My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6606 Gall Blvd
Zephyrhills
>
Building Department
>
Building Plans
>
6606 Gall Blvd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2025 2:01:57 PM
Creation date
2/18/2025 3:28:51 PM
Metadata
Fields
Template:
Building Plans
Street #
6606
Location
Gall Blvd
Contractor
Sonny's BBQ
Building Plans - Permit #
7935
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1-1/2-GAS <br />GAS RISER DIAGRAM — PLUMBING <br />NTS <br />GAS PIPING NOTE: <br />ALL GAS PIPING OUTSIDE, ABOVE AND BELOW MOM SHALL BE SCHEDULE 40 <br />BLACK STEEL MATH FRP COATING AND MALLEABLE FITTING& CONTRACTOR SHALL <br />BE RESPONSBLE FOR ALL PIPING FROM THE METER TO ALL EQUIPMENT INCLIAING <br />ALL TRENCHING, BACKFIU, ETC. ALL EIPOSFD PIPING TO BE PAINTED <br />I <br />� r <br />r/ \ <br />\r <br />111 \ <br />rSS \ <br />4'S5 \ <br />r <br />PLUMBING KEY NOTESEt <br />NOT USED <br />❑2 4 SANITARY WASTE PIPING BELOW GRADE REFER TO CIVIL SITE <br />DRAWING FOR CONINUATION. <br />O dR E11NUON BELOW GRADE. REFER TO CIVIL SITE DRAWING <br />O r GAS PIPING FROM OUTSIDE (VERIFY TYPE), REFER TO SUPPLIER <br />FOR LOCATION, ALL PIPING AND INSTALLATION TO BE PER APPLICABLE <br />GAS CODES. <br />PLUMBING SYMBOLS LEGEND <br />SAIL SOIL PIPE OR WASTE PPE <br />— VENT PIPING <br />COLD WATER PIPING <br />TEMPERED WATER <br />HOT WATER PIPING <br />--D�— BALL VALVE <br />woo WALL CLEANOUT <br />FCO FLOOR CLEANOUT <br />VTR VENT THROUGH ROOF <br />�1 <br />r <br />/ / \ rGR <br />\ rI <br />r 2'IrGR <br />rGR 1-1/Y <br />I\ 14l JIL <br />r I \ \ raI <br />'GR \ <br />\ r / 4'GR �I <br />\ I <br />+CGR r <br />\ / 4GmR <br />r <br />rGR <br />4-GR ES=t OO <br />rGR \ <br />> <br />I I \ram/ <br />W�m <br />rm � 1-1 <br />> <br />rl r Q <br />Y <br />%r 12- <br />I� 'WCO rss \ less <br />\ rss + \ � \ rra� / /I <br />less �J / <br />less 2. / 4'SS L 1 <br />101 \ / <br />u <br />rss r,' rm <br />rss I1-1/2' \ E <br />/ <br />u <br />% less <br />4'SS <br />2- Irss <br />rl <br />I rss <br />r <br />SANITARY RISER DIAGRAM — PLUMBING <br />NTS <br />CT d- 'IO <br />(D <br />LO LO O <br />I\ I\ O <br />• <br />pip pip "0 <br />O O <br />c a <br />0 <br />.s <br />� <br />O <br />rn <br />C <br />C <br />C <br />Ua <br />Q <br />O <br />aU 00 <br />CV <br />-0 <br />O0 <br />U <br />�' <br />� <br />a� o <br />' <br />14- <br />C <br />�� o <br />s <br />0 <br />LO 0 <br />LO 0 <br />0 <br />LO O <br />Q copyright <br />OD s <br />So <br />(5 s <br />CL <br />1.0 0) <br />%o N <br />g I revisions: <br />drawn: GC <br />checked: HD <br />date: 03-21-08 <br />prof. no: P07-15B <br />P-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.