Laserfiche WebLink
GENERAL INFORMATION <br />TERMITE PROTECTION <br />1.1 <br />It is the contractors responsibility to dete ine erection procedure and sequence to ensure the <br />1.1 <br />A permanent sign which identifies the termite treatment provider and need for reinspection and <br />safety of the building and its component its during construction. <br />treatment contract renewal shall be provided. The sign shall be posted near the water heater or <br />electric panel. <br />1.2 <br />All work is to be done in a neat, workmanlike manner by qualified skilled craftsmen. All contractors <br />1.2 <br />Condensate and roof down spouts shall discharge at least 1'-0" away from building side walls. <br />and subcontractors must be properly insured. <br />1.3 <br />Irrigation/sprinkler systems including all risers and spray heads shall not be installed within 1'-0" of the <br />1.3 <br />Care shall be taken to assure that the project site is safe and that debris is removed or collected in a <br />building side walls. <br />secure enclosure. <br />1.4 <br />To provide for inspection for termite infestation, the distance between wall covering and final earth <br />1.4 <br />The work of this project shall include all necessary labor, materials, licenses and permits required <br />grade shall not be less than six inches. Exception: Paint or decorative cementious finish less than <br />to complete the work as indicated by the drawings and specifications in a good and workmanlike <br />5/8" thick adhered directly to the foundation wall, <br />manner. <br />1.5 <br />The Bid for the work shall include that work associated with the renovation of the project <br />1.5 <br />Initial treatment shall be done after all excavation and back fill is complete. <br />that is generally indicated on, but is not necessarily limited to, the drawings and applicable <br />specifications. <br />1.6 <br />Soil disturbed after the initial treatment shall be retreated including spaces boxed for formed. <br />1.6 <br />All work shall be in accordance with the requirements of the latest editions of the 2020 <br />1.7 <br />Boxed areas in concrete floors for subsequent installation of traps, etc., shall be made with <br />Florida Building Code, 2020 Florida Mechanical Code, 2020 Florida Plumbing Code, <br />permanent metal or plastic forms. Permanent forms must be of a size and depth that will <br />National Electrical Code and Life Safety 101 Code all as other applicable codes and <br />eliminate the disturbance of soil after the initial treatment. <br />ordinances. Accessibility must meet the requirements of the 2020 Florida Building <br />Code. <br />1.7 All prospective contractors and subcontractors shall visit the premises in order to become <br />thoroughly familiar with the work and working conditions. Bid amounts shall include all work <br />associated with the various components of the work described on the plans whether shown in full <br />and complete detail or not. <br />1.8 Cost associated with applications for all necessary permits and the actual costs of all <br />necessary permits are to be included as a part of the work and shall be included with bid <br />amounts. <br />1.9 The contractor shall be solely responsible for proper and accurate layout of lines and grades <br />necessary to accomplish the work in a good and workmanlike manner. The contractor shall <br />verify all dimensions and figures indicated on the drawings before laying out the work and will be <br />responsible for any error or inaccuracies resulting from its failure to do so. The architect <br />assumes no responsibility for laying out the work. <br />1.10 Electrical, plumbing and mechanical subcontractors shall provide for additional engineering <br />(if required) and shall secure all necessary permits, pay all associated fees and <br />arrange for all necessary inspections that may be required. <br />1.11 All materials used in the work shall be as specified. In the absence of specifications for any <br />materials required for the performance of the work, materials used shall be the best of their <br />respective kinds. <br />1.12 Any deviations from the drawings and specifications must be approved by the architect prior to <br />construction. Any deviations that are not approved shall become the sole responsibility of the <br />contractor. <br />1.13 All materials, systems, and construction components shall be installed in accordance with the <br />manufacturer's published instructions and specifications. The contractor shall coordinate the work <br />of all trades in order to assure proper clearances and coordination of the work. <br />1.8 Minimum 6 mil vapor retarder must be installed to protect against rainfall dilution. If rainfall <br />occurs before vapor retarder placement, retreatment is require. <br />1.9 Concrete over pour and mortar along the foundation perimeter must be removed before <br />exterior soil treatment. <br />1.10 Soil treatment must be applied under all exterior concrete or grade within 1'-0" of the structure <br />side walls. <br />1.11 An exterior vertical chemical barrier must be installed after construction is complete including <br />landscaping and irrigation. Any soil disturbed after the vertical barrier is applied shall be <br />retreated. <br />1.12 All buildings are required to have pre -construction treatment. <br />1.13 A certificate of compliance must be issued to the building department by a licensed pest control <br />company before a certificate of occupancy will be issued. The certificate of compliance shall <br />state: 'The building has received a complete treatment for the prevention of subterranean <br />termites. The treatment is in accordance with the rules and laws of the Florida Department of <br />Agriculture and Consumer Services."' <br />1.14 After all work is completed, loose wood and fill must be removed from below and within V-0" of <br />the building. This includes all grade stakes, tub trap boxes, forms, shoring or other cellulose <br />containing material. <br />1.15 No wood, vegetation, stumps, cardboard, trash, etc., shall be buried within 16-0" of any <br />building or proposed building, <br />CONCRETE: <br />3.1 Concrete to be normal weight with the following minimum compressive strengths at twenty-eight (28) <br />days: <br />(A) Footings, slab -on -grade, slab fill ------------------- 3,000 psi <br />(B) Masonry filled cells, wall tie beams, and tie columns --- 3,500 psi <br />3.2 Concrete shall be ready -mix per ASTM C94 as follows: <br />1.14 It shall be the responsibility of the contractor to properly store and protect all materials delivered to the job (A) Portland cement ----------------------- ASTM C150 <br />site. Any loss of any nature shall be borne by the contractor. (B) Aggregates --------------------------- ASTM C 33 (3/4 max) <br />(C) No calcium chloride <br />1.15 The premises and work areas shall be maintained in a reasonably neat and orderly condition and (D) Air Entraining -------------------------- ASTM C260 <br />shall be kept free from accumulations of waste and debris. The contractor shall be responsible for (E) Water reducing ------------------------ ASTM C494 <br />removal of all trash, waste and debris from the project site and shall dispose of same in a proper (F) Fly ash ------------------------------- ASTM C618-78 class F <br />and legal manner. <br />1.16 Gasoline, fuel oil, paint thinners and all tither hazardous materials shall not be stored inside of the <br />premises. Use of such products or products containing such components shall only be used with <br />adequate and proper ventilation and shall be dispensed from containers approved for such use. The <br />contractor shall maintain all necessary Material Safety Data Sheets (MSDS) on the project site for all <br />products requiring same. <br />1.17 The contractor shall comply with all applicable rules and regulations of OSHA. <br />1.18 The contractor shall provide and maintain all necessary temporary shoring or bracing as may be <br />required to prevent damage to the owner's property or injury to persons. <br />1.20 <br />1.21 The contractor shall not commence work until the Owner has been provided with a certificate of <br />insurance indicating appropriate minimum insurance coverages. <br />1.22 All work shall be guaranteed by the contractor for a period of one year with exception of products <br />and components whose manufacturers provide for additional warranty and/or guaranty periods or <br />as may be otherwise specified herein. Prior to final payment, the contractor shall provide an <br />originally signed guaranty for the work and other applicable warranties and guaranties to the <br />owner. <br />1.23 A foundation survey shall be performed and a copy of the survey shall be on the site for the <br />building inspector's use, or all property markers hall be exposed and a string stretched from marker <br />to marker to verify required setbacks. <br />3.3 Prepare and place concrete in accordance with the American Concrete Institute (ACI) <br />Manual of Standard Practice, Parts 1, 2, and 3, including recommendations for hot <br />weather concreting and ACI 318 Building Code requirements for reinforced concrete. <br />3.4 Required slump range at discharge end of truck equals (=) three (3) to five (5) <br />inches. <br />3.5 Contractor shall verify locations of all openings and sleeves, slab recesses, etc., as required by <br />other trades before concrete is placed. <br />MASONARY <br />4.1 Hollow load bearing units shall conform to ASTM C90, normal weight N2, with a minimum <br />compressive strength of 1,500 psi. <br />4.2 Bond intersecting masonry walls by either laying 50% of the units at the intersections in <br />an overlapping masonry bond pattern with alternating units bearing 8" on the units below <br />or by installing 4" by 10" rectangular anchors formed from 3/8" reinforcing steel between <br />adjacent units at maximum vertical centers of 16". <br />4.3 Lay all masonry units true to line and grade. Mortar joints shall extend the full width and <br />depth of face shells and shall not exceed 3/8" thickness, except for bed joints at footings <br />which shall not exceed 3/4" thick, <br />4.4 <br />Mortar shall be type M or S and conform to ASTM C270. Mortar shall be used within two (2) <br />4.5 hours of mixing. <br />Place all masonry in running bond with three -eights (3/8) inch mortar joints. <br />CARPENTRY: <br />6.1 Furnish and install all rough and finish carpentry, and cabinet work as required to <br />completely provide for work indicated. <br />6.2 All lumber and plywood shall have grade marks and mill and treatment identification. <br />6.3 Pressure treatments shall include Osmosalts, Osmose K-33, Womansalts or Celcure. <br />6.4 Framing lumber shall be minimum No. 2, Southern Yellow Pine and shall have <br />maximum moisture content of 15%. <br />F fr 1,2000 psi <br />F v= 90 psi <br />F c= 975 psi <br />E = 1,600,000 psi <br />6.5 Curbs, sleepers, nailers, furring, lumber in contact with earth, concrete, masonry or steel, and all <br />exposed and unpainted lumber shall be pressure treated. Pressure treated lumber shall be <br />impregnated with a CCA salt treatment in accordance with F.S. TT-W-571 and bear the <br />American Wood Preserves Institute Quality Mark LP-2, <br />6.6 Provide all necessary anchorage using hot dipped galvanized common or ring shank nails and <br />hot dipped bolts, nuts and washers or wood screws. Staples are not permitted. <br />6.7 Install all framing closely fitted and accurately set, Reinforce all openings with headers and bridge <br />as shown or as required. Space studs and furring at maximum 16" centers. Provide single sole <br />plates and double top plates of the same width as framing members. <br />6.8 Finish lumber for interior trim shall be B and Better Douglas Fir. Provide stain grade <br />material without finger joints, <br />Install all trim in the longest lengths possible to avoid joints. Miter exterior corners, cope interior <br />6•9 corners and carefully scribe woodwork to other adjacent work. Provide profiles to match existing <br />as closely as possible and anchor all trim work with trim headed nails set just below the trim's <br />surface. <br />6.10 All plywood that is used for sheathing shall be a minimum of four plys and unless otherwise <br />specified or required to match an existing condition shall be nominal 5/8" CDX structurally rated for <br />the condition. <br />6.12 <br />All plywood that is to be exposed, finished or not, shall be Douglas Fir A/C grade. Unless <br />otherwise specified or required for the existing condition, all finish plywood shall be 3/4" thick. <br />All Plumbing, Electrical, and Mechanical rough -ins must be complete, inspected, and approved <br />before requesting the framing inspection. <br />THERMAL & MOISTURE PROTECTION: <br />Exterior Sealants: Vulkem 116 or Sonneborn NP-1. <br />Interior Sealants: Dap Acrylic Latex or Pecora AC-20. <br />Plumbing Fixture Sealant: Dow Corning 8640 or G.E. 1700 Series silicone caulking. <br />Install sealants in accordance with manufacturer's directions. <br />ELECTRICAL <br />16.1 This electrical design is intended to meet the requirements of the National Electrical <br />Code, the local building department regulations and the electrical utility. <br />16.2 Wiring devices are to be specification grade. <br />16.3 Contractor is to provide cost options to the owner for: -- energy saving lamps <br />and ballast vs electronic, <br />16.4 The contractor shall furnish all material, labor, tools, equipment and work <br />required for installation of a complete electrical system including lighting and <br />power distribution, telephone conduits, interior and exterior lighting, as indicated <br />on drawings. All work shall comply with the standards of the latest adopted <br />edition of the National Electric Code and all work must meet approval of all <br />additional codes and inspecting authorities. Contractor shall investigate work to <br />be done prior to submitting bid. <br />16.5 Installation: all work shall be done is a neat workmanlike manner by <br />experienced journeymen electricians. <br />16.6 All dimensions must be verified by the contractor and responsibility <br />assumed for accuracy. <br />16.7 All minor work necessary, although not shown, to make this complete electrical <br />installation shall be considered a part of the contract. <br />16.8 Panel board to be square d or approved equal with door unless otherwise <br />specified (locking door, if required by Owner). Install typewritten, two -column <br />directories inside each panel -board indicating what each circuit serves. <br />16.9 All wire to be copper and no wire smaller than #12 awg gauge shall be used on this <br />installation. (exception: low voltage wiring as required) no aluminum wire to be <br />used with the exception of the power company feeder line(s). <br />16.10 Switches: switches controlling panels, load centers, or motors shall be heavy <br />duty square D, ITE, or approved equal. Multiple mains shall be identified as <br />main #1, main #2, etc. <br />16.11 Electrical contractor shall install all exhaust fans, ductwork to be provided and <br />installed by HVAC Contractor. <br />MECHANICAL <br />15.1 The entire installation shall conform to the requirements of the Standard Mechanical Code, <br />NFPA 90A and NFIPA 96, SMCNA, ACCA, and The Energy Efficiency Code for Building <br />Construction, latest editions. <br />15.2 Thermostats shall be mounted at 52" A.F.F. where shown on the plans. <br />15.3 Coordinate and verify electrical characteristics of equipment with the electrical contractor. <br />15.4 Coordinate available space for equipment and locations of diffusers, grilles, piping <br />and devices. <br />15.4 Provide sheet metal weather covers at penetrations and factory curbs for installation of <br />all roof top or wall mounted equipment. <br />DOOR AND WINDOWS <br />8.1 New interior wood doors as scheduled <br />8.2 All metal doors are to be as scheduled. <br />8.3 All exterior windows and glass doors are required to be tested in <br />accordance with ANSI/AMMA/NWWDA 101/IS2 Standard and bear <br />an AMMA or WDMA label identifying the manufacturer, <br />performance characteristics and approved product testing entity, <br />8.4 All exterior windows and doors shall be anchored per published <br />manufacturer's recommendations to achieve the design pressure <br />specified. <br />8.5 Mullions and adjacent door assemblies are required to be tested or <br />engineered to transfer 1.5 times the designed loads to the rough <br />opening substrate. <br />APPROVED PRODUCT LIST <br />1 SIMPSON H10A, HURRICANE TIES, FL#10456.2 <br />2 SIMPSON H2,5A, HURRICANE TIES, FL#10456.3 <br />3 SIMPSON HTA20, HURRICANE TIES, FL#11473 <br />4 HARDI PREVAIL LAPPED SIDING, FL#13192,5 <br />5 DOORS PREMIER PRODUCT, FL 17460.1 <br />6 WINDOWS PLYGEM 1500, FL 15329.1 <br />7 GAF ROOF UNDERLAY, FL#10626.1 <br />8 GAF SHINGLES, FL# 10124.1 <br />G p <br />I HEREBY CERTIFY THAT I HAVE REVIEWED <br />THIS PLAN AND FOUND IT TO BE IN COMPLIANCE WITH ASCE 7-16 AND <br />NAILS - ROOF THE 2020 BUILDING CODE 7TH EDITION <br />8cl-GALV, RING SHANK NAILS OR EQUIVALENT <br />EDGES <br />INFILL <br />\+++►Mri►ii,,,�� <br />ZONE <br />1 <br />4" <br />❑.C, <br />6" <br />0. C, <br />`� <br />ZONE <br />2e <br />4" <br />0. C. <br />6" <br />❑.C,�pN....!�hN <br />ZONE <br />2n <br />4" <br />0. C. <br />4" <br />❑.C, <br />ZONE <br />2r <br />4" <br />0. C. <br />4" <br />❑.C, <br />No.86663 `• <br />ZONE <br />3r <br />4" <br />0. C. <br />4" <br />0, C. <br />,+ <br />ZONE <br />3e <br />4" ❑,C. <br />4" ❑.C, a= 4.0 <br />e <br />- <br />ZONE <br />4 <br />4" <br />0. C. <br />6" <br />0. C. <br />ZONE <br />5 <br />4" <br />0. C. <br />4" <br />❑,C. <br />STATE OF • <br />• e •.F[AQOP __ $off'. <br />HIP AND GABLE ROOF WIND <br />ZONE NAILING DESIGNATIOr14 <br />E <br />U <br />0 <br />a <br />W <br />Wa) <br />C <br />1100 <br />CD <br />O <br />w <br />"' . a <br />m <br />C,2 z � <br />w <br />,_Z5 <br />O <br />Za p <br />w <br />z <br />Cr- <br />LU <br />Z <br />CU L L <br />L J a N <br />o N <br />CD <br />z <br />w <br />Q <br />00 <br />O <br />J <br />LL <br />o <br />a' <br />M <br />S <br />0 <br />a <br />z <br />0 <br />Q <br />0 <br />0 <br />N <br />Z <br />z <br />O <br />z <br />U <br />W <br />Z <br />C <br />a <br />o <br />o <br />v <br />W <br />- Z <br />Z 0 <br />O w <br />N <br />M <br />0 w <br />06 0 P <br />J <br />w <br />U' Q = <br />Cn LLB ~ <br />rn <br />J <br />J <br />Q � ti <br />I „, g N <br />v <br />= <br />t`) <br />O (D <br />n- <br />NJ <br />0 <br />V ) <br />W <br />F_ <br />O <br />Z <br />Q/ <br />I..L <br />W <br />Z <br />�Wn <br />V <br />DRAWING <br />6 <br />