Laserfiche WebLink
Q u <br />m FW <br />co a <br />ZLu� <br />X H <br />V <br />Z <br />z = cr <br />0 V a. <br />PLUMBING DEMOLITION NOTES <br />1. SPECIFIC DEMOLITION NOTES ARE NOT TO BE CONSIDERED ALL INCLUSIVE OR COMPLETE IN THEMSELVES. THE <br />PLUMBING CONTRACTOR SHALL PROVIDE ALL DEMOLITION INCIDENTAL TO OR REQUIRED FOR NEW AND <br />RENOVATED CONSTRUCTION WHETHER OR NOT SPECIFICALLY NOTED AND INCLUDING BUT NOT LIMITED TO THE <br />FOLLOWING: REMOVAL OF PLUMBING FIXTURES, TRIM, SUPPLIES, VALVES, RELATED PIPING, ETC. THAT MIGHT <br />REASONABLY BE REQUIRED TO BE REMOVED IN PREPARATION FOR INSTALLATION OF NEW CONSTRUCTION, <br />SPECIFIED FIXTURES OR OTHER EQUIPMENT REQUIRING PLUMBING. <br />2. DEMOLITION SHALL BE PERFORMED IN SUCH A MANNER THAT WILL NOT DAMAGE ADJOINING SURFACES OR <br />EQUIPMENT INDICATED TO REMAIN. <br />3. WHERE DEMOLITION WOULD AFFECT THE STRUCTURAL INTEGRITY OF THE BUILDING, THE CONTRACTOR SHALL <br />NOTIFY THE ARCHITECT/ENGINEER PRIOR TO PROCEEDING WITH DEMOLITION. <br />4. THIS CONTRACTOR SHALL NOTIFY AND COORDINATE WITH THE HOSPITAL ADMINISTRATION IN WRITING 10 DAYS <br />IN ADVANCE OF ANY AND ALL UTILITY/SYSTEM SERVICE INTERRUPTIONS. <br />5. TEMPORARY SYSTEMS: THE EXISTING SYSTEMS OPERATION SHALL BE MAINTAINED IN RENOVATED AND ADJACENT <br />AREAS UNTIL THE NEW SYSTEMS ARE OPERATIONAL. THIS CONTRACTOR SHALL INCLUDE IN HIS BID ALL COSTS <br />ASSOCIATED WITH KEEPING THE EXISTING SYSTEMS ON LINE. THESE COSTS SHALL INCLUDE, BUT ARE NOT LIMITED <br />TO, THE FOLLOWING: <br />A. TEMPORARY NATURAL GAS PIPING <br />PLUMBING MATERIAL SPECIFICATION <br />1. GAS PIPING <br />SHALL BE SCHEDULE 40 BLACK STEEL PIPE WITH 125 PSI BLACK MALLEABLE IRON FITTINGS. GAS PIPING 2-1/2" AND <br />LARGER SHALL BE WELDED, 2" AND SMALLER SHALL BE SCREWED. <br />2. PLUG VALVES 2" AND SMALLER: SHALL BE LUBRICATED, QUARTER TURN, 200 PSI CWP, CAST IRON BODY AND <br />PLUG, THREADED ENDS, AND BE APPROVED FOR USE IN NATURAL GAS SYSTEMS. <br />3. PLUG VALVES 2-1/2" AND LARGER: SHALL BE LUBRICATED, QUARTER TURN, 200 PSI CWP, CAST IRON BODY AND <br />PLUG, FLANGED ENDS, AND BE APPROVED FOR USE IN NATURAL GAS SYSTEMS. <br />4. SUBMITTAL REQUIREMENTS <br />SUBMIT AN ELECTRONIC COPY OF SHOP DRAWINGS OR LITERATURE ON THE FOLLOWING ITEMS- PLUMBING <br />FIXTURES, WATER HEATERS, EXPANSION TANKS, VALVES, INSULATION, PUMPS, WATER HAMMER ARRESTORS, <br />PIPING, AND FITTINGS. <br />G <br />JC <br />U <br />T <br />)LY <br />NOTE: <br />CONNECT TO EQUIPMENT USING SEMI -RIGID METALLIC TUBING AND <br />FITTINGS. <br />TUBING LENGTH SHALL NOT EXCEED 6'. <br />NATURAL GAS EQUIPMENT CONNECTION <br />NOT TO SCALE <br />PLUMBING GENERAL NOTES <br />1. SPECIFICATIONS, SYMBOLS LIST, ABBREVIATIONS AND DETAILS ARE APPLICABLE TO ALL DRAWINGS MARKED P. <br />2. THESE DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO DEPICT THE GENERAL LOCATION OF PLUMBING <br />SYSTEM COMPONENTS. DO NOT SCALE THESE DRAWINGS. CONSULT ARCHITECTURAL PLANS FOR PROPER <br />DIMENSIONS AND EXACT LOCATION OF PLUMBING EQUIPMENT. <br />3. BEFORE SUBMITTING A BID CAREFULLY STUDY THE CONSTRUCTION DOCUMENTS. CAREFULLY EXAMINE THE <br />PREMISES AND ANY EXISTING WORK. DETERMINE, IN ADVANCE, THE METHODS OF INSTALLING AND CONNECTING <br />THE APPARATUS, THE MEANS TO BE PROVIDED FOR GETTING THE EQUIPMENT INTO PLACE, AND BECOME <br />THOROUGHLY FAMILIAR WITH ALL OF THE REQUIREMENTS OF THE CONTRACT. <br />4. ALL PLUMBING WORK SHALL BE IN ACCORDANCE WITH THE 2017 EDITION OF THE FLORIDA BUILDING CODE <br />INCLUDING ALL SUPPLEMENTS, THE 2014 EDITION OF THE GUIDELINES FOR DESIGN & CONSTRUCTION OF <br />HOSPITAL AND HEALTH CARE FACILITIES, AND ALL APPLICABLE STATE AND LOCAL CODES, RULES AND <br />REGULATIONS. IN CASE OF DIFFERENCES THE MOST STRINGENT SHALL GOVERN. <br />5. NO WORK SHALL BE INSTALLED IN VIOLATION OF ANY GOVERNING CODES. ANY WORK SHOWN ON THE <br />DRAWINGS WHICH IS IN VIOLATION OF SUCH CODES SHALL BE BROUGHT TO THE ATTENTION OF THE <br />CONSTRUCTION MANAGER AND THE OWNER'S REPRESENTATIVE AND SHALL BE RESOLVED PRIOR TO THE <br />INSTALLATION OF THE WORK INVOLVED. <br />6. ALL EXISTING CONDITIONS SHOWN ARE TAKEN FROM EXISTING DRAWINGS AND FIELD SURVEYS. NEITHER <br />ACCURACY NOR COMPLETION OF LOCATIONS SHOWN ON DRAWINGS IS GUARANTEED. DETERMINE EXACT <br />LOCATIONS OF EXISTING SYSTEMS/UTILITIES IN FIELD, WHETHER OR NOT SHOWN ON DRAWINGS. MAKE ALL <br />NECESSARY MODIFICATIONS TO EXISTING CONDITIONS TO PERFORM WORK OF THIS SECTION. THIS SHALL <br />INCLUDE, BUT NOT BE LIMITED TO, OFFSETTING EXISTING PIPING AND MODIFICATIONS REQUIRED FOR <br />COORDINATION WITH ALL OTHER TRADES. <br />7. VERIFY SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO RUNNING ANY PIPING. <br />8. STRUCTURAL COMPONENTS SHALL NOT BE CUT, DRILLED OR MODIFIED IN ANY MANNER WITHOUT THE <br />STRUCTURAL ENGINEER'S REVIEW AND APPROVAL. <br />9. OBTAIN AND PAY FOR ALL PERMITS ASSOCIATED WITH THIS PROJECT AND ARRANGE FOR ALL REQUIRED <br />INSPECTIONS BY THE APPROPRIATE LOCAL AUTHORITIES. <br />10. SEAL ALL EXISTING AND NEW FLOOR/ROOF/WALL PENETRATIONS AS REQUIRED TO MAINTAIN INTEGRITY OF <br />LISTED ASSEMBLY AND PROVIDE SLEEVE WHERE REQUIRED. <br />11. FURNISH ANY MISCELLANEOUS ITEMS NORMALLY USED, SPECIFICALLY MENTIONED OR NOT, TO RENDER A <br />COMPLETE INSTALLATION. <br />12. MANUFACTURER'S MODEL NUMBERS ARE SPECIFIED SOLELY TO ESTABLISH STANDARDS OF QUALITY FOR <br />PERFORMANCE AND MATERIALS. SUBMIT LITERATURE FOR ALL EQUIPMENT AND MATERIALS TO THE ENGINEER OF <br />RECORD FOR APPROVAL. <br />13. PRODUCT INSTALLATION SHALL ADHERE TO MANUFACTURER'S RECOMMENDATIONS. <br />14. REVIEW ALL APPLICABLE MANUFACTURERS' INSTALLATION AND MAINTENANCE DOCUMENTS/REQUIREMENTS <br />PRIOR TO STARTING WORK. ALL WORK SHALL ADHERE TO THE MANUFACTURERS' REQUIREMENTS. IF A CONFLICT <br />EXISTS BETWEEN THE DESIGN DOCUMENTS AND MANUFACTURER'S REQUIREMENTS, THIS CONTRACTOR SHALL <br />NOTIFY THE ENGINEER PRIOR TO STARTING WORK. <br />15. THIS CONTRACTOR SHALL OBTAIN A FULL SET OF ALL EQUIPMENT VENDOR DRAWINGS AND COORDINATE THESE <br />PLANS WITH THE CONTRACT DOCUMENTS PRIOR TO STARTING CONSTRUCTION. ANY DISCREPANCIES NOTED <br />BETWEEN EQUIPMENT VENDOR PLANS AND CONTRACT DOCUMENTS SHALL BE IDENTIFIED AND BROUGHT THE <br />ENGINEER'S ATTENTION PRIOR TO COMMENCING WORK. <br />16. UNLESS OTHERWISE NOTED, ALL PLUMBING FIXTURES, VALVES, PIPING, INSULATION, ETC SHALL BE FIRST <br />QUALITY. THE REUSE OF EXISTING FIXTURES, MATERIALS, EQUIPMENT AND ASSOCIATED COMPONENTS AND <br />ACCESSORIES IS PROHIBITED. <br />17. A DIELECTRIC UNION SHALL BE USED TO JOIN ANY DISSIMILAR MATERIALS. <br />18. CONTRACTOR SHALL COORDINATE ELECTRICAL CHARACTERISTICS AND REQUIREMENTS OF ALL PLUMBING <br />EQUIPMENT WITH THE ELECTRICAL DRAWINGS AND SHALL FURNISH EQUIPMENT WIRED FOR THE VOLTAGES <br />SHOWN HEREIN. <br />19. IT SHALL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THEIR WORK WITH THAT OF ALL OTHER <br />TRADES INCLUDING, BUT NOT LIMITED TO, ELECTRICAL, HVAC, PLUMBING, FIRE PROTECTION, TELECOM, <br />STRUCTURAL, CIVIL, AND GENERAL ARCHITECTURE. THIS SHALL INCLUDE PROVIDING SUFFICIENT SPACE TO MEET <br />ALL OTHER TRADE CLEARANCE REQUIREMENT. <br />20. GUARANTEE ALL PARTS AND LABOR FOR ONE YEAR FROM DATE OF FINAL ACCEPTANCE. <br />21. ALL PIPING, EQUIPMENT, AND VALVES SHALL BE IDENTIFIED IN A MANNER THAT ALLOWS FOR EASY <br />IDENTIFICATION. PIPING SHALL BE LABELED TO IDENTIFY CONTENTS AND DIRECTION OF FLOW. <br />22. ALL PIPING VALVES AND ACCESSORIES SERVING EQUIPMENT SHALL BE INSTALLED IN A MANNER AS TO ALLOW <br />SERVICING AND/OR REMOVAL WITHOUT DISCONNECTING ALL PIPING AND ACCESSORIES. <br />23. PROVIDE CLAMPS, OFFSETS, EXPANSION JOINTS, ANCHORS AND GUIDES AS NECESSARY TO PREVENT STRESS ON <br />PIPING. <br />24. ALL PIPING SHALL BE INSTALLED AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS ARE <br />PROHIBITED UNLESS OTHERWISE INDICATED. <br />25. DEFRAY ALL COSTS INCIDENTAL TO THE GAS PIPING SYSTEM. CONTRACTORS WORK SHALL COMMENCE ON THE <br />HOUSE SIDE OF THE UTILITY COMPANY METER. <br />26. PROVIDE A GASCOCK, UNION AND MINIMUM 4" DIRTLEG AT EACH GAS APPLIANCE CONNECTION. <br />27. THIS CONTRACTOR IS RESPONSIBLE FOR EXTENDING ALL REGULATOR VENTS TO ATMOSPHERE. <br />28. GAS PIPING AND SAFETY DEVICES SHALL CONFORM TO THE REQUIREMENTS OF THE STATE AND LOCAL CODES <br />AND NFPA 54 AND SHALL BE SUBJECT TO THE INSPECTION AND APPROVAL OF THE STATE REGULATORY BOARD. <br />PLUMBING LEGEND <br />SYMBOL <br />DESCRIPTION <br />SYMBOL <br />DESCRIPTION <br />NG <br />NATURAL GAS <br />SHUTOFF VALVE <br />0 <br />PIPE TURNED UP <br />h <br />PLUG VALVE <br />0 <br />PIPE TURNED DOWN <br />PRESSURE REDUCING VALVE <br />CAPON LINE <br />P-1 <br />FIXTURE IDENTIFICATION <br />PLUMBING <br />ABBREVIATIONS <br />ABV -ABOVE <br />FD - FLOOR DRAIN <br />AFF - ABOVE FINISHED FLOOR <br />FLR - FLOOR <br />AP -ACCESS PANEL <br />HW - HOT WATER <br />ASSEM - ASSEMBLY <br />HWR - HOT WATER RETURN <br />BF - BELOW FLOOR <br />PLBG - PLUMBING <br />BFF - BELOW FINISH FLOOR <br />SAN - SANITARY <br />BLW - BELOW <br />ST - STORM <br />CO - CLEANOUT <br />TYP - TYPICAL <br />CONN - CONNECTION <br />US - UNDER SLAB <br />CONT -CONTINUATION <br />V - VENT <br />CW - COLD WATER <br />W - WASTE <br />DN - DOWN <br />WCO - WALL CLEANOUT <br />DW -DOMESTIC WATER <br />WTR - WATER <br />PSI - POUND PER SQUARE INCH <br />CFH - CUBIC FEET PER HOUR <br />CODE CRITERIA <br />FLORIDA BUILDING CODE: <br />2017 FLORIDA BUILDING CODE 6TH EDITION - BUILDING <br />2017 FLORIDA BUILDING CODE 6TH EDITION - FUEL GAS <br />2017 FLORIDA BUILDING CODE 6TH EDITION - MECHANICAL <br />2017 FLORIDA BUILDING CODE 6TH EDITION - PLUMBING <br />2017 FLORIDA BUILDING CODE 6TH EDITION - ENERGY CONSERVATION <br />FLORIDA FIRE PREVENTION CODE: <br />2017 FLORIDA FIRE PREVENTION CODE BASED ON: <br />NFPA 1, FIRE CODE, 2015 EDITION, <br />NFPA 101, LIFE SAFETY CODE, 2015 EDITION <br />HANDICAP ACCESSIBILITY STANDARDS: FLORIDA AMERICANS WITH DISABILITIES ACT: SECTION 553.501-553.514, F.S. <br />AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI): ANSI A117.1 <br />NATIONAL FIRE PROTECTION ASSOCIATION (NFPA): <br />2015 EDITION, NFPA 1- FIRE CODE <br />2013 EDITION, NFPA 13 - STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS <br />NOTE: ALL FIRE SPRINKLER WORK, INCLUDING CHANGES, ADDITIONS, RELOCATIONS, IMPROVEMENTS, AND/OR <br />MODIFICATIONS TO THE FIRE SPRINKLER SYSTEM, MUST BE DONE PER NFPA-13 EDITION, BY A LICENSED FIRE SPRINKLER <br />CONTRACTOR WITH SEPARATE PERMIT AND PLANS. <br />2014 EDITION, NFPA 70 - NATIONAL ELECTRIC CODE <br />2013 EDITION, NFPA 72 - NATIONAL FIRE ALARM AND SIGNALING CODE. <br />NOTE: ALL FIRE ALARM WORK, INCLUDING CHANGES, ADDITIONS, RELOCATIONS, IMPROVEMENTS, AND/OR <br />MODIFICATIONS TO THE FIRE ALARM SYSTEM, MUST BE DONE PER NFPA-72 2010 EDITION, BY A LICENSED FIRE ALARM <br />CONTRACTOR WITH SEPARATE PERMIT AND PLANS. <br />2015 EDITION, NFPA 90A - STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS <br />2015 EDITION, NFPA 90B - STANDARD FOR THE INSTALLATION OF WARM AIR HEATING AND AIR-CONDITIONING SYSTEMS <br />2010 EDITION, NFPA 91- STANDARD FOR EXHAUST SYSTEMS FOR AIR CONVEYING OF VAPORS, GASES, MISTS, AND <br />NONCOMBUSTIBLE PARTICULATE SOLIDS <br />2015 EDITION, NFPA 92 - STANDARD FOR SMOKE -CONTROL SYSTEMS <br />2015 EDITION, NFPA 99 - HEALTH CARE FACILITIES CODE <br />2015 EDITION, NFPA 101- LIFE SAFETY CODE <br />2013 EDITION, NFPA 241- STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS. <br />UNDERWRITERS LABORATORIES INC. (UL): 2015 EDITION, FIRE RESISTANCE DIRECTORY <br />SPECIAL REGULATIONS, SUPPLEMENT, AND AMENDMENTS OF THE STATE AND/OR LOCAL AUTHORITIES HAVING JURISDICTION <br />PLUMBING SHEET INDEX <br />NUMBER <br />SHEET NAME <br />P0.1 <br />PLUMBING NOTES, SCHEDULES, LEGENDS, AND SHEET INDEX <br />P1.1 <br />PLUMBING OVERALL SITE PLAN <br />P2.1 <br />PLUMBING -NEW CONSTUCTION PLAN <br />p <br />i <br />O <br />O <br />Q1 <br />~ <br />O <br />O <br />Ln <br />Q <br />z <br />c <br />m <br />m <br />u <br />Ln <br />bi <br />N <br />N <br />bi <br />�x <br />W0 <br />W <br />O <br />° <br />LL <br />w <br />a. <br />z <br />_z <br />mommi <br />0 <br />(5 <br />5 <br />H <br />0 <br />z <br />a <br />w <br />UA <br />w <br />Z <br />m <br />J <br />N <br />a <br />N <br />00 <br />- <br />M <br />J <br />t <br />N <br />�O <br />tp <br />V <br />r- <br />Z <br />M <br />M <br />Lu <br />O <br />W <br />b <br />- <br />> <br />O <br />Q <br />LL <br />u <br />C_ <br />o <br />Z <br />40 <br />- <br />cv <br />= <br />LI <br />3 <br />LLJ <br />Lu <br />d <br />N <br />N <br />2 <br />4 <br />Q <br />U <br />J <br />a <br />W <br />IV <br />W <br />O <br />x <br />Z <br />aLA <br />� M <br />V M <br />m <br />CC a LL <br />W 41 in <br />L.s <br />a L <br />11.4 CL <br />a M N <br />NETI�yy0 <br />No 48454 * % <br />'O Q! - <br />Q� • STATE OF <br />'•.F�ORIDP.•'•���� <br />s <br />Donald Netinho Jr., P.E. <br />PE 48454 <br />ISSUE DATE: 10/19/2018 <br />PROJECT NUMBER: 2847 <br />REVISIONS: <br />NO. DATE DESCRIPTION <br />PLUMBING NOTES, <br />SCHEDULES, LEGENDS, AND <br />SHEET INDEX <br />TO THE BEST OF THE ENGINEERS KNOWLEDGE, THE PLANS AND SPECIFICATIONS COMPLY WITH THE APPLICABLE MINIMUM BUILDING CODES AND THE APPLICABLE FIRE -SAFETY STANDARDS AS DETERMINED BY THE LOCAL AUTHORITY IN ACCORDANCE WITH CHAPTER 553.79 AND CHAPTER 633, FLORIDA STATUTES. <br />© 2018 APG ENGINEERING <br />Pon 1 <br />