Laserfiche WebLink
PLUMBING <br />LEGEND <br />DESCRIPTION <br />ABBREV. <br />SYMBOL <br />SANITARY PIPING <br />SAN <br />VENT PIPING <br />V <br />-------- <br />COLD WATER PIPING <br />CW <br />— — <br />HOT WATER PIPING <br />HW <br />— — — — <br />GATE VALVE <br />GV <br />CLEAN OUT TO GRADE <br />COTG <br />WALL CLEAN OUT <br />WCO <br />WCO I <br />TYPICAL <br />(TYP) <br />CAP <br />CAP <br />VENT THRU WALL <br />VTW <br />TEE UP <br />TEE DOWN <br />v <br />90' UP <br />900 DOWN <br />SHUT OFF VALVE <br />SOV <br />1. DOMESTIC WATER PIPING SHALL BE CPVC. ALL HW PIPING SHALL BE INSULATED. <br />2. SANITARY WASTE AND VENT PIPING SHALL BE SCHEDULE 40 PVC PIPE WITH SOLVENT <br />FITTINGS. CONFORMING TO ASTM STANDARDS. ALL SANITARY AND VENT PIPING IN FIRE <br />RATED WALLS SHALL BE CAST IRON. <br />3. INSULATION SHALL BE FLEXIBLE UNICELLULAR —SELF —SEAL ARMAFLEX 2000 1/2" <br />THICK FOR HOT WATER PIPING. <br />CONTRACTOR NOTES <br />IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE <br />ARCHITECT, LANDLORD OR TENANT OF ANY DISCREPANCIES <br />ENCOUNTERED ON THE PLANS OR IN SITE CONDITIONS PRIOR TO <br />SUBMISSION OF BID. <br />BIDDERS ARE FAMILIARIZE THEMSELVES WITH CONDITIONS AND SATISFY <br />THEMSELVES AS TO THE NATURE AND SCOPE OF THE WORK. THE BASE <br />BID SHALL REFLECT MODIFICATIONS TO SYSTEMS AND DEVICES AS <br />REQUIRED BY STATE, LOCAL AND FEDERAL CODES WHETHER INDICATED <br />OR NOT ON CONTRACT DOCUMENTS. THE SUBMISSIONS OF A BID WILL <br />BE EVIDENCE THAT SUCH AN EXAMINATION AND COMPLIANCE WITH <br />GOVERNING CODES/REQUIREMENTS HAS BEEN MADE. LATER CLAIMS FOR <br />LABOR, EQUIPMENT, OR MATERIALS REQUIRED, OR FOR DIFFICULTIES <br />ENCOUNTERED WHICH COULD HAVE BEEN FORSEEN HAD AN EXAMINATION <br />AND CODE/REQUIREMENTS REVIEW BEEN MADE, WILL NOT BE ALLOWED. <br />4" DRAIN <br />FROM SE <br />TO GROU <br />CONNECT <br />OUTSIDE. <br />N <br />CONNECT 2" SANITARY PIPE FROM <br />--_ LS-1 TO SITE SANITARY <br />CONNECTION. CONTRACTOR SHALL <br />VERIFY EXACT LOCATION. <br />r \ <br />RAIN PIPE FROM <br />)ND FLOOR TO <br />JND FLOOR. <br />PROPOSED SECOND FLOOR PLAN - SANITARY <br />SCALE: 1 /4"=1'-0" 19167 <br />COM <br />N <br />PROPOSED GROUND FLOOR PLAN - SANITARY <br />SCALE: 1 /4"=1'—O" 19167 <br />EXTEND AND CONNECT 4" <br />SANITARY PIPE TO SITE <br />SANITARY. SEE CIVIL FOR <br />CONTINUATION. <br />PIPE DOWN FROM <br />2 TO SANITARY <br />D FLOOR. <br />011.11111,/ <br />�O�ERT ,//4 <br />.500 7 ' r <br />r <br />Rama EntWise4 ft. <br />P.E. # 56067 Ronald R. Renna, P.E. <br />AUTH. # 00008631 Consulting Engineers <br />3231 Drane Field Road Ph. (863) 646 1258 <br />Lakeland, FI 33811 Fax.(863) 646 8881 <br />0 <br />V <br />U <br />� <br />E0� N <br />V <br />COCO <br />Q <br />N <br />IMM <br />0 <br />N <br />cc <br />V <br />00 <br />O <br />W <br />o� <br />c/) <br />W <br />Z <br />oZ <br />M I- <br />m <br />=WW <br />O <br />2 <br />U Q <br />W J <br />m <br />zz <br />< <br />- <br />oW�W <br />1 <br />�w- o <br />o!W <br />Z w <br />WLL <br />(n <br />WO <br />= <br />�� <br />> � <br />o <br />O <br />� <br />N <br />0 <br />U Z <br />� N <br />01 NOV 2019 <br />