Laserfiche WebLink
i I 1 <br />9 <br />0 <br />O <br />v- <br />O N <br />O <br />4- <br />s= <br />U <br />c <br />Q) <br />It <br />00 <br />0 O <br />c <br />O <br />ze <br />s= 00 <br />U <br />SPECIFICATIONS <br />GENERAL REQUIREMENTS <br />(AS APPLICABLE) DIVISION #1 <br />SUMMARY OF THE WORK <br />I. RENOVATE EXISTING FACILITY. <br />2. THE PERFORMANCE OF ALL CONSTRUCTION UNDER THIS CONTRACT SHALL CONFORM <br />TO ALL APPLICABLE LOCAL CODES AND ORDINANCES AND THE FEDERAL <br />OCCUPATIONAL SAFETY AND HEALTH STANDARD. <br />3. THE CONTRACTOR MUST EXERCISE PROPER PRECAUTION TO VERIFY FIGURES SHOWN <br />ON THE DRAWINGS AND MUST NOTIFY THE DESIGN PROFESSIONAL IF DISCREPENCIES ARE FOUND. <br />A. MECHANICAL. PLUMBING AND ELECTRICAL DRAWINGS ARE DIAGRAMMATICAL. <br />CONTRACTOR TO FURNISH AND INSTALL ALL ITEMS NECESSARY FOR A COMPLETE. <br />FIRST-CLASS INSTALLATION OR THAT ARE ESSENTIAL FOR PROPER OPERATION <br />OF WORK INDICATED. <br />5. NOT USED <br />6. NOT USED <br />7. NOT USED <br />8. ALL MATERIAL TO BE INCORPORATED INTO THE PROJECT SHALL BE NEW. IF <br />REQUIRED. THE CONTRACTOR SHALL FURNISH SATISFACTORY EVIDENCE AS TO KIND <br />AND QUALITY AND MEET ALL SPECIFICATION STANDARD AND REQUIREMENTS. <br />9. THE CONTRACTOR SHALL STORE ALL MATERIALS FOR CONSTRUCT <br />ION AND PROTECT <br />FROM RAIN. PILFERAGE AND DAMAGE CONTRACTOR O SHALL OBTAIN INSURANCE <br />COVERING THE SAME. <br />10. CONTRACTOR IS RESPONSIBLE FOR MEANS AND METHODS OF CONSTRUCTION TO <br />ENSURE THE SAFETY OF THE BUILDING UNTIL STRUCTURAL SYSTEM IS COMPLETED. <br />THIS INCLUDES, BUT IS NOT LIMITED TO. THE ADDITION OF WHATEVER TEMPORARY <br />BRACING. SHORING, GUYS OR TIE -DOWNS THAT MAY BE NECESSARY. SUCH MATERIAL <br />SHALL BE REMOVED AND SHALL REMAIN THE PROPERTY OF THE CONTRACTOR <br />AFTER THE COMPLETION OF THE PROJECT. <br />SHOP DRAWINGS AND SAMPLES <br />I. CONTRACTOR TO PROVIDE DESIGN PROFESSIONAL SHOP DRAWINGS FOR APPROVAL PRIOR TO <br />ORDERING AND FABRICATION OF THE FOLLOWING: <br />A. METAL BUILDING PACKAGE <br />2. CONTRACTOR TO PROVIDE OWNER SAMPLES FOR APPROVAL OR PRODUCT <br />LITERATURE PRIOR TO ORDERING AND OR FABRICATION OF THE FOLLOWING: <br />A. CONCRETE MIX DESIGN AND TESTS <br />B. SOIL POISONING <br />C. ROOFING <br />D. DOORS AND DOOR HARDWARE <br />E. WINDOWS AND FINISHES <br />F. SEALANTS AND CAULKING MATERIALS <br />G. INSULATION PRODUCTS <br />H. ELECTRICAL EQUIPMENT <br />1. HVAC EQUIPMENT <br />J. PLUMBING FIXTURES <br />3. VERIFICATION OF FIELD MEASUREMENTS OR CONDITIONS SHALL REMAIN THE <br />RESPONSIBILITY OF THE CONTRACTOR. <br />4. PROVIDE AUTOCAD .DWG FORMAT AND (1) .PDF) FOR REVIEW. <br />PROJECT CLOSEOUT <br />I. UPON COMPLETION OF THE WORK UNDER THIS CONTRACT AND BEFORE FINAL <br />PAYMENT WILL BE MADE. SUBMIT THE FOLLOWING ITEMS TO THE OWNER: <br />A. SUBMIT ONE COPY OF PROJECT RECORD DOCUMENT TO OWNER, REDLINING <br />SIGNIFICANT CHANGE OR SIGNIFICANT DETAIL NOT SHOWN ON THE ORIGINAL <br />DOCUMENTS ONTO A SET OF BLUEPRINTS. <br />B. SUBMIT PROPERLY EXECUTED RELEASE OF LIEN FROM ALL SUBCONTRACTORS <br />AND MATERIAL SUPPLIERS CONTAINING ORIGINAL SIGNATURES AND RAISED <br />NOTARY SEAL. <br />C. CERTIFICATE OF OCCUPANCY FROM APPLICABLE GOVERNMENT AUTHORITIES. <br />D. WARRANTY / GUARANTY CERTIFICATES AS CALLED FOR IN INDIVIDUAL <br />SECTIONS OF SPECIFICATIONS. <br />E. LETTER CERTIFYING THE DELIVERY OF ALL KEYS TO THE OWNER. <br />F. LETTER CERTIFYING THAT ALL ITEMS ON THE FINAL PUNCH LIST HAVE BEEN <br />COMPLETED OR CORRECTED. <br />G. LIST OF ALL SUBCONTRACTORS INCLUDING ADDRESSES AND TELEPHONE <br />NUMBERS. <br />H. MAINTENANCE MANUAL DETAILING THE PROCEDURES REQUIRED FOR PROPER <br />CARE AND MAINTENANCE OF ALL EQUIPMENT FURNISHED UNDER THE CONTRACT. <br />PROJECT RECORD DOCUMENTS <br />I. MAINTAIN AT THE JOB SITE ONE COPY OF ALL CONTRACT DRAWINGS AND PROJECT <br />MANUAL. CLEARLY MARK THE DRAWINGS AS "PROJECT RECORD COPY". MAINTAIN IN <br />GOOD CONDITION. AVAILABLE AT ALL TIMES FOR INSPECTION BY THE DESIGN PROFESSIONAL. <br />DO NOT USE FOR CONSTRUCTION. <br />2. MARK UP THE MOST APPROPRIATE DOCUMENT TO SHOW: <br />A. SIGNIFICANT CHANGES MADE DURING THE CONSTRUCTION PROCESS. <br />B. SIGNIFICANT DETAIL NOT SHOWN IN THE ORIGINAL CONTRACT DOCUMENTS. <br />3. KEEP PROJECT- RECORD DOCUMENTS CURRENT. DO NOT PERMANENTLY CONCEAL <br />ANY WORK UNTIL THE REQUIRED INFORMATION HAS BEEN RECORDED. <br />4. USE RED LINE ON ALL DOCUMENTS. IN MARKING THE DRAWINGS USE THE SAME <br />SYMBOLS. LEGENDS. ETC. AS USED ON THE DRAWINGS TO IDENTIFY LIKE MATERIAL <br />5. SUBMIT PROJECT RECORD DOCUMENTS TO THE DESIGN PROFESSIONAL UPON COMPLETION OF <br />THE PROJECT AND PRIOR TO FINAL PAYMENT. <br />CONCRETE DIVISION #3 <br />I. WHEN THE CONCRETE FLOOR SLAB IS EXISTING, PREPARE THE SLAB TO RECEIVE <br />FINISH AS INDICATED ON THE PLANS. WHEN ON A GROUND FLOOR LOCATION, THE <br />CONCRETE SLAB FLOOR SHALL BE SEALED IN THE AREAS TO RECEIVE CARPETING. <br />WHEN SLAB FLOOR IS TO BE EXECUTED AS PART OF THE CONTRACT. FOLLOW <br />OWNER'S DIRECTIONS AND SPECIFIATIONS. <br />2. GENERAL CONTRACTOR SHALL INSPECT THE EXISTING SLAB CONDITIONS TO <br />DETERMINE THE AMOUNT OF CONCRETE FLOOR SLAB TO BE CORED/CUT/ REMOVED <br />AND REPLACED FOR INSTALLATION OF ELECTRICAL. MECHANICAL AND PLUMBING <br />WORK AND IF APPLICABLE STEEL COLUMNS FOR GRILLE SUPPORT. <br />ALL CONCRETE TRENCHING AND REFILLING. AS WELL AS ANY AND ALL <br />PENETRATIONS OF THE SLAB, SHALL BE EXECUTED IN ACCORDANCE WITH THE <br />OWNER'S REQUIREMENTS. <br />1 BUILDING NOTES <br />SCALE NTS <br />METALS DIVISION #5 <br />METAL STUDS <br />MATERIAL <br />I. ALL STUD FRAMING MEMBERS SHALL BE OF THE TYPE, SIZE. AND GAUGE AS <br />SHOWN ON THE PLANS. <br />2. GALVANIZED STUDS 12.14. AND 16 GAUGE SHALL BE FORMED FROM STEEL THAT <br />CORRESPONDS TO ASTM A653. STRUCTURAL CALCULATIONS SHOULD BE <br />PREPARED UTILIZING ONE OF THE FOLLOWING GRADES: <br />SQ GRADE 33 MINIMUM YEILD STRENGTH 33 <br />SQ GRADE 40 MINIMUM YEILD STRENGTH 40 <br />SQ GRADE 50 MINIMUM YEILD STRENGTH 50 <br />3. ALL GALVANIZED 18 AND 20 GAUGE STUDS. AND ALL GALVANIZED TRACK. <br />BRIDGING. END CLOSURES AND ACCESSORIES SHALL BE FORMED FROM STEEL <br />THAT CORRESPONDS TO THE REQUIREMENTS OF ASTM A653, SQ GRADE 33. <br />WITH A MINIMUM YEILD OF 33.000 PSI. <br />4. IT IS SUGGESTED THAT ALL STUDS. AND ACCESSORIES SHOULD BE FORMED <br />FROM STEEL HAVING A G-60 GALVANIZED COATING OR EQUIVALENT COATING <br />OR EQUIVALENT. MEETING ASTM A653 AND C955. <br />FABRICATION <br />I. FRAMING COMPONENTS MAY BE PRE -ASSEMBLED INTO PANELS PRIOR TO <br />ERECTING. PREFABRICATED PANELS SHALL BE SQUARE WITH COMPONENTS <br />ATTACHED IN A MANNER AS TO PREVENT RACKING. <br />2. ALL FRAMING COMPONENTS SHALL BE CUT SQUARELY FOR ATTACHMENT TO <br />PERPENDICULAR MEMBERS. OR AS REQUIRED FOR AN ANGULAR FIT AGAINST <br />ABUTTING MEMBERS. MEMBERS SHALL BE HELD POSITIVELY IN PLACE UNTIL <br />PROPERLY FASTENED. <br />3. AXIALLY LOADED STUDS SHALL BE INSTALLED IN A MANNER WHICH WILL ASSURE <br />THAT ENDS OF THE STUDS ARE POSITIONED IN THE TRACK WITH A MINIMUM GAP. <br />PRIOR TO STUD AND TRACK ATTACHMENT. <br />4. PROVIDE INSULATION EQUAL TO THAT SPECIFIED ELSEWHERE IN ALL DOUBLE <br />JAMB STUDS AND DOUBLE HEADER MEMBERS WHICH WILL NOT BE ACCESSIBLE <br />TO THE INSULATION CONTRACTOR. <br />EXECUTION <br />ERECTION <br />I. HANDLING AND LIFTING OF PREFABRICATED PANELS SHALL BE DONE IN A MANNER <br />AS TO NOT CAUSE DISTORTION IN ANY MEMBER. <br />2. TRACKS SHALL BE SECURELY ANCHORED TO THE SUPPORTING STRUCTURE AS <br />SHOWN ON THE PLANS. <br />3. AT TRACK BUTT JOINTS. ABUTTING PIECES OF TRACK SHALL BE SECURELY <br />ANCHORED TO A COMMON STRUCTURAL ELEMENT, OR THEY SHALL BE BUTT - <br />WELDED OR SPLICED TOGETHER. <br />4. STUDS SHALL BE PLUMBED, ALIGNED AND SECURELY ATTACHED TO THE FLANGES <br />OR WEBS OF BOTH UPPER AND LOWER TRACKS. <br />5. JACK STUDS OR CRIPPLES SHALL BE INSTALLED BELOW WINDOW SILLS. ABOVE <br />WINDOW AND DOOR HEADS, AT FREE STANDING STAIR RAILS. AND ELSEWHERE <br />TO FURNISH SUPPORT, AND SHALL BE SECURELY ATTACHED TO SUPPORTING <br />MEMBERS. <br />6. WALL STUD BRIDGING SHALL BE ATTACHED IN A MANNER TO PREVENT STUD <br />ROTATION. BRIDGING ROWS SHALL BE SPACED ACCORDING TO THE <br />FOLLOWING SCHEDULE. WALLS UP TO 10'-0" HEIGHT: ONE ROW AT MID -HEIGHT. <br />WALL EXCEEDING 10'-0" HEIGHT: BRIDGING ROWS SPACED NOT TO EXCEED <br />5'-O" ON -CENTER. <br />WOOD AND PLASTICS DIVISION #6 <br />DESIGN PROFESSIONALURAL WOODWORK <br />1. DESCRIPTION OF WORK: <br />TYPES OF ARCHITECURAL WOODWORK INCLUDE THE FOLLOWING: <br />STANDING AND RUNNING TRIM <br />A. EXTERIOR FASCIA AND SOFFIT <br />B. INTERIOR TRIM <br />CASEWORK <br />PLASTIC LAMINATE COUNTERTOPS <br />CASEWORK <br />2. QUALITY ASSURANCE <br />A. FIELD MEASUREMENTS: TAKE FIELD MEASUREMENTS PRIOR TO COMPONENT <br />FABRICATION TO ENSURE PROPER FITTING OF WORK. <br />B. WIC QUALITY MARKING: MARK EACH UNIT WITH WIC CERTIFIED COMPLIANCE <br />GRADE STAMP INDICATING QUALITY GRADE. <br />3. SUBMITTALS <br />A. PRODUCT DATA FOR MATERIALS. FABRICATION. AND INSTALLATION INCLUDING <br />CATALOG CUTS OF ANCHORS. HARDWARE, FASTENINGS. AND ACCESSORIES. <br />B. SHOP DRAWINGS FOR FABRICATION AND INSTALLATION OF COPARTMENT <br />ASSEMBLIES THAT ARE NOT FULLY DESCRIBED BY DESIGN PROFESSIONALURAL DRAWINGS. <br />PROVIDE TEMPLATE LAYOUTS AND INSTALLATION INSTRUCTIONS FOR <br />ANCHORAGE DEVICES BUILT INTO OTHER WORK. <br />C. SAMPLES OF FULL COLOR RANGE FOR EACH REQUIRED UNIT TYPE. <br />ROUGH CARPENTRY: <br />ALL WOOD FRAMEWORK. WOOD BLOCKING AND PLYWOOD CONSTRUCTION SHALL <br />BE FIRE RETARDANT TREATED AS REQUIRED BY LOCAL CODES AND LANDLORD <br />REQUREMENTS. <br />PARTICLE BOARD SHALL BE UL CLASS I FIRE -RATED, SANDED AND PREPARED TO <br />RECEIVE PLASTIC LAMINATE OR PAINTED METAL LAMINATE. <br />WOOD FRAMING MEMBERS SHALL BE NO. I LIGHT FRAMING DOUGLAS FIR OR NO. 2 <br />OR BETTER YELLOW PINE OF THE DIMENSIONS INDICATED ON THE PLANS. <br />PLYWOOD SHALL BE GRADE B-D DOUGLAS FIR. SANDED AND PREPARED TO <br />RECEIVE PLASTIC LAMINATE. METAL LAMINATE OR PAINT. PLYWOOD BACKING <br />PANELS FOR MOUNTING ELECTRICAL OR TELEPHONE EQUIPMENT SHOULD BE FIRE <br />RETARDANT TREATED PLYWOOD WITH GRADE DESIGNATION. APA C-D PLUGGED <br />INT. NOT LESS THAN 3/4" THICK. <br />PROVIDE FASTENERS AND ANCHORAGE OF THE TYPE. SIZE, MATERIAL AND FINISH <br />AS RECOMMENDED BY APPLICABLE STANDARDS. COMPLYING WITH APPLICABLE <br />FEDERAL SPECIFICATIONS FOR NAILS, STAPLES. SCREWS. BOLTS, NUTS, WASHERS <br />AND ANCHORING DEVICES. <br />PROVIDE BLOCKING AS REQUIRED FOR INSTALLATION OF SHELVING, EQUIPMENT, <br />ACCESSORIES, FIXTURES. AND FINISH HARDWARE OR OTHER HEAVY ITEMS ON <br />WALLS. <br />SEALANTS DIVISION #7 <br />PARTI - GENERAL <br />A. EXPANSION JOINT MATERIAL, SEALANTS AND JOINT BACKING FOR <br />JOINTS BETWEEN DISSIMILAR MATERIALS. <br />I. SILICONE SEALANTS (TYPE S): ASTM C920. SINGLE COMPONENT. <br />NON -SAGGING, NON -STAINING, NON -BLEEDING: FOR USE AS <br />GENERAL CAULKING: COLOR TO MATCH ADJACENT SURFACES, <br />MANUFACTURER BY GE SILICONES OR EQUAL. <br />2. JOINT BACKING: ROUND, OPEN CELL POLYETHYLENE FOAM <br />ROD. <br />PART 2 - PREPARATION / EXECUTION <br />A. REMOVE LOOSE MATERIALS AND FOREIGN MATTER WHICH MIGHT <br />EFFECT ADHESION OF SEALANT. <br />B. CLEAN AND PRIME JOINTS IN ACCORDANCE WITH MANUFACTURER'S <br />INSTRUCTIONS. <br />C. PROTECT ELEMENTS SURROUNDING THE WORK OF THIS SECTION <br />FROM DAMAGE OR DISFIGURATION. <br />D. INSTALL SEALANT IN ACCORDANCE WITH MANUFACTURER'S <br />INSTRUCTIONS. <br />E. INSTALL JOINT BACKING. <br />F. APPLY SEALANT WITHIN RECOMMENDED APPLICATION <br />TEMPERATURE RANGES. CONSULT MANUFACTURER WHEN SEALANT <br />CANNOT BE APPLIED WITHIN THESE TEMPERATURE RANGES. <br />DOORS AND WINDOWS DIVISION #8 <br />METAL DOORS AND FRAMES <br />STEEL DOORS <br />I. MATERIAL: <br />COMMERCIAL QUALITY CARBON STEEL. PICKLED AND OILED. COMPLYING WITH <br />ASTM A-569 AND ASTM A-568. <br />2. SUPPORTS AND ANCHORS: <br />FABRICATE OF NOT LESS THAN 18 GAUGE GALVANIZED SHEET STEEL. <br />3. PRIMER: <br />RUST -INHIBITIVE ENAMEL OR PAINT, EITHER AIR -DRYING OR BAKING. SUITABLE <br />AS A BASE FOR SPECIFIED FINISH PAINTS. <br />STEEL FRAMES <br />1. PROVIDE METAL FRAMES FOR DOORS, TRANSOMS. SIDELIGHTS. AND OTHER <br />OPENINGS OF TYPES AND STYLES AS SHOWN ON DRAWINGS AND SCHEDULES. <br />2. CONCEAL FASTENINGS, UNLESS OTHERWISE INDICATED. <br />3. FABRICATE FRAMES WITH MITERED AND WELDED CORNERS. <br />4. FORM EXTERIOR FRAMES OF HOT DIP GALVANIZED STEEL. <br />WOOD DOORS <br />I. REFERENCES: <br />AWI QUALITY STANDARD. SECTION 1300 OF "DESIGN PROFESSIONALURAL WOODWORK <br />QUALITY STANDARDS." DESIGNATIONS FOR GRADE AND CORE CONSTRUCTION <br />UNDER TYPES OF DOORS REFER TO THIS STANDARD. <br />2. PRODUCT DATA: <br />SUBMIT DOOR MANUFACTURER'S PRODUCT DATA. SPECIFICATIONS. AND <br />INSTALLATION INSTRUCTIONS FOR EACH TYPE OF WOOD DOOR. <br />ALUMINUM WINDOWS <br />I. PERFORMANCE: <br />COMPLY WITH AIR INFILTRATION TESTS, WATER RESISTANCE TESTS. UNIFORM <br />LOAD DEFLECTION TESTS, AND UNIFORM STRUCTURAL TESTS SPECIFIED IN <br />ANSI/AAMA 302-9, SECTION 3. <br />2. PRODUCT DATA: <br />SUBMIT MANUFACTURER'S TECHNICAL PRODUCT DATA. <br />RECOMMENDATIONS. AND STANDARD DETAILS FOR ALUMINUM WINDOW UNITS. <br />3. COORDINATION: <br />CHECK ACTUAL WINDOW OPENINGS IN CONSTRUCTION WORK BY ACCURATE <br />FIELD MEASUREMENT BEFORE FABRICATION. <br />4. MATERIAL: <br />ALLOY AND TEMPER RECOMMENDED BY WINDOW MANUFACTURER FOR <br />STRENGTH, CORROSION RESISTANCE, AND APPLICATION OF REQUIRED FINISH. <br />COMPLY WITH ASTM B-221. <br />HARDWARE <br />I. DEFINITION: <br />BUILDER'S HARDWARE INCLUDES ITEMS WHICH ARE REQUIRED FOR SWING <br />DOORS SPECIFIED: <br />HINGES <br />LOCK CYLINDERS AND KEYS <br />LOCK AND LATCH SETS <br />DEAD BOLTS <br />EXIT DEVICES <br />PUSH/PULL UNITS <br />CLOSERS <br />DOOR TRIM UNITS <br />PROTECTION PLATES <br />LATCHES AND STOPS <br />2. HARDWARE SHALL BE OF THE TYPE. FINISH AND MANUFACTURER SHOWN. <br />MANUFACTURER'S CATALOG NUMBERS USED HEREIN ARE INTENDED TO INDICATE THE <br />QUALITY REQUIRED. ALTERNATE MANUFACTURERS AND PRODUCTS MAY BE <br />SUBMITTED TO THE TENANT FOR SUBSTITUTION APPROVAL. NO OTHERS SHALL BE <br />ACCEPTABLE. <br />3. FURNISH HARDWARE TEMPLATES IN A TIMELY MANNER TO THE VARIOUS AFFECTED <br />TRADES FOR COORDINATION OF THEIR WORK. <br />PARTI - GENERAL <br />A. FURNISH AND INSTALL FINISH HARDWARE FOR INTERIOR AND <br />EXTERIOR DOORS AND ROLLING GRILLES (WHERE APPLICABLE). <br />B. SEE DOOR SCHEDULE FOR SPECIFIC ITEMS. MANUFACTURERS AND <br />MODEL NUMBERS. TEMPLATES SHALL BE FURNISHED FOR USE IN <br />FIELD. <br />C. FOLLOW DHI (DOOR AND HARDWARE INSTITUTE) STANDARDS AND <br />GUIDELINES AND AWI (AMERICAN WOODWORKING INSTITUTE) <br />STANDARDS FOR HARDWARE INSTALLED ON WOOD DOORS. <br />D. FURNISH OWNER WITH MAINTENANCE DATA. MAINTENANCE <br />PROCEDURES, MANUFACTURERS WARRANTIES AND SPECIAL TOOLS. <br />E. FINISHES: PER HARDWARE SCHEDULE <br />F. KEYING <br />I. GENERAL CONTRACTOR TO COORDINATE KEYING AND MASTER <br />KEYING WITH CONSTRUCTION MANAGER. <br />2. GENERAL CONTRACTOR TO INSTALL CONSTRUCTION CORES <br />DURING CONSTRUCTION AND REPLACE WITH PERMANENT AT <br />END OF JOB PRIOR TO TURNOVER. <br />G. PROVIDE COMMERCIAL GRADE HARDWARE. COMPLYING WITH <br />PROJECT SPECIFICATIONS. IN SETS ACCORDING TO THE <br />SCHEDULE HEREIN AND ON DOOR SCHEDULE DRAWING. <br />REFER TO DOOR SCHEDULE HARDWARE. <br />PART 2 - PREPARATION / EXECUTION <br />A. COORDINATE THE WORK WITH OTHER DIRECTLY AFFECTED <br />SECTIONS INVOLVING FABRICATION OF WALL <br />INTERNAL REINFORCEMENT FOR DOOR HARDWARE AND RECESSED <br />ITEMS. <br />B. VERIFY THAT DOORS AND FRAMES ARE READY TO RECEIVE WORK <br />AND DIMENSIONS ARE AS INDICATED. <br />C. INSTALL HARDWARE IN ACCORDANCE WITH MANUFACTURER'S <br />INSTRUCTIONS. <br />D. USE TEMPLATES PROVIDED BY HARDWARE ITEM MANUFACTURER. <br />E. WHEREVER CUTTING AND FITTING IS REQUIRED TO INSTALL HARDWARE <br />ONTO OR INTO SURFACES WHICH ARE LATER TO BE PAINTED OR <br />OTHERWISE FINISHED. INSTALL EACH ITEM COMPLETELY. THEN REMOVE <br />AND STORE DURING APPLICATION OF FINISHES. REINSTALL UPON <br />COMPLETION OF FINISHING OPERATIONS. SPACE FASTENERS AND <br />ANCHORAGES AS INDICATED OR IN ACCORDANCE WITH FACTORY <br />STANDARDS. <br />F. ADJUST HARDWARE FOR SMOOTH OPERATION. <br />FINISHES DIVISION #9 <br />GYPSUM BOARD, FRAMING, 6 ACCESORIES <br />1. GYPSUM WALLBOARD PRODUCTS: <br />A. STANDARD GYPSUM WALLBOARD SHALL BE 48' WIDE WITH TAPERED EDGES. 5/8" <br />THICK AND SHALL CONFORM TO ASTM C-36. <br />B. WATER RESISTANT GYPSUM WALLBOARD SHALL BE SELF FURRING 48" WIDE <br />SHEETS. 5/8" THICK AND CONFORM TO ASTM C-36. <br />2. PRODUCTS AND METAL ACCESSORIES: <br />A. CORNER BEADS AND CASING BEADS SHALL BE STANDARD GALVANIZED <br />STEEL SECTION AND MANUFACTURED FOR USE WITH DRYWALL CONSTRUCTION. <br />B. NAILS SHALL BE ANNULAR RING NAILS CONFORMING TO ASTM C-380. <br />C. SCREWS SHALL BE SELF -DRILLING. CORROSION RESISTANT SCREWS WITH <br />PHILLIP HEADS. <br />3. DRYWALL INSTALLATION: <br />A. THE GYPSUM WALLBOARD SHALL BE INSTALLED BY AN APPROVED, <br />EXPERIENCED DRYWALL APPLICATOR NORMALLY ENGAGED IN THIS TRADE. <br />B. WATER RESISTANT GYPSUM WALLBOARD SHALL BE APPLIED TO WALL IN TOILET <br />ROOMS. <br />C. GYPSUM WALLBOARD OF MAXIMUM PRACTICAL LENGTH SHALL BE USED SO <br />THAT AN ABSOLUTE MINIMUM NUMBER OF END JOINTS OCCUR. BOARDS SHALL <br />BE BROUGHT INTO CONTACT WITH EACH OTHER BUT SHALL NOT BE FORGED <br />INTO PLACE. GYPSUM BOARD JOINTS AT OPENINGS SHALL BE LOCATED SO <br />THAT NO END JOINT WILL ALIGN WITH EDGES OF OPENINGS. ALL END JOINTS <br />SHALL BE STAGGERED. <br />D. APPLY GYPSUM BOARD WITH THE LENGTH AT RIGHT ANGLES TO THE <br />SUPPORTING MEMBERS. CENTER ABUTTING ENDS OR EDGES OVER SUPPORTS. <br />E. FASTENERS SHALL BE SPACED NOT LESS THAN 2" FROM ENDS AND EDGES OF <br />WALLBOARD. WALLBOARD SHALL BE HELD IN FIRM CONTACT WITH SUPPORT <br />SLIGHTLY BELOW THE SURFACE OF THE WALLBOARD WITH CARE BEING TAKEN <br />WHILE FASTENERS ARE BEING PLACED. HEADS SHALL BE DIMPLED NOT TO <br />BREAK THE PAPER FACE. <br />F. APPLY GYPSUM BOARD WITH FASTNERS SPACED 12" ON CENTER IN THE FEILD <br />AND 8" ON CENTER ALONG VERTICAL EDGES. <br />G. ALL JOINTS. INTERNAL ANGLES. DIMPLED CORNERS AND EDGES SHALL BE <br />REINFORCED AND FINISHED USING THE 3-COAT SYSTEM. ALLOW 24 HOURS FOR <br />DRYING TIME BETWEEN APPLICATIONS OF CEMENT. SAND THE CEMENT AFTER <br />EACH COAT IS DRY TO SMOOTH SURFACE EFFECTIVELY CONCEALING THE JOINTS <br />OR FASTENERS. <br />H. JOINT TREATMENT PRODUCTS SHALL BE FIBER REINFORCED TAPE AND READY <br />MIXED JOINT COMPOUND AND TOPPINGS COMPOUND AS RECOMMENDED BY THE <br />GYPSUM BOARD MANUFACTURER. <br />I. CORNER BEADS SHALL BE APPLIED TO ALL EXTERNAL CORNERS. CASING <br />BEADS SHALL BE APPLIED AROUND ALL WALL OR CEILING OPENINGS. <br />J. ALL MATERIALS SHALL BE DELIVERED TO THE JOB SITE IN UNBROKEN <br />MANUFACTURER'S CONTAINERS AND SHALL BE PROPERLY STORED AND <br />PROTECTED FROM THE ELEMENTS UNTIL USE. <br />FINISHES DIVISION #9 <br />(REF. OWNERS SPECS FOR FINISHES) <br />ACOUSTICAL CEILINGS <br />I. DESCRIPTION: <br />EXTENT OF ACOUSTICAL CEILING IS SHOWN AND SCHEDULED ON DRAWINGS <br />FLAME SPREAD: 25 OR LESS <br />SMOKE DEVELOPED: 50 OR LESS <br />2. ACOUITICAL PANELS: <br />TYPE III PANELS - MINERAL COMPOSTION 24"X24- PANEL W/. SQ EDGE. <br />3. METAL SUSPENSION SYSTEM: <br />PROVIDE METAL SUSPENSION SYSTEMS OF TYPE, STRUCTURAL CLASSIFICATION AND <br />FINISH INDICATED WHICH COMPLY WITH APPLICABLE ASTM C-635 REQUIREMENTS. <br />CERAMIC TILE <br />SECTION [-PRODUCTS <br />1.1 CERAMIC TILE SHALL CONFORM TO REQUIREMENTS OF ANSI A137.1-1988 <br />TYPE: CERAMIC TILE. REFER TO MATERIALS SCHEDULE. <br />SIZE: CERAMIC TILE SHALL BE MANUFACTURED TO SPECIFIC SIZE AFTER <br />FIRING AND SHALL BE NOMINAL SIZE. REFER TO MATERIALS SCHEDULE. <br />THICKNESS: CERAMIC TILE SHALL BE MANUFACTURED TO SPECIFIC THICKNESS <br />AFTER FIRING AND SHALL BE NOMINAL, REFER TO MATERIALS SCHEDULE. <br />COLOR: REFER TO MATERIALS SCHEDULE. <br />1.2 SETTING MATERIALS: USE APPROPRIATE INSTALLATION MORTARS ACCORDING TO <br />ANSI AII8. SERIES OR AI36.1992 TYPE I. <br />1.3 GROUTING MATERIALS: SELECT GROUT PER ANSI A118.3. A118.5, AI18.6 OR A116.8- <br />1992. POLYBLEND NON -SANDED GROUT. MANUF.: BONSAL CO. COLOR: PER FINISH SCHEDULE. <br />1.4 WATERPROOFING/ANTI-FRACTURE MEMBRANE: SELECT PER ANSI A118.10-1993 AS <br />REQUIRED. <br />1.5 GROUT SEALER: BONSAL OR EQUAL. <br />SECTION 2-INSTALLATION <br />2.1 ACCEPTABILITY OF SURFACES <br />A. BEFORE TILING, VERIFY THAT ALL SURFACES TO BE TILED ARE STRUCTURALLY <br />SOUND TRUE TO PLANE. AND FALL WITHIN MAXIMUM VARIATIONS SHOWN BELOW: <br />WALLS FLOORS <br />1/8" IN 8' 1/8' IN 10' <br />REPORT ALL UNACCEPTABLE SURFACES TO THE DESIGN PROFESSIONAL IN WRITING. AND DO <br />NOT TILE SUCH SURFACES UNTIL THEY ARE LEVELED ENOUGH TO MEET ABOVE <br />REQUIREMENTS. <br />B. BEFORE TILING. ALL SURFACES MUST BE FREE OF CURING COMPOUNDS. OIL. <br />GREASE. WAX, DIRT, DUST. FORM RELEASES OR OTHER SUBSTANCES THAT <br />WOULD INTERFERE WITH PROPER BOND OF SETTING MATERIALS. IF TILE IS <br />INSTALLED BY THE THIN -SET METHOD. CONCRETE SLABS SHALL BE STEEL <br />TROWEL OR LIGHT BROOM FINISH. <br />2.2 SETTING METHODS: COMPLY WITH APPROPRIATE ANSI A108 SPECIFICATION CURRENT <br />AND TILE COUNCIL OF AMERICA HANDBOOK FOR APPROPRIATE METHOD OF <br />INSTALLATION FOR EACH SPECIFICATION. FOR ADHESIVE MORTAR APPLICATION USE <br />FOLLOWING: WITH FLAT SIDE OF TROWEL, KEY MORTAR INTO SUBSTRATE. USING THE <br />APPROPRIATE SIZE TROWEL. COMB MORTAR IN ONE DIRECTION WITH NOTCHED SIDE <br />OF TROWEL. SET TILE WITH A SLIDING MOTION, PERPENDICULAR TO THE MORTAR <br />RIDGES. OBTAIN AS NEAR AS 100% COVERAGE AS POSSIBLE OF MORTAR TO TILE. <br />MORTAR MUST BE SUFFICIENTLY DISTRIBUTED TO GIVE FULL SUPPORT UNDER ALL <br />CORNERS AND EDGES OF THE TILE. PERIODICALLY. REMOVE SHEETS OR INDIVIDUAL <br />TILES TO ASSURE PROPER BOND COVERAGE CONSISTENT WITH INDUSTRY <br />SPECIFICATIONS. <br />2.3 MAX. GROUT JOINT - REFER TO FINISH SCHEDULE. <br />2.4 EXPANSION JOINTS: INSTALL DESIGN PROFESSIONALURALLY DESIGNED EXPANSION JOINTS AS <br />PER CURRENT TCA DETAIL EJI71. PREFABRICATED EXPANSION JOINT STRIPS CAN <br />ALSO BE USED WHEN SUITABLE. <br />2.5 GROUTING METHODS: FOLLOW EXACTLY GROUT MANUFACTURES INSTRUCTIONS AND <br />COMPLY WITH APPROPRIATE ANSI A108 SPECIFICATION DEPENDING ON TYPE OF <br />GROUT SELECTED. GROUTING IS NOT COMPLETE UNTIL ALL GROUT HAZE AND <br />RESIDUES ARE REMOVED FROM THE SURFACE OF THE TILE. <br />2.6 GROUT SEALER: COMPLY WITH MANUFACTURES INSTRUCTIONS AND APPROPRIATE <br />ANSI SPECIFICATIONS FOR PRODUCT SELECTED. <br />2.7 CLEANING AND PROTECTION <br />A. LEAVE FINISHED INSTALLATION FREE OF CRACKED, CHIPPED. BROKEN. UNBONDED <br />OR OTHERWISE DEFECTIVE TILE WORK. <br />B. PROTECT ALL FLOOR TILE INSTALLATIONS WITH CLEAN CONSTRUCTION PAPER OR <br />OTHER HEAVY COVERING DURING CONSTRUCTION PERIOD TO PREVENT STAINING <br />OR DAMAGE. NO FOOT OR WHEEL TRAFFIC PERMITTED ON FLOOR FOR AT LEAST <br />THREE (3) DAYS AFTER GROUTING. <br />CARPET <br />I. MATERIAL SUPPLIED AND INSTALLED BY TENANT. NO CARPET WORK SHALL BE <br />INSTALLED UNTIL WET TRADES ARE COMPLETE IN THE SAME AREA. SUB -FLOOR <br />SHOULD BE LEVEL. WITH HOLES. CRACKS AND DEPRESSIONS FILLED AND PROTRUDING <br />SURFACES LEVELED BEFORE THE CARPET CAN BE INSTALLED. <br />2. AFTER INSTALLATION OF CARPET, GENERAL CONTRACTOR SHALL PROTECT <br />CARPETING AGAINST DAMAGE OF EVERY KIND AND ESPECTIALLY IN THOSE ZONES <br />WHERE TRAFFIC OF ANY CONSEQUENCES CAN REASONABLY BE EXPECTED TO <br />OCCUR. <br />PAINT <br />I. PROVIDE PAINTING AS SHOWN OR SPECIFIED. THE TERM 'PAINT" INCLUDES ALL <br />OPAQUE OR NATURAL. PRIME. INTERMEDIATE OR FINISH COATS OF FIELD APPLIED <br />COATINGS. APPLY PAINT IN ACCORDANCE WITH MANUFACTURER'S DIRECTIONS. USE <br />APPLICATORS AND TECHNIQUES BEST SUITED FOR SUBSTRATE AND TYPE OF MATERIAL <br />BEING APPLIED. <br />2. PROVIDE TOP -OF -THE -LINE PAINT PRODUCTS MANUFACTURED BY ONE OF THE FOLLOWING <br />MANUFACTURERS: ALL DESCRIPTIONS BASED ON SHERWIN-WILLIAMS: <br />BENJAMIN MOORE. PPG INDUSTRIES, <br />SHERWIN-WILLIAMS. PRATT 6 LAMBERT. <br />3. PROVIDE SUITABLE COVERING TO PROTECT WORK, THE WORK OF OTHERS AND <br />ADJACENT SURFACES AND OBJECTS. REMOVE OR PROTECT SUCH ITEMS AS <br />HARDWARE. ACCESSORIES. PLATES. LIGHT FIXTURES AND SIMILAR ITEMS PLACED <br />PRIOR TO PAINTING. REPOSITION OR REMOVE PROTECTION UPON COMPLETION OF <br />EACH SPACE. <br />4. PREPARE SURFACES TO RECEIVE PAINT: THOROUGHLY CLEAN OFF GRIME. GREASE. <br />DIRT, CHALK. DUST. LOOSE MATERIAL AND OTHER SUBSTANCES THAT MAY INTERFERE <br />WITH PROPER ADHESION OF PAINT. PAINT DRY SURFACE ONLY. SAND LIGHTLY <br />BETWEEN EACH SUCCEEDING COAT OF PAINT. <br />5. FILL DENTS, CRACKS. HOLLOW PLACES. OPEN JOINTS AND OTHER IRREGULARITIES <br />WITH AN APPROVED FILLER SUITABLE FOR THE PURPOSE. AFTER SETTING. SAND TO A <br />SMOOTH. HARD FINISH. <br />6. CLEAN OFF ALL PAINT SPLATTER OCCURRING ON ADJACENT WORK. REPAIR OR REPLACE <br />WITH NEW APPROVED MATERIAL ALL SURFACES DEFACED AS A RESULT OF THE WORK OF <br />THIS SECTION AND LEAVE WORK IN A CLEAN. ACCEPTABLE CONDITION. <br />7. DRYWALL: <br />PRIME GYPSUM BOARD SURFACES WITH A LATEX PRIMER AND APPLY TWO (2) COATS <br />OF LATEX INTERIOR EGGSHELL FINISH. VERIFY WITH OWNERS SPECS. <br />8. WOODWORK: <br />PRIME WOODWORK SURFACES AND TRIMS WITH A WOOD PRIMER. AND APPLY TWO (2) <br />COATS OF "REGAL AQUAGLO" SATIN FINISH ENAMEL. WHEN TRANSPARENT FINISHES <br />ARE CALLED FOR, USE MULTIPLE COATS TO PRODUCE GLASS -SMOOTH SURFACE FILM <br />OF EVEN LUSTER. PROVIDE SATIN FINISH FOR FINAL COAT. <br />9. METAL WORK: <br />PRIME METAL SURFACES (AC REGISTERS AND DIFFUSER ACCESS PANELS) WITH AN <br />ADEQUATE PRIMER AND APPLY TWO (2) COATS OF FLAT LATEX TO MATCH CEILING <br />COLOR. PAINT INTERIOR SURFACES O.D. DUCTS WHERE VISIBLE THROUGH REGISTERS <br />OR GRILLES WITH A FLAT. NON SPECULAR BLACK PAINT. OMIT PRIMER ON SURFACES <br />THAT HAVE BEEN SHOP -PRIMED. <br />10. METAL DOORS: <br />PRIME DOOR SURFACES AND TRIM WITH ENAMEL PRIMER AND APPLY TWO (2) COATS OF <br />SATIN FINISH ENAMEL AS SCHEDULED. <br />II. PLASTER: <br />PRIME PLASTER SURFACES WITH AN APPROVED ALKALI -RESISTANT PRIMER AND APPLY TWO <br />(2) COATS OF ACRYLIC LATEX (FLAT) AS SCHEDULED. <br />FIRE PROTECTION <br />PARTI- GENERAL <br />PROVIDE MULTI -PURPOSE CHEMICAL FIRE EXTINGUISHERS CAPABLE <br />OF EXTINGUISHES CLASS A. B. AND C FIRES. IN QUANTITIES AND <br />LOCATIONS REQUIRED BY LOCAL FIRE MARSHALL. (COORDINATE IN <br />FIELD.) MANUFACTURER: J.L. INDUSTRIES: COSMIC SERIES OR EQUAL. <br />PART 2 - PREPARATION / EXECUTION <br />A. INSTALL MOUNTING BRACKETS AT HEIGHTS TO COMPLY WITH <br />APPLICABLE REGULATIONS OF GOVERNING AUTHORITIES. <br />B. SECURE MOUNTING BRACKETS TO STRUCTURE. SQUARE AND <br />PLUMB. TO COMPLY WITH MANUFACTURER'S INSTRUCTIONS. <br />DIVISION #10 <br />EQUIPMENT DIVISION *11 <br />PARTI-GENERAL <br />A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT WORK AND <br />PLACEMENT WITH THE WORK OF ALL OTHER TRADES AND MAKE <br />ADJUSTMENTS AS REQUIRED TO ACCOMMODATE LOCATIONS OF <br />EQUIPMENT. <br />B. ALL EQUIPMENT WORK SHALL COMPLY WITH ALL GOVERNING <br />BUILDING CODES AND LOCAL CODES. <br />C. EQUIPMENT SHALL BE FURNISHED, UNLOADED. UNPACKED OR <br />UNCRATED AND PLACED ACCORDING TO THE CONSTRUCTION <br />DOCUMENTS. <br />PART 2 - PREPARATION / EXECUTION <br />A ALL EQUIPMENT PROVIDED BY OWNER AND INSTALLED BY GENERAL <br />CONTRACTOR IS TO BE INCLUDED IN GENERAL BID. <br />B. GENERAL CONTRACTOR SHALL NOTIFY THE OWNER IMMEDIATELY <br />OF ANY DAMAGE TO THE EQUIPMENT PRIOR TO INSTALLATION. <br />C. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FINAL <br />HOOKUP OF ALL EQUIPMENT SUCH AS ALL MECHANICAL <br />WORK. PLUMBING. AND ELECTRICAL FOR THE EQUIPMENT UST. <br />D. ALL EQUIPMENT MANUALS. INSTRUCTION BOOKLETS AND <br />WARRANTY INFORMATION SHALL BE NEATLY BOUND AND TURNED <br />OVER TO THE OWNER BEFORE FINAL APPROVAL OF THE BUILDING. <br />MISCELLANEOUS NOTES: <br />I. THE RECEIPT AND USE OF THESE DOCUMENTS CONSTITUTES AGREEMENT THAT <br />EXISTING PROJECT CONDITIONS. INCLUDING THE PRESENCE OF ASBESTOS OR <br />ASBESTOS CONTAINING MATERIALS. ARE AND REMAIN ISSUES OUTSIDE THE SCOPE <br />ADDRESSED BY THESE DOCUMENTS AND THAT THE DESIGN PROFESSIONAL <br />PREPARING THESE DOCUMENTS SHALL NOT. IN ANYWAY. BE LIABLE FOR THE <br />PRESENCE, DISCOVERY. REMOVAL OR HANDLING OF SUCH MATERIALS. <br />2. THESE SPECIFICATIONS MAY INCLUDE SECTIONS WHICH ARE NOT INCLUDED IN <br />THE SCOPE OF WORK. <br />LIGHTNING STEEL I <br />CG19-014 <br />CONNELLY GROUP <br />CONSULTINGICJGI ENGINEERS <br />Q200 <br />2nd Ave South - #465 - St Petersburg, FL 33701 <br />infooconnellyengineering.com <br />L^n <br />(T)813.232.8448 (F)800.698. 1945 <br />t!7 <br />www.connellyengineering.com <br />r <br />0 <br />c <br />Ckj <br />\ <br />FMCHAPTER I <br />INMiI SE MXTRWM TO SE A LOOSE TO PROCEED wrtx THE WORK <br />AM NOT AS WTHO Rfl TO VKLATL CANCEL ALTER OR SET ABU ANY OF THE PROYMM <br />OF THE TECHOW COOEB. RON SHALL BO M = OF A POW PREVENT THE BRLONO <br />PROJECT <br />DATA <br />DESIGNER <br />co <br />\ <br />Cl) <br />OF MORE N PLMdL <br />NMB�TR=10 OR N0.ATIFROM THEREAFTIOOIE OF° THIS COOS EVERYPOINT EMU SHALL BECOME <br />INVALID ML.ESS TIE WORK WTHORRED BY SM PERMIT T M COMNO WInAN 0 <br />MOUTHS AFTER ITS OR AME.OR F THE WORK A MO C O NY BOCK POW M <br />CRC <br />DRAWN BY <br />wMPENOEO OR ABANDONED PON A POW OF 0 MONTHS AFTER THE THE THE WORK re <br />JJC <br />tai <br />Q <br />RREQUIEVEMreHOW �OF Ti �TTHESE APPLLCULE�IN LOING WAND OOF.B�sE�VM COMPLYWrTH TITLETHE <br />SHOT <br />CHECKED <br />o <br />CRC <br />I- <br />o <br />J <br />d <br />I- <br />W <br />W <br />x <br />U) <br />«t <br />s <br />a <br />1w <br />FBC <br />u7 <br />I� <br />a <br />0 <br />6TH EDITION <br />N <br />oA <br />(2017) <br />w <br />a <br />CONNELLY GROUP CONSULTING ENGINEERS AND THEIR <br />o <br />AGENTS, RESERVES THE RIGHT TO REVISE DETAILS <br />> <br />SHOWN HERE AT SUCH TIME AS REVISIONS WILL RESULT <br />a <br />IN ENGINEERING OR ECONOMIC IMPROVEMENTS. THESE <br />N <br />DRAWINGS ARE GRAPHIC REPRESENTATION OF A DESIGN <br />F- <br />W <br />CONCEPT. ACTUAL DETAILS SUBJECT TO FIELD <br />W <br />VERIFICATION. <br />x <br />0 <br />W <br />W <br />N <br />MT <br />C3 L!7 <br />La <br />O <br />O <br />� LL <br />Z <br />W <br />C, <br />un <br />cn <br />Z <br />J <br />3: <br />L <br />C3 <br />V <br />Ln <br />o <br />U_ <br />LL_ <br />N <br />CL <br />� z <br />O W <br />qEL N <br />DRAWING SETS <br />REVIEW 11.14,18100 • 12.04.19102) <br />Elm 00.110.00 <br />PERMIT (BO REVIEW] 09.06.19 <br />PROFESSIONAL SEAL <br />DATE SEALED: SEPTEMBER 8, 2019 <br />\\ ��QNER• <br />�` � • ' vcFai • � <br />No. <br />O <br />._.®• <br />: <br />STA �A/ NZ <br />/, \\\ <br />\ <br />L1J <br />CHRISTOPHER R. CONNELLY, PE <br />C- <br />PE-FL83888 i CA -FL 26841 <br />J <br />a <br />BUILDING NOTES <br />c� <br />G <br />°° <br />AOOO <br />cn <br />