<br />FIRE PROTECTION GENERAL NOTES
<br />1. PRIOR TO SUBMITTING A BID, THE FIRE PROTECTION SYSTEM CONTRACTOR SHALL VISIT THE JOB SITE AND VERIFY
<br />EXACT LOCATIONS OF UTILITIES IN FIELD, ALL EXISTING BUILDING CONDITIONS AND THAT NO WORK WILL BE
<br />REQUIRED OUTSIDE OF THE AREAS OF WORK SHOWN ON THE DRAWINGS.
<br />2. THE FIRE PROTECTION SYSTEM CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING AND VERIFYING A CURRENT
<br />WATER FLOW TEST AND PRESSURE DATA, THE DESIGN OF SHOP DRAWINGS AND, IF REQUIRED, PERFORMING
<br />HYDRAULIC CALCULATIONS. CONTRACTOR SHALL PROVIDE ALL WORK CUSTOMARILY INCLUDED IF NOT SPECIFICALLY
<br />CALLED FOR ON THE PLANSTHE INSTALLATION AND DESIGN SHALL COMPLY WITH
<br />NFPA 13, 2002 EDITION, 2004/2006 FLORIDA FIRE PREVENTION CODE, 2004/2006 FLORIDA BUILDING CODE CHAPTER
<br />NINE FIRE PROTECTION SYSTEMS, FLORIDA ADMINISTRATIVE CODE CHAPTER 61G15-32 AND ALL OTHER CITY, COUNTY
<br />AND STATE REGULATIONS.
<br />3. THE FIRE PROTECTION SYSTEM CONTRACTOR SHALL SUBMIT THE SHOP DRAWINGS (WHICH SHALL INDICATE DESIGN
<br />CRITERIA USED TO ESTABLISH DESIGN DENSITIES I.E. OCCUPANCY USE, OCCUPANCY CLASSIFICATION, TYPE OF
<br />COMMODITY, COMMODITY CLASSIFICATION, STORAGE CONFIGURATION, MAXIMUM AVAILABLE HEIGHT FOR STORAGE, AND
<br />APPROPRIATE CODE REFERENCES), MANUFACTURER'S SPECIFICATIONS AND HYDRAULIC CALCULATIONS, IF REQUIRED,
<br />TO THE LOCAL AUTHORITY HAVING JURISDICTION FOR REVIEW, APPROVAL AND PERMITTING PRIOR TO INSTALLATION
<br />OR MODIFICATION OF THE AUTOMATIC SPRINKLER SYSTEM. ALL DRAWINGS AND CALCULATIONS SHALL BE SIGNED AND
<br />SEALED BY THE FIRE PROTECTION SYSTEM CONTRACTOR'S REGISTERED FIRE PROTECTION ENGINEER. THE ARCHITECT
<br />SHALL RECEIVE TWO COPIES OF THE SHOP DRAWINGS, MANUFACTURER'S SPECIFICATIONS AND REQUIRED HYDRAULIC
<br />CALCULATIONS FOR THEIR RECORDS.
<br />4. THE FIRE PROTECTION SYSTEM CONTRACTOR SHALL VERIFY INSTALLATIONS AND OBSTRUCTIONS OF ALL TRADES AND
<br />SHALL COORDINATE ALL FIRE PROTECTION WORK WITH OTHER TRADES, NEW AND EXISTING, AND ROUTE PIPING TO
<br />AVOID INTERFERENCES.
<br />5. THE FIRE PROTECTION SYSTEM CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FEES, PERMITS AND INSPECTIONS
<br />REQUIRED TO PERFORM THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS AND SHOP DRAWINGS.
<br />6. THE FIRE PROTECTION SYSTEM CONTRACTOR, PER NFPA 13, 2002 EDITION, SHALL PERFORM ALL REQUIRED
<br />ACCEPTANCE TESTS, COMPLETE THE CONTRACTOR'S MATERIAL AND TEST CERTIFICATES, AND FORWARD THE
<br />CERTIFICATES TO THE AUTHORITY HAVING JURISDICTION PRIOR TO ASKING FOR APPROVAL OF THE INSTALLATION.
<br />7. THE FIRE PROTECTION SYSTEM CONTRACTOR, AFTER EXAMINATION OF ALL EXISTING CONDITIONS, PLANS AND
<br />SPECIFICATIONS, SHALL INCLUDE ALL COSTS NECESSARY FOR ALTERATION, MODIFICATIONS, AND/OR ADDITIONS TO
<br />THE FIRE SPRINKLER SYSTEM NECESSARY TO MAKE THE COMPLETE AND FINISHED INSTALLA1ON IN ALL ASPECTS. IT
<br />IS THE INTENT THAT ALL COSTS FOR THE WORK REQUIRED BE IN THE BID OF THIS TRADE.
<br />8. ALL MATERIAL (SPRINKLER HEADS, PIPING, FITTINGS, ETC.) SHALL BE IN CONFORMANCE WITH NFPA 13, 2002
<br />EDITION, AND ALL OTHER APPLICABLE CODES.
<br />9. ALL SHUTDOWNS OF THE FIRE SPRINKLER SYSTEM TO PERFORM THE WORK UNDER THIS CONTRACT SHALL
<br />BE COORDINATED WITH THE BUILDING OWNER/ENGINEERING DEPARTMENT TO MINIMIZE OR AVOID INCONVENIENCE TO
<br />THE BUILDING TENANTS.
<br />10. FIRE PROTECTION PIPING 2" OR SMALLER SHALL BE BLACK STEEL SCHEDULE 40 AND IN ACCORDANCE WITH ASTM
<br />A120 AND ASTM A795. PIPE 2 1 /2" AND LARGER PIPE SHALL BE BLACK STEEL LIGHTWALL SCHEDULE 10 AND IN
<br />ACCORDANCE WITH ASTM A135. PIPING AND FITTINGS SHALL ADHERE TO NFPA, 2002 EDITION.
<br />11. THE SPRINKLER HEADS SHOWN ON THE DRAWING ARE FOR REFERENCE ONLY. MORE HEADS MAY BE NECESSARY
<br />FOR THE DESIGN TO COMPLY WITH ALL CODES AND STANDARDS.
<br />12. THE METHODS OF HANGING PIPE, HEADERS AND BRANCHES SHALL BE APPROVED BY NFPA 13, 2002 EDITION. ALL
<br />PIPING SHALL BE FIRMLY ANCHORED AND SUPPORTED TO PREVENT SWAY AND VIBRATION THE ENTIRE LENGTH.
<br />PROVIDE DETAIL AND INDICATE TYPE OF HANGER TO BE INSTALLED FOR THE FIRE PROTECTION SYSTEM PIPING.
<br />13. PROVIDE FIRE RATED SLEEVES AND UL LISTED FIRESTOPPING AT ALL PENETRATIONS OF SMOKE/FIRE WALLS,
<br />CEILINGS, ROOFS, ETC. FLASH AND COUNTER FLASH ROOF PENETRATIONS.
<br />14. INDICATE CENTER TO CENTER DIMENSIONS, PIPE CUT LENGTHS AND NOMINAL PIPE DIAMETERS ON ALL PIPING.
<br />15. REFER TO AND COORDINATE WITH THE ARCHITECTURAL REFLECTED CEILING PLANS FOR CEILING TYPES, HEIGHTS AND
<br />OTHER CEILING MOUNTED DEVICES. THE OWNER AND THE ARCHITECT RESERVE THE RIGHT TO MODIFY HEAD
<br />LOCATIONS TO CREATE AN AESTHETIC DESIGN.
<br />16. ROUTE ALL PIPING CONCEALED ABOVE CEILINGS, WITHIN WALLS, IN MECHANICAL ROOMS, OR IN CHASES EXCEPT AS
<br />SPECIFICALLY NOTED.
<br />17. COORDINATE LOCATION OF ANY NEW OR RELOCATED SIAMESE CONNECTIONS WITH ARCHITECT, SITE LAYOUT, AND FIRE
<br />DEPARTMENT. PROVIDE REMOTE SIAMESE CONNECTIONS AS REQUIRED FOR FIRE DEPARTMENT ACCESS FROM DRIVE.
<br />18. LOCATION OF INSPECTORS TEST STATIONS, ISOLATION VALVES AND DRAIN DOWN VALVES SHALL
<br />BE COORDINATED AS TO MINIMIZE PLACEMENT OF THESE DEVICES INSIDE TENANT SPACES. PROVIDE DRAIN DOWN
<br />VALVES FOR ANY AND ALL TRAPPED SECTION OF PIPING PER NFPA 13 AND 2002 EDITION. ALL DISCHARGED
<br />SHALL BE ARRANGED TO MINIMIZE DAMAGE TO THE BUILDING. ALL DRAIN PIPING SHALL BE GALVANIZED. PROVIDE
<br />ACCESS PANELS TO ANY VALVES ABOVE NON -ACCESSIBLE CEILING AND IN CHASES. ALL DRAIN DOWN VALVES AND
<br />INSPECTOR'S TEST STATION VALVES SHALL BE CHAINED AND PADLOCKED.
<br />19. ALL ISOLATION VALVES SHALL BE SUPERVISED. PROVIDE TAMPER SWITCHES ON ALL CONTROL VALVES.
<br />COORDINATE WITH FIRE ALARM CONTRACTOR.
<br />20. SPRINKLER HEADS MOUNTED LESS THAN 7 FEET ABOVE FINISHED FLOOR SHALL BE PROTECTED WITH A WIRE CAGE
<br />TYPE GUARD.
<br />21. SPRINKLER CONTRACTOR SHALL INSTALL AND ACTIVATE THE EN11RE SPRINKLER SYSTEM PRIOR TO THE ISSUANCE OF
<br />THE CERTIFICATE OF OCCUPANCY.
<br />22. ALL FIRE PROTECTION SYSTEMS SHALL BE TESTED AS REQUIRED PER NFPA 13, 2002 EDITION AND LOCAL
<br />AUTHORITY HAVING JURISDICTION BEFORE ANY SYSTEMS ARE CONCEALED.
<br />23. CONTRACTOR SHALL CONDUCT HYDROSTATIC TESTS IN COMPLIANCE WITH NFPA 13, 2002 EDITION (TWO HOUR AT
<br />200 PSI OR 100 PSI OVER NORMAL SYSTEM PRESSURE MINIMUM). PIPING SUBJECT TO FREEZING DURING TEST
<br />PERIOD SHALL BE TESTED WITH COMPRESSED AIR.
<br />24. CERTIFICATES OF APPROVAL OF INSTALLATION SHALL BE OBTAINED FROM THE AUTHORITY HAVING JURISDICTION AND
<br />FORWARDED TO THE OWNER.
<br />26. THE FINAL INSPECTION AND APPROVAL OF THE FIRE PROTECTION SYSTEM SHALL BE BY THE LOCAL FIRE MARSHALL.
<br />27. AFTER TESTS ARE CONDUCTED AND ANY REPAIRS COMPLETED, COMPLETELY FLUSH THE PIPING SYSTEMS WITH
<br />WATER UNTIL DISCHARGE SHOWS NO DISCOLORATION.
<br />28. ONLY NEW SPRINKLERS SHALL BE EMPLOYED IN THE INSTALLATION OF SPRINKLER SYSTEMS. AT
<br />LEAST TWELVE SPARE SPRINKLER HEADS OF EACH TYPE, TEMPERATURE RATING, AND ORIFICE
<br />SIZE USED IN THE SYSTEMS SHALL BE KEPT IN THE PREMISES. REPLACEMENT SPRINKLERS
<br />SHALL HAVE THE SAME OPERATING CHARACTERISTICS AS THE SPRINKLER HEADS BEING
<br />REPLACED.
<br />29. ANY PORTION OF THE SPRINKLER SYSTEMS WHICH IS SUBJECT TO FREEZING SHALL BE
<br />PROTECTED AGAINST THIS EXPOSURE.
<br />30. ALARMS SHALL BE OF SUFFICIENT INTENSITY TO BE CLEARLY AUDIBLE IN OVER BACKGROUND
<br />NOISE LEVELS WITH ALL INTERVENING DOORS CLOSED.
<br />31• FIRE STOP ALL PENETRATIONS OF SMOKE/FIRE WALLS. FIRE STOPPING SHALL BE OF U.L.
<br />LISTED ASSEMBLY.
<br />FLORIDA ADMINISTRATIVE CODE CHAPTER
<br />61G15-32 NOTES
<br />61G15-32.003 - COMMON REQUIREMENTS TO ALL FIRE PROTEC11ON ENGINEERING DOCUMENTS
<br />(1) THE FIRE PROTECTION SYSTEM CONTRACTOR'S SCOPE OF WORK SHALL INCLUDE THE PREPARATION AND DESIGN OF
<br />THE FIRE PROTECTION SYSTEM LAYOUT DOCUMENTS AND ALL NECESSARY COMPONENTS, SYSTEMS, MATERIALS,
<br />ASSEMBLIES, EQUIPMENT AND SUPPORT SYSTEMS REQUIRED. SEE GENERAL NOTES AND NOTE (4) BELOW.
<br />(2) THE FIRE PROTECTION SYSTEM AND COMPONENTS SHALL BE TESTED IN ACCORDANCE WITH NFPA 13, 2002 EDITION.
<br />(3) SEE 61 G15-32.004 (2c) BELOW.
<br />(4) THE FIRE WITH NFPAPROTECTION 1133, 2002EDITIONMDESIGN LAYOUT DOCUMENTS PREPARED DESIGNED ACCORDANCE 2004/2006 FLORIDA FIREPREVENTION CODE, 2004/2006 FLORIDA BUILDING CODE
<br />CHAPTER NINE FIRE PROTECTION SYSTEMS AND ALL OTHER APPLICABLE CITY, COUNTY AND STATE REGULATIONS.
<br />(5) PROVIDE PIPING SUPPORT FROM STRUCTURAL AS REQUIRED PER NFPA 13 STANDARDS.
<br />(6) THE FIRE PROTECTION SYSTEM CONTRACTOR WILL PREPARE THE FIRE PROTECTION SYSTEM LAYOUT DOCUMENTS AND
<br />THEREFORE BECOME THE FIRE PROTECTION ENGINEER OF RECORD.
<br />(7) THE FIRE PROTECTION SYSTEM CONTRACTOR SHALL VERIFY THESE REQUIREMENTS.
<br />(8) THE FIRE PROTECTION SYSTEM CONTRACTOR WILL PREPARE THE FIRE PROTECTION SYSTEM LAYOUT DOCUMENTS AND
<br />THEREFORE BECOME THE FIRE PROTECTION ENGINEER OF RECORD AND WILL ASSIST THE AUTHORITY HAVING
<br />JURISDICTION.
<br />61 G15-32.004 - DESIGN OF WATER BASED FIRE PROTECTION SYSTEMS
<br />(1) THE SYSTEM IS AN AUTOMATIC WET SPRINKLER SYSTEM - THE FIRE PROTECTION SYSTEM CONTRACTOR
<br />SHALL VERIFY THESE REQUIREMENTS.
<br />(2a) THE FIRE PROTECTION SYSTEM CONTRACTOR SHALL VERIFY THE POINT OF SERVICE.
<br />(2b) SEE 61G15-32.003 (4) ABOVE.
<br />(2c) THE FIRE PROTECTION SYSTEM IN THIS PROJECT SHALL COVER THESE OCCUPANCIES:
<br />ALL KITCHEN SPACES, EMPLOYEE SERVICE SPACES, STORAGE
<br />ROOMS, MECHANICAL ROOMS AND ELECTRICAL ROOMS SHALL BE CLASSIFIED AS ORDINARY
<br />HAZARD GROUP I. ALL OTHER AREAS SHALL BE CLASSIFIED AS LIGHT HAZARD.
<br />(2d) THE FIRE PROTECTION SYSTEM CONTRACTOR'S SYSTEM LAYOUT DOCUMENTS SHALL INDICATE THE SYSTEM TYPE,
<br />DENSITIES, DEVICE TEMPERATURE RATING AND SPACING FOR EACH SEPARATE HAZARD OCCUPANCY. HYDRAULIC
<br />CALCULATIONS SHALL BE PERFORMED IN ACCORDANCE WITH NFPA 13 , 2002 EDITION, AS REQUIRED.
<br />(2e) THE FIRE PROTECTION SYSTEM CONTRACTOR SHALL VERIFY THE WATER SUPPLY DATA.
<br />(2f) THE FIRE PROTECTION SYSTEM CONTRACTOR SHALL VERIFY ALL FLOW TEST AND PRESSURE DATA.
<br />(2g) THE FIRE PROTECTION SYSTEM CONTRACTOR SHALL VERIFY VALUING AND ALARM REQUIREMENTS.
<br />(2h) THE LOCAL UTILITY PURVEYOR AND FIRE MARSHALL CONTINUOUSLY MONITOR THE WATER SUPPLY FOR CONTAMINANTS
<br />WHICH MAY CAUSE MICROBIAL INDUCED CORROSION. THE ENGINEER SHALL BE NOTIFIED IF ANY CORRECTIVE
<br />MEASURE'S SHALL BE TAKEN.
<br />(2i) THE DOUBLE CHECK VALVE ASSEMBLY SHALL BE LOCATED ON SITE BY THE CIVIL ENGINEER.
<br />REFER TO CIVIL DRAWINGS FOR LOCATION.
<br />(2j) ALL YARD AND INTERIOR FIRE PROTECTION COMPONENTS SHALL BE LISTED IN ACCORDANCE WITH NFPA 13, 2002
<br />EDITION.
<br />(3) THE FIRE PROTECTION SYSTEM CONTRACTOR WILL PREPARE THE FIRE PROTECTION SYSTEM LAYOUT DOCUMENTS AND
<br />THEREFORE BECOME THE FIRE PROTECTION ENGINEER OF RECORD.
<br />(4) THE FIRE PROTECTION SYSTEM CONTRACTOR WILL PREPARE THE FIRE PROTECTION SYSTEM LAYOUT DOCUMENTS AND
<br />THEREFORE BECOME THE FIRE PROTECTION ENGINEER OF RECORD.
<br />PROVIDE WITH
<br />DOUBLE CHECK VALVE ASSEMBLY - DETAIL
<br />i
<br />FIRE SPRINKLER HEAD SCHEDULE
<br />TYPE
<br />TEMP
<br />ORIFICE
<br />K-FACT
<br />QUICK RESPONSE RECESSED PENDENT
<br />SPRINKLER HEAD - TYCO MODEL
<br />155'
<br />1 /2"
<br />5.6
<br />"TY-FRB"
<br />QUICK RESPONSE RECESSED PENDENT
<br />SPRINKLER HEAD - TYCO MODEL
<br />200'
<br />1 /2"
<br />5.6
<br />200'
<br />"TY-FRB"
<br />0
<br />QUICK RESPONSE RECESSED DRY
<br />PENDENT SPRINKLER HEAD - TYCO
<br />155'
<br />1
<br />5.6
<br />DRY
<br />MODEL "DS-1"
<br />QUICK RESPONSE DRY SIDEWALL
<br />-4DRY
<br />SPRINKLER HEAD - TYCO MODEL
<br />155'
<br />1"
<br />5.6
<br />"DS-1"
<br />�- (2) 2-1/2" FIRE
<br />DEPARTMENT CONNECTIONS.
<br />CHECK
<br />TO SPRINKLER SYSTEM
<br />FLOW SWITCH
<br />TEST AND DRAIN
<br />VALVE.
<br />2" DRAIN TO OUTSIDE J
<br />J
<br />FINISHED FLOOR SLAB
<br />THRUST BLOCK J
<br />PRESSURE GAUGE
<br />',� ELECTRIC BELL
<br />EXTERIOR WALL
<br />4" U.G. FIRE MAIN. REFER TO CIVIL
<br />SITE PLAN FOR CONTINUATION.
<br />D.I. UNDG UNDER BLDG
<br />FIRE RISER - DETAIL
<br />N TS
<br />PROVIDE WITH TAMPER SWITCH -
<br />POST INDICATOR VALVE - DETAIL
<br />L
<br />0,
<br />Nr
<br />>
<br />"C
<br />L"
<br />Lr) O
<br />r
<br />I
<br />•
<br />0�
<br />011 %0
<br />4-
<br />o
<br />o
<br />v
<br />c
<br />o
<br />`'-
<br />Oa
<br />c
<br />'c
<br />c
<br />0
<br />a
<br />a)
<br />0
<br />00
<br />0
<br />N
<br />M
<br />O
<br />_0
<br />U
<br />W
<br />o
<br />v
<br />�-
<br />0
<br />i
<br />�
<br />c
<br />o
<br />L
<br />m
<br />10 Cu
<br />w r?
<br />Z
<br />ao
<br />L } � (g)
<br />JQ iu0,av
<br />(� z r`
<br />v ww ax��
<br />Z0N� �pl�'t
<br />Wv i� �a~�
<br />© copyright
<br />N
<br />lq-
<br />LO
<br />M
<br />" M
<br />a O
<br />0 .
<br />L
<br />_O
<br />v;
<br />o =
<br />m s
<br />O s
<br />�o a
<br />�O N
<br />revisions:
<br />0
<br />0
<br />0
<br />0
<br />drawn: HD
<br />checked: HD
<br />date: 03-21-08
<br />prof. no: P07-15B
<br />FS= 1