My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
5338 8th St
Zephyrhills
>
Building Department
>
Building Plans
>
5338 8th St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2025 9:46:20 AM
Creation date
2/18/2025 3:21:14 PM
Metadata
Fields
Template:
Building Plans
Street #
5338
Location
8th St
Contractor
Crenshaw Consullting Engineers
Building Plans - Permit #
8669
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jc <br />�J <br />2 <br />E-202 <br />7th Ave <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />•�• <br />w <br />w <br />w <br />w <br />.�• <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />.� <br />w <br />w <br />w <br />w <br />w <br />.► <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w w w w w w w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />.► <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w <br />w w <br />w w w w <br />w w w w w <br />w .�• w w <br />w w w w w <br />.�• w w w w w w .� •� w <br />w w w w <br />w w w w w <br />w w w w <br />w 2 1 w w w w w w <br />E-201 E-202 w w w w w <br />w w w w w .�• w <br />w w w w w <br />w w w w w w w <br />w w w w w <br />w w w w w w <br />w w w w <br />w w w w w w <br />w w w w w w w w w w w <br />w w w w w w w w w w <br />w w W w w w w w <br />w w w w w w w <br />w w w w w w w w <br />w w <br />w w w w w w w w w <br />w w <br />•�• w w w <br />w <br />w w <br />w w <br />w w <br />w w w w <br />w w w <br />w II w w .�• <br />w w w w w w w w <br />w w w <br />II w �• w <br />w w w <br />w w w <br />w w w •�• w w w w <br />w w <br />w <br />w � <br />w <br />w w <br />w w w w <br />w w w w w <br />w w w w w w <br />SITE ,P�LAN <br />SCALE: o. <br />DUKE ENERGY TO DIRECTIONAL <br />BORE TO NEW PROPOSED <br />it <br />LOCATION FOR 500 KVA <br />PADMOUNT <br />W <br />EXISTING DIP POLE <br />0 <br />OP�O�WERLE: 11w_PLAN11 - <br />7th Ave <br />Nil N� % BTC POWER <br />V <br />EVPC 200 2�803 85 <br />200 kW POWER BOXITOWER #2 <br />BTC POWER <br />BTC POWER lj/ EVPC-200-2480-3-65 <br />EVDSP-350-5-120�2-C4-0 200 kW POWER BOXrrOWER #1 <br />DISPENSER #1 WHEEL STOP <br />EV PARKING EV PARKING SPACE <br />SPACE SIGN SIGN (ADA) <br />WHEEL STOP <br />• <br />NEW 500 KVA 480/277V, 3PH <br />TRANSFORMER ON LARGE PRECAST <br />TRANSFORMER PAD. LOCATION <br />IS APPROXIMATE. CONFIRM <br />WITH UTILITY AND OWNER. <br />SIZE BY UTILITY. SEE E101 FOR <br />DETAILS. <br />PANEL A — <br />SAFETY SWITCH <br />BOLLARD • 25KVA 1PH. <br />XFMR <br />BTC POWER • • <br />EVOSP-350-5-120-0-2-C-4-0 <br />DISPENSER #2 <br />9, ___r 4'-G <br />MINIMUM <br />MEASUREMENT <br />ADA COMPLIANT EV <br />CHARGER PARKING <br />SPACE <br />PANEL C <br />PANEL B <br />14/ <br />41 <br />QJ <br />\—�METER ON POST. <br />J/ SEE DETAIL #3 <br />ON E401. <br />CONFIRM <br />LOCATION WITH <br />J UTILITY. <br />14/ q/ <br />14/ <br />INSTALLATION NOTES: <br />1. CHARGING EQUIPMENT SHOWN IN APPROXIMATE LOCATIONS ONLY. <br />FOR EXACT LOCATIONS CONFIRM WITH OWNER AND INSTALLER FOR <br />ALL EQUIPMENT. SEE E101 FOR ADDITIONAL DETAILS. <br />2. VERIFY THAT THE PLACEMENT OF THE DISPENSER IS SUFFICIENT TO <br />REACH THE CHARGING PORT OF THE VEHICLES. <br />3. SEE E301 FOR DISPENSER CLEARANCE REQUIREMENTS. <br />4. THE POWER BOXES SHALL HAVE A MINIMUM OF FOUR FEET <br />CLEARANCE ON THE SIDE WHERE THE ACCESS DOOR IS LOCATED. <br />5. TRIMMING OF EXISTING TREES AND BUSHES MIGHT BE NECESSARY. <br />NVI <br />qI <br />0 <br />C <br />h <br />x <br />0 <br />�A <br />`v <br />or <br />E r: <br />co <br />W <br />V <br />J fV <br />J �. <br />Q Ln <br />Lu W M <br />� _J <br />V <br />V) <br />0o = <br />Ln oC <br />= M = <br />Ln <br />W W <br />N N <br />gym..... <br />DATE: <br />SEPTEMBER 23, 2024 <br />CONTENTS <br />SITE PLAN <br />E=201 <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.