<br />PLUMBING DEMOLITION NOTES
<br />1. SPECIFIC DEMOLITION NOTES ARE NOT TO BE CONSIDERED ALL INCLUSIVE OR COMPLETE IN THEMSELVES. THE
<br />PLUMBING CONTRACTOR SHALL PROVIDE ALL DEMOLITION INCIDENTAL TO OR REQUIRED FOR NEW AND
<br />RENOVATED CONSTRUCTION WHETHER OR NOT SPECIFICALLY NOTED AND INCLUDING BUT NOT LIMITED TO THE
<br />FOLLOWING: REMOVAL OF PLUMBING FIXTURES, TRIM, SUPPLIES, VALVES, RELATED PIPING, ETC. THAT MIGHT
<br />REASONABLY BE REQUIRED TO BE REMOVED IN PREPARATION FOR INSTALLATION OF NEW CONSTRUCTION,
<br />SPECIFIED FIXTURES OR OTHER EQUIPMENT REQUIRING PLUMBING.
<br />2. DEMOLITION SHALL BE PERFORMED IN SUCH A MANNER THAT WILL NOT DAMAGE ADJOINING SURFACES OR
<br />EQUIPMENT INDICATED TO REMAIN.
<br />3. WHERE DEMOLITION WOULD AFFECT THE STRUCTURAL INTEGRITY OF THE BUILDING, THE CONTRACTOR SHALL
<br />NOTIFY THE ARCHITECT/ENGINEER PRIOR TO PROCEEDING WITH DEMOLITION.
<br />4. THIS CONTRACTOR SHALL NOTIFY AND COORDINATE WITH THE HOSPITAL ADMINISTRATION IN WRITING 10 DAYS
<br />IN ADVANCE OF ANY AND ALL UTILITY/SYSTEM SERVICE INTERRUPTIONS.
<br />5. TEMPORARY SYSTEMS: THE EXISTING SYSTEMS OPERATION SHALL BE MAINTAINED IN RENOVATED AND ADJACENT
<br />AREAS UNTIL THE NEW SYSTEMS ARE OPERATIONAL. THIS CONTRACTOR SHALL INCLUDE IN HIS BID ALL COSTS
<br />ASSOCIATED WITH KEEPING THE EXISTING SYSTEMS ON LINE. THESE COSTS SHALL INCLUDE, BUT ARE NOT LIMITED
<br />TO, THE FOLLOWING:
<br />A. TEMPORARY NATURAL GAS PIPING
<br />PLUMBING MATERIAL SPECIFICATION
<br />1. GAS PIPING
<br />SHALL BE SCHEDULE 40 BLACK STEEL PIPE WITH 125 PSI BLACK MALLEABLE IRON FITTINGS. GAS PIPING 2-1/2" AND
<br />LARGER SHALL BE WELDED, 2" AND SMALLER SHALL BE SCREWED.
<br />2. PLUG VALVES 2" AND SMALLER: SHALL BE LUBRICATED, QUARTER TURN, 200 PSI CWP, CAST IRON BODY AND
<br />PLUG, THREADED ENDS, AND BE APPROVED FOR USE IN NATURAL GAS SYSTEMS.
<br />3. PLUG VALVES 2-1/2" AND LARGER: SHALL BE LUBRICATED, QUARTER TURN, 200 PSI CWP, CAST IRON BODY AND
<br />PLUG, FLANGED ENDS, AND BE APPROVED FOR USE IN NATURAL GAS SYSTEMS.
<br />4. SUBMITTAL REQUIREMENTS
<br />SUBMIT AN ELECTRONIC COPY OF SHOP DRAWINGS OR LITERATURE ON THE FOLLOWING ITEMS- PLUMBING
<br />FIXTURES, WATER HEATERS, EXPANSION TANKS, VALVES, INSULATION, PUMPS, WATER HAMMER ARRESTORS,
<br />PIPING, AND FITTINGS.
<br />G
<br />JC
<br />U
<br />T
<br />)LY
<br />NOTE:
<br />CONNECT TO EQUIPMENT USING SEMI -RIGID METALLIC TUBING AND
<br />FITTINGS.
<br />TUBING LENGTH SHALL NOT EXCEED 6'.
<br />NATURAL GAS EQUIPMENT CONNECTION
<br />NOT TO SCALE
<br />PLUMBING GENERAL NOTES
<br />1. SPECIFICATIONS, SYMBOLS LIST, ABBREVIATIONS AND DETAILS ARE APPLICABLE TO ALL DRAWINGS MARKED P.
<br />2. THESE DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO DEPICT THE GENERAL LOCATION OF PLUMBING
<br />SYSTEM COMPONENTS. DO NOT SCALE THESE DRAWINGS. CONSULT ARCHITECTURAL PLANS FOR PROPER
<br />DIMENSIONS AND EXACT LOCATION OF PLUMBING EQUIPMENT.
<br />3. BEFORE SUBMITTING A BID CAREFULLY STUDY THE CONSTRUCTION DOCUMENTS. CAREFULLY EXAMINE THE
<br />PREMISES AND ANY EXISTING WORK. DETERMINE, IN ADVANCE, THE METHODS OF INSTALLING AND CONNECTING
<br />THE APPARATUS, THE MEANS TO BE PROVIDED FOR GETTING THE EQUIPMENT INTO PLACE, AND BECOME
<br />THOROUGHLY FAMILIAR WITH ALL OF THE REQUIREMENTS OF THE CONTRACT.
<br />4. ALL PLUMBING WORK SHALL BE IN ACCORDANCE WITH THE 2017 EDITION OF THE FLORIDA BUILDING CODE
<br />INCLUDING ALL SUPPLEMENTS, THE 2014 EDITION OF THE GUIDELINES FOR DESIGN & CONSTRUCTION OF
<br />HOSPITAL AND HEALTH CARE FACILITIES, AND ALL APPLICABLE STATE AND LOCAL CODES, RULES AND
<br />REGULATIONS. IN CASE OF DIFFERENCES THE MOST STRINGENT SHALL GOVERN.
<br />5. NO WORK SHALL BE INSTALLED IN VIOLATION OF ANY GOVERNING CODES. ANY WORK SHOWN ON THE
<br />DRAWINGS WHICH IS IN VIOLATION OF SUCH CODES SHALL BE BROUGHT TO THE ATTENTION OF THE
<br />CONSTRUCTION MANAGER AND THE OWNER'S REPRESENTATIVE AND SHALL BE RESOLVED PRIOR TO THE
<br />INSTALLATION OF THE WORK INVOLVED.
<br />6. ALL EXISTING CONDITIONS SHOWN ARE TAKEN FROM EXISTING DRAWINGS AND FIELD SURVEYS. NEITHER
<br />ACCURACY NOR COMPLETION OF LOCATIONS SHOWN ON DRAWINGS IS GUARANTEED. DETERMINE EXACT
<br />LOCATIONS OF EXISTING SYSTEMS/UTILITIES IN FIELD, WHETHER OR NOT SHOWN ON DRAWINGS. MAKE ALL
<br />NECESSARY MODIFICATIONS TO EXISTING CONDITIONS TO PERFORM WORK OF THIS SECTION. THIS SHALL
<br />INCLUDE, BUT NOT BE LIMITED TO, OFFSETTING EXISTING PIPING AND MODIFICATIONS REQUIRED FOR
<br />COORDINATION WITH ALL OTHER TRADES.
<br />7. VERIFY SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO RUNNING ANY PIPING.
<br />8. STRUCTURAL COMPONENTS SHALL NOT BE CUT, DRILLED OR MODIFIED IN ANY MANNER WITHOUT THE
<br />STRUCTURAL ENGINEER'S REVIEW AND APPROVAL.
<br />9. OBTAIN AND PAY FOR ALL PERMITS ASSOCIATED WITH THIS PROJECT AND ARRANGE FOR ALL REQUIRED
<br />INSPECTIONS BY THE APPROPRIATE LOCAL AUTHORITIES.
<br />10. SEAL ALL EXISTING AND NEW FLOOR/ROOF/WALL PENETRATIONS AS REQUIRED TO MAINTAIN INTEGRITY OF
<br />LISTED ASSEMBLY AND PROVIDE SLEEVE WHERE REQUIRED.
<br />11. FURNISH ANY MISCELLANEOUS ITEMS NORMALLY USED, SPECIFICALLY MENTIONED OR NOT, TO RENDER A
<br />COMPLETE INSTALLATION.
<br />12. MANUFACTURER'S MODEL NUMBERS ARE SPECIFIED SOLELY TO ESTABLISH STANDARDS OF QUALITY FOR
<br />PERFORMANCE AND MATERIALS. SUBMIT LITERATURE FOR ALL EQUIPMENT AND MATERIALS TO THE ENGINEER OF
<br />RECORD FOR APPROVAL.
<br />13. PRODUCT INSTALLATION SHALL ADHERE TO MANUFACTURER'S RECOMMENDATIONS.
<br />14. REVIEW ALL APPLICABLE MANUFACTURERS' INSTALLATION AND MAINTENANCE DOCUMENTS/REQUIREMENTS
<br />PRIOR TO STARTING WORK. ALL WORK SHALL ADHERE TO THE MANUFACTURERS' REQUIREMENTS. IF A CONFLICT
<br />EXISTS BETWEEN THE DESIGN DOCUMENTS AND MANUFACTURER'S REQUIREMENTS, THIS CONTRACTOR SHALL
<br />NOTIFY THE ENGINEER PRIOR TO STARTING WORK.
<br />15. THIS CONTRACTOR SHALL OBTAIN A FULL SET OF ALL EQUIPMENT VENDOR DRAWINGS AND COORDINATE THESE
<br />PLANS WITH THE CONTRACT DOCUMENTS PRIOR TO STARTING CONSTRUCTION. ANY DISCREPANCIES NOTED
<br />BETWEEN EQUIPMENT VENDOR PLANS AND CONTRACT DOCUMENTS SHALL BE IDENTIFIED AND BROUGHT THE
<br />ENGINEER'S ATTENTION PRIOR TO COMMENCING WORK.
<br />16. UNLESS OTHERWISE NOTED, ALL PLUMBING FIXTURES, VALVES, PIPING, INSULATION, ETC SHALL BE FIRST
<br />QUALITY. THE REUSE OF EXISTING FIXTURES, MATERIALS, EQUIPMENT AND ASSOCIATED COMPONENTS AND
<br />ACCESSORIES IS PROHIBITED.
<br />17. A DIELECTRIC UNION SHALL BE USED TO JOIN ANY DISSIMILAR MATERIALS.
<br />18. CONTRACTOR SHALL COORDINATE ELECTRICAL CHARACTERISTICS AND REQUIREMENTS OF ALL PLUMBING
<br />EQUIPMENT WITH THE ELECTRICAL DRAWINGS AND SHALL FURNISH EQUIPMENT WIRED FOR THE VOLTAGES
<br />SHOWN HEREIN.
<br />19. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THEIR WORK WITH THAT OF ALL OTHER
<br />TRADES INCLUDING, BUT NOT LIMITED TO, ELECTRICAL, HVAC, PLUMBING, FIRE PROTECTION, TELECOM,
<br />STRUCTURAL, CIVIL, AND GENERAL ARCHITECTURE. THIS SHALL INCLUDE PROVIDING SUFFICIENT SPACE TO MEET
<br />ALL OTHER TRADE CLEARANCE REQUIREMENT.
<br />20. GUARANTEE ALL PARTS AND LABOR FOR ONE YEAR FROM DATE OF FINAL ACCEPTANCE.
<br />21. ALL PIPING, EQUIPMENT, AND VALVES SHALL BE IDENTIFIED IN A MANNER THAT ALLOWS FOR EASY
<br />IDENTIFICATION. PIPING SHALL BE LABELED TO IDENTIFY CONTENTS AND DIRECTION OF FLOW.
<br />22. ALL PIPING VALVES AND ACCESSORIES SERVING EQUIPMENT SHALL BE INSTALLED IN A MANNER AS TO ALLOW
<br />SERVICING AND/OR REMOVAL WITHOUT DISCONNECTING ALL PIPING AND ACCESSORIES.
<br />23. PROVIDE CLAMPS, OFFSETS, EXPANSION JOINTS, ANCHORS AND GUIDES AS NECESSARY TO PREVENT STRESS ON
<br />PIPING.
<br />24. ALL PIPING SHALL BE INSTALLED AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS ARE
<br />PROHIBITED UNLESS OTHERWISE INDICATED.
<br />25. DEFRAY ALL COSTS INCIDENTAL TO THE GAS PIPING SYSTEM. CONTRACTORS WORK SHALL COMMENCE ON THE
<br />HOUSE SIDE OF THE UTILITY COMPANY METER.
<br />26. PROVIDE A GASCOCK, UNION AND MINIMUM 4" DIRTLEG AT EACH GAS APPLIANCE CONNECTION.
<br />27. THIS CONTRACTOR IS RESPONSIBLE FOR EXTENDING ALL REGULATOR VENTS TO ATMOSPHERE.
<br />28. GAS PIPING AND SAFETY DEVICES SHALL CONFORM TO THE REQUIREMENTS OF THE STATE AND LOCAL CODES
<br />AND NFPA 54 AND SHALL BE SUBJECT TO THE INSPECTION AND APPROVAL OF THE STATE REGULATORY BOARD.
<br />PLUMBING LEGEND
<br />SYMBOL
<br />DESCRIPTION
<br />SYMBOL
<br />DESCRIPTION
<br />NG
<br />NATURAL GAS
<br />SHUTOFF VALVE
<br />0
<br />PIPE TURNED UP
<br />h
<br />PLUG VALVE
<br />0
<br />PIPE TURNED DOWN
<br />PRESSURE REDUCING VALVE
<br />CAPON LINE
<br />P-1
<br />FIXTURE IDENTIFICATION
<br />PLUMBING
<br />ABBREVIATIONS
<br />ABV -ABOVE
<br />FD - FLOOR DRAIN
<br />AFF - ABOVE FINISHED FLOOR
<br />FLR - FLOOR
<br />AP -ACCESS PANEL
<br />HW - HOT WATER
<br />ASSEM - ASSEMBLY
<br />HWR - HOT WATER RETURN
<br />BF - BELOW FLOOR
<br />PLBG - PLUMBING
<br />BFF - BELOW FINISH FLOOR
<br />SAN - SANITARY
<br />BLW - BELOW
<br />ST - STORM
<br />CO - CLEANOUT
<br />TYP - TYPICAL
<br />CONN - CONNECTION
<br />US - UNDER SLAB
<br />CONT -CONTINUATION
<br />V - VENT
<br />CW - COLD WATER
<br />W - WASTE
<br />DN - DOWN
<br />WCO - WALL CLEANOUT
<br />DW -DOMESTIC WATER
<br />WTR - WATER
<br />PSI - POUND PER SQUARE INCH
<br />CFH - CUBIC FEET PER HOUR
<br />CODE CRITERIA
<br />FLORIDA BUILDING CODE:
<br />2017 FLORIDA BUILDING CODE 6TH EDITION - BUILDING
<br />2017 FLORIDA BUILDING CODE 6TH EDITION - FUEL GAS
<br />2017 FLORIDA BUILDING CODE 6TH EDITION - MECHANICAL
<br />2017 FLORIDA BUILDING CODE 6TH EDITION - PLUMBING
<br />2017 FLORIDA BUILDING CODE 6TH EDITION - ENERGY CONSERVATION
<br />FLORIDA FIRE PREVENTION CODE:
<br />2017 FLORIDA FIRE PREVENTION CODE BASED ON:
<br />NFPA 1, FIRE CODE, 2015 EDITION,
<br />NFPA 101, LIFE SAFETY CODE, 2015 EDITION
<br />HANDICAP ACCESSIBILITY STANDARDS: FLORIDA AMERICANS WITH DISABILITIES ACT: SECTION 553.501-553.514, F.S.
<br />AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI): ANSI A117.1
<br />NATIONAL FIRE PROTECTION ASSOCIATION (NFPA):
<br />2015 EDITION, NFPA 1- FIRE CODE
<br />2013 EDITION, NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS
<br />NOTE: ALL FIRE SPRINKLER WORK, INCLUDING CHANGES, ADDITIONS, RELOCATIONS, IMPROVEMENTS, AND/OR
<br />MODIFICATIONS TO THE FIRE SPRINKLER SYSTEM, MUST BE DONE PER NFPA-13 EDITION, BY A LICENSED FIRE SPRINKLER
<br />CONTRACTOR WITH SEPARATE PERMIT AND PLANS.
<br />2014 EDITION, NFPA 70 - NATIONAL ELECTRIC CODE
<br />2013 EDITION, NFPA 72 - NATIONAL FIRE ALARM AND SIGNALING CODE.
<br />NOTE: ALL FIRE ALARM WORK, INCLUDING CHANGES, ADDITIONS, RELOCATIONS, IMPROVEMENTS, AND/OR
<br />MODIFICATIONS TO THE FIRE ALARM SYSTEM, MUST BE DONE PER NFPA-72 2010 EDITION, BY A LICENSED FIRE ALARM
<br />CONTRACTOR WITH SEPARATE PERMIT AND PLANS.
<br />2015 EDITION, NFPA 90A - STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS
<br />2015 EDITION, NFPA 90B - STANDARD FOR THE INSTALLATION OF WARM AIR HEATING AND AIR-CONDITIONING SYSTEMS
<br />2010 EDITION, NFPA 91- STANDARD FOR EXHAUST SYSTEMS FOR AIR CONVEYING OF VAPORS, GASES, MISTS, AND
<br />NONCOMBUSTIBLE PARTICULATE SOLIDS
<br />2015 EDITION, NFPA 92 - STANDARD FOR SMOKE -CONTROL SYSTEMS
<br />2015 EDITION, NFPA 99 - HEALTH CARE FACILITIES CODE
<br />2015 EDITION, NFPA 101- LIFE SAFETY CODE
<br />2013 EDITION, NFPA 241- STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS.
<br />UNDERWRITERS LABORATORIES INC. (UL): 2015 EDITION, FIRE RESISTANCE DIRECTORY
<br />SPECIAL REGULATIONS, SUPPLEMENT, AND AMENDMENTS OF THE STATE AND/OR LOCAL AUTHORITIES HAVING JURISDICTION
<br />PLUMBING SHEET INDEX
<br />NUMBER
<br />SHEET NAME
<br />P0.1
<br />PLUMBING NOTES, SCHEDULES, LEGENDS, AND SHEET INDEX
<br />P1.1
<br />PLUMBING OVERALL SITE PLAN
<br />P2.1
<br />PLUMBING -NEW CONSTUCTION PLAN
<br />p
<br />i
<br />O
<br />O
<br />Q1
<br />~
<br />O
<br />O
<br />Ln
<br />Q
<br />z
<br />c
<br />m
<br />m
<br />u
<br />Ln
<br />bi
<br />N
<br />N
<br />bi
<br />�x
<br />W0
<br />W
<br />O
<br />°
<br />LL
<br />w
<br />a.
<br />z
<br />_z
<br />mommi
<br />0
<br />(5
<br />5
<br />H
<br />0
<br />z
<br />a
<br />w
<br />UA
<br />w
<br />Z
<br />m
<br />J
<br />N
<br />a
<br />N
<br />00
<br />-
<br />M
<br />J
<br />t
<br />N
<br />�O
<br />tp
<br />V
<br />r-
<br />Z
<br />M
<br />M
<br />Lu
<br />O
<br />W
<br />b
<br />-
<br />>
<br />O
<br />Q
<br />LL
<br />u
<br />C_
<br />o
<br />Z
<br />40
<br />-
<br />cv
<br />=
<br />LI
<br />3
<br />LLJ
<br />Lu
<br />d
<br />N
<br />N
<br />2
<br />4
<br />Q
<br />U
<br />J
<br />a
<br />W
<br />IV
<br />W
<br />O
<br />x
<br />Z
<br />aLA
<br />� M
<br />V M
<br />m
<br />CC a LL
<br />W 41 in
<br />L.s
<br />a L
<br />11.4 CL
<br />a M N
<br />NETI�yy0
<br />No 48454 * %
<br />'O Q! -
<br />Q� • STATE OF
<br />'•.F�ORIDP.•'•����
<br />s
<br />Donald Netinho Jr., P.E.
<br />PE 48454
<br />ISSUE DATE: 10/19/2018
<br />PROJECT NUMBER: 2847
<br />REVISIONS:
<br />NO. DATE DESCRIPTION
<br />PLUMBING NOTES,
<br />SCHEDULES, LEGENDS, AND
<br />SHEET INDEX
<br />TO THE BEST OF THE ENGINEERS KNOWLEDGE, THE PLANS AND SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM BUILDING CODES AND THE APPLICABLE FIRE -SAFETY STANDARDS AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH CHAPTER 553.79 AND CHAPTER 633, FLORIDA STATUTES.
<br />© 2018 APG ENGINEERING
<br />Pon 1
<br />
|