My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
4330 20th St (42)
Zephyrhills
>
Building Department
>
Building Plans
>
4330 20th St (42)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 9:10:00 AM
Creation date
2/18/2025 3:19:24 PM
Metadata
Fields
Template:
Building Plans
Street #
4330
Location
20th St
Contractor
Haskell
Building Plans - Permit #
19482
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- <br />U) <br />00 <br />o- <br />N <br />00 <br />0 <br />N <br />cz <br />75 <br />0 <br />C <br />Is <br />r <br />U <br />r` <br />0 <br />0 <br />o <br />IT <br />N <br />E <br />M <br />C <br />0 <br />LL <br />8 7 6 5 4 3 2 1 <br />_ r— <br />r r s X 814 <br />I r <br />.0100, <br />_ D <br />DOD <br />L ' "IYam` —_ `_ 1.1� - .. - —'I► <br />COT ov�-X 82.1--`---~ - — - <br />©D <br />Oil <br />SF <br />F1 wo� :w-�- -- <br />y00"i --� 'i <br />000 SF <br />f III <br />` / �. s _ -- 0D �► 'i \-ODD <br />coo <br />Vol <br />7.4 'S X _.... �.s a✓'I `.� �- -• `UV "` �_ f _ ..,.. _ I I <br />�-- �x .---—���_--- ._---- _----- L nth <br />_ _ <br />x -- �►�� --iiiis/�� SUMP00 SUMP <br />INV-75.23 75.53SF <br />C' �, ` — — --- =- �F— —SF� F — — — — --�� — — _ — — — —_— — = — — _ — P P - - �� - --- -- -- C <br />R <br />0 At <br />SF Cf) <br />82.3 <br />- — --- --_- - - - - - - - - �p-_-_-__----- - - - - - ------------------ <br />can / (Sl <br />--`-= - - <br />0 LL <br />LL <br />f11 <br />{ in cf' % <br />z1Q/ P-1 I / <br />I{ x / �I <br />NLL / Q3 <br />I <br />I Q QLL / <br />00 I II <br />LIMITS OF DISTURBANCE x <br />"J EROSION AND SEDIMENT NOTES: LEGEND: <br />Lf) AREA = 0.56 AC (24.326 Vj <br />% IP-1 <br />1. THE EROSION CONTROL PLANS PROVIDE THE MINIMUM REQUIREMENTS TO MEET LOCAL, STATE AND <br />Ll FEDERAL REGULATIONS. THE CONTRACTOR SHALL PROVIDE ADDITIONAL EROSION CONTROL MEASURES AS NECESSARY TO CONTROL SEDIMENT RUNOFF FROM THE SITE. LOD LIMIT OF DISTURBANCE <br />2. THE CONTRACTOR SHALL HAVE A QUALIFIED INSPECTOR ON -SITE FOR EROSION AND SEDIMENT <br />CONTROL ACTIVITIES. THE QUALIFIED INSPECTOR SHALL MEET ALL OF THE REQUIREMENTS AS <br />EXIS OUTLINED IN PART IV SECTION A AND B OF THE SPDES GENERAL PERMIT FOR CONSTRUCTION I P-� DROP INLET PROTECTION <br />WATER VALVE . r IHP\ / , ACTIVITIES. <br />& BOX <br />82.4 <br />I � I <br />It <br />1 i <br />i 1 <br />I � 1 <br />{I <br />SF <br />i LL SOD <br />I82.7 o I I SF Ij <br />F SF <br />L D <br />i <br />A I I , I I SOD f <br />P -� <br />II I I I ( \ <br />G RCPI #3 JRH 04/30/2018 <br />E RCPI#2 JRH 03/30/2018 <br />D RCPI JRH 03/16/2018 H <br />B CIVIL PERMIT ISSUE JRH 02/15/2018 5 <br />REV. REVISION DESCRIPTION DRN. REV. DATE REV. <br />8 7 <br />i <br />i <br />i <br />i <br />i <br />■ <br />F— <br />I I <br />ADDENDUM #2 <br />FO #5 <br />REVISION DESCRIPTION <br />3. THE CONTRACTOR SHALL INSPECT THE EROSION CONTROL ELEMENTS EVERY 14 DAYS OR WITHIN <br />24 HOURS OF A 0.5 INCH RAINFALL EVENT, THE REPORTS SHALL BE MAINTAINED ON -SITE DURING <br />THE CONSTRUCTION ACTIVITIES, <br />4. SOIL STOCKPILES ON -SITE SHALL BE PROTECTED BY SITE FENCE PLACED AROUND THE BASE OF <br />THE STOCKPILE, <br />5, THE CONTRACTOR SHALL PROVIDE A LOW SIDE DUMPSTER LINED WITH PLASTIC FOR CONCRETE <br />CLEANOUT, CONCRETE CLEANOUT SHOULD BE MAINTAINED IN A DESIGNATED AREA TO REDUCE THE <br />RUNOFF. <br />6, ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION <br />WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS <br />FROM THE LAST LAND -DISTURBING ACTIVITY. <br />E&S SEQUENCE OF CONSTRUCTION: <br />1. INSTALL INLET PROTECTION AND SILT FENCE AS NECESSARY TO PROTECT EXISTING STORM <br />STRUCTURES <br />2. MAINTAIN DUST CONTROL AND STREET SWEEPING TO REDUCE SEDIMENT ON PAVED AREAS <br />3. ALL AREAS NEED TO BE STABILIZED PRIOR TO REMOVAL OF THE EROSION AND SEDIMENT CONTROL <br />MEASURES. <br />*THE CONTRACTOR SHALL SUBMIT ALTERNATE PLANS TO THE PROJECT MANAGER AND ENGINEER PRIOR <br />TO DEVIATING FROM THE SEQUENCE OF CONSTRUCTION. <br />DISTURBED AREA: 0.56 AC <br />40�I�ASKELL The Haskell Company <br />KJC 05/16/2018 III Riverside Avenue <br />Jacksonville, Florida 32202 <br />Phone # (904)791-4500 <br />KJC 05/01 /2018 <br />DRN. REV. DATE REV. REVISION DESCRIPTION DRN. REV. DATE °� DE "M 3401007 <br />6 5 4 <br />NOETH AMERICA <br />CORPORATE ENGINEERING OFFICE <br />1322 CRESTSIDE DRIVE, SUITE 100 <br />COPPELL, TEXAS 75019 <br />3 <br />O SOD PLACEMENT <br />SF SILT FENCE SF <br />DC DUST CONTROL <br />PRELIMINARY <br />NOT FOR CONSTRUCTION <br />THIS DRAWING IS NOT IN FINAL FORM AND IS BEING TRANSMITTED SOLELY FOR REVIEW, <br />COMMENT AND INTERPRETATION BY THE PUBLIC AGENCY FURTHERMORE, THIS DOCUMENT <br />MAY SUBSEQUENTLY BE REVISED BY THE ENGINEER TO REFLECT RESOLUTION OF ISSUES WITH <br />THE PUBLIC AGENCY PRIOR TO FINAL ACTION BY THE AGENCY. CHANGES, REVISIONS AND <br />MODIFICATIONS MAY PROMPT ADDITIONAL DOCUMENT SUBMITTAL FOR AGENCY APPROVAL <br />WAREHOUSE EXPANSION <br />ZEPHYRHILLS NATURAL SPRING WATER <br />ZEPHYRHILLS, FLORIDA <br />Tlhs Infa wm ion 0ontak W an this documil t Is the sal of NiM,U <br />and may not In copal or disolossd to odds unbw au=by N%Kk <br />DATE 1x1IJ VWC si <br />2 <br />0 20 40 <br />A <br />Y, <br />mot` � �•�,�+L%E�S JJA �'�.. <br />�4��� <br />No ' <br />r � : A <br />r e � <br />STATE OF <br />` 2' <br />.0 <br />EROSION AND SEDIMENT CONTROL PLAN <br />SIM %UT Ill <br />D C-161 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.