My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
6740 Dairy Rd
Zephyrhills
>
Building Department
>
Building Plans
>
6740 Dairy Rd
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2025 2:16:57 PM
Creation date
2/18/2025 3:30:06 PM
Metadata
Fields
Template:
Building Plans
Street #
6740
Location
Dairy Rd
Contractor
Velasquez-Celindes
Building Plans - Permit #
3062
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLUMBING GENERAL NOTES: <br />1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF THE FLORIDA PLUMBING <br />CODE. CHECK OUT AND CONNECT ALL FIXTURES AND EQUIPMENT REQUIRING PLUMBING. <br />2. NECESSARY, OBVIOUSLY REQUIRED PLUMBING ITEMS THAT ARE NOT SHOWN ON THE DRAWINGS DOES NOT <br />RELIEVE THE CONTRACTOR FROM HIS RESPONSIBILITY TO INSTALL A COMPLETE OPERATING PLUMBING SYSTEM. <br />3. ALL PLUMBING FIXTURES SHALL BE SELECTED BY THE OWNER AND INSTALLED BY THE CONTRACTOR. (PLUMBING <br />FIXTURES INDICATED ON THE DRAWINGS ARE FOR REFERENCE ONLY, EXISTING FIXTURES OR EQUAL QUALITY <br />AND CRAFTSMANSHIP MAY BE USED AS DIRECTED) <br />4. ALL PLUMBING WORK SHALL BE INSTALLED PER THE RULES AND REGULATIONS OF THE STATE HEALTH DEPARTMENT, <br />STATE PLUMBING CODE (LATEST EDITION) AND LOCAL ORDINANCES HAVING JURISDICTION OF PROJECT SITE AREA. <br />5. MAINTAIN AS —BUILT DRAWINGS DAILY. SUBMIT TO ENGINEER/OWNER AFTER COMPLETION OF ALL WORK. <br />6. PLUMBING CONTRACTOR SHALL RESPONSIBLE FOR COMMUNICATION WITH THE LOCAL BUILDING DEPARTMENT AND <br />INSPECTION PERSONNEL TO REVIEW CONTRACT DOCUMENTS PRIOR TO INSTALLATION. <br />7. PROVIDE ALL CUTTING REQUIRED FOR THE INSTALLATION OF PLUMBING WORK. FINISH PATCHING SHALL BE COORDINATED <br />WITH THE GENERAL CONTRACTOR. <br />PLUMBING MATERIALS SHALL MATCH EXISTING. CUT AND REPAIR EXISTING FLOOR AS REQUIRED. (IF APPLICABLE) <br />8. FINAL WATER PIPING ROUTING SHALL BE COORDINATED WITH THE GENERAL CONTRACTOR. <br />9. ALL EXTERIOR UNDERGROUND WATER PIPING SHALL BE TYPE "L" HARD COPPER TUBING. PIPING INSIDE OF BUILDING SHAL <br />BE TYPE "M" HARD COPPER OR CPVC. <br />10. ALL WATER PIPING SHALL BE SUPPORTED RIGIDLY AND IN LINE FROM BUILDING STRUCTURE. OFFSET PIPING TO AVOID <br />STRUCTURAL MEMBERS, CANTS, FLASHING, MECHANICAL AND ELECTRICAL EQUIPMENT, ETC. <br />11. ALL FIXTURES AND EQUIPMENT SHALL HAVE SHUT—OFF VALVES AT OR NEAR EQUIPMENT. <br />4" BUILDING SANITARY WASTE LINE RUN ® J' PER <br />FOOT SLOPE & CONNECT TO EXISTING SANITARY <br />SEWER LINE(FIELD VERIFY EXACT LOCATION AND <br />COORDINATE WITH EXISTING INVERT ELEVATION) <br />WASTE WATER PLAN <br />SCALE: 1/4" = F-0" <br />THESE CONSTRUCTION DOCUMENTS HAVE BEEN <br />PREPARED UNDER THE DIRECT SUPERVISION OF <br />PIERRE M. VALLES, P.E. (FL #661 �mi P,'IERRE M. <br />VALLES, HEREBY CERTIFIW T T Rio <br />DOCUMENTS COMPLY L;,p( <br />SECTIONS OF THE FL© , 'I IDIµS 2(%, <br />7TH EDITION. �. < <br />PLANS SHALL REFMRI�N�E PLIANCE WITR THEM <br />2020, 7TH EDITION:FLOIjDA BUILD#4G CODE, <br />RESIDENTIAL SEC11ON V01, D <br />ASCE 7-16. �R•, <br />Q _tC-1,t" asu�ti�o ATE <br />cli <br />z <br />0 <br />Z <br />Z <br />w <br />:im <br />00 <br />0 - <br />ww <br />J x <br />Q F. <br />O <br />wm <br />00 <br />wr <br />00 <br />W z <br />cl0 <br />LLJ U <br />U0 <br />wQ <br />ay <br />=o <br />cn <br />J Z <br />J w <br />=0 <br />c J <br />J <br />Z Q <br />w 0 <br />�LL <br />�w <br />Li z <br />o� <br />wa <br />F-W <br />zc� <br />Ow <br />mm <br />IOOz <br />FDQ <br />z <br />w� <br />o; <br />zLLI <br />J <br />J <br />it <br />O <br />F_ <br />U <br />Q <br />K <br />z <br />Z <br />O <br />C) <br />z <br />z <br />Q <br />z <br />cl <br />a <br />O <br />U <br />K <br />O <br />0 <br />w <br />z Z <br />U j <br />oU) <br />wz <br />UO <br />:' U <br />0 Z <br />O C7 <br />W(o <br />aw <br />w 0 <br />x <br />w0 <br />m0 <br />Ow <br />w <br />00 <br />z�- <br />wW <br />¢0 <br />z <br />U) o <br />w0 <br />2z <br />UZ <br />w� <br />U) <br />w <br />�W <br />a <br />ai z <br />w <br />U U <br />OU <br />0w <br />w <br />a m <br />w <br />F w <br />Z= <br />—r <br />2 CD <br />z <br />U z <br />�Q <br />Wm <br />O <br />ow <br />a" <br />m~ <br />W = <br />x0 <br />ox <br />O�0 <br />Q� <br />rQ <br />xa <br />OD <br />x <br />a= <br />o F- <br />Uz <br />Z <br />g0 <br />z� <br />OD <br />gw <br />0z <br />OU) <br />co <br />ww <br />xm <br />~O <br />mr <br />>} <br />mw <br />wx <br />mF- <br />J <br />N0 <br />�O <br />wz <br />ax <br />Xj <br />ww <br />00 <br />z <br />J Q <br />_ <br />zK <br />oZ <br />z¢ <br />w� <br />w0 <br />0 <br />02 <br />ww <br />• <br />• <br />1111 <br />1111 <br />• <br />III I <br />IIIIIIIIIIIII. <br />•• <br />•'-:=' <br />oo <br />■c1■■l <br />i=' �1 <br />• <br />• <br />0 <br />CD <br />cn <br />• <br />1 <br />• <br />0 <br />'IT <br />75 <br />� <br />< <br />QQ� <br />W <br />J <br />W <br />D <br />cn <br />� <br />Q <br />J <br />W <br />ryLL <br />>- <br />r <br />Q <br />� <br />� <br />Cfl <br />N <br />L0 <br />Cf) <br />J <br />� <br />W <br />N <br />O <br />LL <br />Q <br />0— <br />co <br />Q <br />J <br />Ir— <br />CM <br />1 <br />Lo <br />/M—lN <br />\ I <br />Ir— <br />M <br />W <br />U) ® w <br />W N Z <br />00 <br />53_ <br />Q <br />��T--- <br />5■ \ / \/ <br />Jc `'M) <br />COW <br />W :3 -� <br />• W U <br />ryo LLW M <br />W ��E <br />II- cu <br />a- LF- <br />DRAWN <br />ELCO <br />CHECKED <br />DATE <br />OCTOBER 5, 2021 <br />SCALE <br />NOTED <br />JOB NO. <br />SHEET <br />P-2 <br />OF 13 <br />LOT# <br />
The URL can be used to link to this page
Your browser does not support the video tag.