1 1 1. f �. FUN. .. L BL--I' L___L _-__-_.__._- _-_ <br />FIRE PROTECTION GENERAL NOTES <br />1. PRIOR TO SUBMITTING A BID, THE FIRE PROTECTION SYSTEM CONTRACTOR SHALL VISIT THE JOB SITE AND VERIFY <br />EXACT LOCATIONS OF UTILITIES IN FIELD, ALL EXISTING BUILDING CONDITIONS AND THAT NO WORK WILL BE <br />REQUIRED OUTSIDE OF THE AREAS OF WORK SHOWN ON THE DRAWINGS. <br />2. THE FIRE PROTECTION SYSTEM CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND VERIFYING A CURRENT <br />WATER FLOW TEST AND PRESSURE DATA, THE DESIGN OF SHOP DRAWINGS AND, IF REQUIRED, PERFORMING <br />HYDRAULIC CALCULATIONS. CONTRACTOR SHALL PROVIDE ALL WORK CUSTOMARILY INCLUDED IF NOT SPECIFICALLY <br />CALLED FOR ON THE PLANSTHE INSTALLATION AND DESIGN SHALL COMPLY WITH <br />NFPA 13, 2002 EDITION, 2004/2006 FLORIDA FIRE PREVENTION CODE, 2004/2006 FLORIDA BUILDING CODE CHAPTER <br />NINE FIRE PROTECTION SYSTEMS, FLORIDA ADMINISTRATIVE CODE CHAPTER 61G15-32 AND ALL OTHER CITY, COUNTY <br />AND STATE REGULATIONS. <br />3. THE FIRE PROTECTION SYSTEM CONTRACTOR SHALL SUBMIT THE SHOP DRAWINGS (WHICH SHALL INDICATE DESIGN <br />CRITERIA USED TO ESTABLISH DESIGN DENSITIES I.E. OCCUPANCY USE, OCCUPANCY CLASSIFICATION, TYPE OF <br />COMMODITY, COMMODITY CLASSIFICATION, STORAGE CONFIGURATION, MAXIMUM AVAILABLE HEIGHT FOR STORAGE, AND <br />APPROPRIATE CODE REFERENCES), MANUFACTURER'S SPECIFICATIONS AND HYDRAULIC CALCULATIONS, IF REQUIRED, <br />TO THE LOCAL AUTHORITY HAVING JURISDICTION FOR REVIEW, APPROVAL AND PERMITTING PRIOR TO INSTALLATION <br />OR MODIFICATION OF THE AUTOMATIC SPRINKLER SYSTEM. ALL DRAWINGS AND CALCULATIONS SHALL BE SIGNED AND <br />SEALED BY THE FIRE PROTECTION SYSTEM CONTRACTOR'S REGISTERED FIRE PROTECTION ENGINEER. THE ARCHITECT <br />SHALL RECEIVE TWO COPIES OF THE SHOP DRAWINGS, MANUFACTURER'S SPECIFICATIONS AND REQUIRED HYDRAULIC <br />CALCULATIONS FOR THEIR RECORDS. <br />4. THE FIRE PROTECTION SYSTEM CONTRACTOR SHALL VERIFY INSTALLATIONS AND OBSTRUCTIONS OF ALL TRADES AND <br />SHALL COORDINATE ALL FIRE PROTECTION WORK WITH OTHER TRADES, NEW AND EXISTING, AND ROUTE PIPING TO <br />AVOID INTERFERENCES. <br />5. THE FIRE PROTECTION SYSTEM CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FEES, PERMITS AND INSPECTIONS <br />REQUIRED TO PERFORM THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS AND SHOP DRAWINGS. <br />6. THE FIRE PROTECTION SYSTEM CONTRACTOR, PER NFPA 13, 2002 EDITION, SHALL PERFORM ALL REQUIRED <br />ACCEPTANCE TESTS, COMPLETE THE CONTRACTOR'S MATERIAL AND TEST CERTIFICATES, AND FORWARD THE <br />CERTIFICATES TO THE AUTHORITY HAVING JURISDICTION PRIOR TO ASKING FOR APPROVAL OF THE INSTALLATION. <br />7. THE FIRE PROTECTION SYSTEM CONTRACTOR, AFTER EXAMINATION OF ALL EXISTING CONDITIONS, PLANS AND <br />SPECIFICATIONS, SHALL INCLUDE ALL COSTS NECESSARY FOR ALTERATION, MODIFICATIONS, AND/OR ADDITIONS TO <br />THE FIRE SPRINKLER SYSTEM NECESSARY TO MAKE THE COMPLETE AND FINISHED INSTALLA1ON IN ALL ASPECTS. IT <br />IS THE INTENT THAT ALL COSTS FOR THE WORK REQUIRED BE IN THE BID OF THIS TRADE. <br />8. ALL MATERIAL (SPRINKLER HEADS, PIPING, FITTINGS, ETC.) SHALL BE IN CONFORMANCE WITH NFPA 13, 2002 <br />EDITION, AND ALL OTHER APPLICABLE CODES. <br />9. ALL SHUTDOWNS OF THE FIRE SPRINKLER SYSTEM TO PERFORM THE WORK UNDER THIS CONTRACT SHALL <br />BE COORDINATED WITH THE BUILDING OWNER/ENGINEERING DEPARTMENT TO MINIMIZE OR AVOID INCONVENIENCE TO <br />THE BUILDING TENANTS. <br />10. FIRE PROTECTION PIPING 2" OR SMALLER SHALL BE BLACK STEEL SCHEDULE 40 AND IN ACCORDANCE WITH ASTM <br />A120 AND ASTM A795. PIPE 2 1 /2" AND LARGER PIPE SHALL BE BLACK STEEL LIGHTWALL SCHEDULE 10 AND IN <br />ACCORDANCE WITH ASTM A135. PIPING AND FITTINGS SHALL ADHERE TO NFPA, 2002 EDITION. <br />11. THE SPRINKLER HEADS SHOWN ON THE DRAWING ARE FOR REFERENCE ONLY. MORE HEADS MAY BE NECESSARY <br />FOR THE DESIGN TO COMPLY WITH ALL CODES AND STANDARDS. <br />12. THE METHODS OF HANGING PIPE, HEADERS AND BRANCHES SHALL BE APPROVED BY NFPA 13, 2002 EDITION. ALL <br />PIPING SHALL BE FIRMLY ANCHORED AND SUPPORTED TO PREVENT SWAY AND VIBRATION THE ENTIRE LENGTH. <br />PROVIDE DETAIL AND INDICATE TYPE OF HANGER TO BE INSTALLED FOR THE FIRE PROTECTION SYSTEM PIPING. <br />13. PROVIDE FIRE RATED SLEEVES AND UL LISTED FIRESTOPPING AT ALL PENETRATIONS OF SMOKE/FIRE WALLS, <br />CEILINGS, ROOFS, ETC. FLASH AND COUNTER FLASH ROOF PENETRATIONS. <br />14. INDICATE CENTER TO CENTER DIMENSIONS, PIPE CUT LENGTHS AND NOMINAL PIPE DIAMETERS ON ALL PIPING. <br />15. REFER TO AND COORDINATE WITH THE ARCHITECTURAL REFLECTED CEILING PLANS FOR CEILING TYPES, HEIGHTS AND <br />OTHER CEILING MOUNTED DEVICES. THE OWNER AND THE ARCHITECT RESERVE THE RIGHT TO MODIFY HEAD <br />LOCATIONS TO CREATE AN AESTHETIC DESIGN. <br />16. ROUTE ALL PIPING CONCEALED ABOVE CEILINGS, WITHIN WALLS, IN MECHANICAL ROOMS, OR IN CHASES EXCEPT AS <br />SPECIFICALLY NOTED. <br />17. COORDINATE LOCATION OF ANY NEW OR RELOCATED SIAMESE CONNECTIONS WITH ARCHITECT, SITE LAYOUT, AND FIRE <br />DEPARTMENT. PROVIDE REMOTE SIAMESE CONNECTIONS AS REQUIRED FOR FIRE DEPARTMENT ACCESS FROM DRIVE. <br />18. LOCATION OF INSPECTORS TEST STATIONS, ISOLATION VALVES AND DRAIN DOWN VALVES SHALL <br />BE COORDINATED AS TO MINIMIZE PLACEMENT OF THESE DEVICES INSIDE TENANT SPACES. PROVIDE DRAIN DOWN <br />VALVES FOR ANY AND ALL TRAPPED SECTION OF PIPING PER NFPA 13 AND 2002 EDITION. ALL DISCHARGED <br />SHALL BE ARRANGED TO MINIMIZE DAMAGE TO THE BUILDING. ALL DRAIN PIPING SHALL BE GALVANIZED. PROVIDE <br />ACCESS PANELS TO ANY VALVES ABOVE NON -ACCESSIBLE CEILING AND IN CHASES. ALL DRAIN DOWN VALVES AND <br />INSPECTOR'S TEST STATION VALVES SHALL BE CHAINED AND PADLOCKED. <br />19. ALL ISOLATION VALVES SHALL BE SUPERVISED. PROVIDE TAMPER SWITCHES ON ALL CONTROL VALVES. <br />COORDINATE WITH FIRE ALARM CONTRACTOR. <br />20. SPRINKLER HEADS MOUNTED LESS THAN 7 FEET ABOVE FINISHED FLOOR SHALL BE PROTECTED WITH A WIRE CAGE <br />TYPE GUARD. <br />21. SPRINKLER CONTRACTOR SHALL INSTALL AND ACTIVATE THE EN11RE SPRINKLER SYSTEM PRIOR TO THE ISSUANCE OF <br />THE CERTIFICATE OF OCCUPANCY. <br />22. ALL FIRE PROTECTION SYSTEMS SHALL BE TESTED AS REQUIRED PER NFPA 13, 2002 EDITION AND LOCAL <br />AUTHORITY HAVING JURISDICTION BEFORE ANY SYSTEMS ARE CONCEALED. <br />23. CONTRACTOR SHALL CONDUCT HYDROSTATIC TESTS IN COMPLIANCE WITH NFPA 13, 2002 EDITION (TWO HOUR AT <br />200 PSI OR 100 PSI OVER NORMAL SYSTEM PRESSURE MINIMUM). PIPING SUBJECT TO FREEZING DURING TEST <br />PERIOD SHALL BE TESTED WITH COMPRESSED AIR. <br />24. CERTIFICATES OF APPROVAL OF INSTALLATION SHALL BE OBTAINED FROM THE AUTHORITY HAVING JURISDICTION AND <br />FORWARDED TO THE OWNER. <br />26. THE FINAL INSPECTION AND APPROVAL OF THE FIRE PROTECTION SYSTEM SHALL BE BY THE LOCAL FIRE MARSHALL. <br />27. AFTER TESTS ARE CONDUCTED AND ANY REPAIRS COMPLETED, COMPLETELY FLUSH THE PIPING SYSTEMS WITH <br />WATER UNTIL DISCHARGE SHOWS NO DISCOLORATION. <br />28. ONLY NEW SPRINKLERS SHALL BE EMPLOYED IN THE INSTALLATION OF SPRINKLER SYSTEMS. AT <br />LEAST TWELVE SPARE SPRINKLER HEADS OF EACH TYPE, TEMPERATURE RATING, AND ORIFICE <br />SIZE USED IN THE SYSTEMS SHALL BE KEPT IN THE PREMISES. REPLACEMENT SPRINKLERS <br />SHALL HAVE THE SAME OPERATING CHARACTERISTICS AS THE SPRINKLER HEADS BEING <br />REPLACED. <br />29. ANY PORTION OF THE SPRINKLER SYSTEMS WHICH IS SUBJECT TO FREEZING SHALL BE <br />PROTECTED AGAINST THIS EXPOSURE. <br />30. ALARMS SHALL BE OF SUFFICIENT INTENSITY TO BE CLEARLY AUDIBLE IN OVER BACKGROUND <br />NOISE LEVELS WITH ALL INTERVENING DOORS CLOSED. <br />31• FIRE STOP ALL PENETRATIONS OF SMOKE/FIRE WALLS. FIRE STOPPING SHALL BE OF U.L. <br />LISTED ASSEMBLY. <br />FLORIDA ADMINISTRATIVE CODE CHAPTER <br />61G15-32 NOTES <br />61G15-32.003 - COMMON REQUIREMENTS TO ALL FIRE PROTEC11ON ENGINEERING DOCUMENTS <br />(1) THE FIRE PROTECTION SYSTEM CONTRACTOR'S SCOPE OF WORK SHALL INCLUDE THE PREPARATION AND DESIGN OF <br />THE FIRE PROTECTION SYSTEM LAYOUT DOCUMENTS AND ALL NECESSARY COMPONENTS, SYSTEMS, MATERIALS, <br />ASSEMBLIES, EQUIPMENT AND SUPPORT SYSTEMS REQUIRED. SEE GENERAL NOTES AND NOTE (4) BELOW. <br />(2) THE FIRE PROTECTION SYSTEM AND COMPONENTS SHALL BE TESTED IN ACCORDANCE WITH NFPA 13, 2002 EDITION. <br />(3) SEE 61 G15-32.004 (2c) BELOW. <br />(4) THE FIRE WITH NFPAPROTECTION 1133, 2002EDITIONMDESIGN LAYOUT DOCUMENTS PREPARED DESIGNED ACCORDANCE 2004/2006 FLORIDA FIREPREVENTION CODE, 2004/2006 FLORIDA BUILDING CODE <br />CHAPTER NINE FIRE PROTECTION SYSTEMS AND ALL OTHER APPLICABLE CITY, COUNTY AND STATE REGULATIONS. <br />(5) PROVIDE PIPING SUPPORT FROM STRUCTURAL AS REQUIRED PER NFPA 13 STANDARDS. <br />(6) THE FIRE PROTECTION SYSTEM CONTRACTOR WILL PREPARE THE FIRE PROTECTION SYSTEM LAYOUT DOCUMENTS AND <br />THEREFORE BECOME THE FIRE PROTECTION ENGINEER OF RECORD. <br />(7) THE FIRE PROTECTION SYSTEM CONTRACTOR SHALL VERIFY THESE REQUIREMENTS. <br />(8) THE FIRE PROTECTION SYSTEM CONTRACTOR WILL PREPARE THE FIRE PROTECTION SYSTEM LAYOUT DOCUMENTS AND <br />THEREFORE BECOME THE FIRE PROTECTION ENGINEER OF RECORD AND WILL ASSIST THE AUTHORITY HAVING <br />JURISDICTION. <br />61 G15-32.004 - DESIGN OF WATER BASED FIRE PROTECTION SYSTEMS <br />(1) THE SYSTEM IS AN AUTOMATIC WET SPRINKLER SYSTEM - THE FIRE PROTECTION SYSTEM CONTRACTOR <br />SHALL VERIFY THESE REQUIREMENTS. <br />(2a) THE FIRE PROTECTION SYSTEM CONTRACTOR SHALL VERIFY THE POINT OF SERVICE. <br />(2b) SEE 61G15-32.003 (4) ABOVE. <br />(2c) THE FIRE PROTECTION SYSTEM IN THIS PROJECT SHALL COVER THESE OCCUPANCIES: <br />ALL KITCHEN SPACES, EMPLOYEE SERVICE SPACES, STORAGE <br />ROOMS, MECHANICAL ROOMS AND ELECTRICAL ROOMS SHALL BE CLASSIFIED AS ORDINARY <br />HAZARD GROUP I. ALL OTHER AREAS SHALL BE CLASSIFIED AS LIGHT HAZARD. <br />(2d) THE FIRE PROTECTION SYSTEM CONTRACTOR'S SYSTEM LAYOUT DOCUMENTS SHALL INDICATE THE SYSTEM TYPE, <br />DENSITIES, DEVICE TEMPERATURE RATING AND SPACING FOR EACH SEPARATE HAZARD OCCUPANCY. HYDRAULIC <br />CALCULATIONS SHALL BE PERFORMED IN ACCORDANCE WITH NFPA 13 , 2002 EDITION, AS REQUIRED. <br />(2e) THE FIRE PROTECTION SYSTEM CONTRACTOR SHALL VERIFY THE WATER SUPPLY DATA. <br />(2f) THE FIRE PROTECTION SYSTEM CONTRACTOR SHALL VERIFY ALL FLOW TEST AND PRESSURE DATA. <br />(2g) THE FIRE PROTECTION SYSTEM CONTRACTOR SHALL VERIFY VALUING AND ALARM REQUIREMENTS. <br />(2h) THE LOCAL UTILITY PURVEYOR AND FIRE MARSHALL CONTINUOUSLY MONITOR THE WATER SUPPLY FOR CONTAMINANTS <br />WHICH MAY CAUSE MICROBIAL INDUCED CORROSION. THE ENGINEER SHALL BE NOTIFIED IF ANY CORRECTIVE <br />MEASURE'S SHALL BE TAKEN. <br />(2i) THE DOUBLE CHECK VALVE ASSEMBLY SHALL BE LOCATED ON SITE BY THE CIVIL ENGINEER. <br />REFER TO CIVIL DRAWINGS FOR LOCATION. <br />(2j) ALL YARD AND INTERIOR FIRE PROTECTION COMPONENTS SHALL BE LISTED IN ACCORDANCE WITH NFPA 13, 2002 <br />EDITION. <br />(3) THE FIRE PROTECTION SYSTEM CONTRACTOR WILL PREPARE THE FIRE PROTECTION SYSTEM LAYOUT DOCUMENTS AND <br />THEREFORE BECOME THE FIRE PROTECTION ENGINEER OF RECORD. <br />(4) THE FIRE PROTECTION SYSTEM CONTRACTOR WILL PREPARE THE FIRE PROTECTION SYSTEM LAYOUT DOCUMENTS AND <br />THEREFORE BECOME THE FIRE PROTECTION ENGINEER OF RECORD. <br />PROVIDE WITH <br />DOUBLE CHECK VALVE ASSEMBLY - DETAIL <br />i <br />FIRE SPRINKLER HEAD SCHEDULE <br />TYPE <br />TEMP <br />ORIFICE <br />K-FACT <br />QUICK RESPONSE RECESSED PENDENT <br />SPRINKLER HEAD - TYCO MODEL <br />155' <br />1 /2" <br />5.6 <br />"TY-FRB" <br />QUICK RESPONSE RECESSED PENDENT <br />SPRINKLER HEAD - TYCO MODEL <br />200' <br />1 /2" <br />5.6 <br />200' <br />"TY-FRB" <br />0 <br />QUICK RESPONSE RECESSED DRY <br />PENDENT SPRINKLER HEAD - TYCO <br />155' <br />1 <br />5.6 <br />DRY <br />MODEL "DS-1" <br />QUICK RESPONSE DRY SIDEWALL <br />-4DRY <br />SPRINKLER HEAD - TYCO MODEL <br />155' <br />1" <br />5.6 <br />"DS-1" <br />�- (2) 2-1/2" FIRE <br />DEPARTMENT CONNECTIONS. <br />CHECK <br />TO SPRINKLER SYSTEM <br />FLOW SWITCH <br />TEST AND DRAIN <br />VALVE. <br />2" DRAIN TO OUTSIDE J <br />J <br />FINISHED FLOOR SLAB <br />THRUST BLOCK J <br />PRESSURE GAUGE <br />',� ELECTRIC BELL <br />EXTERIOR WALL <br />4" U.G. FIRE MAIN. REFER TO CIVIL <br />SITE PLAN FOR CONTINUATION. <br />D.I. UNDG UNDER BLDG <br />FIRE RISER - DETAIL <br />N TS <br />PROVIDE WITH TAMPER SWITCH - <br />POST INDICATOR VALVE - DETAIL <br />L <br />0, <br />Nr <br />> <br />"C <br />L" <br />Lr) O <br />r <br />I <br />• <br />0� <br />011 %0 <br />4- <br />o <br />o <br />v <br />c <br />o <br />`'- <br />Oa <br />c <br />'c <br />c <br />0 <br />a <br />a) <br />0 <br />00 <br />0 <br />N <br />M <br />O <br />_0 <br />U <br />W <br />o <br />v <br />�- <br />0 <br />i <br />� <br />c <br />o <br />L <br />m <br />10 Cu <br />w r? <br />Z <br />ao <br />L } � (g) <br />JQ iu0,av <br />(� z r` <br />v ww ax�� <br />Z0N� �pl�'t <br />Wv i� �a~� <br />© copyright <br />N <br />lq- <br />LO <br />M <br />" M <br />a O <br />0 . <br />L <br />_O <br />v; <br />o = <br />m s <br />O s <br />�o a <br />�O N <br />revisions: <br />0 <br />0 <br />0 <br />0 <br />drawn: HD <br />checked: HD <br />date: 03-21-08 <br />prof. no: P07-15B <br />FS= 1 <br />N TS <br />N TS <br />