<br />GENERAL DE111 OLITION NOTL.�•
<br />1. ALL DEMOLITION SHALL BE IN ACCORDANCE WITH THE APPLICABLE BUILDING CODE AND ALL LOCAL
<br />ORDINANCES.
<br />2. DURING ALL PHASES OF DEMOLITION AND CONSTRUCTION, THE GENERAL CONTRACTOR SHALL
<br />MAINTAIN INTEGRI T TO THE STRUCTURE TO BE DEMOLISHED AND ADJACENT AREAS TO REMAIN
<br />WITH INTERIOR OR EXTERIOR SHOR!"3G. BRACING OR SUPPORT TO PREVENT MOVEMENT,
<br />SETTLEMENT, OR COLLAPSE OF S T RUCTUREE. EXISTIING STRUCTURE TO REMAN SHALL BE SAFER OFF
<br />AND PROTECTED FROM ELEMENTS AT ALL TIMES.
<br />3. WHERE THE EXISTING WORK 1S TO BE CUT, UNDERPINNED, AND/OR SHORED, CONTRACTOR SHALL
<br />PROVIDE ALL SHORING, NEEDLING, BRACING, WEDGING, AND DRY PACKING, AND BE RESPONSIBLE
<br />FOR THE SAFE T Y OF THE STRUCTURE DURING THESE OPERATIONS.
<br />4. AREA OF WORK SHALL BE KEPT CLEAN AT ALL TIMES.
<br />5. ANY MATERIALS DEEMED AS HAZARDOUS, SUCH AS BUT NOT LIMITED TO ASBESTOS OR LEAD
<br />PAINTS SHALL BE REMOVED AS REQUIRED BY FEDERAL, STATE, OR LOCAL CODES. CONTRACTOR
<br />SHALL UTILIZE THE APPROPRIATE TECHNIQUES, PROCEDURES, AND DISPOSAL METHODS AS PER
<br />STANDARD PRACTICE AND ALL FEDERAL, STATE, AND LOCAL CODES.
<br />6. CONTRACTOR SHALL REMOVE ALL EXISTING MECHANICAL EQUIPMENT, DUC IP OR}:, HANGERS.
<br />AND CONTROLS NOT SCHEDULED TO BE REUSED, BACK. TO THE EXISTING CURB. CURBS NOT
<br />SCHEDULED TO BE REUSED OR ADAPTEDFOR NEW UNITS SHALL BE CAPPED AND INSULATED FOR .A
<br />WEATHERTIGHT SEAL. DO NOT ABANDON. SEAL ALL PENETRATIONS THROUGH WALLS, AND FLOORS
<br />AT REMOVED MECHANICAL COMPONENTS.
<br />7. CONTRACTOR SHALL REMOVE ALL PLUMBING FIXTURES, DRAINS, PIPING SYSTEMS, ETC. NOT
<br />SCHEDULED FOR REUSE BACK TO NEAREST ACTIVE LINE SCHEDULED FOR REUSE. CAP AND SEAL
<br />LINES AT ACTIVE LINES. DO NOT ABANDON COMPONENT IN PLACE. SEAL ALL PENS?RF,T!ONS
<br />THROUGH WALLS AND FLOORS AT REMOVED PLUMBING SYSTEM COMPONEN rS.
<br />8. CONTRACTOR SHALL REMOVE ALL ELECT R1C-'AL LIGHT NG P'•f'r RE-S, HIANGEAR,_VMRING DEVICES,
<br />CONDUIT FOXF_S, WIRING PANELS, FIRE ALARMS, FTC. N:DT SC; ? ,' !LED FOR REUSE BACK r
<br />SERVICE OR NEARES',' J-6OX T; FREMAIN. DO NOT ABANDON 4 UP �I'CaiFed i S %NPLACE, --tiEAL. f-d L
<br />PENETRATIONS THROUGH WALLS AND FLOURS AT LiEl OVER ELECTRICAL SYS ;T M9 COMPONENTS.
<br />9. DEMOLISH AND RE.M9VE ANY RErAA;INIi`yG SUSPEitiDED CEILING C'Ii'ONENTS.
<br />10. EXISTING COINC 'ETE FLOOR SLA3 SHALL `BE LEVELED. BROOi I CLEAN" l!TH iN�:z,'EN!A"Ni'4G
<br />ADHESIVE_ RES!DiJtS, AND SEALED.
<br />11. REMOVAL OF ALL DEMOLITION AND :;ONSTRUC T ION DEBRIS SHALL SE %r"OORCINATED BE 1 VVEEN
<br />THE GENERAL CONTRACTOR AND THE LANDLORD AND SHALL COMPLY WITH ALL APPLICABLE CODES
<br />AND ORDINANCES.
<br />12, UPON COMPLETION OF DEMOLITION CONTRACTOR SHALL FIELD VERIFY ALL OVERALL
<br />DIMENSIONS, COLUMN SPACING, AND EXISTING OPENING SIZES. AND LOCATIONS, WITH DIMENSIONS
<br />INDICATED ON THE CONTRACT DRAINING S, NOTFARCHITECT OF ANY DISCREPANCIES.
<br />EXTERIOR WALLS:
<br />GC TO REPAIR AND REPLACE INSULATION AT EXTERIOR
<br />WALLS AS REQUIRED.
<br />DEMOLITION CEILING PLAN LEGEND
<br />DEMOLITION OF EXISTING GWB CEILING
<br />DEMOLITION OF EXISTING ACT CEILING
<br />—zz
<br />f
<br />l
<br />1
<br />I
<br />r
<br />esign ;-Iz ty es
<br />r i 'ct re
<br />I T� ) 81 E %C o I Dd v
<br />Tampa, Flotic.k) 3 605
<br />p 813 241 6700 f 813 247 ,3757
<br />•-��si �ana�j�I�s4�(Irc:�f{i,�le�t�.=:e.�:o;?��
<br />Al" reproduction & inm;'le.^.tiJ?l rf�p5ttv
<br />ngnts reservad 2017
<br />Project
<br />Do
<br />DrVIG - L"
<br />Z rE P H YRHillLIt-
<br />5935 7th Street Zephyrhllls,
<br />FL 33542
<br />Prepare: for
<br />Prepared
<br />DWITA MEDICAL GROUP
<br />In Association with:
<br />HEES & ASSOCI,IJES, Icy`:.
<br />CONTACT: KAR1_ H'
<br />1381 5TH ST
<br />SARASOTA, FL 34236
<br />PHONE. 941 955.45t;5
<br />KEYNOTES GENESIS EN3INEER GROUP. LLC
<br />- -- --- GONT"^T: "11KE HANEY
<br />20.C21 ;Ceiling To Be Removed1000 N. ASHL.EY DR. #900
<br />?AMPA, FL
<br />PHONE: 813.523.6A
<br />GENESIS ENGINEER GROUP. LLC
<br />CONTACT: NIIK` HIANEY
<br />1000 N. ASHLEY CiR. *900
<br />TA.N!PA, FQL
<br />PHONE:
<br />,y
<br />ProSLaal deaf
<br />T
<br />At
<br />c
<br />-Andrew-E� i 2'1012018
<br />15805 "j4 111:22:33 AM
<br />No. Revision Description Date
<br />1 PERM!T AND BID SET 12/10/2018
<br />t0. Date
<br />Drawn By: WJ Checked By: SRS
<br />Project Number: 18190
<br />Sheet Tile
<br />FIRST FLOOR
<br />DEMOLITION
<br />CEILING FLAN
<br />Original cvawinp is 24 x 36 Do not
<br />scale contents of dra%4ng
<br />1 DEMOLITION REFLECTED CEILING PLAN
<br />1 /4" - 1'-0" Sheet Number
<br />■