Laserfiche WebLink
I - --- ' I <br />_ L 1 I 1 1 _ 1 1 1 ,ll1 II' _ 01111 11 i I 1 ---11 _ 1 R v, 1111fli Ill II'L11111 111R'pw?' -1 111,-- - _I- - IL - - 1— — I - _ 1 11 1-.—_ — -- -- - <br />3 <br />a <br />GENERAL DE111 OLITION NOTL.�• <br />1. ALL DEMOLITION SHALL BE IN ACCORDANCE WITH THE APPLICABLE BUILDING CODE AND ALL LOCAL <br />ORDINANCES. <br />2. DURING ALL PHASES OF DEMOLITION AND CONSTRUCTION, THE GENERAL CONTRACTOR SHALL <br />MAINTAIN INTEGRI T TO THE STRUCTURE TO BE DEMOLISHED AND ADJACENT AREAS TO REMAIN <br />WITH INTERIOR OR EXTERIOR SHOR!"3G. BRACING OR SUPPORT TO PREVENT MOVEMENT, <br />SETTLEMENT, OR COLLAPSE OF S T RUCTUREE. EXISTIING STRUCTURE TO REMAN SHALL BE SAFER OFF <br />AND PROTECTED FROM ELEMENTS AT ALL TIMES. <br />3. WHERE THE EXISTING WORK 1S TO BE CUT, UNDERPINNED, AND/OR SHORED, CONTRACTOR SHALL <br />PROVIDE ALL SHORING, NEEDLING, BRACING, WEDGING, AND DRY PACKING, AND BE RESPONSIBLE <br />FOR THE SAFE T Y OF THE STRUCTURE DURING THESE OPERATIONS. <br />4. AREA OF WORK SHALL BE KEPT CLEAN AT ALL TIMES. <br />5. ANY MATERIALS DEEMED AS HAZARDOUS, SUCH AS BUT NOT LIMITED TO ASBESTOS OR LEAD <br />PAINTS SHALL BE REMOVED AS REQUIRED BY FEDERAL, STATE, OR LOCAL CODES. CONTRACTOR <br />SHALL UTILIZE THE APPROPRIATE TECHNIQUES, PROCEDURES, AND DISPOSAL METHODS AS PER <br />STANDARD PRACTICE AND ALL FEDERAL, STATE, AND LOCAL CODES. <br />6. CONTRACTOR SHALL REMOVE ALL EXISTING MECHANICAL EQUIPMENT, DUC IP OR}:, HANGERS. <br />AND CONTROLS NOT SCHEDULED TO BE REUSED, BACK. TO THE EXISTING CURB. CURBS NOT <br />SCHEDULED TO BE REUSED OR ADAPTEDFOR NEW UNITS SHALL BE CAPPED AND INSULATED FOR .A <br />WEATHERTIGHT SEAL. DO NOT ABANDON. SEAL ALL PENETRATIONS THROUGH WALLS, AND FLOORS <br />AT REMOVED MECHANICAL COMPONENTS. <br />7. CONTRACTOR SHALL REMOVE ALL PLUMBING FIXTURES, DRAINS, PIPING SYSTEMS, ETC. NOT <br />SCHEDULED FOR REUSE BACK TO NEAREST ACTIVE LINE SCHEDULED FOR REUSE. CAP AND SEAL <br />LINES AT ACTIVE LINES. DO NOT ABANDON COMPONENT IN PLACE. SEAL ALL PENS?RF,T!ONS <br />THROUGH WALLS AND FLOORS AT REMOVED PLUMBING SYSTEM COMPONEN rS. <br />8. CONTRACTOR SHALL REMOVE ALL ELECT R1C-'AL LIGHT NG P'•f'r RE-S, HIANGEAR,_VMRING DEVICES, <br />CONDUIT FOXF_S, WIRING PANELS, FIRE ALARMS, FTC. N:DT SC; ? ,' !LED FOR REUSE BACK r <br />SERVICE OR NEARES',' J-6OX T; FREMAIN. DO NOT ABANDON 4 UP �I'CaiFed i S %NPLACE, --tiEAL. f-d L <br />PENETRATIONS THROUGH WALLS AND FLOURS AT LiEl OVER ELECTRICAL SYS ;T M9 COMPONENTS. <br />9. DEMOLISH AND RE.M9VE ANY RErAA;INIi`yG SUSPEitiDED CEILING C'Ii'ONENTS. <br />10. EXISTING COINC 'ETE FLOOR SLA3 SHALL `BE LEVELED. BROOi I CLEAN" l!TH iN�:z,'EN!A"Ni'4G <br />ADHESIVE_ RES!DiJtS, AND SEALED. <br />11. REMOVAL OF ALL DEMOLITION AND :;ONSTRUC T ION DEBRIS SHALL SE %r"OORCINATED BE 1 VVEEN <br />THE GENERAL CONTRACTOR AND THE LANDLORD AND SHALL COMPLY WITH ALL APPLICABLE CODES <br />AND ORDINANCES. <br />12, UPON COMPLETION OF DEMOLITION CONTRACTOR SHALL FIELD VERIFY ALL OVERALL <br />DIMENSIONS, COLUMN SPACING, AND EXISTING OPENING SIZES. AND LOCATIONS, WITH DIMENSIONS <br />INDICATED ON THE CONTRACT DRAINING S, NOTFARCHITECT OF ANY DISCREPANCIES. <br />EXTERIOR WALLS: <br />GC TO REPAIR AND REPLACE INSULATION AT EXTERIOR <br />WALLS AS REQUIRED. <br />DEMOLITION CEILING PLAN LEGEND <br />DEMOLITION OF EXISTING GWB CEILING <br />DEMOLITION OF EXISTING ACT CEILING <br />—zz <br />f <br />l <br />1 <br />I <br />r <br />esign ;-Iz ty es <br />r i 'ct re <br />I T� ) 81 E %C o I Dd v <br />Tampa, Flotic.k) 3 605 <br />p 813 241 6700 f 813 247 ,3757 <br />•-��si �ana�j�I�s4�(Irc:�f{i,�le�t�.=:e.�:o;?�� <br />Al" reproduction & inm;'le.^.tiJ?l rf�p5ttv <br />ngnts reservad 2017 <br />Project <br />Do <br />DrVIG - L" <br />Z rE P H YRHillLIt- <br />5935 7th Street Zephyrhllls, <br />FL 33542 <br />Prepare: for <br />Prepared <br />DWITA MEDICAL GROUP <br />In Association with: <br />HEES & ASSOCI,IJES, Icy`:. <br />CONTACT: KAR1_ H' <br />1381 5TH ST <br />SARASOTA, FL 34236 <br />PHONE. 941 955.45t;5 <br />KEYNOTES GENESIS EN3INEER GROUP. LLC <br />- -- --- GONT"^T: "11KE HANEY <br />20.C21 ;Ceiling To Be Removed1000 N. ASHL.EY DR. #900 <br />?AMPA, FL <br />PHONE: 813.523.6A <br />GENESIS ENGINEER GROUP. LLC <br />CONTACT: NIIK` HIANEY <br />1000 N. ASHLEY CiR. *900 <br />TA.N!PA, FQL <br />PHONE: <br />,y <br />ProSLaal deaf <br />T <br />At <br />c <br />-Andrew-E� i 2'1012018 <br />15805 "j4 111:22:33 AM <br />No. Revision Description Date <br />1 PERM!T AND BID SET 12/10/2018 <br />t0. Date <br />Drawn By: WJ Checked By: SRS <br />Project Number: 18190 <br />Sheet Tile <br />FIRST FLOOR <br />DEMOLITION <br />CEILING FLAN <br />Original cvawinp is 24 x 36 Do not <br />scale contents of dra%4ng <br />1 DEMOLITION REFLECTED CEILING PLAN <br />1 /4" - 1'-0" Sheet Number <br />■ <br />