Laserfiche WebLink
Juri,diction Stamp <br />a <br />a o c <br />� a.o <br />at <br />O @L <br />L j <br />it (0)u) <br />°m <br />O - Y <br />U ` Ell <br />o Q o <br />_Q) <br />in <br />Cch <br />U C <br />°U -D O <br />C 2N <br />cL <br />0 02 <br />y 3 M <br />E o a <br />a L <br />c : <br />z 3:-5 <br />c Z; <br />3 xa <br />N 0 <br />-0 <br />a M <br />x 0 Q <br />°w <br />No <br />() �O <br />o c c <br />r9a � <br />C <br />3=C5o <br />p a <br />U C <br />° o° <br />o N� <br />c a> <br />L ° O <br />rh (6 0 <br />Y <br />m <br />a nM <br />c 0� <br />m c �o <br />E 2 E <br />0 <br />N N O <br />a7 @ U <br />O � O <br />U � <br />C C N <br />O y V <br />�t <br />n :3a <br />m � d <br />� ° w <br />a° <br />(D 0 c0 <br />3 <br />U <br />y� <br />c _ m <br />a, v o <br />'° in 10 N U <br />0 <br />M z`o <br />c 'a..; <br />m E <br />o� <br />O L <br />�Q <br />�o <br />N U C <br />(DN <br />m �$ <br />C m <br />°m <br />01,00 <br />_o <br />E `o <br />E c Y <br />o m <br />m 3 5 <br />Zc 0 <br />° Y <br />O '3 <br />uj (6 c0 <br />00 <br />0 <br />I <br />CER-2 WALL TILE WAINSCOT TO ALIGN <br />W/ WINDOW SILL, ALL WALLS. <br />00 <br />I <br />I � <br />Nf <br />_i <br />�I <br />Ii �I <br />I <br />I �I <br />ElI' N <br />M <br />�I <br />FINISH PLAN: 1st Floor <br />SCALE:1/4" = V-0" <br />- --- - - - - --501" 6.3/8" - <br />" 9'-6 1 /2" - - 5" - - - 23'-1 " <br />4'-5/8" 3'-2" 5'�, 8'-5 3/4 4 1/2" �, _ - <br />1 <br />STAIR - --OD <br />CL. <br />56 sq ft 11 NT- <br />i <br />ER- PT <br />- RESTRO M 1 <br />1_ <br />115 UP <br />104 sq ft <br />Ex RECEPTICk <br />m---- ER- - 101 <br />�l-- - 589 sq fif <br />I <br />- CORRIDOR _ <br />114 <br />-- <br />_I <br />_ 35 sq ft <br />8'-1 3 11'- 0" 9' <br />- - - - _ y , 1� �I 12'-7 <br />- - 2'-1" 1K t'-8" 2' 6" 1 <br />I <br />-- I <br />I . <br />I I <br />J N <br />1137 - -- _ <br />7t <br />ft-- <br />SERVE <br />R <br />��I �- FLOOR FINISHES `'' <br />11 CONTINUE UNDER <br />90 sq ft MILLWORK, TYR.- <br />T_ <br />CT- <br />- - - EX. ELEV.Li <br />11257s ft <br />q - - - <br />- <br />I - --- <br />_ 1 I I I <br />-- <br />N' <br />I <br />� I I I I <br />FLOOR CORE TO SUPPLY POWER <br />--L -MILLWORK-,- <br />MINI- <br />, <br />COORDINATE WITH MILLWORK <br />i 1 I <br />SE POWER & DATA PLAN AND ' <br />I EL CTRICAL PLANS FOR MORE <br />�OS INFIORMATION. �I <br />1 'I <br />i 04 <br />I <br />sq ; <br />ER- <br />• II JI I I I 1 I <br />I I <br />I - ICI 4'-11" � I <br />i <br />CT-1 I L <br />-- <br />j FLOOR TILE 1 <br />I I <br />SET POINT _ <br />M <br />- 3,159 sq f---- _ _ -+- I <br />- - �. <br />III I <br />- - - 20'-10 7/8 1 -1" � 6'-0" 2'-5 1/2" 1'-� <br />SALES <br />- _ 103 NT- <br />847 sq ft <br />EX. VAULT- <br />109 -.. - <br />194 sq ft 5'-8-1/4" -- 17'4" <br />00 <br />- - <br />II - <br />- c 17r s7ft- <br />- - 80 <br />1 STAiR12 <br />I I <br />up <br />l 4 sq ft <br />Ii EX -- <br />- _ --I <br />- L - ! --- -- - - <br />_ 4'-10" ---10,,� 13'-10 1/8" 1 I� - - - 22'-7-1/4"- <br />/ 49'-6 3/8" <br />EX <br />EX. MECH. <br />108 <br />102 sq ft <br />62 <br />100 - <br />105 <br />_-45 sq <br />-- -- 5" Icy 6'-2" <br />I� <br />LEGEND: <br />/( ) FD FLOOR DRAIN <br />XSJ SCHLUTER JOLLY TRANSITION STRIP <br />- - - PAINT OR OTHER FINISH ASSOCIATED W/ADJACENT WALL <br />-7)1 <br />FINISH NOTES: <br />1. NO FINISH SUBSTITUTIONS MAY BE MADE UNLESS <br />APPROVED BY ARCHITECT. <br />2. APPLICATION OF CONTROLLED INTERIOR FINISHES SHALL <br />BE IN CONFORMANCE WITH LOCAL AND STATE CODES. <br />3. DECORATIVE MATERIALS SHALL BE MAINTAINED IN A <br />FLAME-RETARDANT CONDITION. <br />4. SUBMIT THE FOLLOWING SAMPLES FOR ARCHITECT'S <br />APPROVAL: <br />A. THREE (3) 12"x12" SAMPLES FOR ALL PAINT, VINYL AND <br />FABRIC FINISHES AND COLORS APPLIED TO A SUBSTRATE <br />WHICH IS REPRESENTATIVE OF THE SURFACE TO BE <br />FINISHED. SUBMIT PAINT SAMPLES FROM THE PAINT LOT OR <br />LOTS INTENDED FOR APPLICATION. <br />B. THREE (3) 12"x12" SAMPLES OF ALL FLOOR COVERINGS. <br />5. WHERE MATERIALS ARE NOT RETURNABLE, SUBMIT <br />SAMPLES TO ARCHITECT BEFORE PLACING FULL ORDERS. <br />6. NOTIFY ARCHITECT IMMEDIATELY OF ITEMS WITH LONG <br />LEAD TIMES. <br />7. ALL FLOOR MATERIAL TRANSITIONS TO BE CONCEALED <br />UNDER DOOR, TYP. USE SS SCHLUTER JOLLY TRIM STRIPS, <br />TYP. ALL FLOORING TO BE LEVEL AND SLIP RESISTANT IN <br />COMPLIANCE WITH FFPC 101 7TH EDITION CHAPTER 7. <br />8. REFER TO FINISH SCHEDULE SHEET A004. <br />9. LOCATE FLOOR DRAINS UNDER SINKS IN RESTROOMS, <br />TYP. <br />10. TENANT TO APPROVE ALL FINISHES PRIOR TO ORDERING. <br />FLOORING INSTALLATION NOTES: <br />1. CONTRACTOR TO REFER TO INTERIOR ELEVATIONS FOR <br />ADDITIONAL TILE CLADDING AT WALLS, COLUMNS, AND <br />MILLWORK, ETC. <br />2. CONTRACTOR TO INSTALL ALL TILE AND CARPET FLOOR <br />FINISHES CONTINUOUS UNDER CABINETRY, EQUIPMENT, <br />APPLIANCES, AND FIXTURES, UNO. <br />3. INSTALLATION OF ANY FLOOR FINISH INDICATES <br />ACCEPTANCE OF THE SUBSTRATE BY THE INSTALLER. DO <br />NOT INSTALL ANY FLOOR FINISHES UNTIL THE SUBSTRATES <br />HAVE BEEN PREPARED TO INDUSTRY STANDARDS, AS <br />DEFINED IN ANSI PUBLICATIONS A108, A118, AND A136 AND <br />MANUFACTURER SPECS, TYP. <br />4. PATTERNS SHOWN IN PLAN ARE FOR ILLUSTRATIVE <br />PURPOSES ONLY, AND DO NOT REPRESENT ACTUAL <br />PATTERNS OR MATERIAL/ FINISH DIRECTIONS. REFER TO <br />WRITTEN DESCRIPTIONS OF FLOORING MATERIALS AND <br />DETAIL DRAWINGS FOR ACTUAL PATTERNS. <br />FBC CHAPTER 8 INTERIOR FINISHES COMPLIANCE: <br />GROUP M / NON SPRINKLERED OCCUPANCY: <br />INT. EXIT STAIRWAYS, RAMPS & EXIT PASSAGEWAYS: <br />FLOOR TILE JOINTS TO 'CLASS A <br />BE CONTINUOUS CORRIDORS, ENCLOSURE FOR EXIT ACCESS STAIRWAYS & <br />THROUGH ALL ROOMS, RAMPS: <br />TYP. - CLASS A <br />ROOMS AND ENCLOSED SPACES: <br />- CLASS B <br />PROJECT <br />NORTH <br />(803.1.4 ACCEPTANCE CRITERIA FOR TEXTILE AND <br />EXPANDED VINYL WALL OR CEILING COVERINGS TESTED TO <br />ASTM E84 OR UL 723.) TEXTILE WALL AND CEILING <br />COVERINGS AND EXPANDED VINYL WALL AND CEILING <br />COVERINGS SHALL HAVE A CLASS A FLAME SPREAD INDEX <br />IN ACCORDANCE WITH ASTM E84 OR UL 723 AND BE <br />PROTECTED BY AN AUTOMATIC SPRINKLER SYSTEM <br />INSTALLED IN ACCORDANCE WITH SECTION 903.3.1.1 OR <br />903.3.1.2. TEST SPECIMEN PREPARATION AND MOUNTING <br />SHALL BE IN ACCORDANCE WITH ASTM E2404. <br />FINISH GENERAL NOTES: <br />1. REFER TO FINISH SCHEDULE FOR FLOOR COVERING AND <br />FINISH CODES AND SPECIFICATIONS <br />2. FLOOR FINISHES ARE SHOWN FOR FIELD RUN AND <br />PATTERN ONLY. REFER TO COLOR AND FINISH SCHEDULES <br />FOR MATERIAL SPECIFICATIONS. <br />3. ALL PAINTED AND WALL COVERING SURFACES SHALL BE <br />PRIMED AND RECEIVE ONE FINISH COAT. SEE PAINT <br />MANUFACTURER'S SPECIFICATION SHEETS FOR <br />RECOMMENDED PRIMERS COMPATIBLE WITH EACH <br />SPECIFIED FINISH SYSTEM. <br />4. PAINT ALL SURFACES FLOOR TO CEILING. <br />5. ALL METAL SURFACES TO BE PAINTED WITH LOW GLOSS <br />OIL BASE PRIMER AND OIL BASE FINISH COATS IN COLORS <br />INDICATED IN FINISHES TABLE. <br />6. PAINT ON ALL GYP. BD. SURFACES TO BE APPLIED WITH A <br />HEAVY KNAP ROLLER. <br />7. GROUT TO BE SEALED PER MANUFACTURER'S <br />RECOMMENDATIONS. CLEAN SEALER OFF THE ADJACENT <br />FLOOR SURFACES. <br />8. ENSURE PROPER ENVIRONMENTAL CONDITIONS ARE MET <br />FOR THE IN INSTALLATION OF ALL INTERIOR FINISHES. <br />9. CONTROL JOINTS ARE USED WHERE COLUMN GRID RUNS <br />THROUGH TILE AREAS. START AND ALIGN TILE WHERE <br />CONTROL JOINTS OCCUR U.N.O. FLOOR FINISHES TO <br />CONTINUE UNDER GYP. BD. GYP. BD. TO BE HELD UP FROM <br />FLOOR SLAB 5/8". IF GYP. BOD. DOES NOT ALLOW FINISH <br />UNDERNEATH, HOLD FLOOR FINISH AS TIGHT AS POSSIBLE <br />TO GYP. BD. <br />10. TRANSITION STRIPS TO BE MITERED AT INTERSECTIONS. <br />11. FLOOR FINISHES ARE TO BE SLIP RESISTANT. <br />12. GC TO INSPECT CONDITION OF FLOOR SLAB AND PATCH <br />OR REPAIR SURFACE IMPERFECTIONS. IF FLOOR LEVELING <br />IS REQUIRED, ARDEX MUST BE USED AND IT MUST BE <br />INSTALLED BY AN ARDEX CERTIFIED INSTALLER. <br />13. GC TO TEST CONCRETE SLAB FOR MOISTURE CONTENT <br />PRIOR TO INSTALLATION OF ALL FLOOR FINISHES. <br />14. GC TO USE MOISTURE BARRIER PRODUCTS <br />RECOMMENDED BY FLOORING MANUFACTURERS OR <br />QUALIFIED APPROVED BY FLOORING MANUFACTURER. <br />/ram 15. REFER TO RENDERINGS PROVIDED BY ARCHITECT FOR <br />1 CLARIFICATION ON PAINT COLOR PLACEMENT. <br />client <br />PLANTS OF RUSKIN LLC <br />JOHN TIPTON <br />PO BOX 126 <br />RUSKIN , FL 33575 <br />john.tipton@altmed.com <br />electrical engineer <br />JEWITT ENGINEERING INC. <br />623 BAYSIDE DR. <br />FORT MEYERS, FL 33919 <br />239-432 1550 <br />jjewltt@comcast.net <br />mechanical / plumbing engineer <br />KEVATRON ENGINEERING, INC. <br />2324 CORAL POINT DRIVE <br />CAPE CORAL, FL <br />KEVIN ADAMS <br />kevatron60@gmail.com <br />239-242-7367 <br />drawing releases <br />02 15 APR, 2022 ISSUED FOR PERMIT [' t <br />01 13 APR, 2022 ISSUED FOR CLIENT REVIEW <br />b: <br />issue dale issued for <br />architect <br />►` <br />tj�q� t <br />collective office a <br />ARCHITECTURE <br />t ' <br />INTERIORS <br />�; tl <br />DESIGN STRATEGY <br />' <br />1 <br />9 east 24th st., chicago, illinois 60616 <br />1-312-818-2006 1 www.collectiveoffice.com <br />' * <br />�' <br />i 11 <br />I hereby certify that these plans were prepared under my direction <br />and to the the best of my knowledge conform to the State and Local <br />tLLti <br />M <br />Building Codes and Ordinances. <br />Lw <br />F 0Rt <br />l.i <br />WOMSON •_ •co <br />•. <br />• ARo 91 <br />t. <br />�� <br />�� IZ <br />1' <br />Project <br />MUV - ZEPHYRHILLS, FL <br />4 <br />Location 5230 6TH ST <br />ZEPHYR HILLS, FL <br />, <br />i`i'i <br />Drawing Title <br />rr': <br />FINISH PLAN <br />Drawing No. <br />Al06 <br />I <br />Issued For Job No. <br />.i <br />22013.0 <br />Date;, <br />Permit 04-15-2022 <br />