Laserfiche WebLink
Jurisdiction Stamp <br />E <br />ar <br />0 <br />0 <br />Z <br />N <br />U <br />C <br />c <br />m <br />CL <br />N <br />m <br />m <br />Y <br />0 <br />0 <br />m <br />t <br />m <br />E <br />v <br />0 <br />d <br />0 <br />a <br />a <br />d o c <br />O r <br />U L j <br />2 q n <br />U <br />� � m <br />Y <br />U � � <br />o Q `o <br />c 01 m <br />C U C <br />0 -, 0 <br />o CL <br />In <br />C Qo <br />m ` <br />0 0 .o <br />E <br />« a L <br />N c_ U <br />C •'J N <br />� � O <br />-0 - <br />a) 0 0 <br />at c .c <br />a = E <br />x �a <br />la r- <br />c 0 <br />U 0 <br />0 c c <br />o � - <br />3 0 0 <br />o N <br />v, w <br />0 c <br />o <br />O rn <br />c m <br />of <br />u N <br />m M <br />CL in <br />E y <br />Y w c <br />0 <br />O 09 c <br />E a E <br />c 0 <br />c <br />y N o <br />m � <br />O U <br />O = <br />Cn <br />0 a <br />m ccc <br />o <br />Z O <br />U 3 <br />C0 <br />O d v <br />0 <br />2 <br />a :Q <br />0 $ m <br />Q' L <br />n0 <br />0 C <br />c 3� <br />0 $ U <br />m b <br />(D v, o <br />� inU <br />� m <br />N n <br />_m E y <br />n °U= <br />v E <br />cQ <br />0 @ <br />� @� <br />O <br />U <br />d U C <br />3 m c <br />�0 <br />L a) O <br />c <br />'c c m <br />0 09 d <br />E o 0 <br />pC - <br />U � y <br />c m <br />m 3 � <br />Z o o <br />_C_ <br />_ 3 <br />y� <br />y C Y <br />.0 = 9n <br />0 <br />C UQ <br />U <br />L � <br />m � <br />c = <br />.m co w <br />mL <br />L N <br />N � O <br />C> 0 n <br />EL a) <br />a� 55 <br />O Z y <br />U <br />y Q o <br />0 <br />U O o <br />= Z <br />� Q c <br />a <br />F- <br />O ai <br />0 � <br />LIFE SAFETY NOTES: <br />SUMMARY ANALYSIS OF 2020 FLORIDA BUILDING CODE: <br />EXISTING OCCUPANCY CLASSIFICATION: <br />MERCANTILE GROUP M <br />PROPOSED OCCUPANCY CLASSIFICATION: <br />MERCANTILE GROUP M <br />TENANT AREA: <br />7,046 SF <br />TOTAL OCCUPANT LOAD: <br />81 OCCUPANTS (FBC TABLE 1004.5) <br />EGRESS WIDTH REQUIRED: <br />0.2" PER OCCUPANT (X81 PEOPLE) <br />(UN-SPRINKLERED BUILDING) <br />16.2" TOTAL <br />EGRESS WIDTH PROVIDED: <br />(2) EXIT AT 34" CLEAR <br />68" TOTAL EGRESS WIDTH PROVIDED" <br />"NO LOCK OR SPECIAL KNOWLEDGE SHALL BE REQUIRED TO OPEN ANY EGRESS DOOR FROM THE EGRESS SIDE." <br />MAX. ALLOWABLE TRAVEL DISTANCE: <br />200'-0" (M-OCCUPANCY, UNSPRINKLERED BUILDING) <br />MAX. COMMON PATH OF TRAVEL: <br />751-011 <br />ACTUAL MAX. TRAVEL DISTANCE: <br />701-411 <br />TYPE OF CONSTRUCTION: <br />CONSTRUCTION TYPE: <br />III-B (UN-SPRINKLERED) <br />MAX AREA M OCCUPANCY: <br />1 STORY / 9,000 SF PER STORY <br />FIRE RESISTANCE RATING REQUIREMENTS FOR <br />BUILDING ELEMENT (FBC TABLE 601) <br />PRIMARY STRUCTURAL FRAME <br />0 <br />INTERIOR BEARING WALLS <br />0 <br />EXTERIOR BEARING WALLS <br />0 <br />INTERIOR NON -BEARING WALLS <br />0 <br />EXTERIOR NON -BEARING WALLS <br />0 <br />FLOOR CONSTRUCTION <br />0 <br />ROOF CONSTRUCTION <br />0 <br />FINISHES <br />ALL INTERIOR FINISHES TO COMPLY WITH FFPC 101 7TH EDITION 10.2.2. AND CHAPTER 10 FOR MERCANTILE OCCUPANCY <br />PROJECT AREAS: <br />- GROSS TENANT AREA: 7,046 SF <br />- AREA OF WORK: <br />-1ST FLOOR: 3,917 SF <br />-2ND FLOOR: 630 SF <br />- TOTAL PROJECT AREA: 4,547 SF <br />NOTES: <br />1. FROM TABLE 1017.2, SPACES WITH MULTIPLE EXITS IN "MI' <br />MERCANTILE UN -SPRINKLED HAVE MAXIMUM OF 200'-0" TRAVEL <br />DISTANCE. <br />KEYED LIFE SAFETY NOTES: <br />J FEC - POTTER ROEMER 7000 SERIES RECESSED ALTA FIRE EXTINGUISHER CABINET. <br />O FE - BRACKET MOUNTED FIRE EXTINGUISHER <br />O TACTILE EXIT SIGN TO COMPLY WITH SEC 1013.4. <br />EXIT WIDTH: <br />34" > OCCUPANT LOAD (81) X 0.2" <br />34" > 16.2" <br />LIFE SAFETY PLAN: 1st Floor <br />SCALE:1/8" = V-0" <br />- MOST REMOTE POINT FOR <br />"FRONT OF HOUSE" <br />OCCUPANCY. <br />- - - - - - - - <br />- - - - - - - <br />- - - - - - - - - - - - - - - - <br />I <br />I <br />FFI <br />I <br />CL. <br />116 <br />ft <br />� <br />;1,97R <br />119_) <br />del <br />I <br />1 uP <br />&E�79N <br />s <br />r �' <br />�,+�,a:` <br />I m� <br />I <br />101 <br />CORRI <br />r- 9 s ft <br />q <br />I <br />�AVEL <br />DIk <br />µ x,! <br />"d .fir , <br />r w yrF I dF i ✓r <br />70'-4 <br />135s <br />�il1 <br />Ln <br />mA <br />I <br />N <br />I <br />I, <br />I <br />' y <br />FAULT <br />I <br />I <br />10 <br />194 <br />� <br />sNaqt <br />,- <br />IF m. <br />MEC <br />I <br />108 <br />I <br />02 q <br />yN <br />P <br />I <br />I <br />L- - - - - - - - - - - - - - - - <br />- <br />- - <br />- <br />EXIT WIDTH: <br />34" > OCCUPANT LOAD (81) X 0.2" <br />34" > 16.2" <br />I <br />MOST REMOTE POINT FOR <br />"BACK OF HOUSE" <br />OCCUPANCY. <br />EXIT WIDTH: <br />34" > OCCUPANT LOAD (81) X 0.2" <br />34" > 16.2" <br />PROJECT <br />NORTH <br />DRAWING NOTES: <br />7. ALL PLUMBING CLEAN -OUTS SHALL BE INSTALLED WHERE READILY ACCESSIBLE. <br />15. ALL REQUESTS FOR SUBSTITUTIONS OF ITEMS SPECIFIED SHALL BE SUBMITTED <br />1. UNLESS OTHERWISE NOTED OR INDICATED, ALL DIMENSIONS ON THESE <br />CONTRACTOR SHALL COORDINATE ALL CLEAN -OUT LOCATIONS WITH EQUIPMENT, <br />IN WRITING AND WILL BE CONSIDERS ONLY IF BETTER SERVICE FACILITIES, A MORE <br />DOCUMENTS SHALL BE TO FACE OF CURB, FACE OF CONCRETE OR MASONRY, <br />AND CABINETS. SUBMIT A PLAN OF ALL PROPOSED LOCATIONS TO ARCHITECT FOR <br />ADVANTAGEOUS <br />DELIVERY DATE, OR A LOWER PRICE WITH CREDIT TO THE <br />FACE OF FINISH OR CENTERLINE OF GRIDS. <br />APPROVAL PRIOR TO INSTALLATION. <br />OWNER / <br />TENANT WILL BE PROVIDED WITHOUT SACRIFICING QUALITY, APPEARANCE, <br />AND FUNCTION. UNDER NO CIRCUMSTANCES <br />WILLTHE ARCHITECT BE REQUIRED TO <br />2. ALL VERTICAL DIMENSIONS SHOWN ARE FROM FLOOR SLAB, UNLESS OTHERWISE <br />B. ALL MILLWORK SHALL CONFORM TO AWMAC "CUSTOM GRADE" WOODWORKING <br />PROVE THAT <br />A PRODUCT PROPOSED FOR <br />SUBSTITUTION IS OR IS NOT EQUAL <br />NOTED. <br />STANDARDS UNLESS OTHERWISE NOTED. <br />QUALITY <br />TO THE PRODUCT SPECIFIED. <br />3. DIMENSIONS SHOWN IN FIGURES TAKE PRECEDENCE OVER DIMENSIONS SCALED <br />9. FIELD MEASURE AS REQUIRED FOR ALL MILLWORK CONDITIONS PRIOR TO <br />16. PROJECT SPECIFICATIONS ARE AN INTEGRAL PART OF THESE PLANS -- <br />FROM DRAWINGS. LARGE SCALE DRAWINGS AND DETAILS TAKE PRECEDENCE OVER <br />FABRICATION. <br />SUBSTITUTIONS FOR SPECIFIED MATERIALS <br />REQUIRE THE WRITTEN APPROVAL FROM <br />SMALLER SCALE DRAWINGS. <br />THE ARCHITECT. <br />10. PROVIDE AND INSTALLALL NECESSARY WALL BACKING, STIFFENERS, BRACING, <br />4. THE TERM "ALIGN", AS USED IN THESE DOCUMENTS, SHALL MEAN TO ACCURATELY <br />BACK-UP PLATES AND / OR SUPPORTING BRACKETS AS REQUIRED FOR THE <br />17. UNLESS OTHERWISE NOTES IN THE CONTRACT DOCUMENTS. THE CONTRACTOR <br />LOCATE FINISHES IN THE SAME PLANE. <br />INSTALLATION OF WALL -MOUNTED OR SUSPENDED EQUIPMENT OR BUILT-IN ITEMS. <br />SHALL SUBMIT THREE (3) SETS OF SHOP DRAWINGS. <br />SHOP DRAWINGS SHOULD <br />VERIFY REQUIREMENTS WITH MANUFACTURERS PRIOR TO INSTALLATION. SUPPLY <br />INCLUDE <br />DETAILED, FABRICATION AND ERECTION DRAWINGS, SETTING DRAWINGS, <br />5. "TYPICAL" AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITION IS <br />CATALOG CUT SHEETS FOR ARCHITECT'S APPROVAL. <br />DIAGRAMMATIC DRAWINGS, AND MATERIAL SCHEDULES. LOCATION AND ORIENTATION <br />THE SAME OR REPRESENTATIVE FOR ALL SIMILAR CONDITIONS THROUGHOUT, <br />OF ALL ITEMS <br />SHOULD BE CLEARLY INDICATED. BEGIN FABRICATION OF SHOP ITEMS <br />UNLESS NOTED OTHERWISE. <br />11. PROVIDE AND INSTALLALL NECESSARY ELECTRICAL CONNECTIONS AND <br />AFTER RECEIVING ARCHITECT'S OR DESIGNER'S <br />APPROVAL OF SHOP DRAWINGS. <br />PLUMBING SUPPLY, FITTINGS & CONNECTORS TO COMPLETE INSTALLATION OF <br />6. DETAILS ARE USUALLY KEYED AND NOTED "TYPICAL" ONLY ONCE, WHEN THEY <br />APPLIANCES & EQUIPMENT INDICATED ON PLAN. VERIFY REQUIREMENTS WITH <br />18. THE ARCHITECT'S <br />REVIEW OF SHOP DRAWINGS SHALL NOT RELIEVE THE <br />FIRST OCCUR AND ARE REPRESENTATIVE OF ALL SIMILAR CONDITIONS <br />MANUFACTURERS PRIOR TO INSTALLATION. SUPPLY CATALOG CUT SHEETS FOR <br />GENERAL <br />CONTRACTOR OR SUBCONTRACTOR FROM RESPONSIBILITY FOR <br />THROUGHOUT, UNLESS NOTED OTHERWISE. <br />ARCHITECT'S APPROVAL. <br />DEVIATIONS FROM THE DRAWINGS OR SPECIFICATIONS UNLESS THEY HAVE, IN <br />WRITING, <br />AND BROUGHT TO THE ATTENTION OF THE ARCHITECT SUCH DEVIATIONS <br />INTERIOR / EXTERIOR NOTES: <br />12. CONTRACTOR TO VERIFY LOCATION OF ALL THERMOSTATS WITH ARCHITECT AND <br />AT THE TIME <br />OF THE SUBMISSION, NOR SHALL <br />IT RELIEVE THEM (GENERAL <br />1. WHERE ELECTRICAL, MECHANICAL, AND/ OR PLUMBING ITEMS, SUCH AS LIGHTS, <br />OR MECHANICAL ENGINEER PRIOR TO INSTALLATION. <br />CONTRACTOR) FROM RESPONSIBILITY FOR ERRORS OF ANY SORT IN THE SHOP <br />DUCTS, PIPING, DOWNSPOUTS, ETC. ARE TO PENETRATE ANY BUILDING FOOTINGS, <br />DRAWINGS. <br />SLABS, FLOORS, STRUCTURAL FRAMING, WALL PARTITIONS, CEILINGS, ETC., IT IS <br />13. PREPARE ALL FLOOR SURFACES AS REQUIRED TO RECEIVED FINISHES AS NOTED <br />REQUIRED THAT AN APPROPRIATELY SIZED OPENING OR CLEARANCE BE FURNISHED. <br />ON FINISH PLAN, ENLARGED FINISH PLANS & FINISH LEGEND. <br />CONTRACTOR SHALL COORDINATE THE INSTALLATION OF STRUCTURAL, <br />ABBREVIATIONS: <br />AFF Above finish floor <br />MECHANICAL, PLUMBING AND ELECTRICAL WORK. ANY CONFLICT OR DISCREPANCY <br />14. UNLESS OTHERWISE NOTED, ALL GYPSUM BOARD SURFACES, WALLS, AND <br />ACOUST <br />Acoustical <br />WITHIN CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE ARCHITECT'S <br />CEILINGS SHALL BE TAPED, SANDED SMOOTH TO A "LEVEL 4" FINISH, SO AS TO <br />ACT <br />Acoustical tile <br />ATTENTION FOR CLARIFICATION. <br />RECEIVE PAINT OR WALL COVERING MATERIAL. <br />ADJ <br />Adjustable <br />A/C <br />Air conditioning <br />2. CONTRACTOR, ALONG WITH MECHANICAL CONTRACTOR, SHALL PROVIDE AND <br />15. PROVIDE SOUND INSULATION AT PERIMETER WALLS OF RESTROOMS, STAIRS, AND <br />ALT <br />ALUM <br />Alternate <br />Aluminum <br />LOCATE ACCESS DOORS/PANELS IN WALL & CEILING CONSTRUCTION AS REQUIRED <br />ACROSS CEILING OF RESTROOMS TO CREATE AN ACOUSTIC ENVELOPE, UNLESS <br />AB <br />Anchor bolt <br />TO PROVIDE ACCESS TO MECHANICAL, PLUMBING & ELECTRICAL WORK. <br />NOTED OTHERWISE. <br />ARCH <br />Architect(ural) <br />CONTRACTOR SHALL SUBMIT A PLAN OFF ALL PROPOSED ACCESS PANEL <br />AD <br />BSMT <br />Area drain <br />Basement <br />LOCATIONS TO ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION. <br />CEILING NOTES: <br />BM <br />Beam <br />1. FIELD VERIFY ALL CLEARANCES OF DUCTS, PIPES. ETC., AND NOTIFY ARCHITECT <br />B.M. <br />Bench mark <br />3. ALL PENETRATIONS AT RATED CONSTRUCTION SHALL BE PROTECTED TO MAINTAIN <br />OF ANY CONFLICTS PRIOR TO INSTALLATION OF LIGHTS, ETC. <br />BTWN <br />Between <br />RATING IN ACCORDANCE WITH SECTION 714 OF FBCB. <br />BIT <br />BLK <br />Bituminous <br />Block <br />2. PLACEMENT OF LIGHT FIXTURES IN AREAS WHERE MAIN DUCTS MAY CAUSE <br />BLKNG <br />Blocking <br />4. WHERE OCCURS, CONTRACTOR SHALL PATCH ANY EXISTING WALLS AND/OR <br />INTERFERENCE MUST BE APPROVED BY ARCHITECT PRIOR TO INSTALLATION. <br />BD <br />Board <br />CEILING AS NEEDED TO REFURBISH THE SPACE AND REPAIR ALL DAMAGES CAUSED <br />BOT <br />Bottom <br />BY CONTRACTOR. <br />POWER & DATA NOTES: <br />B/ <br />B <br />Bottom of <br />Building <br />1. COORDINATE TELEPHONE/ DATA INSTALLATION WITH APPROPRIATE SUB- <br />BUURR <br />Built-up roofing <br />5. INTERIOR WALLS AND CEILINGS SHALL BE INSTALLED IN ACCORDANCE TO STATE <br />CONTRACTOR. <br />CAB <br />Cabinet <br />AND MUNICIPAL CODES, INCLUDING REQUIREMENTS FOR FLAME SPREAD AND <br />CPT <br />Carpet <br />SMOKE DENSITY RATINGS FOR FINISH MATERIALS. <br />2. ALL OUTLETS TO BE INSTALLED AT LOCATIONS SHOWN BY DIMENSIONS ON THE <br />Cl <br />CB <br />Cast iron <br />Catch basin <br />ELECTRICAL PLAN. DIMENSION ALL OUTLETS FROM THE CENTERLINE OF THE OUTLET <br />CLG <br />Ceiling <br />6. WHEN USED, ALL NOISE BARRIER BATTS (SOUND INSULATION) AND INSULATION <br />BOX. NON -DIMENSIONED OUTLETS ARE TO LOCATED AT THE NEAREST WALL STUD. <br />CT <br />Ceramic tile <br />BATTS SHALL BE NON-COMBUSTIBLE AND SHALL NOT CONTAIN OR UTILIZE OZONE <br />CIRC <br />Circumference <br />GRAPHIC SYMBOLS <br />DEPLETING COMPOUNDS. <br />2. ALL NEW WALL MOUNTED 15, 20, AND 30 AMP RECEPTACLES OUTLETS TO BE <br />COL <br />Column <br />CENTERED AT +12" A.F.F. HORIZONTAL, U.N.O., ALL LOCATIONS TO BE VERIFIED BY <br />C <br />CMU <br />Concrete <br />Concrete masonry unit <br />O EXISTING GRID LINE <br />7. ALL NEW CONSTRUCTION MATERIALS SHALL BE 100%ASBESTOS-FREE. <br />ARCHITECT AND CLIENT BEFORE INSTALLATION <br />CONST <br />Construction <br />CONT <br />Continuous or continue <br />8. THE CONTRACTOR AT HIS OWN EXPENSE, SHALL KEEP THE PROJECT AND <br />3. WHEN OUTLETS ARE GROUPED TOGETHER (2 OR MORE), THEY ARE TO BE SPACED <br />CO <br />CONTR <br />Carbon monoxide <br />Contractor <br />Oi NEW GRID LINE <br />SURROUNDING AREA FREE FROM DUST AND DEBRIS. THE WORK SHALL BE IN <br />NO MORE THAN 2" APART. <br />COOOD <br />Coordinate <br />CONFORMANCE WITH THE AIR AND WATER POLLUTION CONTROL STANDARDS AND <br />CJ <br />Control joint <br />REGULATIONS OF THE STATE/MUNICIPAL DEPARTMENT OF HEALTH. <br />4. ALL NEW LIGHT SWITCHES TO BE CENTERED AT +36" A.F.F., U.N.O., ALL LOCATIONS <br />CS <br />Countersink <br />A.1 WALL TAG <br />TO BE VERIFIED BY ARCHITECT AND CLIENT BEFORE INSTALLATION <br />CSL <br />Clear sealer <br />DTL <br />9. CONSTRUCTION DEBRIS AND WASTES SHALL BE DEPOSITED AT AN APPROPRIATE <br />DAM <br />D atmeter <br />S.1 SCREEN TYPE <br />SITE. THE CONTRACTOR SHALL INFORM THE OWNER REPRESENTATIVE OF THE <br />5. WHEN LIGHT SWITCHES ARE GROUPED TOGETHER, GANG LIGHT SWITCHES <br />DIM <br />Dimension <br />LOCATION OF DISPOSAL SITES. <br />TOGETHER TO A MAXIUM OF 3 SWITCHES IN ONE GANG. MORE THAN 3 SWITCHES AT <br />DR <br />Door <br />ANY ONE LOCATION TO BE APPROVED BY ARCHITECT. <br />hung <br />F 1 FINISH TYPE <br />10. CONTRACTORS SHALL BE RESPONSIBLE FOR THE GENERAL CLEANING OF THE <br />DH <br />DS <br />Down <br />Downspout <br />JOB AFTER PROJECT COMPLETION. WHERE APPLICABLE, CLEANING SHALL INCLUDE, <br />6. WHERE ELECTRICAL WORK IS SPECIFIED IN CONJUNCTION WITH CABINETWORK, <br />DWG <br />Drawing <br />BUT NOT BE LIMITED TO, THE EXTERIOR AND THE INTERIOR OF THE BUILDING, THE <br />LAMPS AND FIXTURES ARE TO BE PROVIDED BY THE GENERAL CONTRACTOR. <br />DF <br />Drinking fountain <br />BUILDING SECTION <br />PATH OF TRAVEL TO THE JOB SITE, PARKING LOTS, ELEVATORS, LOBBIES, AND <br />E <br />ELEC <br />East <br />Electrical) <br />CORRIDOR CARPETS. <br />7. CUT-OUTS FOR SWITCHES, OUTLETS, ETC, AS REQUIRED BY THE CABINET <br />EWC <br />Electric water cooler <br />CONTRACTOR ARE TO BE COORDINATED WITH THE ELECTRICAL CONTRACTOR, <br />EL <br />Elevation <br />WALL SECTION <br />11. THE CONTRACTOR SHALL PROVIDE PEDESTRIAN PROTECTION, WHERE REQUIRED <br />U.N.O. ALL RECEPTACLES WHERE MILLWORK OCCURS SHALL BE LOCATED PER <br />ELEV <br />Elevator <br />PER STATE AND LOCAL CODES. <br />ELEVATIONS OF THE MILLWORK ITEM IN QUESTION. <br />EMER <br />EQ <br />Emergency <br />Equal <br />EXTERIOR ELEVATION <br />EXH <br />Exhaust <br />12. NO HAZARDOUS MATERIALS SHALL BE USED OR STORED WITHIN THE BUILDING <br />8. ALL WALL COVER PLATES SHALL BE WHITE, MATCH TYPICAL WALL CUT-OUTS FOR <br />EXIST <br />Existing <br />WHICH DOES NOT COMPLY WITH THE LOCAL FIRE AUTHORITY AND STATE AND <br />SWITCHES, OUTLETS, ETC. AS REQUIRED BY THE CABINET. <br />EXP <br />Exposed: <br />INTERIOR ELEVATIONS <br />MUNICIPAL REQUIREMENTS. <br />EXPEN <br />EXT <br />Expansion <br />Exterior <br />9. ALL SEPARATE CIRCUIT RECEPTACLES TO BE ORANGE COLOR WITH BUILDING <br />FIN <br />Finished) <br />13. CONTRACTOR SHALL BE RESPONSIBLE FOR BLOCKING OFF SUPPLY AND RETURN <br />STANDARD COLOR COVER PLATE. <br />FACP <br />Fire alarm control panel <br />DETAIL DRAWING TAG <br />AIR GRILLES, DIFFUSERS & DUCTS TO KEEP DUST FROM ENTERING INTO AIR <br />FE <br />Fire extinguisher <br />DISTRIBUTION SYSTEMS. <br />DOOR NOTES: <br />FEC <br />Fire extinguisher cabinet <br />1. ALL DOORS AND DOOR HARDWARE SHALL MEET THE REQUIREMENTS OF ALL <br />FHS <br />FR <br />Fire hose station <br />Fire -rated <br />e DETAIL TAG <br />14. BUILDINGS UNDERGOING CONSTRUCTION, ALTERATION OR DEMOLITION SHALL BE <br />GOVERNING CODES & STANDARDS. ALL HARDWARE TO BE LEVER TYPE. NOTIFT THE <br />FLR <br />Floor(ing) <br />DONE IN ACCORDANCE WITH STATE AND MUNICIPAL CODES. <br />ARCHITECT IMMEDIATELY IN CASE OF DISCREPANCY. <br />FD <br />Floor drain <br />DETAIL REVERSED <br />e <br />FTNG <br />Footing <br />SCOPE: <br />2. FIELD MEASURE, AS REQUIRED, ALL DOORS PRIOR TO FABRICATION. <br />F <br />FUURR <br />Foundation <br />Furred (ing) <br />1. ALL WORK AND MATERIALS DESCRIBED HEREIN ARE THE RESPONSIBILITY OF THE <br />FWC <br />Fabric wall covering <br />e DETAIL SIMILAR <br />OWNER. THE TERMS "GENERAL CONTRACTOR", "CONTRACTOR", OR <br />3. LATCHING AND LOCKING DOORS THAT ARE HAND OPERATED SHALL BE OPERABLE <br />GA <br />Gage. Gauge <br />"SUBCONTRACTOR" REFER TO THOSE ENGAGED BY THE OWNER TO PERFORM THE <br />WITH A SINGLE EFFORT WITHOUT REQUIRING THE ABILITY TO GRASP THE HARDWARE <br />GALV <br />GC <br />Galvanized <br />General contract(or) <br />oh s' <br />WORK FOR THE OWNER. THE OWNER IS NOT RELIEVED FROM THE RESPONSIBILITY <br />(LEVER OR PUSH TYPE). VERIFY CONDITION AT EXISTING DOORS. <br />GJ <br />Grout Joint <br />ELEVATION MARKER <br />FOR THE PERFORMANCE OF SUCH CONTRACTORS. <br />GL <br />Glass. Glazing <br />4. MAXIMUM EFFORT TO OPERATE DOORS SHALL NOT EXCEED THE REQUIREMENTS <br />GWB <br />Gypsum wall board <br />se.zs' <br />2. ALL RULES AND REGULATIONS, SCOPE OF WORK AND PROCEDURES INDICATED <br />OF THE STATE AND LOCAL BUILDING CODES. <br />HB <br />H <br />Herringbone pattern <br />Hardwood <br />ELEVATION DATUM <br />WILL BE PREFORMED BY THE GENERAL CONTRACTOR, THEIR AGENTS, <br />HTG <br />Heating <br />SUBCONTRACTORS, AND SUPPLIERS TO PROVIDE A TOTAL AND COMPLETE <br />5. RATED DOORS SHALL COMPLY WITH REQUIREMENTS OF ALL GOVERNING CODES & <br />HVAC <br />Heating, venting, air cond. <br />ROOM NAME <br />PROJECT FOR THE OWNER. WORK SHOWN IN THESE NOTES IS TO BE PERFORMED BY <br />STANDARDS. <br />HT <br />Height <br />THE GENERAL CONTRACTOR OR SUBCONTRACTORS, AGENT AND, OR SUPPLIERS <br />HM <br />HP <br />Hollow metal <br />High point <br />ONLY, WHETHER OR NOT THE WORK IS DELINEATED PROPERLY. <br />6. ALL HARDWARE TO BE LEVER -TYPE PER LOCAL AND STATE CODES AND <br />CEILING <br />12,�„ INTERIOR CEILING HEIGHT <br />STANDARDS. <br />HRR <br />Horizontal <br />3. THE WORK CONTAINED IN THESE CONTRACT DOCUMENTS AND, OR <br />ID <br />Inside diameter <br />�5 <br />SPECIFICATIONS IS TO BE PERFORMED BY THE GENERAL CONTRACTOR AND, OR ITS <br />7. OPENING HARDWARE IS TO BE CENTERED BETWEEN 34" AND 38" ABOVE FINISH <br />IN <br />INSUL <br />Inch <br />+� EXISTING ELEVATION <br />SUBCONTRACTORS WHETHER OR NOT SPECIFICALLY NOTED OTHERWISE. <br />FLOOR IN ACCORDANCE WITH SECTION 1010.1.9.2 OF FBCB AND SECTION 404.2.7 OF <br />INT <br />Interior <br />interior <br />FBCA AS APPLICABLE. <br />INV <br />Invert <br />1o3.2s <br />4. FOR CLARIFICATION PURPOSES, TENANT, CLIENT AND OWNER ARE THE SAME <br />JT <br />Joint <br />+ NEW ELEVATION <br />PARTY, LANDLORD IS THE PARTY LEASING THE SPACE TO THE TENANT, AND THE <br />8. SPECIAL LOCKING DEVICES SHALL BE OF AN APPROVED TYPE. <br />LAM <br />LLP <br />Laminate(d) <br />Length. Long <br />GENERAL CONTRACTOR, WHETHER WORKING FOR THE LANDLORD OR THE TENANT, <br />Low point <br />FIN. FL. FINISH FLOOR HEIGHT <br />WILL BE REQUIRED TO HANDLE ALL WORK IN THESE DOCUMENTS UNLESS <br />9. PROVIDE WEATHER SEALS ON ALL EXTERIOR DOORS PER ANSI STANDARDS. <br />LT <br />Light <br />10375' <br />SPECIFICALLY NOTED OTHERWISE. <br />MDF <br />Medium density fiberboard <br />10. CONTRACTORS IS RESPONSIBLE TO COORDINATE & VERIFY ALL DOOR FRAME <br />MH <br />MFR <br />Manhole <br />Manufacter(ure) <br />D1 DOOR <br />5. THE GENERAL CONTRACTOR IS REQUIRED TO HAVE ALL SUBCONTRACTORS <br />THROAT THICKNESS' FOR EACH LOCATION. <br />MAS <br />Masonry <br />LABEL <br />REVIEW THESE NOTE PRIOR TO BIDDING AND TO FAMILIARIZE ALL PERSONS AND <br />MO <br />Masonry opening <br />SUBCONTRACTORS WORKING ON THIS PROJECT WITH THESE GENERAL NOTES AND <br />11. ALL DOOR FRAMES TO BE FACTORY FINISHED. <br />MATL <br />Materia (s) <br />F 101 <br />THE CONTRACT DOCUMENTS NOTED, LANDLORD'S DESIGN CRITERIA AND THE <br />MAX <br />MECH <br />Maximum <br />Mechanical <br />ROOM NUMBER <br />EXECUTED LEASE AGREEMENT BETWEEN LANDLORD AND TENANT. ANY <br />12. ALL DOOR STOPS TO HAVE 2x6 BACKING IN THE WALL BEHIND. <br />MTL <br />Metal <br />DISCREPANCY BETWEEN THESE CONTRACT DOCUMENTS AND THE LEASE OR DESIGN <br />MIN <br />Minimum <br />99 <br />CRITERIA INFORMATION US TO BE REPORTED TO TENANT'S ARCHITECT PRIOR TO <br />13. MAXIMUM UNDERCUT OF ALL DOORS NOT IN A RATED CORRIDOR SHALL NOT <br />MISC <br />Miscellaneous <br />REVISION NUMBER <br />THE START OF ANY WORK. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR <br />EXCEED 1/4" ABOVE FINISH FLOOR SURFACE OR THRESHOLD. <br />MULL <br />NA <br />Mullion <br />Not applicable <br />FULLY ACQUAINTING THEMSELVES WITH THE CONTENT AND SCOPE OF THESE <br />NRC <br />National Research Council <br />SPECIFICATIONS, AND SPECIAL ATTENTION SHOULD BE GIVEN TO THE <br />14. CONTRACTOR SHALL REFINISH ANY BLEMISHED DOOR OR REPLACE SAID DOOR IF <br />NOM <br />Nominal <br />REVISION CLOUD <br />SPECIFICATIONS THROUGHOUT THE SPAN OF THE PROJECT BY THIS GENERAL <br />NOT TO REFINISH TO " AS NEW" CONDITION. <br />N <br />North <br />CONTRACTOR, SUPERVISORS AND SUBCONTRACTORS, AS THE STANDARD <br />NIC <br />NTS <br />Not In contract <br />Not to scale <br />ESTABLISHED HEREIN SHALL BE APPLIED, WITH EMPHASIS TO ALL WORK. CHECK <br />FINISH NOTES: <br />OC <br />On center(s) <br />WORK POINT <br />"RESPONSIBILITY SCHEDULE" FOR ALLOCATION OF WORK SPECIFIED. ALL WORK IS <br />1. NO FINISH SUBSTITUTIONS MAY BE MADE UNLESS APPROVED BY ARCHITECT. <br />OPNG <br />Opening <br />BY THE OWNER UNLESS NOTED. WORK DECLARED UNACCEPTABLE BY THE TENANT <br />OPP <br />Opposite <br />DEMOLITION <br />AND OWNER SHALL BE CORRECTED IN A MANNER AND TO A DEGREE OF QUALITY AS <br />2. APPLICATION OF CONTROLLED INTERIOR FINISHES SHALL BE IN CONFORMANCE <br />OD <br />OH <br />Outside diameter <br />Overhead <br />- - - <br />ACCEPTABLE BY THE TENANT AND OWNER. <br />WITH STATE AND LOCAL CODES. <br />CHID <br />Overhead door <br />PNT <br />Painted) <br />EXISTING TO REMAIN <br />6. THE GENERAL CONTRACTOR AND ALL SUBCONTRACTORS ARE REQUIRED TO <br />3. DECORATIVE MATERIALS SHALL BE MAINTAINED IN A FLAME-RETARDANT <br />PART BD <br />Partical board <br />CHECK AND VERIFY ALL DIMENSIONS AND FIELD CONDITIONS AT BUILDING SITE AND <br />CONDITION. <br />PLSTR <br />PLUM <br />Plaster <br />Plastic laminate <br />PREMISES AND NOTIFY IN WRITING IMMEDIATELY TO THE OWNER, THE OWNER'S <br />PLUMB <br />Plumbing <br />FLUORESCENT FIXTURE <br />ARCHITECT AND THE OWNER'S CONSTRUCTION REPRESENTATIVE ANY AND ALL <br />4. SUBMIT THE FOLLOWING SAMPLES FOR ARCHITECT'S APPROVAL: <br />PWD <br />Plywood <br />DISCREPANCIES AND LIST ANY WORK NOT YET COMPLETED PRIOR TO STARTING <br />PT <br />Point <br />WORK. ANY WORK REQUIRED, DUE TO FAILURE OF THE BIDDING CONTRACTOR TO <br />A. THREE (3) 12"xl2" SAMPLES FOR ALL PAINT, VINYL AND FABRIC FINISHES AND <br />PVC <br />PFIN <br />Polyvinyl chloride <br />�{ <br />REPORT DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE DRAWING AND <br />COLORS APPLIED TO A SUBSTRATE WHICH IS REPRESENTATIVE OF THE SURFACE TO <br />QT <br />Quarry rile <br />QuarPrefry <br />DOWN LIGHT <br />SPECIFICATIONS PROVIDED BY THE OWNER, SHALL BE PERFORMED AND PAID FOR <br />BE FINISHED. SUBMIT PAINT SAMPLES FROM THE PAINT LOT OR LOTS INTENDED FOR <br />RAD <br />Radius <br />BY THE GENERAL CONTRACTOR THAT IS AWARDED THIS PROJECT. <br />APPLICATION. <br />RB <br />Running bond <br />-� <br />REC <br />Recommended <br />STRIP LIGHTING <br />FINISHES: <br />B. ONE (1) 24"x24" MOCK-UP WITH SAMPLE SEAM (CENTERED) OF ALL FABRIC AND <br />REFRIG <br />REF <br />Refrigerator <br />Refinish <br />11 <br />1. FLOOR PREP: INSTALL MIN 5/16" DUROCK UNDERLAYMENT ON TOP OF WOOD <br />VINYL FINISHES AND COLOR. <br />REQ'D <br />Required <br />EMERGENCY CIRCUIT <br />SUBSTRATE IN BATHROOMS, DUROCK TO BE GLUED AND SCREWED; INSTALL NEW <br />RA <br />Return air <br />PLYWOOD OR DUROCK IN KITCHEN TO PROVIDE EVEN SURFACE FOR NEW TILE <br />C. THREE (3) 12"xl2" SAMPLES OF ALL FLOOR COVERING. <br />ROW <br />Right of way <br />INSTALLATION. <br />RD <br />Roofrdrain <br />SINGLE POLE SWITCH <br />D. SUBMIT ACTUAL CUTTINGS OF EACH PRODUCT FOR COLOR AND QUALTIY <br />RM <br />Room <br />2. HARDWOOD: PATCH, SAND AND REFINISH EXISTING HARDWOOD FLOORING. MIN. 1 <br />CONTROL. <br />RO <br />Rough opening <br />COAT SEALER AND 2 COATS LOW VOC, NON TOXIC, SATIN FINISH, POLYURETHANE <br />SAB <br />SECT <br />Sound Attenuation Blanket <br />Section <br />SINGLE POLE <br />TYPE FINISH;. <br />5. WHERE MATERIALS ARE NOT RETURNABLE, SUBMIT SAMPLES TO ARCHITECT <br />SHT <br />Sheet <br />SWITCH 3-WAY <br />3 <br />BEFORE PLACING FULL ORDERS. <br />SIM <br />Similar <br />{ <br />3. FLOOR PREP: INSTALL MIN 5/16" DUROCK UNDERLAYMENT ON TOP OF WOOD <br />Sc <br />Solid core <br />(I <br />I) DUPLEX RECEPTACLE <br />SUBSTRATE IN BATHROOMS, DUROCK TO BE GLUED AND SCREWED; INSTALL NEW <br />6. SUBMIT SEAMING PLAN FOR CARPET TO ARCHITECT FOR APPROVAL PRIOR TO <br />STC <br />STN <br />Sound transmission class <br />Stone <br />I <br />t (SWITCHED) <br />PLYWOOD OR DUROCK IN KITCHEN TO PROVIDE EVEN SURFACE FOR NEW TILE <br />CARPET ORDER. <br />S <br />South <br />INSTALLATION. <br />SPRK <br />Sprinkler <br />QUAD RECEPTACLE <br />7. NOTIFY ARCHITECT IMMEDIATELY OF ITEMS WITH LONG LEAD TIMES. <br />SO <br />Square <br />(SWITCHED) <br />4. CERAMIC WALL TILES: INSTALL NEW CERAMIC WALL TILE IN BATHROOM; 7' HIGH IN <br />SQ FT <br />SS IN <br />Square feet <br />Square inch <br />TUB ENCLOSURE. TILE TO BE GROUTED AND SEALED, TILE CAULKED TO TUB WITH <br />8. ALL PAINT FINISH OF METAL PARTS OF DOORS, HANDRAILS, PERIMETER <br />SS <br />Stainless steel <br />SILICONE CAULK, NOT GROUTED, <br />ENCLOSURES, ETC., SHALL BE SEMI -GLOSS, UNLESS OTHERWISE NOTED. <br />STD <br />Standard <br />TELEPHONE CONNECTION <br />Ll <br />STL <br />Steel <br />EQUIPMENT: <br />9. WHERE PAINT COLORS CHANGE, CORNERS ARE TO BE CUT -IN FREE OF <br />STOR <br />STRUCT <br />Storage <br />Structure(al) <br />1. PROVIDE AND INSTALL NEW REFRIGERATOR, STOVE, OTR MICROWAVE AND <br />OVERLAPPING. <br />SYM <br />Symmetry(ical) <br />DATA CONNECTION <br />DISHWASHER FOR EACH UNIT. PROVIDE WASHER AND DRYER FOR OWNERS UNIT. <br />TEL <br />Telephone <br />APPLIANCES TO BE ENERGY STAR RATED. <br />10. PRIOR TO THE INSTALLATION OF WALL COVERINGS, SURFACES SHALL BE <br />TV <br />Television <br />PROPERLY PREPARED WITH SEALER PER MANUFACTURER'S RECOMMENDATIONS. <br />TC <br />Terra cotta <br />THERMOSTAT <br />THK <br />Thick(ness) <br />2. APPLIANCE SPECIFICATION BY OWNER. <br />THE <br />To Match Existing <br />11. THE INTENT OF DRAWINGS AND SPECIFICATIONS IS TO INCLUDE ALL LABOR, <br />T&G <br />Tongue and groove <br />FLOOR PLAN NOTES: <br />MATERIALS, AND SERVICES NECESSARY FOR THE COMPLETION OF ALL WORK <br />T <br />Tread <br />WALL MOUNTED <br />SC <br />1. CONTRACTOR AND ARCHITECT TO REVIEW & APPROVE CHALK LINES OF PARTITION <br />SHOWN, DESCRIBED, OR REASONABLY IMPLIED BUT NOT LIMITED TO THAT <br />TYP <br />Topical <br />LIFE SAFETY <br />LAYOUT PRIOR TO COMMENCEMENT OF PARTITION CONSTRUCTION. <br />EXPLICITLY INDICATED IN THE CONTRACT DOCUMENTS. <br />LINO <br />Unless otherwise noted <br />UL <br />Underwriters Laboratory <br />SC CEILING MOUNTED <br />2. EXTEND ALL STUDS AND WALL MATERIALS TO CONSTRUCTION ABOVE, UNLESS <br />12. INSTALLALL MANUFACTURED ITEMS, MATERIALS, AND EQUIPMENT IN STRICT <br />UR <br />Urinal <br />LIFE SAFETY <br />OTHERWISE INDICATED. <br />ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS, UNLESS NOTED <br />VB <br />VERT <br />Vapor barrier <br />Vertical <br />OTHERWISE. <br />VIF <br />Verify in field <br />EXIT SIGN <br />3. DOOR OPENINGS IN PARTITIONS NOT DIMENSIONED ARE TO BE LOCATED WITHIN 6" <br />V <br />Vinyl <br />OF ADJACENT PERPENDICULAR PARTITION. <br />13. ANY WORK INSTALLED IN CONFLICT WITH THE CONSTRUCTION DRAWINGS, <br />VFB <br />Vinyl base <br />OJ JUNCTION BOX <br />WITHOUT THE PRIOR APPROVAL OF THE OWNER AND THE ARCHITECT <br />VT <br />Vinyl tile <br />4. USE WATER RESISTANT GYPSUM BOARD AT ALL AREAS SUBJECT TO MOISTURE OR <br />SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE. <br />VCR <br />VNR <br />Vinyl composite rile <br />Veneer <br />WHERE TILE IS USED. <br />VWC <br />Vinyl wall covering <br />pp POWER POLE <br />14. THE GENERAL CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY OF ANY <br />W/O <br />Without <br />5. ALL PLUMBING WORK SHALL BE IN ACCORDANCE WITH STATE AND MUNICIPAL <br />SPECIFIED MATERIALS OR EQUIPMENT WHICH ARE EITHER UNAVAILABLE OR THAT <br />WC <br />WD <br />Water closet <br />Wood <br />CODES. <br />WILL CAUSE A DELAY IN THE CONSTRUCTION COMPLETION SCHEDULE. THE <br />WDW <br />Window <br />CONTRACTOR SHALL SUBMIT CONFIRMATIONS OF DELIVERY DATES FOR ORDERS OF <br />WI <br />Wrought iron <br />SPRINKLER <br />6. ALL HOT WATER LINES SHALL BE PROPERLY INSULATED, SEE PLUMBING <br />MATERIALS AND EQUIPMENT HAVING LONG LEAD TIMES. <br />WH <br />Water heater <br />DRAWINGS. <br />WP <br />WP <br />Work point <br />Waterproof(ing) <br />WR <br />Water resistant <br />FD FLOOR DRAIN <br />client <br />PLANTS OF RUSKIN LLC <br />JOHN TIPTON <br />PO BOX 126 <br />RUSKIN, FL 33575 <br />john.tipton@altmed.com <br />electrical engineer <br />JEWITT ENGINEERING INC. <br />623 BAYSIDE DR. <br />FORT MEYERS, FL 33919 <br />239432-1550 <br />jjjewitt@comcast.net <br />mechanical / plumbing engineer <br />KEVATRON ENGINEERING, INC. <br />2324 CORAL POINT DRIVE <br />CAPE CORAL, FL <br />KEVIN ADAMS <br />kevatron60@gmall.com <br />239-242-7367 <br />drawing releases <br />02 15 APR. 2022 ISSUED FOR PERMIT <br />01 13 APR. 2022 ISSUED FOR CLIENT REVIEW <br />issue date Issued for <br />architect <br />collectiveoffice <br />ARCHITECTURE <br />INTERIORS <br />DESIGN STRATEGY <br />9 east 24th st., Chicago, Illinois 60616 <br />1-312-818-2006 1 www.collectiveoffice.com <br />I hereby certify that these plans were prepared under my direction <br />and to the the best of my knowledge conform to the Stale and Local <br />Building Codes and Ordinances. <br />rofFL!? <br />R�Oq <br />��• AR10138y •`(V <br />ERE _ <br />Project <br />MUV - EPHYRHILLS, FL <br />Location 5230 6TH ST <br />ZEPHYR HILLS, FL <br />Drawing Title <br />GENERAL NOTES <br />Drawing No. A00 1 <br />Issued For Job No. <br />22013.0 <br />Date <br />Permit 04-15-2022 <br />