Laserfiche WebLink
Framing Layout Notes: <br />REVISIO <br />NO I DATE I DESCRIPTION <br />Framing layout draw by Daniel M Ossrnan Drafting Service, Inc. a a schematic <br />"on only. It is theresponsibility of the General Contractor to make a field <br />inspection to verify "ALL" existing field conditions including accuracy in dimensions with <br />proposed plans. General Contract "MUST" certify in writing (the time and date) that <br />this field inspection was conducted on and submitted to truss manufacture. If this field <br />inspection was "NOT" done prior to giving said plans to the truss manufacture, then the <br />"GENERAL CONTRACTOR WILL BE HELD LIABLE FOR ALL COST OF ANY / ALL <br />MISTAKES" on pre-engineered busses Out we constructed ucted for said project. Daniel M. <br />Ossrmari Drafting Service, inc. WLL NOT BE HELD LIABLE" for errors made on any <br />*aming (aw or +000 . <br />op, Upon mawing said plans from the General Contractor ... this truss manufacture <br />"MUST" make a thew "OVW fielclinspection 3 a <br />conditions, lea slopes,overhangs, n . dirriensions prior to the manufactuift of <br />busses. gym.rtify (the tiffe and daft) that this field inspecbon <br />was conducted on by their company. This cerfitication must be given to the General <br />Contractor g prior to project. <br />All thickened slabs / footing on foundation plan are located according to the schematic <br />truss layout drawn by Daniel M. Ossman Drafting Service, Inc. Only truss manufacture <br />can change these locations due to truss bearing points and "MUST" notify General <br />Contractor of these changes as soon as possible. <br />4 All hurricane truss straps specified on said project are to be used unless otherwise <br />specified by truss manufacture. AN hurricane straps specified are "Simpson Strong Tie" <br />( or equal ), unless noted otherwise. Only truss manufacture can change any / or all <br />truss straps that are specified on truss layout drawn by Daniel M. Ossman Drafting <br />Service, Inc. Truss manufacture must first notify General Contractor in writing of these <br />changes as soon as possible. <br />Connection Schedule <br />Manufacturer <br />Model <br />Uplift <br />FI Product <br />Location I Use <br />Name <br />No. <br />Approval Number <br />Simpson <br />HETA20 <br />#1810 <br />FL 11473.3 <br />Wood beam connection to concrete <br />Strom Tie <br />column. <br />Simpson <br />MBHA3.5 <br />#1585 <br />FI 10456.7 <br />WOod beam hanger to exterior concrete <br />S Tie <br />6111.88 <br />block wall. <br />structure connection to wood <br />gim� a <br />H10A <br />#1140 <br />FI 10466.7 <br />� <br />Simpson <br />HETA20 <br />#1810 <br />FL 11473.3 <br />Roof structure connection to concrete <br />StrongTie <br />block wall. <br />1. Any products that are substituted, must "MUST" or "EXCEED" products specified. <br />Contractor "MUST" provide data to building inspector at thne of inspection. Only truss <br />company can modify hurricane clips and connections specified and must coordinate with <br />General Contractor with any changes to plans. <br />2. All existing ceiling heights to remain the same. Proposed ceiling freight to be a min. of <br />8' - 0", contractor to fold verify with owner. <br />5 Truss design drawings shall be prepared in acconderce to and conforraeioe with section <br />R802.10.1. These documents shall be provided by the truss manufacture at time of truss <br />delivery and approved by the building official prior to the installation of the roof truss. <br />(See code section items 1-12). <br />6 This plan as indicated is diagrammatical in nature for permit and contract purposes only. <br />Any revisions as required by the truss company's engineer as indicated on truss company's <br />sealed drawings shall superseded this drawing. This also includes truss company's <br />specified hurricane and other anchors supersede one shown on this drawing. <br />7 If shingles are being used, shingles MUST comply with section 905.2.2, 905.2.4.1 and <br />table R - 905.2.6.1 for wind resistance, FBC mwidenW code 8th edition (2017) residential. <br />8 CONTRACTOR, MUST CUTE WITH TRUSS MANUFACTURE FOR ALL VAULTED, TRAY, <br />FLAT AND OR OTHER CEiUNG TYPES. CONTRACTOR El 100% RESPONSIBLE FOR THE <br />EXTERIOR WALL. CONSTRUCTHM METHOD WHERE A GABLE END iS CONSTRUCTED. <br />ALL EXTERIOR WALLS MUST COMPLY WITH THE FBC RESMENTIAL CODE 6TH EDIMON <br />(2017) RESIDENTIAL, SECTION R - M FOR CONSTRUCTION METHODS. SEE ADDITIONAL <br />ATTACHED STRUCTURAL SHEETS FOR GABLE END BRACING DETAN.S. DANIEL M. OSSMAN <br />DRAFTING SERVICE AND ARCHRECT WHO SIGNED / SEALED THE PLANS, ASSUMES NO <br />RESPONSIBILITY DUE TO NEGLIGENCE OF THE CONTRACTORS FAN-URE TO FOLLOW <br />THE BUILDING CODE FOR GABLE END CONSTRUCTION. <br />ROOF FRAMING LAYOUT <br />Approx. roof pitch: 4 112 "MUST" be field verify by truss manufacture and approved by <br />owner and / or contractor before the production of roof trusses. <br />Proposed finish ceiling height: 8' - 0" (min.). Contractor to field verify and "MATCH" the <br />ceiling height of the existing house. All finished ceiling heights are the responsibility of the <br />contractor and "MUST" be coordinated with the owner prior to the beginning of construction. <br />All lintel heights are the responsibility of the contractor and "MUST" be coordinated with the <br />owner prior to the beginning of construction. <br />Truss company "MUST" field verify all existing roof conditions, roof slope, overhang bearing <br />points, tie-in, etc. before engineering and manufacturing of roof trusses. Daniel M. Ossman <br />Drafting Service and Architect who signed / sealed the plans assumes no responsibility for <br />errors in production of roof trusses due to negligence to conduct proper and accurate field <br />inspection by truss manufacture and dimensioning. <br />CONTRACTOR, MUST COORDINATE WITH TRUSS MANUFACTURE FOR ALL VAULTED, <br />TRAY, FLAT AND OR OTHER CEILING TYPES. CONTRACTOR IS 100% RESPONSIBLE <br />FOR THE EXTERIOR WALL CONSTRUCTION METHOD WHERE A GABLE END IS <br />CONSTRUCTED. ALL EXTERIOR WALLS MUST COMPLY WITH THE FBC RESIDENTIAL <br />CODE 6TH EDITION (2017) RESIDENTIAL, CHAPTER 6, FOR WALL CONSTRUCTION <br />METHODS. SEE ADDITIONAL ATTACHED STRUCTURAL SHEETS FOR GABLE END <br />BRACING DETAILS. DANIEL M. OSSMAN DRAFTING SERVICE AND ARCHITECT WHO <br />SIGNED I SEALED THE PLANS, ASSUMES NO RESPONSIBILITY DUE TO NEGLIGENCE <br />OF THE CONTRACTORS FAILURE TO FOLLOW THE BUILDING CODE FOR GABLE END <br />CONSTRUCTION. <br />r5*1 r^ w e%ear-• ^— L r--+.v r r_ I -- a_ I ef P' r>f, f"1 r <br />2-2X12 <br />WOOD (!:;EM <br />(TrP.) <br />2 x 4 L00140UM <br />CD 24rf a.C. <br />a � <br />� y <br />� � a <br />� a a <br />O A �A <br />O L <br />$° w <br />v <br />sa <br />.w � •w <br />A v <br />a� <br />W <br />r <br />O 'a �y Go WthW UN <br />LO <br />a L 0 0 <br />CLIX <br />s 5 oQ <br />c c ° a <br />M o� <br />Z _Ju_ <br />4om <br />C CO CL M <br />� c--U•S�s ai <br />3 c co <br />> Q .r T- <br />c >,:p <br />EEC°Ln0 <br />Noco <br />d-��=M <br />p °`>m�a <br />00 M 0 M AH <br />a: ttf <br />e E E 0 C 1 ate--- 0 <br />t0 <br />F-a SN LiNa <br />N <br />♦♦^^ U0 <br />Z <br />Q �0 <br />J .,..r Iz <br />0 <br />Z cM <br />p%,. CL <br />J N <br />D <br />m <br />JOB NO. <br />5737 18TH STREET <br />DATE <br />MARCH 23, 2019 <br />DRAWN BY <br />Daniel M. Ossman <br />SCALE: 1 /4" = V - 0" <br />SHEET NO. <br />A - 5 <br />