEL PIPE. EXTEND DRAIN AND DRAIN PLUG BEYOND INSULATION TO <br />FACILITATE DRAINING. <br />7. CONNECTION FROM ENGINE TO EXHAUST SYSTEM: INSTALL A STAINLESS STEEL, BELLOWS TYPE, <br />FLEXIBLE SECTION OF A MINIMUM 36 INCHES BETWEEN THE EXHAUST MANIFOLD AND THE EXHAUST <br />SILENCER. <br />8. SYSTEM INSULATION: FULLY INSULATE EXHAUST SYSTEMS (UNDER DIVISION 23) THAT ARE INSTALLED <br />INSIDE STRUCTURES. INSTALL SLEEVES FOR LINES PASSING THROUGH WALLS TO PASS THROUGH. <br />9. THE INSTALLED INSULATION SHALL BE COVERED WITH ALUMINUM JACKET 0.016 INCH THICK. THE <br />JACKET IS TO BE HELD IN PLACE BY BANDS OF 0.015 INCH THICK BY 0.5 INCH WIDE ALUMINUM. <br />2.04 ALTERNATOR (GENERATOR) <br />A. ALTERNATOR: 4-POLE, 1800 RPM (60 HZ OUTPUT) REVOLVING FIELD, SYNCHRONOUS GENERATOR <br />COMPLYING WITH NEMA MG 1; CONNECTED TO ENGINE WITH FLEXIBLE COUPLING; VOLTAGE OUTPUT <br />CONFIGURATION AS INDICATED, WITH RECONNECTABLE LEADS FOR 3 PHASE ALTERNATORS. <br />B. 3/4 TO 5/6 PITCH, FORM WOUND, SINGLE BEARING, BRUSHLESS TYPE, WITH SIX LEADS. TWO OR MORE <br />GENERATORS THAT WILL BE PARALLELED SHALL HAVE IDENTICAL PITCH, IMPEDANCES, AND 3RD <br />HARMONIC VOLTAGES. WHERE ONE OR MORE GENERATORS WILL BE PARALLELED WITH AN EXISTING <br />GENERATOR(S), THE THE PITCH, IMPEDANCES, AND 3RD HARMONIC VOLTAGES WILL BE OPTIMIZED FOR <br />BEST POSSIBLE PERFORMANCE. <br />C. CONSTRUCTION SHALL PREVENT MECHANICAL, ELECTRICAL, AND THERMAL DAMAGE DUE TO VIBRATION, <br />OVERSPEED UP TO 125 PERCENT OF RATING, AND HEAT DURING OPERATION AT 110 PERCENT OF RATED <br />CAPACITY. <br />D. EXCITER: <br />1. EXCITER TYPE: BRUSHLESS; PROVIDE PERMANENT MAGNET GENERATOR (PMG) EXCITATION SYSTEM; <br />SELF-EXCITED (SHUNT) SYSTEMS ARE NOT PERMITTED. <br />2. PMG EXCITATION SHORT-CIRCUIT CURRENT SUPPORT: CAPABLE OF SUSTAINING 300 PERCENT OF <br />RATED OUTPUT CURRENT FOR 10 SECONDS. <br />3. VOLTAGE REGULATION (WITH PMG EXCITATION): PLUS/MINUS 0.5 PERCENT FOR ANY CONSTANT LOAD <br />FROM NO LOAD TO FULL LOAD. <br />4. ROTATING RECTIFIER SHALL EMPLOY THREE PHASE SENSING. <br />5. VOLTAGE REGULATOR: STATIC TYPE WITH A VOLTAGE ADJUSTING RHEOSTAT FURNISHED IN THE <br />CONTROL PANEL SHALL PROVIDE PLUS OR MINUS 5 PERCENT ADJUSTMENT OF OUTPUT -VOLTAGE <br />OPERATING BAND. <br />E. TEMPERATURE RISE: COMPLY WITH UL 2200. <br />F. INSULATION SYSTEM: NEMA MG 1, CLASS F OR CLASS H; SUITABLE FOR ALTERNATOR TEMPERATURE <br />RISE. <br />G. ENCLOSURE: NEMA MG 1, DRIP -PROOF. <br />H. TOTAL HARMONIC DISTORTION: NOT GREATER THAN FIVE PERCENT. <br />I. ALTERNATOR HEATER: PROVIDE STRIP HEATER TO PREVENT MOISTURE CONDENSATION ON <br />ALTERNATOR WINDINGS. <br />J. STEADY-STATE VOLTAGE REGULATION: PLUS OR MINUS 1% FROM NO LOAD TO FULL LOAD WITH STEADY <br />STATE MODULATION OF Yz%. <br />K. TRANSIENT VOLTAGE REGULATION: NOT MORE THAN 25% VARIATION UPON APPLICATION OF FULL LOAD <br />WITH RECOVERY TO STEADY SATE CONDITIONS WITHIN 3 SECONDS. <br />L. STEADY-STATE FREQUENCY REGULATION: PLUS OR MINUS 1/2%. <br />M. STEADY-STATE FREQUENCY <br />CY STABILITY: WHEN SYSTEM IS OPERATING AT ANY CONSTANT LOAD WITHIN <br />THE RATED LOAD, THERE SHALL BE NO RANDOM SPEED VARIATIONS OUTSIDE THE STEADY-STATE <br />OPERATIONAL BAND AND NO HUNTING OR SURGING OF SPEED. <br />N. TRANSIENT FREQUENCY REGULATION: NOT MORE THAN 2% VARIATION UPON APPLICATION OF FULL <br />LOAD. <br />O. OUTPUT WAVEFORM: AT NO LAD, O HARMONIC CONTENT MEASURED LINE TO NEUTRAL SHALL NOT <br />EXCEED 2 PERCENT TOTAL WITH NO SLOT RIPPLE. TELEPHONE INFLUENCE FACTOR, DETERMINED <br />ACCORDING TO NEMA MG 1, SHALL NOT EXCEED 50 PERCENT. <br />P. SUSTAINED SHORT CIRCUIT CURRENT: CAPABLE OF SUPPLYING A MINIMUM OF 300% OF RATED FULL <br />LOAD CURRENT FOR A MINIMUM 10 SECONDS FOR A THREE-PHASE BOLTED SHORT CIRCUIT WITH <br />AUTOMATIC CLEARING OF THE FAULT WITHOUT DAMAGE TO WINDING INSULATION OR OTHER <br />GENERATOR SYSTEM COMPONENTS. <br />Q. STARTTIME: CAPABLE OF REACHING OPERATING VOLTAGE AND FREQUENCY WITHIN THE SHORTEST <br />TIME PRACTICABLE AND WITHIN EIGHT (8) SECONDS. <br />R. OVERSIZING GENERATOR COMPARED WITH THE RATED OUTPUT OF THE ENGINE IS PERMISSIBLE TO <br />MEET SPECIFIED PERFORMANCE. SHOW RATINGS REQUIRED ON THE CONTRACT DOCUMENTS RATHER <br />THAN THE RATINGS THAT WOULD NORMALLY BE APPLIED TO THE GENERATOR SIZE ON THE NAMEPLATE <br />DATA. <br />2.05 GENERATOR SET CONTROL SYSTEM <br />A. PROVIDE MICROPROCESSOR -BASED CONTROL SYSTEM FOR AUTOMATIC CONTROL, MONITORING, AND <br />PROTECTION OF GENERATOR SET. INCLUDE SENSORS, WIRING, AND CONNECTIONS NECESSARY FOR <br />FUNCTIONS/INDICATIONS SPECIFIED. <br />B. CONTROL PANEL: <br />1. CONTROL PANEL MOUNTING: UNIT -MOUNTED UNLESS OTHERWISE INDICATED; VIBRATION ISOLATED. <br />2. GENERATOR SET CONTROL FUNCTIONS: <br />UPON RECEIVING CORRESPONDING <br />TIC MODE: INITIATES GENERATOR SET START/SHUTDOWN A. AUTOMATIC <br />SIGNAL FROM REMOTE DEVICE (E.G. AUTOMATIC TRANSFER SWITCH). <br />B. MANUAL MODE: INITIATES GENERATOR SET START SHUTDOWN UPON DI <br />RECTION FROM OPERATOR. <br />C. RESET MODE: CLEARS ALL FAULTS, ALLOWING GENERATOR SET RESTART AFTER A SHUTDOWN. <br />D. EMERGENCY STOP: IMMEDIATELY SHUTS DOWN GENERATOR SET (WITHOUT TIME DELAY) AND PREVENTS <br />AUTOMATIC RESTARTING UNTIL MANUALLY RESET. <br />E. CYCLE CRANKING: PROGRAMMABLE CRANK TIME, REST TIME, AND NUMBER OF CYCLES. <br />F. TIME DELAY: PROGRAMMABLE FOR SHUTDOWN (ENGINE COOLDOWN) AND START (ENGINE WARMUP). <br />G. VOLTAGE ADJUSTMENT: ADJUSTABLE THROUGH RANGE OF PLUS/MINUS 5 PERCENT. <br />3. GENERATOR SET STATUS INDICATIONS: <br />A. VOLTAGE (VOLTS AQ LINE -TO -LINE, LINE -TO -NEUTRAL FOR EACH PHASE. <br />B. CURRENT (AMPS): FOR EACH PHASE. <br />C. FREQUENCY (HZ). <br />D. REAL POWER (W/KW). <br />E. REACTIVE POWER (VAR/KVAR). <br />F. APPARENT POWER (VA/KVA). <br />G. POWER FACTOR. <br />H. DUTY LEVEL: ACTUAL LOAD AS PERCENTAGE OF RATED POWER. <br />I. ENGINE SPEED (RPM). <br />J. BATTERY VOLTAGE (VOLTS DC). <br />K. ENGINE OIL PRESSURE. <br />L. ENGINE COOLANT TEMPERATURE. <br />M. ENGINE RUN TIME. <br />N. GENERATOR POWERING LOAD (POSITION SIGNAL FROM TRANSFER SWITCH). <br />4. GENERATOR SET PROTECTION AND WARNING/SHUTDOWN INDICATIONS: <br />A. COMPLY WITH NFPA 110; CONFIGURABLE FOR NFPA 110 LEVEL 1, OR NFPA 99 SYSTEMS INCLUDING BUT <br />NOT LIMITED TO THE FOLLOWING PROTECTIONS/INDICATIONS: <br />1) OVERCRANK (SHUTDOWN). <br />2) LOW COOLANT TEMPERATURE (WARNING). <br />3) HIGH COOLANT TEMPERATURE (WARNING). <br />4) HIGH COOLANT TEMPERATURE (SHUTDOWN). <br />5) LOW OIL PRESSURE (WARNING). <br />6) LOW OIL PRESSURE (SHUTDOWN). <br />7) OVERSPEED (SHUTDOWN). <br />8) LOW FUEL LEVEL (WARNING). <br />9) LOW COOLANT LEVEL (WARNING/SHUTDOWN). <br />10) GENERATOR CONTROL NOT IN AUTOMATIC MODE (WARNING). <br />11) HIGH BATTERY VOLTAGE (WARNING). <br />12) LOW CRANKING VOLTAGE (WARNING). <br />13) LOW BATTERY VOLTAGE (WARNING). <br />14) BATTERY CHARGER FAILURE (WARNING). <br />15) COMMON ALARM <br />16) SILENCE SWITCH <br />B. IN ADDITION TO NFPA 110 REQUIREMENTS, PROVIDE THE FOLLOWING PROTECTIONS/INDICATIONS: <br />1) HIGH AC VOLTAGE (SHUTDOWN). <br />2) LOW AC VOLTAGE (SHUTDOWN). <br />3) HIGH FREQUENCY (SHUTDOWN). <br />4) LOW FREQUENCY (SHUTDOWN). <br />5) OVERCURRENT (SHUTDOWN). <br />6) FUEL TANK LEAK (WARNING), WHERE APPLICABLE. <br />C. PROVIDE CONTACTS FOR LOCAL AND REMOTE COMMON ALARM. <br />D. PROVIDE LAMP TEST FUNCTION THAT ILLUMINATES ALL INDICATOR LAMPS. <br />S. OTHER CONTROL PANEL FEATURES: <br />A. EVENT LOG. <br />B. SILENCE SWITCH. <br />C. REMOTE ANNUNCIATOR: <br />1. REMOTE ANNUNCIATOR MOUNTING: WALL -MOUNTED; PROVIDE FLUSH -MOUNTED OR <br />SURFACE -MOUNTED ANNUNCIATOR AS INDICATED. <br />2. INCLUDE CONTROL WIRING BETWEEN THE REMOTE ANNUNCIATOR PANEL AND THE ENGINE <br />GENERATOR. WIRING SHALL BE AS REQUIRED BY THE MANUFACTURER. <br />3. GENERA <br />TOR SET STATUS INDICATIONS: <br />A. GENERATOR POWERING LOAD (VIA POSITION SIGNAL FROM TRANSFER SWITCH). <br />B. COMMUNICATION FUNCTIONAL. <br />4. GENERATOR SET WARNING/SHUTDOWN INDICATIONS: <br />A. COMPLY WITH NFPA 110 FOR LEVEL 1 SYSTEMS INCLUDING BUT NOT LIMITED TO THE FOLLOWING <br />INDICATIONS: <br />1) OVERCRANK (SHUTDOWN). <br />2) LOW COOLANT TEMPERATURE (WARNING). <br />3) HIGH COOLANT TEMPERATURE (WARNING). <br />4) HIGH COOLANT TEMPERATURE (SHUTDOWN). <br />5) LOW OIL PRESSURE (WARNING). <br />6) LOW OIL PRESSURE (SHUTDOWN). <br />7) OVERSPEED (SHUTDOWN). <br />8) LOW FUEL LEVEL (WARNING). <br />9) LOW COOLANT LEVEL (WARNING/SHUTDOWN). <br />10) HIGH BATTERY VOLTAGE (WARNING). <br />11) LOW CRANKING VOLTAGE (WARNING). <br />12) LOW BATTERY VOLTAGE (WARNING). <br />13) BATTERY CHARGER FAILURE (WARNING). <br />14) COMMON ALARM. <br />15) PROVIDE AUDIBLE ALARM WITH SILENCE FUNCTION. <br />16) PROVIDE LAMP TEST FUNCTION THAT ILLUMINATES ALL INDICATOR LAMPS. <br />D. REMOTE EMERGENCY STOP: PROVIDE APPROVED RED, MUSHROOM STYLE REMOTE EMERGENCY STOP <br />BUTTON WITH A BREAKABLE GLASS ENCLOSURE WHERE INDICATED OR REQUIRED BY AUTHORITIES <br />HAVING JURISDICTION. <br />2.06 GENERATOR OVERCURRENT AND FAULT PROTECTION <br />A. GENERATOR CIRCUIT BREAKER: MOLDED -CASE, ELECTRONIC -TRIP TYPE; 100 PERCENT RATED; <br />COMPLYING WITH UL489. <br />1. TRIPPING CHARACTERISTICS: ADJUSTABLE LONG-TIME AND SHORT -TIME DELAY AND INSTANTANEOUS. <br />2. TRIP SETTINGS: SELECTED TO COORDINATE WITH GENERATOR THERMAL DAMAGE CURVE. <br />3. SHUNT TRIP: CONNECTED TO TRIP BREAKER WHEN GENERATOR SET IS SHUT DOWN BY <br />OTHER PROTECTIVE DEVICES. <br />4. MOUNTING: ADJACENT TO OR INTEGRATED WITH CONTROL AND MONITORING PANEL. <br />B. GENERATOR PROTECTOR: MICROPROCESSOR -BASED UNIT SHALL CONTINUOUSLY MONITOR CURRENT <br />LEVEL IN EACH PHASE OF GENERATOR OUTPUT, INTEGRATE GENERATOR HEATING EFFECT OVER TIME, <br />AND PREDICT WHEN THERMAL DAMAGE OF ALTERNATOR WILL OCCUR. WHEN SIGNALED BY GENERATOR <br />PROTECTOR OR OTHER GENERATOR -SET PROTECTIVE DEVICES, A SHUNT -TRIP DEVICE IN THE <br />GENERATOR DISCONNECT SWITCH SHALL OPEN THE SWITCH TO DISCONNECT THE GENERATOR FROM <br />LOAD CIRCUITS. PROTECTOR SHALL PERFORM THE FOLLOWING FUNCTIONS: <br />1. INITIATES A GENERATOR OVERLOAD ALARM WHEN GENERATOR HAS OPERATED AT AN OVERLOAD <br />EQUIVALENT TO 110 PERCENT OF FULL -RATED LOAD FOR 60 SECONDS. INDICATION FOR THIS ALARM IS <br />INTEGRATED WITH OTHER GENERATOR -SET MALFUNCTION ALARMS. <br />2. UNDER SINGLE OR THREE-PHASE FAULT CONDITIONS, REGULATES GENERATOR TO 300 PERCENT OF <br />RATED FULL -LOAD CURRENT FOR UP TO 10 SECONDS. <br />T APPROACHES THE THERMAL DAMAGE <br />3. AS OVERCURRENT HEATING EFFECT ON THE GENERATOR <br />POINT OF THE UNIT, PROTECTOR SWITCHES THE EXCITATION SYSTEM OFF, OPENS THE GENERATOR <br />DISCONNECT DEVICE, AND SHUTS DOWN THE GENERATOR SET. <br />4. SENSES CLEARING OF A FAULT BY OTHER OVERCURRENT DEVICES AND CONTROLS RECOVERY OF <br />RATED VOLTAGE TO AVOID OVERSHOOT. <br />2.07 GENERATOR SET ENCLOSURE <br />A. ENCLOSURE TYPE: LEVEL 2, SOUND ATTENUATING, WEATHER PROTECTIVE. <br />B. ENCLOSURE MATERIAL: ALUMINUM. <br />C. HARDWARE MATERIAL: STAINLESS STEEL. <br />D. COLOR: MANUFACTURER'S STANDARD. <br />E. ACCESS DOORS: LOCKABLE, WITH ALL LOCKS KEYED ALIKE. <br />F. OPENINGS: DESIGNED TO PREVENT BIRD/RODENT ENTRY. <br />G. EXTERNAL DRAINS: EXTEND OIL AND COOLANT DRAIN LINES TO EXTERIOR OF ENCLOSURE FOR <br />MAINTENANCE SERVICE. <br />H. ENCLOSURE SHALL BE SUITABLE FOR WINDS UP TO 150 MILES PER HOUR ROOF LOAD SHALL BE EQUAL <br />TO OR GREATER THAN 40 POUNDS PER SQUARE FOOT NON -DISTRIBUTED LOADING AS REQUIRED. <br />1. SOUND ATTENUATING ENCLOSURES: LINE ENCLOSURE WITH NON-HYDROSCOPIC, SELF -EXTINGUISHING <br />SOUND -ATTENUATING MATERIAL. MAXIMUM 85 DBA AT 5 FEET FROM ANY SIDE, TOP AND BOTTOM TO NO <br />MORE THAN 78 DBA WHEN MEASURED AT 23 FEET HORIZONTALLY FROM ANY PART OF THE ENCLOSURE <br />UNLESS OTHERWISE NOTED ON PLANS. SOUND RATINGS SHALL BE BASED ON FULL LOAD CONDITION OF <br />ENGINE GENERATOR IN A SINGLE UNIT OPERATION CONDITION. <br />J. THE ENCLOSURE SHALL BE PROVIDED WITH A FACTORY -INSTALLED AND FACTORY -WIRED PANELBOARD <br />OR EQUIVALENT, 20A 120V RECEPTACLES FOR MAINTENANCE, AND COMPACT FLUORESCENT <br />VAPORPROOF-TYPE FIXTURES WITH GUARDS AND SWITCHES. PROVIDE LIGHTING FIXTURES FOR TASK <br />ILLUMINATION, BATTERY -POWERED LIGHTING UNITS (MINIMUM 2). <br />K. UTILIZE AN UPWARD DISCHARGING RADIATOR HOOD. <br />L. EXHAUST SILENCERS: WHERE EXHAUST SILENCERS ARE MOUNTED WITHIN ENCLOSURE IN MAIN ENGINE <br />COMPARTMENT, INSULATE SILENCER TO MINIMIZE HEAT DISSIPATION AS NECESSARY FOR OPERATION AT <br />RATED LOAD UNDER WORST CASE AMBIENT TEMPERATURE. <br />2.08 VIBRATION ISOLATION DEVICES <br />A. ELASTOMERIC ISOLATOR PADS: OIL- AND WATER-RESISTANT ELASTOMER OR NATURAL RUBBER, <br />ARRANGED IN SINGLE OR MULTIPLE LAYERS, MOLDED WITH A NONSLIP PATTERN AND GALVANIZED -STEEL <br />BASEPLATES OF SUFFICIENT STIFFNESS FOR UNIFORM LOADING OVER PAD AREA, AND FACTORY CUT TO <br />SIZES THAT MATCH REQUIREMENTS OF SUPPORTED EQUIPMENT. <br />1. MATERIAL: STANDARD NEOPRENE. <br />2. DUROMETER RATING: 30. <br />3. NUMBER OF LAYERS: ONE. <br />B. RESTRAINED SPRING ISOLATORS: FREESTANDING STEEL OPEN -SPRING ISOLATORS WITH SEISMIC <br />RESTRAINT. <br />1. HOUSING: STEEL WITH RESILIENT VERTICAL -LIMIT STOPS TO PREVENT SPRING EXTENSION DUE TO <br />WIND LOADS OR IF WEIGHT IS REMOVED; FACTORY -DRILLED BASEPLATE BONDED TO 1/4-INCH THICK, <br />ELASTOMERIC ISOLATOR PAD ATTACHED TO BASEPLATE UNDERSIDE; AND ADJUSTABLE EQUIPMENT <br />MOUNTING AND LEVELING BOLT THAT ACTS AS BLOCKING DURING INSTALLATION. <br />2. OUTSIDE SPRING DIAMETER: NOT LESS THAN 80 PERCENT OF COMPRESSED HEIGHT OF THE SPRING <br />AT RATED LOAD. <br />3. MINIMUM ADDITIONAL TRAVEL: 50 PERCENT OF REQUIRED DEFLECTION AT RATED LOAD. <br />4. LATERAL STIFFNESS: MORE THAN 80 PERCENT OF RATED VERTICAL STIFFNESS. <br />S. OVERLOAD CAPACITY: SUPPORT 200 PERCENT OF RATED LOAD, FULLY COMPRESSED, WITHOUT <br />DEFORMATION OR FAILURE. <br />2.09 SOURCE QUALITY CONTROL <br />A. SEE SECTION 014000 - QUALITY REQUIREMENTS, FOR ADDITIONAL REQUIREMENTS. <br />B. PERFORM PRODUCTION TESTS ON GENERATOR SETS AT FACTORY TO VERIFY OPERATION AND <br />PERFORMANCE CHARACTERISTICS PRIOR TO SHIPMENT. INCLUDE CERTIFIED TEST REPORT WITH <br />SUBMITTALS. <br />PART 3 EXECUTION <br />3.01 EXAMINATION <br />A. VERIFY THAT FIELD MEASUREMENTS ARE AS SHOWN ON THE DRAWINGS. <br />B. VERIFY THAT THE RATINGS AND CONFIGURATIONS OF GENERATOR SETS AND AUXILIARY EQUIPMENT ARE <br />CONSISTENT WITH THE INDICATED REQUIREMENTS. <br />C. VERIFY THAT ROUGH -INS FOR FIELD CONNECTIONS ARE IN THE PROPER LOCATIONS. <br />D. VERIFY THAT MOUNTING SURFACES ARE READY TO RECEIVE EQUIPMENT. <br />E. VERIFY THAT CONDITIONS ARE SATISFACTORY FOR INSTALLATION PRIOR TO STARTING WORK. <br />F. PROCEED WITH INSTALLATION ONLY AFTER UNSATISFACTORY CONDITIONS HAVE BEEN CORRECTED. <br />3.02 INSTALLATION <br />A. PERFORM WORK IN A NEAT AND WORKMANLIKE MANNER IN ACCORDANCE WITH NECA 1 . <br />B. INSTALL PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. <br />C. INSTALL GENERATOR SETS AND ASSOCIATED ACCESSORIES IN ACCORDANCE WITH NECA/EGSA 404 <br />D. ARRANGE EQUIPMENT TO PROVIDE MINIMUM CLEARANCES AND REQUIRED MAINTENANCE ACCESS. <br />E. INSTALL PACKAGED ENGINE GENERATOR TO PROVIDE ACCESS WITHOUT REMOVING CONNECTIONS OR <br />ACCESSORIES FOR PERIODIC MAINTENANCE. <br />F. ALL CONNECTIONS BETWEEN THE ENGINE GENERATOR AND EXTERIOR SYSTEMS, SUCH AS FUEL LINES, <br />ELECTRICAL CONNECTIONS, AND ENGINE EXHAUST SYSTEM AND AIR EXHAUST SHROUD, SHALL BE <br />FLEXIBLE. <br />G. PROVIDE REQUIRED SUPPORT AND ATTACHMENT IN ACCORDANCE WITH SECTION 260529. <br />H. USE MANUFACTURER'S RECOMMENDED OIL AND COOLANT, SUITABLE FOR THE WORST CASE AMBIENT <br />TEMPERATURES. <br />I. PROVIDE ENGINE EXHAUST PIPING IN ACCORDANCE WITH SECTION 235100 WHERE NOT FACTORY <br />INSTALLED. <br />1. INCLUDE PIPING EXPANSION JOINTS, PIPING INSULATION, THIMBLE, CONDENSATION TRAP/DRAIN, RAIN <br />CAP HANGERS SUPPORTS ETC. AS INDICATED OR AS REQUIRED. <br />/ Q <br />2. DO NOT EXCEED MANUFACTURER'S MAXIMUM BACK PRESSURE REQUIREMENTS. <br />J. INSTALL EXHAUST SILENCER IN ACCORDANCE WITH SECTION 235100, WHERE NOT FACTORY INSTALLED. <br />K. ELECTRICAL WIRING: INSTALL ELECTRICAL DEVICES FURNISHED BY EQUIPMENT MANUFACTURERS BUT <br />NOT SPECIFIED TO BE FACTORY MOUNTED. <br />L. PROVIDE GROUNDING AND BONDING IN ACCORDANCE WITH SECTION 260526. <br />1. GROUND THE ENGINE GENERATOR FRAME AND ENCLOSURE USING AN EQUIPMENT GROUNDING <br />CONDUCTOR SIZED IN ACCORDANCE WITH THE NEC. <br />2. NEUTRAL CONNECTION: SOLIDLY GROUNDED SYSTEM NEUTRAL. THE LOCATION OF THE NEUTRAL <br />CONNECTION SHALL BE AS SHOWN ON THE DRAWINGS <br />M ENGAGE THE SERVICES OF A FACTORY TRAINED ENGINEER FOR PERIODIC JOBSITE VISITS DURING <br />E <br />INSTALLATION TO ENSURE THAT THE SYSTEM IS BEING INSTALLED IN ACCORDANCE WITH <br />MANUFACTURER'S RECOMMENDATIONS. HAVE FACTORY ENGINEER COORDINATE WITH THE <br />SWITCHGEAR FIELD ENGINEER TO ENSURE PROPER APPLICATION OF THE LOAD SHEDDING AND LOAD <br />ADDING PROGRAM. <br />N. IDENTIFY SYSTEM WIRING AND COMPONENTS IN ACCORDANCE WITH SECTION 260553. <br />3.03 FIELD QUALITY CONTROL <br />A. ENGAGE A FACTORY -AUTHORIZED SERVICE REPRESENTATIVE TO PERFORM A COMPLETE OPERATIONAL <br />SEQUENCE TEST AS DIRECTED BY THE ENGINEER OR AS INCLUDED IN THE COMMISSIONING DOCUMENTS. <br />COORDINATE THIS PERFORMANCE TEST WITH TESTING OF AUTOMATIC TRANSFER SWITCHES. <br />B. NOTIFY OWNER AND ENGINEER AT LEAST TWO WEEKS PRIOR TO SCHEDULED INSPECTIONS AND TESTS. <br />C. NOTIFY AUTHORITIES HAVING JURISDICTION AND COMPLY WITH THEIR REQUIREMENTS FOR SCHEDULING <br />INSPECTIONS AND TESTS AND FOR OBSERVATION BY THEIR PERSONNEL. <br />D. PROVIDE ALL EQUIPMENT, TOOLS, AND SUPPLIES REQUIRED TO ACCOMPLISH INSPECTION AND TESTING, <br />INCLUDING LOAD BANK AND FUEL. <br />E. PRELIMINARY INSPECTION AND TESTING TO INCLUDE, AT A MINIMUM: <br />1. INSPECT EACH SYSTEM COMPONENT FOR DAMAGE AND DEFECTS. <br />2. VERIFY TIGHTNESS OF MECHANICAL AND ELECTRICAL CONNECTIONS ARE ACCORDING TO <br />MANUFACTURER'S RECOMMENDED TORQUE SETTINGS. <br />3. CHECK FOR PROPER OIL AND COOLANT LEVELS. <br />F. PREPARE AND START SYSTEM IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. <br />G. FURNISH A RESISTANCE -TYPE LOAD FOR THE TESTING OF THE ENGINE GENERATOR. TEST LOADS SHALL <br />ALWAYS INCLUDE ADEQUATE RESISTANCE TO ASSURE STABILITY OF THE LOADS AND EQUIPMENT <br />DURING ALL OF THE TESTING OPERATIONS. THE TEST LOAD KW RATING SHALL NOT BE LESS THAN 100% <br />OF THE SPECIFIED KW RATING OF THE ENGINE GENERATOR. <br />H. INSPECTION AND TESTING TO INCLUDE, AT A MINIMUM: <br />1. NFPA 110 ACCEPTANCE TESTS: PERFORM TESTS REQUIRED BY NFPA 110 THAT ARE ADDITIONAL TO <br />THOSE SPECIFIED HERE INCLUDING, BUT NOT LIMITED TO SINGLE-STEP 100% FULL -LOAD PICKUP TEST. <br />2. VERIFY COMPLIANCE WITH STARTING AND LOAD ACCEPTANCE REQUIREMENTS. <br />3. VERIFY VOLTAGE AND FREQUENCY; MAKE REQUIRED ADJUSTMENTS AS NECESSARY. <br />4. VERIFY PHASE SEQUENCE. <br />5. VERIFY CONTROL SYSTEM OPERATION, INCLUDING SAFETY SHUTDOWNS. <br />6. VERIFY OPERATION OF AUXILIARY EQUIPMENT AND ACCESSORIES (E.G. BATTERY CHARGER, HEATERS, <br />ETC.). <br />7. STARTING SYSTEM TEST: <br />A. DEMONSTRATE THAT THE BATTERIES AND CRANKING MOTOR ARE CAPABLE OF FIVE STARTING ATTEMPTS <br />OF 15 SECONDS CRANKING EACH AT 15-SECOND INTERVALS WITH THE BATTERY CHARGER TURNED OFF. <br />8. BATTERY TESTS: EQUALIZE CHARGING OF BATTERY CELLS ACCORDING TO MANUFACTURER'S <br />WRITTEN INSTRUCTIONS. RECORD INDIVIDUAL CELL VOLTAGES. <br />A. MEASURE CHARGING VOLTAGE AND VOLTAGES BETWEEN AVAILABLE BATTERY TERMINALS FOR <br />FULL -CHARGING AND FLOAT -CHARGING CONDITIONS. CHECK ELECTROLYTE LEVEL AND SPECIFIC <br />GRAVITY UNDER BOTH CONDITIONS. <br />B. TEST FOR CONTACT INTEGRITY OF ALL CONNECTORS. PERFORM AN INTEGRITY LOAD TEST AND A <br />CAPACITY LOAD TEST FOR THE BATTERY. <br />C. VERIFY ACCEPTANCE OF CHARGE FOR EACH ELEMENT OF THE BATTERY AFTER DISCHARGE. <br />D. VERIFY THAT MEASUREMENTS ARE WITHIN MANUFACTURER'S SPECIFICATIONS. <br />9. BATTERY -CHARGER TESTS: VERIFY SPECIFIED RATES OF CHARGE FOR BOTH EQUALIZING AND <br />FLOAT -CHARGING CONDITIONS. <br />10. REMOTE ANNUNCIATOR PANEL TESTS: <br />A. SIMULATE CONDITIONS TO VERIFY PROPER OPERATION OF EACH VISUAL OR AUDIBLE INDICATION, <br />INTERCONNECTING HARDWARE AND SOFTWARE, AND RESET BUTTON. <br />11. VOLTAGE AND FREQUENCY TRANSIENT STABILITY TESTS: USE RECORDING OSCILLOSCOPE TO <br />MEASURE VOLTAGE AND FREQUENCY TRANSIENTS FOR 50 AND 100 PERCENT STEP -LOAD INCREASES <br />AND DECREASES, AND VERIFY THAT PERFORMANCE IS AS SPECIFIED. <br />12. HARMONIC -CONTENT TESTS: MEASURE HARMONIC CONTENT OF OUTPUT VOLTAGE UNDER 25 <br />PERCENT AND AT 100 PERCENT OF RATED LINEAR LOAD. VERIFY THAT HARMONIC CONTENT IS WITHIN <br />SPECIFIED LIMITS. <br />13. EXHAUST EMISSIONS TEST: COMPLY WITH APPLICABLE GOVERNMENT TEST CRITERIA. <br />14. NOISE LEVEL TESTS: MEASURE A -WEIGHTED LEVEL OF NOISE EMANATING FROM GENERATOR -SET <br />INSTALLATION, INCLUDING ENGINE EXHAUST AND COOLING -AIR INTAKE AND DISCHARGE, AT FOUR <br />DESIGNATED LOCATIONS, ON THE PROPERTY LINE, AND COMPARE MEASURED LEVELS WITH <br />REQUIRED VALUES. <br />15. LEAK TEST: AFTER INSTALLATION, CHARGE SYSTEM AND TEST FOR LEAKS. REPAIR LEAKS AND <br />RETEST UNTIL NO LEAKS EXIST. <br />C AS BEEN ENERGIZED START UNITS TO CONFIRM <br />16. OPERATIONAL TEST: AFTER ELECTRICAL CIRCUITRY H <br />PROPER MOTOR ROTATION AND UNIT OPERATION. <br />17. RETEST: CORRECT DEFICIENCIES IDENTIFIED BY TESTS AND OBSERVATIONS AND RETEST UNTIL <br />SPECIFIED REQUIREMENTS ARE MET. <br />18. PERFORM LOAD TESTS USING LOAD BANK AT 100 PERCENT FULL LOAD FOR MINIMUM OF 2. BUILDING <br />LOAD MAY BE USED IF AVAILABLE AND APPROVED BY OWNER. <br />19. COORDINATE THIS PERFORMANCE TEST WITH TESTING OF PARALLELING SWITCHGEAR AND <br />AUTOMATIC TRANSFER SWITCHES. <br />20. DEMONSTRATE THAT THE ENGINE GENERATOR WILL ATTAIN PROPER VOLTAGE AND FREQUENCY <br />WITHIN THE SPECIFIED TIME LIMIT FROM A COLD START AFTER THE CLOSING OF A SINGLE CONTACT. <br />21. AUTOMATIC OPERATION TESTS: <br />A. TEST THE ENGINE GENERATOR AND ASSOCIATED AUTOMATIC TRANSFER SWITCHES TO DEMONSTRATE <br />AUTOMATIC STARTING, LOADING AND UNLOADING. THE LOAD FOR THIS TEST SHALL BE THE ACTUAL <br />CONNECTED LOADS. INITIATE LOSS OF NORMAL SOURCE AND VERIFY THE SPECIFIED SEQUENCE OF <br />OPERATION. RESTORE THE NORMAL POWER SOURCE AND VERIFY THE SPECIFIED SEQUENCE OF <br />OPERATION. VERIFY RESETTING OF CONTROLS TO NORMAL. <br />I. FURNISH CERTIFICATIONS REQUIRED BY NFPA 110, PARAGRAPH 7.13.11. <br />J. PROVIDE FIELD EMISSIONS TESTING WHERE NECESSARY FOR CERTIFICATION. <br />K. SOUND LEVEL TESTS: MEASURE SOUND LEVELS FOR COMPLIANCE WITH SPECIFIED REQUIREMENTS. <br />IDENTIFY AND REPORT AMBIENT NOISE CONDITIONS. <br />L. CORRECT DEFECTIVE WORK, ADJUST FOR PROPER OPERATION, AND RETEST UNTIL ENTIRE SYSTEM <br />COMPLIES WITH CONTRACT DOCUMENTS. <br />M. SUBMIT DETAILED REPORTS INDICATING INSPECTION AND TESTING RESULTS AND CORRECTIVE ACTIONS <br />TAKEN. <br />1. RECORD THE FOLLOWING TEST DATA AT 30-MINUTE INTERVALS: <br />A. TIME OF DAY, AS WELL AS READING OF RUNNING TIME INDICATOR. <br />B. KW. <br />C. VOLTAGE ON EACH PHASE. <br />D. AMPERES ON EACH PHASE. <br />E. ENGINE RPM. <br />F. FREQUENCY. <br />G. COOLANT WATER TEMPERATURE. <br />H. FUEL PRESSURE. <br />1. OIL PRESSURE. <br />J. OUTDOOR TEMPERATURE. <br />K. AVERAGE AMBIENT TEMPERATURE IN THE VICINITY OF THE ENGINE GENERATOR. <br />N. INFRARED SCANNING: AFTER SUBSTANTIAL COMPLETION, BUT NOT MORE THAN 60 DAYS AFTER FINAL <br />ACCEPTANCE, PERFORM AN INFRARED SCAN OF EACH POWER WIRING TERMINATION AND EACH BUS <br />CONNECTION. REMOVE ALL ACCESS PANELS SO TERMINATIONS AND CONNECTIONS ARE ACCESSIBLE TO <br />PORTABLE SCANNER. <br />1. FOLLOW-UP INFRARED SCANNING: PERFORM AN ADDITIONAL FOLLOW-UP INFRARED SCAN 11 MONTHS <br />AFTER DATE OF SUBSTANTIAL COMPLETION. <br />2. INSTRUMENT: USE AN INFRARED SCANNING DEVICE DESIGNED TO MEASURE TEMPERATURE OR TO <br />DETECT SIGNIFICANT DEVIATIONS FROM NORMAL VALUES. PROVIDE CALIBRATION RECORD FOR <br />DEVICE. <br />3. RECORD OF INFRARED SCANNING: PREPARE A CERTIFIED REPORT THAT IDENTIFIES TERMINATIONS <br />AND CONNECTIONS CHECKED AND THAT DESCRIBES SCANNING RESULTS. INCLUDE NOTATION OF <br />DEFICIENCIES DETECTED, REMEDIAL ACTION TAKEN, AND OBSERVATIONS AFTER REMEDIAL ACTION. <br />3.04 CLEANING <br />A. CLEAN EXPOSED SURFACES TO REMOVE DIRT, PAINT, OR OTHER FOREIGN MATERIAL AND RESTORE TO <br />MATCH ORIGINAL FACTORY FINISH. <br />3.05 CLOSEOUT ACTIVITIES <br />A. DEMONSTRATION: DEMONSTRATE PROPER OPERATION OF SYSTEM TO OWNER, AND CORRECT <br />DEFICIENCIES OR MAKE ADJUSTMENTS AS DIRECTED. <br />B. PROVIDE FIELD ENGINEER FOR 1 DAYS OF OWNER TRAINING ON THE SYSTEM OPERATION. SCHEDULE <br />THE TRAINING ONE MONTH IN ADVANCE WITH OWNER. PREPARE AN AGENDA COMBINING CLASS TIME <br />WITH HANDS ON DEMONSTRATIONS AND EXPERIENCE. SEND THE AGENDA TO THE OWNER PRIOR TO <br />TRAINING FOR REVIEW. <br />C. TRAINING: TRAIN OWNER'S PERSONNEL ON OPERATION, ADJUSTMENT, AND MAINTENANCE OF SYSTEM. <br />1. USE OPERATION AND MAINTENANCE MANUAL AS TRAINING REFERENCE, SUPPLEMENTED WITH <br />ADDITIONAL TRAINING MATERIALS AS REQUIRED. <br />2. INSTRUCTOR: MANUFACTURER'S AUTHORIZED REPRESENTATIVE. <br />3. LOCATION: AT PROJECT SITE. <br />D. AFTER SUCCESSFUL ACCEPTANCE TEST AND JUST PRIOR TO SUBSTANTIAL COMPLETION, REPLACE AIR, <br />OIL, AND FUEL FILTERS. <br />3.06 PROTECTION <br />A. PROTECT INSTALLED ENGINE GENERATOR SYSTEM FROM SUBSEQUENT CONSTRUCTION OPERATIONS. <br />3.07 MAINTENANCE <br />A. PROVIDE TO OWNER A PROPOSAL AS AN ALTERNATE TO THE BASE BID, A SEPARATE MAINTENANCE <br />CONTRACT FOR THE SERVICE AND MAINTENANCE OF ENGINE GENERATOR SYSTEM FOR TWO YEARS <br />FROM DATE OF SUBSTANTIAL COMPLETION; INCLUDE A COMPLETE DESCRIPTION OF PREVENTIVE <br />MAINTENANCE, SYSTEMATIC EXAMINATION, ADJUSTMENT, INSPECTION, AND TESTING, WITH A DETAILED <br />SCHEDULE. <br />B. PROVIDE TROUBLE CALL-BACK SERVICE UPON NOTIFICATION BY OWNER: <br />1. PROVIDE ON -SITE RESPONSE WITHIN 4 HOURS OF NOTIFICATION. <br />2. INCLUDE ALLOWANCE FOR CALL-BACK SERVICE DURING NORMAL WORKING HOURS AT NO EXTRA <br />COST TO OWNER. <br />3. OWNER WILL PAY FOR CALL-BACK SERVICE OUTSIDE OF NORMAL WORKING HOURS ON AN HOURLY <br />BASIS, BASED ON ACTUAL TIME SPENT AT SITE AND NOT INCLUDING TRAVEL TIME; INCLUDE HOURLY <br />RATE AND DEFINITION OF NORMAL WORKING HOURS IN MAINTENANCE CONTRACT. <br />C. MAINTAIN AN ON -SITE LOG LISTING THE DATE AND TIME OF EACH INSPECTION AND CALL-BACK VISIT, THE <br />CONDITION OF THE SYSTEM, NATURE OF THE TROUBLE, CORRECTION PERFORMED, AND PARTS <br />REPLACED. <br />END OF SECTIONSECTION 263600 <br />TRANSFER SWITCHES <br />PART 1 GENERAL <br />1.01SECTION INCLUDES <br />A. TRANSFER SWITCHES FOR LOW -VOLTAGE (600 V AND LESS) APPLICATIONS AND ASSOCIATED <br />ACCESSORIES: <br />1. AUTOMATIC TRANSFER SWITCHES. <br />2. INCLUDES SERVICE ENTRANCE RATED TRANSFER SWITCHES. <br />B. THIS SECTION INCLUDES TRANSFER SWITCHES RATED 600 V AND LESS. REFER TO DRAWINGS FOR <br />QUANTITY, RATING AND CONFIGURATION OF TRANSFER SWITCHES. CONFIGURATIONS INCLUDE THE <br />FOLLOWING: <br />1. AUTOMATIC AND NONAUTOMATIC TRANSFER SWITCHES. <br />2. 3-POLE AND 4-POLE TRANSFER SWITCHES. <br />3. CLOSED OR OPEN TRANSITION SWITCHES. <br />C. THIS SECTION INCLUDES A REMOTE ANNUNCIATION AND CONTROL SYSTEM FOR MONITORING AND <br />CONTROL OF SWITCHES. <br />D. PROVIDE TRANSFER SWITCHES, GENERATORS AND PARALLELING SWITCHGEAR TOGETHER AS A <br />COMPLETE FUNCTIONING SYSTEM THROUGH A SINGLE VENDOR. <br />E. PROVIDE TRANSFER SWITCHES AND GENERATOR AS A COMPLETE FUNCTIONING EMERGENCY POWER <br />SYSTEM THROUGH A SINGLE VENDOR. <br />1.02RELATED SECTIONS <br />A. DRAWINGS AND GENERAL PROVISIONS OF THE CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY <br />CONDITIONS AND DIVISION 01 SPECIFICATION SECTIONS, APPLY TO THIS SECTION. <br />B. SECTION 033000 - CAST -IN -PLACE CONCRETE: CONCRETE EQUIPMENT PADS. <br />C. SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS. <br />D. SECTION 260529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS. <br />E. SECTION 26 0500 - COMMON WORK RESULTS FOR ELECTRICAL. <br />F. SECTION 26 0519 - LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES. <br />G. SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS. <br />H. SECTION 26 0533 - RACEWAYS AND CONDUIT SYSTEMS. <br />I. SECTION 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS: IDENTIFICATION PRODUCTS AND <br />REQUIREMENTS. <br />J. SECTION 263213 - ENGINE GENERATORS: FOR INTERFACE WITH TRANSFER SWITCHES. <br />1. INCLUDES CODE REQUIREMENTS APPLICABLE TO WORK OF THIS SECTION. <br />2. INCLUDES ADDITIONAL TESTING REQUIREMENTS. <br />K. SECTION 263213 - ENGINE GENERATORS: TESTING REQUIREMENTS. <br />1.03REFERENCE STANDARDS <br />A. NECA 1- STANDARD FOR GOOD WORKMANSHIP IN ELECTRICAL CONSTRUCTION; 2010. <br />B. NEMA 250 - ENCLOSURES FOR ELECTRICAL EQUIPMENT (1000 VOLTS MAXIMUM); 2014. <br />C. UL 1008: UNDERWRITERS LABORATORIES STANDARD FOR AUTOMATIC TRANSFER SWITCHES. <br />D. NETA ATS - ACCEPTANCE TESTING SPECIFICATIONS FOR ELECTRICAL POWER EQUIPMENT AND SYSTEMS; <br />2013. <br />E. NFPA 70 - NATIONAL ELECTRICAL CODE; MOST RECENT EDITION ADOPTED BY AUTHORITY HAVING <br />JURISDICTION, INCLUDING ALL APPLICABLE AMENDMENTS AND SUPPLEMENTS. <br />F. UL 869A - REFERENCE STANDARD FOR SERVICE EQUIPMENT; CURRENT EDITION, INCLUDING ALL <br />REVISIONS. <br />G. UL 1008 - TRANSFER SWITCH EQUIPMENT; CURRENT EDITION, INCLUDING ALL REVISIONS. <br />H. NFPA 99: ESSENTIAL ELECTRICAL SYSTEMS FOR HEALTH CARE FACILITIES <br />I. NFPA 101: LIFE SAFETY CODE <br />J. NFPA 110: STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS <br />K. IEEE 241: I.E.E.E. RECOMMENDED PRACTICE FOR ELECTRICAL POWER SYSTEMS IN COMMERCIAL <br />BUILDINGS. <br />L. IEEE 446: I.E.E.E. RECOMMENDED PRACTICE FOR EMERGENCY AND STANDBY POWER SYSTEMS. <br />1.04ADMINISTRATIVE REQUIREMENTS <br />A. COORDINATION: <br />1. COORDINATE COMPATIBILITY OF TRANSFER SWITCHES TO BE INSTALLED WITH WORK PROVIDED <br />UNDER OTHER SECTIONS OR BY OTHERS. <br />2. COORDINATE THE WORK WITH OTHER TRADES TO AVOID PLACEMENT OF DUCTWORK, PIPING, <br />EQUIPMENT, OR OTHER POTENTIAL OBSTRUCTIONS WITHIN THE DEDICATED EQUIPMENT SPACES AND <br />Q Q <br />WORKING CLEARANCES REQUIRED BY NFPA 70 <br />3. COORDINATE ARRANGEMENT OF EQUIPMENT WITH THE DIMENSIONS AND CLEARANCE <br />REQUIREMENTS OF THE ACTUAL EQUIPMENT TO BE INSTALLED. <br />4. COORDINATE THE WORK WITH PLACEMENT OF SUPPORTS, ANCHORS, ETC. REQUIRED FOR MOUNTING. <br />5. NOTIFY ENGINEER OF ANY CONFLICTS WITH OR DEVIATIONS FROM THE CONTRACT DOCUMENTS. <br />OBTAIN DIRECTION BEFORE PROCEEDING WITH WORK. <br />1.05SUBMITTALS <br />A. MANUFACTURER'S DETAILED FIELD TESTING PROCEDURES. <br />B. PRODUCT DATA: PROVIDE CATALOG SHEETS SHOWING VOLTAGE, SWITCH SIZE, RATINGS AND SIZE OF <br />SWITCHING AND OVERCURRENT PROTECTIVE DEVICES, OPERATING LOGIC, SHORT CIRCUIT RATINGS, <br />DIMENSIONS, AND ENCLOSURE DETAILS. <br />C. SHOP DRAWINGS: DIMENSIONED PLANS, ELEVATIONS, SECTIONS, AND DETAILS SHOWING MINIMUM <br />CLEARANCES, CONDUCTOR ENTRY PROVISIONS, GUTTER SPACE, INSTALLED FEATURES AND DEVICES, <br />AND MATERIAL LISTS FOR EACH SWITCH SPECIFIED. <br />D. SINGLE -LINE DIAGRAM: SHOW CONNECTIONS BETWEEN TRANSFER SWITCH, BYPASS/ISOLATION SWITCH, <br />POWER SOURCES AND LOAD SHOWING INTERLOCKING PROVISIONS FOR EACH COMBINED TRANSFER <br />SWITCH AND BYPASS/ISOLATION SWITCH. <br />E. MANUFACTURER'S INSTRUCTIONS: INDICATE APPLICATION CONDITIONS AND LIMITATIONS OF USE <br />STIPULATED BY PRODUCTTESTING AGENCY. INCLUDE INSTRUCTIONS FOR STORAGE, HANDLING, <br />PROTECTION, EXAMINATION, PREPARATION, AND INSTALLATION OF PRODUCT. <br />F. OPERATION DATA: INSTRUCTIONS FOR OPERATING EQUIPMENT UNDER EMERGENCY CONDITIONS WHEN <br />ENGINE GENERATOR IS RUNNING. <br />G. MAINTENANCE DATA: ROUTINE PREVENTATIVE MAINTENANCE AND LUBRICATION SCHEDULE. LIST <br />SPECIAL TOOLS, MAINTENANCE MATERIALS, AND REPLACEMENT PARTS. <br />H. FIELD QUALITY -CONTROL TEST REPORTS <br />1.06000RDINATION <br />A. COORDINATE SIZE AND LOCATION OF CONCRETE BASES. CASTANCHOR-BOLT INSERTS INTO BASES. <br />CONCRETE, REINFORCEMENT, AND FORMWORK REQUIREMENTS ARE SPECIFIED IN DIVISION 03. <br />1.07QUALITY ASSURANCE <br />A. COMPLY WITH THE FOLLOWING: <br />1. NFPA 70 (NATIONAL ELECTRICAL CODE). <br />2. NFPA 110 (STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS); MEET REQUIREMENTS FOR <br />SYSTEM LEVEL SPECIFIED IN SECTION 263213. <br />3. NFPA 99 (HEALTHCARE FACILITIES CODE). <br />B. PRODUCT LISTING ORGANIZATION QUALIFICATIONS: AN ORGANIZATION RECOGNIZED BY OSHA AS A <br />NATIONALLY RECOGNIZED TESTING LABORATORY (NRTL) AND ACCEPTABLE TO AUTHORITIES HAVING <br />JURISDICTION. <br />C. CONFORM TO REQUIREMENTS OF NFPA 70. <br />D. MANUFACTURER QUALIFICATIONS: COMPANY SPECIALIZING IN MANUFACTURING THE PRODUCTS <br />SPECIFIED IN THIS SECTION WITH MINIMUM THREE YEARS DOCUMENTED EXPERIENCE AND WITH SERVICE <br />FACILITIES WITHIN 100 MILES OF PROJECT. <br />E. SUPPLIER QUALIFICATIONS: AUTHORIZED DISTRIBUTOR OF SPECIFIED MANUFACTURER WITH MINIMUM <br />THREE YEARS DOCUMENTED EXPERIENCE. <br />F. SOURCE LIMITATIONS: OBTAIN TRANSFER SWITCHES, ANNUNCIATORS AND OTHER EQUIPMENT DEFINED <br />IN THIS SECTION THROUGH ONE SOURCE FROM A SINGLE MANUFACTURER. <br />G. ELECTRICAL COMPONENTS, DEVICES, AND ACCESSORIES: LISTED AND LABELED AS DEFINED IN NFPA 70, <br />ARTICLE 100, BY A TESTING AGENCY ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION, AND MARKED <br />FOR INTENDED USE. <br />H. PRODUCTS: LISTED AND CLASSIFIED BY UNDERWRITERS LABORATORIES INC. AS SUITABLE FOR THE <br />PURPOSE SPECIFIED AND INDICATED. <br />1.08DELIVERY, STORAGE, AND HANDLING <br />A. RECEIVE, INSPECT, HANDLE, AND STORE TRANSFER SWITCHES IN ACCORDANCE WITH MANUFACTURER'S <br />INSTRUCTIONS. <br />B. STORE IN A CLEAN, DRY SPACE. MAINTAIN FACTORY WRAPPING OR PROVIDE AN ADDITIONAL HEAVY <br />CANVAS OR HEAVY PLASTIC COVER TO PROTECT UNITS FROM DIRT, WATER, CONSTRUCTION DEBRIS, <br />AND TRAFFIC. <br />C. HANDLE CAREFULLY IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS TO AVOID DAMAGE TO <br />TRANSFER SWITCH COMPONENTS, ENCLOSURE, AND FINISH. <br />1.09FIELD CONDITIONS <br />A. MAINTAIN FIELD CONDITIONS WITHIN MANUFACTURER'S REQUIRED SERVICE CONDITIONS DURING AND <br />AFTER INSTALLATION. <br />1.10WARRANTY <br />A. SEE SECTION 017800 - CLOSEOUT SUBMITTALS, FOR ADDITIONAL WARRANTY REQUIREMENTS. <br />B. PROVIDE MINIMUM ONE YEAR MANUFACTURER WARRANTY COVERING REPAIR OR REPLACEMENT DUE TO <br />DEFECTIVE MATERIALS OR WORKMANSHIP. <br />1.11REGULATORY REQUIREMENTS <br />A. IN ACCORDANCE WITH INTERNATIONAL <br />A IONAL BUILDING CODE, MANUFACTURER SHALL TEST OR ANALYZE THE <br />TRANSFER SWITCH COMPONENTS AND ITS MOUNTING SYSTEM OR ANCHORAGE AND SUBMIT A <br />CERTIFICATE OF COMPLIANCE FOR REVIEW AND ACCEPTANCE <br />T E BY ENGINEER AND BY THE BUILDING <br />OFFICIAL. QUALIFICATION SHALL BE BY AN ACTUAL TEST ON A SHAKE TABLE, BY THREE-DIMENSIONAL <br />SHOCK TESTS, BY AN ANALYTICAL METHOD USING DYNAMIC CHARACTERISTICS AND FORCES, BY THE USE <br />OF EXPERIENCE DATA OR BY A MORE RIGOROUS ANALYSIS PROVIDING FOR EQUIVALENT SAFETY. REFER <br />THE IBC AND ASCE 7-05 FOR COMPLETE REQUIREMENTS. <br />1.12DELIVERY, STORAGE AND HANDLING <br />A. TRANSFER SWITCHES SHALL BE PROVIDED WITH ADEQUATE LIFTING MEANS AND SHALL BE ABLE TO BE <br />Q <br />ROLLED OR MOVED INTO INSTALLATION POSITION AND BOLTED <br />OL ED DIRECTLY TO FLOOR WITHOUT USING <br />FLOOR SILLS. <br />B. DELIVER, STORE, PROTECT, AND HANDLE PRODUCTS IN ACCORDANCE WITH RECOMMENDED PRACTICES <br />LISTED IN MANUFACTURER'S INSTALLATIONI AND MAINTENANCE MANUALS. <br />C. INSPECT AND REPORT CONCEALED DAMAGE TO CARRIER WITHIN SPECIFIED TIME. <br />D. STORE IN A CLEAN, DRY SPACE. MAINTAIN FACTORY PROTECTION OR COVER WITH HEAVY-DUTY PLASTIC, <br />MINIMUM 6 MIL, TO KEEP OUT DIRT, WATER, CONSTRUCTION DEBRIS, AND TRAFFIC. HEAT ENCLOSURES <br />TO PREVENT CONDENSATION. <br />E. HANDLE TRANSFER SWITCHES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS TO <br />AVOID DAMAGING EQUIPMENT, INSTALLED DEVICES, AND FINISH. LIFT ONLY BY INSTALLED LIFTING <br />PROVISIONS. <br />1.13PROJECT CONDITIONS (SITE ENVIRONMENTAL CONDITIONS) <br />A. FOLLOW APPLICABLE NEMA ANSI AND NECA STANDARD PRACTICES BEFORE DURING D AN AFTER <br />INSTALLATION. <br />B. TRANSFER SWITCHES SHALL BE LOCATED IN WELL -VENTILATED AREAS, FREE FROM EXCESS HUMIDITY, <br />DUST, AND DIRT AND AWAY FROM HAZARDOUS MATERIALS. AMBIENT TEMPERATURE OF AREA WILL BE <br />BETWEEN MINUS 30 AND PLUS 40 DEGREES C. INDOOR LOCATIONS SHALL BE PROTECTED TO PREVENT <br />MOISTURE FROM ENTERING ENCLOSURE. <br />C. INTERRUPTION OF EXISTING ELECTRICAL SERVICE: DO NOT INTERRUPT ELECTRICAL SERVICE TO <br />FACILITIES OCCUPIED BY OWNER OR OTHERS UNLESS PERMITTED UNDER THE FOLLOWING CONDITIONS <br />AND THEN ONLY AFTER ARRANGING TO PROVIDE TEMPORARY ELECTRICAL SERVICE: <br />1. NOTIFY CONSTRUCTION MANAGER AND OWNER NO FEWER THAN FIVE DAYS IN ADVANCE OF <br />PROPOSED INTERRUPTION OF ELECTRICAL SERVICE. <br />2. DO NOT PROCEED WITH INTERRUPTION OF ELECTRICAL SERVICE WITHOUT CONSTRUCTION <br />MANAGER'S OR OWNER'S WRITTEN PERMISSION. <br />1.14WARRANTY <br />A. MANUFACTURER WARRANTS EQUIPMENTTO BE FREE FROM DEFECTS IN MATERIALS AND WORKMANSHIP <br />FOR 1 YEAR FROM DATE OF INSTALLATION OR 18 MONTHS FROM DATE OF DELIVERY, WHICHEVER <br />OCCURS FIRST. <br />1.15EXTRA MATERIALS <br />A. PROVIDE SPARE PARTS AS RECOMMENDED BY MANUFACTURER AND AS INDICATED ON THE DRAWINGS. <br />B. PROVIDE A COMPLETE SET OF SPARE FUSES OF ALL SIZES AND RATINGS USED IN THE SWITCHES. <br />PART 2 PRODUCTS <br />2.01 MANUFACTURERS <br />A. BASIS -OF -DESIGN PRODUCT: SUBJECT TO COMPLIANCE WITH REQUIREMENTS, PROVIDE PRODUCTS BY <br />ONE OF THE FOLLOWING: <br />1. ASCO POWER TECHNOLOGIES, LP: WWW.ASCO.COM. <br />2. EATON CORPORATION; CUTLER -HAMMER PRODUCTS; MODEL : WWW.EATON.COM. <br />3. GE ZENITH CONTROLS. <br />4. KOHLER POWER SYSTEMS. GENERATOR DIVISION. <br />S. ONAN/CUMMINS POWER GENERATION; INDUSTRIAL BUSINESS GROUP. <br />6. GENERAC POWER SYSTEMS, INC. <br />7. SPECTRUM DETROIT DIESEL. <br />B. SUBSTITUTIONS: SEE SECTION 016000 - PRODUCT REQUIREMENTS. <br />C. PRODUCTS OTHER THAN BASIS OF DESIGN ARE SUBJECTTO COMPLIANCE WITH SPECIFIED <br />REQUIREMENTS AND PRIOR APPROVAL OF ENGINEER. BY USING PRODUCTS OTHER THAN BASIS OF <br />DESIGN, CONTRACTOR ACCEPTS RESPONSIBILITY FOR COSTS ASSOCIATED WITH ANY NECESSARY <br />MODIFICATIONS TO RELATED WORK, INCLUDING ANY DESIGN FEES. <br />0 <br />g <br />'L, <br />O <br />O <br />01 <br />0) <br />� <br />O <br />O <br />O <br />an <br />Q <br />Z <br />Q <br />v <br />C <br />m <br />C5 <br />m <br />U <br />iiiiiiiiiiiiiiiiiiiiiQJ <br />Z <br />Ln <br />Ln <br />N <br />N <br />r- <br />r- <br />W0 <br />(0 <br />N <br />x <br />Uj <br />J <br />LL <br />� <br />3 <br />CL <br />Z <br />_Z <br />t! <br />O <br />(5 <br />p <br />0: <br />a <br />w <br />W <br />0C <br />- <br />LL <br />l7 <br />Z <br />m <br />2 <br />O <br />J <br />r4 <br />a <br />N <br />00 <br />- <br />m <br />-+ <br />.c <br />(V <br />r- <br />u <br />o <br />cc <br />Z <br />m <br />m <br />u <br />v <br />M <br />'.r <br />W <br />Ob <br />O <br />C <br />j <br />O <br />- <br />a) <br />a <br />LL <br />a <br />L <br />L <br />o <br />Z <br />to <br />d <br />M <br />Iu <br />,I <br />3 <br />i <br />(D <br />N <br />CU <br />Lu <br />0-u <br />a <br />00 <br />- <br />a <br />..4 <br />U <br />_ <br />_ <br />a <br />W <br />N <br />W <br />.. <br />w <br />D <br />o <br />O <br />= <br />cc <br />Z <br />O <br />W <br />a <br />-p <br />InIn <br />M <br />z <br />W <br />V <br />oc <br />-a <br />M <br />m <br />0 <br />R <br />a <br />a <br />A <br />L. <br />o <br />� <br />W <br />4 <br />�^ <br />W <br />L <br />a <br />O <br />M <br />= <br />L <br />A <br />s <br />Z <br />Q <br />00 <br />M <br />CL <br />4) <br />N <br />\\���G"CEWIS JD /iy'v�/ <br />CEN's�\ SI F0C, <br />_ :, 1No 38680 <br />)� , 1 = <br />�, , <br />- 1 "' •, w - <br />r.I ii ` <br />% N �� <br />Q '• \`I STATE OF" ' , <br />i�� p�ORIDP' •... A <br />.,,/,IN llli%%%\\� <br />George Johnson, P.E. <br />PE38680 <br />ISSUE DATE: 10/19/2018 <br />PROJECT NUMBER: 2847 <br />REVISIONS: <br />NO. DATE I DESCRIPTION <br />ELECTRICAL SPECIFICATIONS <br />E5m5 <br />TO THE BEST OF THE ENGINEERS KNOWLEDGE, THE PLANS AND SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM BUILDING CODES AND THE APPLICABLE FIRE -SAFETY STANDARDS AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH CHAPTER 553.79 AND CHAPTER 633, FLORIDA STATUTES. <br />© 2018 APG ENGINEERING <br />