Laserfiche WebLink
I _ 1 1 �. 1 I _- i— -I __ -.1'' _ — - _ - I. I I I . _ _ -11 V ' II'' 111 Tl '! ' e 'r Ic1 --pr_ <br />r PT 11P - — '1 11 l'1 "I I �'1fr q. •'I' ' .e! ! 11� _ 'll I I I _ I _ I 1 i • 111_1WW1111' F- No <br />TANK <br />EART <br />(BY <br />O � <br />• WARNING . <br />1. 3 PHASE CIRCUIT TO PUMP. IF ANY HIGH LEG, <br />CONNECT TO L3. <br />1 THERE MUST BE AN INDIVIDUAL BREAKER AND <br />CIRCUIT PER HOSE REEL. <br />3. THE CONTROL, HOSE REEL, VESSEL SUMP <br />HEATER CIRCUIT, AND OPTIONAL EQUIPMENT <br />(IF EQUIPPED) CANNOT BE CONNECTED TO THE <br />PUMP MOTOR CIRCUIT IN ANY WAY! DOING SO <br />WILL VOID WARRANTY. <br />4. ANY MODIFICATIONS TO ELECTRICAL SYSTEM <br />WITHOUT WRITTEN APPROVAL WVILL VOID <br />WARRANTY. <br />AVGAS EQUIPMENT AREA <br />1 2 3 4 5 <br />_H_N . G_C_NO <br />TB-1 %FF111 <br />ro !01O ( )) <br />SCULLY <br />ST-15E(LK) <br />CONDUIT - INTRINSICALLY SAFE WIRINI <br />STARTER ENCLOSURE <br />NHT 12GA. <br />3LK 8GA. <br />3LK 8GA. <br />3LK 8GA. <br />NHT 12GA. <br />NHT 12GA. <br />3LK 8GA. <br />FIELD WIRING TO BE SIZED BY ELECTRICIAN <br />ACCORDING TO LOAD, VOLTAGE, AND <br />DISTANCE FROM POWER SUPPLY <br />SUGGESTED <br />-OP BREAKER PANEL <br />(BY OTHERS) <br />SHUNT TRIP <br />DISCONNECTS <br />ENTIRE PANEL <br />It AVGAS PUMP CIRCUIT <br />L2 1 11:1 230VAC <br />21 ACTUAL FULL LOAD <br />L3 AMPS <br />JET -A CONT CIRCUIT <br />L1!I 1 � 120VAC <br />20 FULL LOAD AMP <br />BREAKER REQUIRED <br />0 <br />HOSE REEL <br />L1 1 + 120VAC <br />20 FULL LOAD AMPS <br />BREAKER REQUIRED <br />NEUTRAL <br />LIGHT CIRCUIT <br />1 � 120VAC <br />- 20 FULL LOAD AMP <br />BREAKER REQUIRED <br />COMPUTER CIRCUIT <br />10 120VAC <br />20 FULL LOAD AMPS <br />BREAKER REQUIRED <br />moi% � <br />I <br />AABA-CON- <br />VIATION SERVICES <br />ABA -CON INC. <br />P.O. BOX 308 <br />TITUSVILLE, FL 32781 <br />PHONE: (321) 567-4967 <br />FAX: (321) 607 6805 <br />WEB: <br />www.aba-con.com <br />PROPRIETARY AND CONFIDENTIAL <br />The information contained in this drawing is the sole <br />property of ABA -CON Aviation Services. Any reproducton <br />in part or as a whole is prohibited without written <br />permission of ABA -CON Aviation Services. <br />PROJECT CONTRACTOR: <br />ADAMS TANK & LIFT, INC. <br />4568 131 STAVE NORTH <br />CLEARWATER, FL 33762 <br />JOB NUMBER: <br />2105 <br />DRAWING NUMBER: <br />2105-50 <br />DATE: 6/18/2021 <br />REVISIONS <br />DATE I DESCRIPTION <br />SCALE:XX:XX <br />DRATNI i 7 <br />KM <br />APPR*VED BY: <br />SR <br />CLIENT: <br />ZEPHYRHILLS <br />MUNICIPAL <br />AIRPORT <br />ZEPHYRHILLS, <br />FLORIDA <br />DESIGN TEAM TITLE: <br />Utk # <br />• <br />I <br />0 <br />ADAMS TANK AND LIFT INC. <br />4568 131 ST AVE N <br />CLEARWATER, FL 33762 <br />727-540-0931 <br />NO. <br />DATE <br />REVISION DESCRIPTION <br />This item has been digitally signed and sealed by Soumya Chakrabarti, PE, <br />on date shown. Printed copies of this document are not considered signed <br />and sealed and the signature must be verified on any electronic copies. <br />C HA K,pq'%'��, <br />••�\ r E N SF• ":9q�%� <br />_ * No. 66380 <br />_0 STATE OF <br />SS�ONAL <br />��G``��• <br />/11111111111\ <br />SOUMYA CHAKRABARTI <br />FL. REG # 66380 <br />TANK AND PIMPING <br />PLANS & DETAILS <br />SITE DESIGNATIONS: <br />FUEL FARM <br />REPLACEMENT - <br />SCALE: AS NOTED <br />JOB # 01 <br />DATE: <br />09-23-2021 <br />DESIGNED BY: <br />DRAWN BY: <br />SS <br />FILE NAME: <br />CHECKED BY: <br />DRAWING TITLE: <br />AVGAS TANK ELECTRICAL <br />SCHEMATIC <br />SHEETNO; <br />TA-5 <br />