Laserfiche WebLink
I it <br />4{{ SLAB <br />6X6 10/10 WIRE MESH <br />6 MIL VISQUEEN <br />VAPOR BARRIER <br />(1) *5 REBAR IN THICKENED EDGE <br />-- ---------------------------- <br />_ 4 EXISTING <br />TS{{ 12{{ FOUNDATION <br />- ---------------- <br />05 REBAR BEND TIED TO THE REBAR <br />IN THE THICKENED EDGE AND EPDXIED <br />INTO THE EXISTING FOUNDATION. MIN <br />EMBEDDMENT OF 4". USE SIMPSON AT <br />ADHESIVE FL* 11506,1 <br />(1) REBAR OF THE NEW FOOTER SHOULD BE ATTACHED TO THE <br />EXISTING FOUNDATION USING THE SAME METHOD AT EACH INTERSECTING <br />LOCATION. <br />NEW SLAB TO EXISTING FOUNDATION <br />MONOLITHIC SLAB_ <br />4" / 3000 PSI MONOLITHIC CONCRETE SLAB <br />OVER CLEAN, TREATED AND COMPACTED SOIL. <br />THE SOIL WILL BE TREATED FOR TERMITES <br />AS PER THE DETAIL PAGE OF THIS PLAN. <br />ro" x 6" 10/10 WIRE MESH OVER (oMIL. VISQUEEN <br />VAPOR BARRIER WILL BE INSTALLED FOR <br />REINFORCING THE SLAB, FIBERMESH CONCRETE <br />CAN BE USE IN PLACE OF THE WIRE MESH, <br />THIS FOUNDATION WAS DESIGNED WITH A 2000 <br />P5F SOIL BEARING CAPACITY, <br />I� <br />`A <br />i <br />\v <br />0 <br />tt <br />cq <br />I <br />I <br />I <br />I <br />cq <br />1\ i <br />I <br />� <br />i <br />i <br />�I <br />(�l <br />I <br />i <br />ALL CONCRETE USED ON THIS JOB WILL BE 3000 PSI, <br />(1) 05 RESAR <br />4" SLAB <br />DATE : SCALE: <br />c3/ 14 / 11 1/4" = V-011 PAGE 2 <br />DESIGN SERVICES INC. <br />MOBILE/ OFFICE 352-206-5Bn <br />R. S, H A{} NLE, OFFICE FAX 352-588-2342 <br />P O BOX 13255 SAN ANTONIO <br />FLA. 3351ao <br />EMAIL: hanley06gembarcImall,com <br />TREATMENT: ( SOIL CHEMICAL BARRIER METHOD) <br />1) A PERMANENT SIGN TO IDENTIFY THE TERMITE TREATMENT PROVIDER AND <br />NEED FOR RE -INSPECTION AND TREATMENT CONTRACT RENEWAL SHALL BE PROVIDED. <br />THE SIGN SHALL BE POSTED NEAR THE WATER HEATER OR ELECTRIC PANEL, <br />2) CONDINBATE AND ROOF DOWN SPOUTS SHALL DICHARGE AT LEAST 1'-0" AWAY FROM <br />THE BUILDING SIDEWALLS. <br />3) IRRIGATION SYSTEMS INCLUDING ALL RISERS AND SPRAY HEADS SHALL <br />NOT BE INSTALLED WITHIN 1'-0" OF THE BUILDINGS SIDEWALLS. <br />4) TO PROVIDE FOR INSPECTION FOR TERMITE INFESTATION BETWEEN WALL COVERING <br />AND FINAL EARTH GRADE SHALL NOT BE LESS TWA b INCHES ( EXCEPTION PAINT OR <br />DECORATIVE CEMENTIOUS FINISH LESS THAN 5/8" THICK ADHERED DIRECTLY TO THE <br />FOUNDATION WALL.) <br />5) INITIAL TREATMENT SHALL BE DONE AFTER ALL EXCAVATION AND BACK FILL 15 COMPLETED. <br />ro) SOIL DISTURBED AFTER THE INITIAL TREATMENT SHALL BE RETREATED INCLUDING SPACES BOXED <br />OR FORMED. <br />l) BOXED AREAS IN CONCRETE FLOORS FOR SUBSEQUENT INSTALLLATION OF TRAPS, ETC. SHALL BE <br />MADE WITH PERMANENT METAL OR PLASTIC FORMS. PERMANENT FORMS MUST BE OF A SIZE AND <br />DEPTH THAT WILL ELIMINATE THE DISTURBANCE OF 501L AFTER THE INITIAL TREATMENT <br />B) A MINIMUM fio MIL VAPOR RETARDER MUST BE INSTALLED TO PROTECT AGAINST <br />RAINFALL DILUTION. IF RAINFALL OCCURS BEFORE VAPOR RETARDER PLACEMENT, <br />RE -TREATMENT IS REQUIRED, <br />S) CONCRETE OVER POUR AND MORTAR ALONG THE FOUNDATION PERIMETER MUST BE <br />REMOVED BEFORE EXTERIOR SOIL TREATMENT. <br />10) SOIL TREATMENT MUST BE APPLIED UNDER ALL EXTERIOR CONCRETE OR !GRADE WITH 1'-0" <br />OF THE STRUCTURES SIDEWALLS. <br />IU AN EXTERIOR VERTICAL CHEMICAL BARRIERS MUST BE INSTALLED AFTER <br />CONSTRUCTION IS COMPLETE INCLUDING LANDSCAPING AND IRRIGATION, <br />ANY SOIL DISTURBED AFTER THE VERTICAL BARRIER 15 APPLIED, SHALL BE <br />RETREATED. <br />12) ALL BUILDINGS ARE REQUIRED TO HAVE PRE -CONSTRUCTION TREATMENT. <br />13) A CERTIFICATE OF COMPLIANCE MUST BE ISSUED TO THE BUILDING DEPARTMENT BY <br />A LICENSED PEST CONTROL COMPANY BEFORE A CERTIFICATE OF OCCUPANCY WILL <br />BE ISSUED. THE CERTIFICATE OF COMPLIANCE SHALL STATE- " THE BUILDING HAS <br />RECEIVED A COMPLETE TREATMENT FOR THE PREVENTION OF SUBTERRANEAN TERMITES. <br />THE TREATMENT IS IN ACCORDANCE WITH THE RULES AND LAWS OF THE <br />FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES. <br />14_) AFTER ALL WORK 15 COMPLETE LOOSE WOOD AND FILL MUST BE REMOVED FROM <br />BELOW AND WITHIN 1'-0" OF THE BUILDING. THIS INCLUDES ALL GRADE STAKES,TUB <br />TRAP BOXES, FORMS,SHORING OR OTHER CELLULOSE CONTAINING MATERIAL. <br />15) NO WOOD , VEGETATION, STUMPS, CARDBOARD ,TRASH ETC. , SHALL BE BURIED WITHIN <br />15'-O" OF ANY BUILDING OR PROPOSED BUILDING, <br />FINISHED GRADE <br />i{ S{{ <br />12" <br />6X6 10/10 IiJIR1= MESH <br />J F Q {1 <br />6 MIL VISQUEEN // 4 G' <br />VAPOR BARRIER <br />12u <br />THICKENED EDGE <br />FOUNDATION FLAN <br />JOB NAME AND ADDRESS: <br />EFRAIN MONTES—MENDOZA <br />38ro01 NORTH AVE <br />ZEPHY HILLS , FLORIDA <br />COVERED WALK 30ro 5F <br />DAV ID W. SMITH, M5. PE. <br />FLORIDA LIC.* 53608 <br />352-521-08(25 OFFICE 352-521-08(ol FAX, <br />S909 WALLASTON DRIVE DADE CITY ,FLA, 33525 <br />I HEREBY CERTIFY THAT I HAVE REVIEWED THIS <br />PLAN AND FOUND IT TO BE IN COMPLIANCE WITH <br />ASCE-1, THE FLORIDA BUILDING CODE 200-1 EDITION <br />AND THE 2009 SUPPLEMENTS WITH ALL REVISIONS <br />AND UPDATES TO FBC-O-I, <br />i <br />DAVID W. SMIT14 MS. PE. 0 53600 <br />-1 r <br />