Laserfiche WebLink
-- -- d- _11 t I I 1- <br />I_ ' I I I II Plil 1L <br />m <br />Ln <br />0 <br />If <br />.o <br />r, <br />N <br />J <br />9 <br />0 <br />t <br />m <br />0 <br />cn <br />0 <br />.a <br />M <br />J <br />0 <br />I <br />LO <br />0 <br />t <br />Q <br />0 <br />0 <br />li <br />t° <br />4) <br />E <br />v` <br />C <br />J <br />y <br />ti <br />_E <br />O <br />vl <br />M <br />z <br />ga <br />0 <br />i <br />U <br />.G <br />i <br />co <br />t <br />i <br />c <br />0 <br />0 <br />0 <br />45 <br />0 <br />a <br />N <br />0 <br />4 <br />m <br />CROSS BRACING DETAIL (TYP.) <br />SCALE: NTS <br />TRUSS NOTES: <br />1. WOOD TRUSS ERECTOR SHALL PROVIDE BRACING ACCORDING TO ANSI/TP1-2014 MAY B FRAMED RIDGE <br />MAY BE NAILED <br />(TRUSS PLATE INSTITUTE) NOTE THAT THE COMBINED WIND AREA IS GREATER w/ MIN. (4) 12d WHEN <br />BEFORE THE ROOF SHEATHING IS APPLIED, AND BRACING SHALL THEREFORE BE IT LANDS NEXT TO <br />INSTALLED AS THE TRUSSES ARE ERECTED. INADEQUATE BRACING IS THE MOST PRE-ENG. TRUSS <br />COMMON CAUSE OF ACCIDENT IN WOOD TRUSS CONSTRUCTION. FULL BUNDLES <br />OF PLYWOOD SHALL NOT BE PLACED ON TRUSSES. THIS CONSTRUCTION LOAD <br />SHOULD BE LIMITED TO 8 SHEETS OF PLYWOOD ON ANY PAIR OF TRUSSES & <br />SHALL BE LOCATED ADJACENT TO THE SUPPORTS. NO EXCESS CONCENTRATION <br />OF ANY CONSTRUCTION MATERIAL (SUCH AS GRAVEL OR SHINGLES) SHALL BE PLACED <br />ON THE TRUSSES IN ANY ONE AREA THEY SHALL BE SPREAD OUT EVENLY OVER <br />A LARGE AREA SO AS TO AVOID OVERLOADING ANY ONE TRUSS. <br />2. ALL BRACING (DB,CB,BB) SHOWN ABOVE SHALL BE IN ADDITION TO CONTINUOUS <br />LATERAL BRACING SPECIFIED BY THE TRUSS MANUFACTER ALL LATERAL BRACING <br />SPECIFIED BY TRUSS MANUF. SHALL HAVE ADDITIONAL DIAGONAL BRACES AT 20'-0" <br />O.C. MAXIMUM. <br />3. ALL BRACES SHALL BE 2X4 NOMINAL DIMENSION LUMBER & SHALL BE ATTACHED w/ (3) 12d <br />NAILS AT EACH TRUSS INTERSECTION. Cg <br />4. ADDITIONAL BOTTOM CHORD BRACING SHALL BE INSTALLED AS REQUIRED BY TRUSS <br />DESIGN WHEREVER ADEQUATE STRUCTURAL CEILING ARE NOT <br />ATTACHED DIRECTLY TO THE BOTTOM CHORD OF THE TRUSS. DB <br />5. PROVIDE TRUSS BLOCKING AT ALL TRUSS BEARING SUPPORTS WHERE TRUSS <br />DEPTH EXCEEDS STANDARD HEEL HEIGHT. SEE TYP. TRUSS BLOCKING DETAILS <br />Vvl G-IVu `W Lnt/I r I I\VVV vv L-L., <br />TYP. HAND FRAMING ABOVE TRUSS <br />2X4 STUDS & PLATES AT 2'-0" O.C. <br />EACH DIRECTION TYP. U.N.O. <br />2x8 BLOCKING NAILED @ <br />EACH SIDE w/ (3) 12d NAILS <br />WHEN REQUIRED w/ (2) <br />SIMPSON HTS20 w/ (24) 10d x <br />1 1/2" NAILS EACH <br />�3 <br />TB <br />PRE-ENG. TRUSS <br />2X4 BLOCKING <br />2X4 DIAGONAL AT 8'-0" O.C. BETWEEN EA. TRUSS CONT. ROOF SHEATHING AT TRUSS TOP — <br />MAX & EACH END ALTERNATE A CHORD AT ALL HAND FRAMED AREAS TYP. <br />DIRECTION TYP. —� <br />�LWOOD TRUSS --j <br />A <br />TYP. WOOD TRUSS BLOCKING DETAIL <br />SCALE: NTS <br />WOOD WALL <br />OR TRUSS. <br />SEE PLAN <br />STRUCTURAL SHEATHING <br />ATTACHED PER NAILING <br />SCHEDULE <br />�= M0 • - <br />2X4 CONT. W/ (2) <br />16d COMMONS <br />NAILS EACH <br />STUD TYP. T&B <br />—TRUSS OR <br />ROOF SYSTEM <br />SHEAR TRANSFER <br />EXTERIOR. WALLr7 <br />SCALE: NTS <br />DIAGONAL - <br />AT 8'-0" <br />MAX <br />TRUSS <br />SEE ROOF <br />PLAN SHEATHING <br />2X4 BLOCKING <br />BETWEEN TRUSSES <br />SECT. A -A <br />PROVIDE 2X4 MIN. BLOCKING AT <br />Q OF HIP/RIDGE, TYP.BETWEEN <br />TRUSSES W/ (2) 12D NAILS EACH <br />END TO TRUSS TOP CHORD <br />TYP. <br />�'A TRUSS <br />G.T. ---- — <br />ADD 2X4 ALONGSIDE — <br />TOP CHORD WHEN REQ'D <br />TO PREVENT PLYWOOD <br />SPAN FROM EXCEEDING JACK <br />MAX 24" SPAN (EITHER USSES HIP <br />SIDE OR BOTH IF REQ'D) G.T <br />(2) 12D NAILS AT 12" O.C. MAX <br />HIP/RIDGE BLOCKING DETAIL <br />SCALE: NTS <br />VERTICAL SCAB 2 x 6 <br />#2 SPF 48" O.C. W/ (4) <br />10d TOP & BOTTOM <br />OR SIMPSON H2.5A w/ <br />(10) 8d NAILS <br />COLLAR TIE <br />EVERY 3rd <br />RAFTER <br />2x4 SPF 2 (2) #7 x 3-1/2" <br />WOOD SCREW EACH <br />TRUSS OR SIMPSON <br />H2.5A w/ (10) 8d NAILS <br />AT 48" O.C. <br />BEVEL CUTS <br />(OPTIONAL) <br />2x8 #2 SPF RIDGE BEAM <br />2x6 #2 SYP RAFTERS FOR SPANS 4FT <br />TO 8FT 2X4 RAFTERS FOR SPANS LESS <br />THAN 4FT @ 2'-0"O.C. MAX. w/ (3) 10d <br />COMMON TOENAILS TO TIE BEAM <br />2X4 CONT. AT—/ CONC. MASONRY <br />T & B CHORD STEEL OR WOOD <br />BEARING SUPPORT <br />A -A ALTERNATE BLOCKING <br />DETAIL a@ INTERIOR BEARING <br />SCALE: NTS <br />PROVIDE BLOCKING AT ALL TRUSS BEARING <br />SUPPORT WHERE TRUSS DEPTH EXCEEDS <br />STANDARD HEEL HEIGHT <br />VARIES <br />ROOF SHEATHING <br />ATTACHED PER <br />2X4 #2 SPF BRACING @ NAILING SCHEDULE <br />16" O.C. W/ (4) 12d COMMON TRUSSES. <br />TOENAILS TO TOP SEE TRUSS PLAN <br />PLATE & (2) 12d END MIN. (2) 2x4 FOR CONNECTION <br />NAILS TO TRUSS FSPFTEOP INFORMATION. <br />BOTTOM CHORD <br />VARIES SEE PLAN <br />FOR WALL LOCATION <br />�— MIN. 2X4 #2 SPF STUDS @ <br />If <br />16" O.C. W/ EXTERIOR <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE & <br />(3) 12d TOENAILS TO <br />OL SEE PLAN FOR <br />PLATE BELOW <br />TOP OF WALL <br />MIN. 2X4 #2 SYP P.T. PLATE <br />W/ 1 /2"X8" EPDXY ANCHOR <br />MASONRY WALL SEE <br />@ 3" FROM EACH END & <br />PLAN FOR MORE <br />p <br />16" O.C. MAX. <br />INFO. <br />° <br />SECTION <br />@ ENTRY <br />r8 <br />SCALE: NTS <br />N"j <br />SIMPSON LSTA18 <br />w/ (12) 10d NAILS <br />CENTERED AT <br />SPLIT TO TIE <br />BEAMS TOGETHER <br />SEE FLOOR PLAN <br />FOR COLUMN SIZE <br />& ADDITIONAL INF( <br />(2) 2x8 #2 SYP wf <br />O.S.B. FLITCH Pt <br />TOP @ TRUSS B <br />U.N.O. ON ROOF <br />PLAN <br />TYPIC <br />WALL <br />NOTE: PENDING BEAM <br />BEARING LOCATION, THE <br />BEAM CAN SIT ON TOP OF <br />COLUMN w/ (2) SIMPSON <br />HTS20 w/ (24) 10d x 1 1/2" <br />NAILS EACH <br />SIMPSON HU46/HUC46 w/ (8) <br />16d NAILS TO POST & (4) 10d <br />NAILS TO BEAM <br />SUPPORT COLUMN BUILT-UP <br />(2) 2x4's OR 4x4 w/ (2) 10d <br />NAILS @ 8" O.C. EACH PLY <br />(SHOWN AS 4 x 4) <br />(2) SIMPSON HETA20 w/ (8) 10d <br />x 1 1/2" NAILS EACH - OR (2) <br />SIMPSON MSTAM36 w/ (7) 10d <br />& (4) 1/4"x2 114" TITENS EACH <br />TIE BEAM <br />BEAM aC� RAISED ENTRY <br />2 MASONRY WALL r4 <br />SCALE: NTS <br />SIMPSON HUC410 w/ (14) <br />L.SEE PLAN L. <br />FOR CANT. <br />16d INTO HEADER & (6) <br />10d INTO BEAM - SEE <br />ROOF PLAN FOR MORE <br />71/ <br />INFO <br />SEE FLOOR PLAN FOR <br />COLUMN SIZE & BASE <br />7l16" OSB FLITCH PLATE <br />CONNECTION INFO <br />REQ'D ONLY WHEN <br />INDICATED ON BM. <br />SCHEDULE/PLAN <br />7/16" OSB FLITCH PLATE <br />SEE FLOOR PLAN <br />FOR <br />REQ'D ONLY WHEN <br />COLUMN SIZE & BASE <br />OPTION A SCHEDULE/PLANINDICATED ON M OPTION B CONNECTION IN OPTION C <br />COMMON BM. TO POST ATTACHMENT �a� <br />SEE ROOF PLAN <br />FOR BEAM SIZE & <br />CONNECTION INFO. <br />SIMPSON MTS18 w/ (14) <br />10d NAILS TYP. U.N.O. <br />SEE FLOOR PLAN FOR — <br />COLUMN SIZE & <br />ADDITIONAL INFO. <br />(WOOD COLUMN SHOWN) <br />A A <br />SEE PLAN FOR <br />SEE PLAN FOR <br />CANTILEVER IF <br />INDICATED <br />CORNER G SEE FOUNDATION <br />PLAN FOR MORE INFO <br />5" <br />COMMON BM. ATTACHMENT <br />SCALE: NTS <br />2X4 STUDS w/ SIMPSON <br />SP1 w/ (10) 10d NAILS <br />AT BASE SEE J/S6 FOR <br />MORE INFO. <br />EXTERIOR SHEATHING <br />ATTACHED PER <br />NAILING SCHEDULE <br />2x4 BASE PLATE W/ <br />SIMPSON LSTA30 w/ <br />(22) 10d NAILS OR <br />SIMPSON MTS12 w/ <br />(14) 10d x 1 1/2" NAILS <br />TO FLOOR GIRDER <br />BELOW @ 16" O.C. <br />16" FLOOR SYSTEM FLOOR GIRDER <br />SEE PLAN FOR SEE PLAN FOR <br />DIRECTION CONNECTION <br />SECTION a@ FLOOR <br />CONNECTION 22 <br />SCALE:NTS <br />SCALE: 3/4"=V-0" <br />SEE 1/S5 FOR <br />ADDITIONAL <br />OUTLOOKER <br />INFO. <br />1� <br />1/2" PLYWOOD <br />(2) 16d NAILS TO <br />EACH COMMON <br />TRUSS/ FRAMING <br />TYP TOP & BOTTOM <br />fBM. SPLICE OVER <br />CENTER OF POST <br />MIDDLE <br />SEE PLAN FOR <br />8d NAILS AT VALLEY TRUSS <br />4" O.C. INFO. <br />`—• MASONRY WALL BELOW: SIMPSON <br />°°. HETA16 w/ (9) 10d x 1 1/2" NAILS @ <br />MASONRY WALL 4'-0" O.C. TO GABLE TRUSS <br />OR BEAM . BEAM BELOW: SIMPSON HTS20 w/ <br />SEE TRUSS PLAN —::a (24) 10d x 1 1/2" NAILS @ 4'-0" O.C. <br />TO GABLE TRUSS <br />Q COMMON TRUSS <br />SEE ROOF PLAN <br />FOR CONNECTION <br />SECTION AT HIP GABLE rj_2� <br />SCALE: NTS <br />EXTERIOR <br />ATTACHED <br />SCHEDULE <br />JACK TRUSS (AS SHOWN) <br />OR GABLE END SEE TRUSS <br />LAYOUT <br />CLIP EACH TRUSS <br />(SEE ROOF PLAN <br />FOR TYPE) <br />FRAME OUT TO <br />BLOCK EDGE <br />SEE PLAN <br />FOR BEAM SIZE <br />2x SPF #2 <br />AT 16" O.C. <br />BUILDER FRAME <br />RADIUS <br />AS REQUIRED <br />KNEEWALL a@ ENTRY FRONT WALL <br />SCALE: NTS <br />2X4 #2 SYP NAILER. NAIL <br />TO STUDS w/ (3)16d AT <br />EACH STUD - TOENAIL <br />EACH TRUSS TO NAILER <br />W/ (3)10d <br />ROOF AND EXTERIOR <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE <br />SEE 2ND FLOOR WALL SECTION <br />FOR ADDITIONAL INFORMATION <br />SIMPSON LUS26 w/ (8) 10d NAILS —' <br />OR IF 2 PLY TRUSS SIMPSON <br />LUS26-2 w/ (8) 16d NAILS TO <br />SEE FLOOR FRAMING PLAN <br />LEDGER <br />AND J/S6 FOR MORE INFO. <br />2X10 #2 SYP CONT. LEDGER w/ (3) <br />VERIFY WITH PLAN FOR <br />LOCATION AND DIRECTION <br />1/2" X 4 1/2" LAG SCREWS ATTACH <br />(IF PARALLEL SEE 2/D2 FOR <br />LAG SCREWS INTO END OF EACH <br />BLOCKING INFO) <br />FLOOR TRUSS, 24" O.C. MAX. (AT <br />EACH SIDE OF G.T. INSTALL (4) LAG <br />MASONRY WALL <br />SCREWS EACH SIDE) <br />(TYPICAL) <br />SECTION AT LOW <br />ROOF 9 <br />SCALE:NTS <br />LOW ROOF/WALL <br />SHEATHING ATTACHED <br />PER NAILING SCHEDULE <br />2x STUDS @ 16" O.C. <br />W/ SIMPSON SP1 w/ (10) 10d <br />NAILS AT BASE & SIMPSON <br />SP2 w/ (12) 10d NAILS AT TOP <br />2x BLOCKING BETWEEN STUDS <br />TO TRUSS W/ (2) 12d TOENAILS <br />EACH END ( BETWEEN TRUSSES <br />(2) 12d NAILS TO EACH VERTICAL <br />STUD) <br />2x BASE PLATE W/ (2) 12d <br />NAILS @ 16" O.C. ALONG W/ <br />SIMPSON MTS12 w/ (14) 10d x <br />1 1/2" NAILS TO BLOCKING <br />BELOW @ 16" O.C. <br />PLYWOOD <br />FLOORING <br />LOW ROOF TRUSS W/� <br />L (2) 2x6 BLOCKING UNDER FLOOR G.T. <br />RAISED BOTTOM CHORD <br />2nd FLOOR WALL w/ SEE PLAN <br />EXTENSION SEE TRUSS <br />SIMPSON LUS24-2 w/ (16) <br />MANUF. SPEC'S FOR <br />16d NAILS AT EACH END <br />CONNECTIONS TO G.T. <br />SECTION @ <br />BUMP OUT 39 <br />SCALE: NTS <br />DETAILS &SECTIONS <br />0 <br />�.e <br />iV <br />y W <br />o <br />N'.. f0 C-' ►.. <br />N <br />21. � <br />a� <br />= E <br />�+ <br />co <br />J a✓ Oo <br />1. <br />r� <br />x� <br />a �tya <br />To the best of the Engineers knowledge, information and belief, <br />the structural <br />plans and specifications contained within these <br />drawings comply with the 2020 Florida Building Code - <br />Residential <br />7th Edition. Engineers signature and seal is only for <br />the structural <br />engineering portions of the drawing pages bearing <br />Engineers <br />signature and seal. <br />W <br />8 E <br />4 <br />O N O <br />5 � C: <br />0 <br />g� <br />of rn�� <br />Z� . � <br />y uiMw <br />v <br />LL w <br />J LL w o <br />_ w <br />o <br />Z m qrn <br />rya <br />W o@Ncn <br />Z � co z Q J <br />ILW 0�6jO� m w <br />/R N -� <br />OU o <br />Z <br />W ❑❑ <br />z N M <br />N <br />0 <br />Z � N <br />v� <br />� o <br />N <br />N <br />N zCzCD <br />o <br />a--J <br />U <br />0 w <br />�N <br />(U <br />di <br />z�W I <br />von <br />c M <br />¢ 0 <br />N <br />I� <br />ti <br />o <br />w <br />co <br />M <br />n ¢ <br />o� <br />Z <br />® <br />a E <br />ZZ <br />Za <br />14 <br />® <br />mo <br />co <br />oQ <br />00 <br />0K <br />O E <br />N <br />ao ¢ <br />o <br />aZ <br />W. <br />K <br />Cy <br />U <br />ym <br />oz <br />Z <br />J <br />Q° <br />QW <br />�z <br />N <br />oa <br />z <br />go <br />a <br />W <br />W <br />U <br />ao <br />aLL <br />�3 <br />J� <br />_� <br />W <br />O <br />Omi <br />a <br />�U <br />cY <br />ZI< <br />0 <br />= <br />�( <br />J <br />LOm <br />LO <br />co <br />Qco <br />(3) <br />Fes- <br />� <br />(10 T <br />N <br />� <br />Y <br />T <br />m <br />m <br />LN <br />r- <br />Qi <br />aj-+ <br />N <br />a) <br />N <br />r <br />T <br />�Q <br />r <br />C0 <br />T <br />E <br />z <br />z <br />E Mcc <br />FL <br />o a; <br />v _j a o <br />C <br />JOB <br />NO: 22-06475 <br />SCALE: AS NOTED <br />SHEET NO. <br />D1 <br />