My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6606 Gall Blvd
Zephyrhills
>
Building Department
>
Building Plans
>
6606 Gall Blvd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2025 2:01:57 PM
Creation date
2/18/2025 3:28:51 PM
Metadata
Fields
Template:
Building Plans
Street #
6606
Location
Gall Blvd
Contractor
Sonny's BBQ
Building Plans - Permit #
7935
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4" 20GA MTL. STUD <br />OUTRIGGERS AT 16" <br />0. C. TYP. <br />--- L--1 --- L—_---1---I—__1:--L--1---L-- ---L-- --- ---I--- --- L__J--- L--1--- <br />um0 <br />STEEL JOIST ROOF FRAMING NOTES: <br />1. ROOF FRAMING IN THIS REGION SHALL BE 1 1 /2"— 20 GAGE TYPE "B" <br />6. <br />JOIST MANUFACTURER TO DESIGN JOIST FOR THE UPLIFT FORCE SHOWN <br />(WIDE RIB) METAL DECK SPANNING OVER OPEN WEB STEEL JOIST <br />ON THE LOADING SCHEDULE AND PROVIDE CERTIFICATION THAT CHORD <br />SPACED AT O 5'-0" O.C. (U.N.O.). <br />MEMBERS HAVE BEEN INVESTIGATED FOR REVERSE STRESSES DUE TO <br />1A. ROOF FRAMING IN THIS REGION SHALL BE 5/8" FIRE —TREATED <br />ALL UPLIFT FORCES. ADDITIONAL BRIDGING SHALL BE PROVIDED AT THE <br />PLYWOOD SPANNING OVER 8"-20 GAUGE METAL STUD RAFTERS AT 24" <br />FIRST INTERIOR BOTTOM CHORD PANEL POINT OF ALL JOISTS SUBJECT <br />MAX. TYP. U.N.O. 0 C <br />/ <br />TO NET UPLIFT PER STEEL JOIST INSTITUTE. <br />7. <br />FRAME ALL JOIST BOTTOM CHORD MEMBERS TO BEAM BOTTOM <br />1B. ROOF FRAMING IN THIS REGION SHALL BE 5/8" FIRE —TREATED <br />FLANGES. INSTALLATION TO BE DONE AFTER ALL DEAD LOADS ARE <br />PLYWOOD OVER PRE—ENGINEERED METAL STUD TRUSSES AT 2'-0" O/C <br />APPLIED. <br />MAX. METAL STUD TRUSSES ARE TO BE DESIGNED BY FLORIDA <br />8. <br />RAIN LEADER SHOWN THUS® R.L. ON PLAN. SEE PLUMBING DRAWINGS <br />REGISTERED PROFESSIONAL ENGINEER AND SIGNED AND SEALED <br />FOR SIZE AND LOCATIONS. <br />DRAWINGS AND CALCULATIONS ARE TO BE SUBMITTED TO E.O.R. FOR <br />9. <br />FOR PLAN DIMENSIONS NOT SHOWN, SEE ARCHITECTURAL DRAWINGS. <br />REVIEW. <br />1C. ROOF FRAMING IN THIS REGION IS TO BE PLYWOOD ON 2x6 TONGUE <br />10. <br />:: <br />DENOTES FLAT ROOF. <br />AND GROOVE DECKING SPANNING OVER 4x10 SAW LUMBER RAFTERS O <br />4'-0" O/C MAX SPACING TYP. AS SHOWN IN PLAN. <br />11 <br />........... :. <br />PROVIDE MOMENT CONNECTION AT BEAMS SHOWN THUS <br />ON <br />2. DIRECTION OF METAL DECK SPAN SHOWN THUS ad ON PLAN. PLAN. <br />3. FOR ROOF DRAIN LOCATIONS AND SIZE SEE ARCHITECTURAL DRAWINGS. 12. COLUMN DESIGNATIONS SHOWN THUS O ON PLAN. FOR COLUMN <br />FOR FRAMING SEE TYPICAL DETAIL 5-302/S3.03. SCHEDULE, SEE DRAWING S3.05. <br />4. FOR TYPICAL DETAILS SEE DRAWINGS S3.01 THRU S3.05 AND FOR <br />GENERAL NOTES SEE DRAWING S1.01. 13. O DENOTES COLUMN STOP AT THIS LEVEL. <br />5. ( ) DENOTES UNDERSIDE OF METAL DECK ELEVATION. 14. FOR LOAD SCHEDULE & WIND DESIGN DATA, SEE DRAWING S3.05. <br />PCL-4 CONT. <br />SEE 4-033 ON S3.02 <br />I <br />I <br />I <br />I <br />I, <br />I <br />I <br />- -- -- --- — -- --- — ---T— ---- ---- --T —T-- — <br />---- ---- ---- ---- _L-- ---- ---L ---� -- 1 —1-- <br />» l <br />fi fi fi I <br />1 <br />ItII <br />19 J <br />1EE ETA STU cn <br />R FR ING OTES CIA Im <br />1 I <br />I I <br />__ +.... <br />"I loll <br />-----I //x\\ — -- ---- x\\ — — — — I l i — — — — — /\\\— — — — — — — — — — — — I I I //' \\ I I <br />i <br />r `I I r `I I I I r I I I r I I I <br />,i <br />-----I \x' I-- -- - — — — — - x' ---- -----� <br />/ \ / \ <br />oe <br />I <br />STEEL JOI <br />it <br />R° FRAMING NOTE #1 <br />I I I itI I I <br />4'-4" 4'-0" 4' 0" 4'-0' 4'-0" 4'-0" <br />» I <br />SEE TIMBER <br />ROOF FRAMING <br />NOTE #11C <br />I <br />I <br />t I <br />II <br />1 <br />I <br />I <br />a <br />I <br />I 4" I <br />Ile 11 <br />\\ /� \\ / I <br />x — — — — — — — x \ / — — — — \ <br />/ \ / 100 <br />\ / \ <br />it <br />5'-0" 5'-0" 5'-0' 5'-0" 5'-0' 5'-0" 5'- ' <br />Y I YI Y) y1 � I,. t, ,i CY01 YI I I� Y Y <br />a0 I ODI 0I 00 I� -- i N l II I COI �I �I C00 <br />4 �I �I Nol I { <br />Itz N N N N . N N N N N N N N N <br />N <br />11.00S4.0 \ / \ S4.0 <br />U \ / \ / <br />— — — — — x — — — — — — — x \ / 000, <br />— — — — — — — — — — — — — — — — — — <br />Ole <br />001 <br />.T <br />11 it ! i <br />it <br />I I \\ // ----- <br />I -----I /x\ �- --------� /x\ I- t- -I r- ------ ----t----r--- -� <br />__�,_,__..� / \ <br />1 P i <br />I FRAME ROOF OPENING I I I I II <br />I 1 1 SEE DETAIL 5-302 S303 <br />FOR IADD'L. INFO. (TTYP)I I I I I <br />4.0 1 I I - <br />----- — — — — <br />— — — — <br />---- ---- ---- �' l'--'— ----------- ------------------ --- -- S2 <br />v <br />4-10 1 2 — W21x50 _ -- ---- ---- --- — — — <br />- - <br />I — — — — — <br />-- _ — ----- ----- ----- ----- ----- — — — i 10K1 aI \ I <br />I 7- <br />SEE STEEL JOIST <br />I Ii1I IiIIoH— M I I I I ROOF FRAMING NOTE #1 <br />_0Y o \/ ,'IN4.0 <br />v/ <br />L a -C-4N <br />< - - - - / <br />Z Y Y Y ]C Y \ a. N <br />N N N N N N N N N 10K1 <br />I I I I <br />I I I W a I \\ // I I I I I I I\ / I 4.07 \ // <br />I <br />I I /x r--——-----I------I------I------I-----� x \/ o \/ <br />000p <br />I I I T i 10K1 � <br />X a 1 SLOPE 1 I I I I I I I la 1 1 1 <br />Ii i 4'-5 j" 4'-54' 4'-5 j" 4'-5 j" 4'-5 j» 4•-51" 4'-51" 4'-5 j» <br />2X4 PURLINS <br />AT 16" O.C. <br />1 4,5 <br />V It b s <br />_J <br />PCL-3 <br />A/F/777=1z/A// //y/ <br />i <br />Ce <br />Ir <br />Ix <br />Ix <br />w <br />cr <br />Ix <br />cc <br />Cr <br />W <br />Ix <br />0: <br />W <br />X <br />it -ilia <br />11. <br />I� <br />I <br />E ROOF <br />TRUSS <br />., TYP <br />A- <br />I <br />I <br />I <br />I <br />R <br />FRAMING <br />RT-1 Al. <br />OTES <br />24" 0 <br />1 <br />I <br />I <br />l <br />I <br />I <br />I <br />I <br />I <br />PCL— <br />PCL— ir--PCL-4 <br />10 <br />4 1 RAFTERS Ar, 48" O.C. <br />�15 LQ <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />A <br />PCL-1 PCL-2 PCL-2 CL-1of <br />CONT. HORIZ. UPLIFT BRIDGING roof framing plan <br />AT FIRST PANEL POINT OF JOIST <br />BOTTOM CHORD (TYP EACH END) <br />"X" TYPE BRIDGING <br />PER JOIST MFR. (TYP) <br />CONT. HORIZ. BRIDGING <br />NUMBER OF ROWS AND SIZE <br />PER JOIST MFR. (TYP) <br />scale: 1 /4"=1'-0r' <br />I 2X4 PURLINS T 16" O.C.N <br />a <br />0 <br />Z <br />_ <br />I <br />Q <br />P <br />TB-1 P.T. 6X10 <br />SAW LUMBER BEAMS <br />AT ALL COLS. AS SHOWN <br />2X4 OUTRIGGERS I <br />AT 24" O.C. <br />h <br />ARMANDO A. CASTELLON, P.E. <br />FL. LIC. No. 43453 <br />U <br />v <br />2 <br />2 <br />O <br />N <br />c <br />U <br />O� <br />C <br />C <br />C <br />U� <br />Q <br />O <br />U <br />0 <br />III <br />D <br />V <br />0 <br />s <br />011 1111 10 <br />11.0 L0 N O <br />a a"o <br />O O <br />1q, "IT <br />c a <br />0 `~ <br />r- <br />a <br />0 0000 <br />0 CV <br />C M <br />-Op <br />0 O <br />C •+- <br />0 <br />c <br />L o <br />'D <br />LO cn O <br />U <br />z <br />o <br />w <br />z� <br />N '- <br />NCII <br />N <br />J LLJ <br />4h 8 <br />NnN N <br />� LLJ <br />Hinz <br />V) 0'-n E 0 <br />Nei <br />V)ZC� <br />aOZ <br />�M�m a <br />�o <br />� U LLJ <br />• <br />�$ � <br />J�p CC5 <br />Na!M rz U to <br />N <br />lGl <br />a N � <br />W <br />© copyright <br />CV <br />LO <br />cM <br />CO <br />O O <br />O <br />CD s <br />'O >' <br />O __C <br />�O 0- <br />*sO N <br />revisions: <br />drawn: sc/dm <br />checked: rd <br />date: 1-15-08 <br />prof. no: P07-15B <br />S2,02 <br />Signature Date <br />P:12000 Pro)ects\2002 R K CollaboraHve\2002-010 Sonnys Prototype - Zephyrhil1slSdw91S2.02.dwI 2008-02-27 2:23:52 PM, Noel <br />
The URL can be used to link to this page
Your browser does not support the video tag.