MUV - ZEPHYRHILLS, FL
<br />MEDICAL CANNABIS DISPENSARY
<br />TENANT BUILD -OUT
<br />04-15-2022
<br />PERMIT
<br />ARCHITECT
<br />COLLECTIVE OFFICE, P.C.
<br />9 E 24TH STREET
<br />CHICAGO, IL 60616
<br />1-312-818-2006
<br />www.collectiveoffice.com
<br />JEFF KLYMSON, AIA NCARB
<br />FLORIDA LICENSE No. AR101389
<br />EXPIRES: 02-28-2023
<br />I hereby certify that these drawings and documents were
<br />prepared under my direct supervision and to the best
<br />of my professional knowledge, conform to the local and
<br />State building codes and zoning ordinances.
<br />This item has been electronically signed and sealed by
<br />Jeff Klymson, Architect on the date adjacent to the seal
<br />using a SHA authentication code. Printed copies of this
<br />document are not considered signed and sealed and the
<br />SHA authentication code must be verified on any
<br />electronic copies.
<br />PROJECT DIRECTORY:
<br />CLIENT -
<br />PLANTS OF RUSKIN LLC
<br />PO BOX 126
<br />RUSKIN, FL 33575
<br />JOHN TIPTON
<br />john.tipton@altmed.com
<br />ELECTRICAL ENGINEER:
<br />I` • co:F 6otASON •
<br />• '• PR�p13a9 : �4J
<br />41
<br />� 0 •G�
<br />C�`STERE� P�
<br />`1I�IZL
<br />JEWITT ENGINEERING INC.
<br />623 BAYSIDE DR.
<br />FORT MEYERS, FL 33919
<br />JEFF JEWITT
<br />jjjewitt@comcast.net
<br />239-432-1550
<br />MECHANICAL / PLUMBING ENGINEER:
<br />KEVATRON ENGINEERING, INC.
<br />2324 CORAL POINT DRIVE
<br />CAPE CORAL, FL
<br />KEVIN ADAMS
<br />kevatron60@gmail.com
<br />239-242-7367
<br />ADDRESS:
<br />5230 6TH ST
<br />ZEPHYR HILLS, FL 33542
<br />PIN No.:
<br />11 -26-21 -0010-15400-0190
<br />NOTICE TO CONTRACTORS PROJECT SUMMARY CONTINUED
<br />NOTICE TO CONTRACTORS
<br />OCCUPANCY CALCULATIONS:
<br />1. THE CONTRACT DOCUMENTS FOR THIS PROJECT INCLUDE AN OWNER- CONTRACTOR
<br />OCCUPANCY CLASSIFICATION:
<br />AGREEMENT (AN EXECUTED WRITTEN PROPOSAL PREPARED BY THE CONTRACTOR DESCRIBING
<br />THE WORK) AND THESE DRAWINGS PREPARED BY THE ARCHITECT. THE ARCHITECT IS PROVIDING
<br />TENANTAREA:
<br />A "PLANS ONLY" SERVICE. NO OTHER TYPE OF ARCHITECTURAL SERVICE IS INTENDED OR
<br />IMPLIED. THESE PLANS ARE TO BE USED ONLY BY COMPETENT CONTRACTORS LICENSED TO
<br />TOTAL OCCUPANT LOAD:
<br />WORK WITHIN THE CITY OF CHICAGO, AND KNOWLEDGEABLE IN THE BUILDING TRADES.
<br />2. THE CONTRACTOR MUST FAMILIARIZE WITH THE PROJECT LOCATION AND EXISTING
<br />PROJECT AREAS:
<br />CONDITIONS. CONTRACTOR MUST CHECK AND VERIFY ALL DIMENSIONS AND WILL BE
<br />RESPONSIBLE FOR THEM. DISCREPANCIES WITH PLANS AND EXISTING CONDITIONS MUST BE
<br />-GROSS TENANT AREA:
<br />REPORTED TO THE ARCHITECT PRIOR TO COMMENCEMENT OF ANY WORK. NON- COMPLIANCE
<br />WITH THE ABOVE CONDITION DISQUALIFIES ANY CONTRACTOR CLAIMS FOR ADDITIONAL
<br />- AREA OF WORK:
<br />COMPENSATION, OR TIME IN THE SCHEDULE
<br />-1ST FLOOR:
<br />-2ND FLOOR:
<br />3. ADMINISTRATION OF THE CONTRACT IS BY THE OWNER OR THE OWNER'S REP. THE
<br />-TOTAL PROJECT AREA:
<br />CONTRACTOR AND OWNER ARE SOLELY RESPONSIBLE FOR BUILDING CONSTRUCTION PROCESS
<br />AND JOBSITE SAFETY.
<br />4. THE DRAWINGS INDICATE THE GENERAL SCOPE OF THE PROJECT AND THE ARCHITECTURAL
<br />PLUMBING FIXTURE CALCULATIONS:
<br />INTENT. THIS INCLUDES THE DIMENSIONS OF THE BUILDING, PRIMARY ARCHITECTURAL
<br />-OCCUPANCY: MERCANTILE
<br />ELEMENTS, AND TYPES OF STRUCTURAL, MECHANICAL, ELECTRICALAND PLUMBING SYSTEMS.
<br />(FPC TABLE 403.1)
<br />5. THE DRAWINGS DO NOT NECESSARILY INDICATE OR DESCRIBE ALL THE WORK REQUIRED FOR
<br />- MIN FIXTURES REQ'D:
<br />REALIZATION OF THE SCOPE OR INTENT OF THE PROJECT, NOR THE REQUIREMENTS OF THE
<br />CONTRACT DOCUMENTS. BASED ON THE GENERAL SCOPE DESCRIBED IN THESE DRAWINGS, THE
<br />CONTRACTOR WILL FURNISH AND INSTALL ALL THE ITEMS REQUIRED FOR THE PROPER
<br />EXECUTION OF THE INTENDED SCOPE OF THIS PROJECT.
<br />-FIXTURES PROVIDED:
<br />6. THE ARCHITECT'S DECISION AS TO WHAT IS INCLUDED IN THE SCOPE AND WHAT IS NOT WILL
<br />BE FINAL AND BINDING FOR THE CONTRACTOR. 7. BY SUBMITTING A BID OR PRICE PROPOSAL,
<br />THE CONTRACTOR CONCEDES TO EXAMINING AND UNDERSTANDING ALL THE CONTRACT
<br />DOCUMENTS INCLUDING THESE DRAWINGS. 8. THE INTENTION OF THE CONTRACT DOCUMENTS
<br />IS TO PERFORM THE WORK REQUIRED TO ACHIEVE THE FINISHED PROJECT IN A FIRST CLASS
<br />MANNER, COMPLYING WITH APPLICABLE TRADE STANDARDS AND GUIDELINES, LOCAL, STATE
<br />AND NATIONAL CODES, AND OBSERVING OSHA RULES.
<br />9. THE COMMENCEMENT OF WORK AFFIRMS THAT THE CONTRACTOR IS FULLY INFORMED OF THE
<br />SCOPE OF WORK AND THE TIME, WORK, MATERIALS, EQUIPMENT, APPLIANCES AND SERVICES
<br />NECESSARY TO ACHIEVE THE SCOPE OF WORK. 10. THE CONTRACTOR MUST SUBMIT TO THE
<br />OWNER AND COPY TO THE ARCHITECT A CERTIFICATE OF INSURANCE WHICH NAMES THE
<br />FOLLOWING AS ADDITIONALLY INSURED FOR THIS PROJECT:
<br />A) OWNER;
<br />B) ARCHITECT;
<br />C) ZEPHYRHILL BUILDING DEPARTMENT, PASCO COUNTY;
<br />CODE SUMMARY
<br />CODE COMPLIANCE SUMMARY NOTES:
<br />1. ALL EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT A KEY OR SPECIAL
<br />KNOWLEDGE.
<br />2. ALL INTERIOR LOAD AND NON -LOAD BEARING PARTITIONS SHALL BE 1 5/8"x 3 5/8" WITH 5/8"
<br />GYPSUM WALL BOARD ON EACH SIDE UNLESS NOTED OTHERWISE.
<br />3. ALL INTERIOR FINISHES TO BE A MINIMUM OF CLASS 1 MATERIAL WITH FLAME SPREAD RATIO
<br />OF0TO25.
<br />GENERAL SUMMARY NOTES:
<br />1. LIST OF CODES ACCEPTED BY THE JURISDICTION OF ZEPHYRHILL BUILDING DEPARTMENT,
<br />PASCO COUNTY
<br />A. FLORIDA BUILDING CODE 7TH EDITION (2020);
<br />B. 2017 NATIONAL ELECTRICAL CODE;
<br />C. FLORIDA BUILDING CODE 7TH EDITION (2020) ENERGY CONSERVATION;
<br />D. FLORIDA FIRE PREVENTION CODE 7TH EDITION (2020);
<br />E. FLORIDA BUILDING CODE 7TH EDITION (2020) MECHANICAL;
<br />F. FLORIDA BUILDING CODE 7TH EDITION (2020) PLUMBING.
<br />G. FLORIDA FIRE PREVENTION CODE 7TH EDITION (2020)
<br />2. CONTRACTOR TO VERIFY ALL DIMENSIONS IN THE FIELD.
<br />3. NOTED DIMENSIONS PRECEDE SCALE, DRAWINGS ARE NOT TO BE SCALED.
<br />4. INTERIOR DIMENSIONS ARE TO THE FACE OF FINISHED WALLS, UNLESS OTHERWISE NOTED.
<br />5. ALL MATERIALS AND EQUIPMENT MUST BE INSTALLED IN COMPLIANCE WITH MANUF'S
<br />INSTRUCTIONS AND RECOMMENDATIONS.
<br />6. CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND PROPER DISPOSAL OF ALL DEBRIS
<br />GENERATED BY THE WORK. CLEAN-UP IS REQUIRED ON A DAILY BASIS ON THE JOBSITE. DEBRIS
<br />IS TO BE DISPOSED OF LEGALLY.
<br />7. A WRITTEN GUARANTEE OF ALL CONTRACTORS WORK SHALL BE PROVIDED. THIS GUARANTEE
<br />IS FOR DEFECTS IN MATERIALS, EQUIPMENT AND WORKMANSHIP.
<br />PROJECT SUMMARY
<br />JURISDICTION:
<br />ZEPHYRHILL BUILDING DEPARTMENT, PASCO COUNTY
<br />ADDRESS:
<br />5230 6TH ST
<br />ZEPHYR HILLS, FL 33542
<br />LAND AREA:
<br />21,000 SF
<br />LEGAL DESCRIPTION:
<br />TOWN OF ZEPHYRHILLS PB 1 PG 54 LOTS 19 20 21 22 23 & 24 BLOCK 154 OR 1575 PG 1898
<br />SCOPE OF WORK:
<br />ALTERATION WORK TO BE DONE IN ACCORDANCE TO THE WORK AREA COMPLIANCE METHOD
<br />PER FLORIDA BUILDING CODE - EXISTING BUILDINGS (7TH EDITION)(2020) SECTION 301.3.2
<br />LEVEL 3 ALTERATIONS
<br />SCOPE OF WORK INCLUDES:
<br />COMPLETE INTERIOR IMPROVEMENTS, TO CONSIST OF NEW INTERIOR PARTITIONS, FINISHES
<br />AND MILLWORK; MODIFIED ELECTRICAL, PLUMBING AND MECHANICAL SYSTEMS; LIMITED
<br />MODIFICATIONS TO THE ENVELOPE. NO ADDED BUILDING AREA.
<br />- NEW EXTERIOR SIGNAGE UNDER SEPARATE PERMIT
<br />- SITE IMPROVEMENTS LIMITED TO REFURBISHMENT OF EXISTING LANDSCAPE.
<br />CONSTRUCTION TYPE: III-B (UN-SPRINKLERED)
<br />ZONING: FBC5
<br />PIN: 11-26-21-0010-15400-0190
<br />MERCANTILE GROUP M
<br />7,046 SF
<br />81 OCCUPANTS (FBC TABLE 1004.5)
<br />7,046 SF
<br />3,917 SF
<br />630 SF
<br />4,547 SF
<br />81 PEOPLE
<br />1 WC/ 500 OCC.
<br />1 LAV/ 750 OCC.
<br />1 DRINKING FOUNTAIN/ 1,000 OCC.
<br />1 SERVICE SINK
<br />3 WC
<br />1 URINAL
<br />3 LAV
<br />4 DRINKING FOUNTAINS
<br />1 SERVICE SINK
<br />1 BREAK RM. SINK
<br />U)
<br />CO
<br />PROJECT DRAWINGS
<br />COVER
<br />COVER SHEET
<br />A001
<br />GENERAL NOTES
<br />A002
<br />WALL & FLOOR TYPES
<br />A003
<br />DOOR TYPES
<br />A004
<br />WINDOW TYPES
<br />A005
<br />SCHEDULES
<br />A006
<br />ADA GUIDELINES
<br />A007
<br />GENERAL CONDITIONS
<br />A008
<br />GENERAL CONDITIONS
<br />A009
<br />GENERAL CONDITIONS
<br />D101
<br />DEMO PLAN
<br />D102
<br />DEMO PLAN
<br />A101
<br />FLOOR PLAN
<br />A102
<br />FLOOR PLAN
<br />A103
<br />RCP
<br />A104
<br />RCP
<br />A105
<br />DRIVE THRU DEMO & RCP
<br />A106
<br />FINISH PLAN
<br />A107
<br />FINISH PLAN
<br />A108
<br />POWER & DATA PLAN
<br />A109
<br />POWER & DATA PLAN
<br />A200
<br />ELEVATIONS
<br />A201
<br />ELEVATIONS
<br />A410
<br />INTERIOR ELEVATIONS
<br />A411
<br />INTERIOR ELEVATIONS
<br />A412
<br />INTERIOR ELEVATIONS
<br />A413
<br />INTERIOR ELEVATIONS
<br />A500
<br />MILLWORK DETAILS
<br />A501
<br />MILLWORK DETAILS
<br />A502
<br />MILLWORK DETAILS
<br />A503
<br />MILLWORK DETAILS
<br />P101
<br />PLUMBING PLAN
<br />P601
<br />PLUMBING SCHEDULES & DETAILS
<br />M101
<br />HVAC PLAN
<br />M601
<br />HVAC SCHEDULES & DETAILS
<br />E001
<br />ELECTRICAL NOTES
<br />E101
<br />ELECTRIAL DEMO PLAN
<br />E102
<br />1ST FLOOR LIGHTING PLAN
<br />E103
<br />2ND FLOOR LIGHTING PLAN
<br />E104
<br />POWER & SYSTEMS PLAN
<br />E601
<br />RISER DIAGRAM & PANELS
<br />6TH AVE
<br />Y I
<br />J
<br />IIL
<br />3
<br />W
<br />0
<br />=
<br />Ulf i
<br />Z W
<br />_ J
<br />O
<br />Z -)
<br />Il0
<br />Y U
<br />-
<br />o z
<br />a
<br />Ui
<br />X W
<br />V
<br />8
<br />W
<br />o
<br />OD
<br />EXISTING ONE
<br />TORY BUILDING
<br />2093 US HIGHWAY 92
<br />AUBURNDALE, FL 33823
<br />EXIT
<br />L 7
<br />ADD ALTERNATE FOR PRICING:
<br />- RESEAL ALL ASPHALT COMPLETE;
<br />- RE STRIPE PARKING LOT COMPLETE (TME);
<br />- PRESSURE WASH AND CLEAN ALL CONCRETE;
<br />- REPORT TO OWNER ANY ASPHALT/ CONC. REPAIRS REQUIRED.
<br />SITE PLAN
<br />SCALE: 1/32" = 1'-0"
<br />ALL WORK SHALL COMPLY WITH
<br />NFFA CODES AND STANDARDS
<br />REVIEW DATE /)�-
<br />CITY OF ZEPHYRHILLS
<br />FIRE AND LIFE SAFETY EXAMINE
<br />ALL WORK SHALL COMPLY W ODE REVAILiNG
<br />CODES ALOR CTRIC BUILDING
<br />OD
<br />NATION nF ZE.PHYRHIL—,
<br />AND THE CITY
<br />ORDINANCES
<br />� w�ri- �; III>��Rc l ►� ., S I JSn--
<br />C o.W; U I�--0 /� CCi f/Zi� �iL L-'/
<br />REVIEW DATE: z
<br />CITY OF ZEPHYRHILLS
<br />BUILDING OFFICIAL_��,} f
<br />PROJECT NORTH
<br />NORTH 0
<br />6
<br />J
<br />m
<br />Q
<br />J
<br />LL
<br />►M, a.T
<br />bZ3a
<br />�-I-- CPO
<br />O
<br />^` 8
<br />00
<br />/ cp >
<br />N V
<br />O N
<br />`T
<br />c .
<br />V
<br />W W
<br />m
<br />w W U)
<br />O
<br />_0Z
<br />w
<br />:S'c6'
<br />Ww
<br />�
<br />V
<br />�
<br />aZo
<br />(D �
<br />�
<br />N
<br />d-
<br />Ln
<br />C'M
<br />M
<br />J
<br />LL
<br />U)
<br />J
<br />F- J
<br />CO =
<br />Z
<br />Cn
<br />>
<br />~
<br />CO
<br />o0
<br />QLoN
<br />CLlI_
<br />W
<br />IL
<br />Cn
<br />Q
<br />O
<br />
|