Laserfiche WebLink
MASONRY L I NTEL ASSEMSL I ES <br />SEE SCHEDULE AND SMOFIGATIONS FOR ADD'L INFO <br />r r-7 rr-- <br />1LQJI+i - MIN. N COW-W30W I LQJ I MIN (1)C.CUR5E/B01� <br />I I BEAM ABOVE LINTEL I I BEAM ABOVE UWEL <br />6R= �zRour <br />4.. ' 4.. , <br />BOTTOM REIaF. <br />p■ PRECAST LINTEL W . PRECAST LINTEL W <br />t-'�-F B tiEIPF.IiSNF. <br />MB-1 MB-2 <br />COURSE, IF ' TOP C <br />I i TOP CE, IF 1 L4J It- OURSE, <br />m °pt' I L4J I REQ'D P32 ARGN. L____,, REQU PER ARGN. <br />TOP REW OR CONT. � BEAM <br />BOND BEAM REINF. REINF. AS RW'D <br />GROUT <br />OF -an BOTTOM FEW. <br />BOTTOM REINF. -_ra PRECAST LINTEL W <br />PRECAST LINTEL W #--Y-t <br />EH9EPM Ftew. <br />ENDED REAP. <br />MB-3 MB-4 <br />MASONRY LINTEL DETAILS <br />REINFORCEMENT <br />MARK <br />DESIGNATION <br />TOP <br />BOTTOM <br />5HEAR REINFORCEMENT <br />43-1 <br />8F8-OB/OT <br />----- <br />--- <br />MB-2 <br />8F8-I5/OT <br />--- <br />(1) #5 <br />MB-3 <br />W16-113AT <br />(1) #5 <br />(1) #5 <br />143-4 <br />8WI4-IB <br />APPROVED LINTEL MANUFACTURERS ARE: GA5T-GRETE, QUALITY PREGAST CO., <br />AND LOTT'S GONGRETE. <br />NOTE5: <br />I. ALL LINTEL5 w/ 5PAN5 GREATER THAN 14'-O" 5HALL BE PRESTRE55ED. <br />2.5HORE FILLED LINTEL5 A5 REQURIED. <br />3. ALL LINTELS 5HALL HAVE 4" MINIMUM BEARING U.N.O. <br />4. DO NOT GUT OR MODIFY PRE5TRE55ED LINTELS. <br />5. ALL REINFORGEMENT 5HALL BE GRADE 60, fy=60 ksl <br />6. ALL LINTELS SPEGIFIED ON PLAN ARE MINIMUM 51ZE REQUIRED BY DE56N. <br />7. ALL LINTELS ARE TO BE LOCATED DIRECTLY ABOVE THE OPENING BELOW <br />SHEET LIST INDEX <br />5HEET DE5GRIPTION <br />5HEET TITLE <br />5-0.0 <br />5TRUGTURAL NOTE5 <br />F-1.0 <br />5LAB PLAN <br />F-2.0 <br />BLOCK PLAN <br />5-1.3 <br />ROOF FRAMING PLAN <br />50-1 <br />FOUNDATION DETAILS <br />50-2 <br />5TRUGTURAL DETAIL5 <br />P1555-1 <br />5TRU6TURAL DETAILS <br />GENERAL STRUCTURAL NOTES <br />FOUNDATION <br />• DE51GN 15 BA5ED ON 7th EDITION (2020) FLORIDA BUILDING CODE. <br />• FOOTING DE516N - THE5E FOOTINGS HAVE BEEN ENGINEERED FOR A <br />MINIMUM ALLOWABLE 501L BEARING GAPAGITY OF 1,500 P5F. <br />• ALL LUMBER EXP05ED TO WEATHER OR IN CONTACT W/ GONGRETE <br />OR MA50NRY FOUNDATION SHALL BE PRESERVATIVE TREATED <br />5OUTHERN PINE #2. <br />• FASTEN PARTITION WALL5 TO 5LA13 WITH Y4" DIA. x 23/4" LONG <br />TAPGON5 0 32" o.c. MAX. WITH A MINIMUM OF 2 TAPGON5 PER <br />PLATE, 12" MAX. FROM PLATE END5. <br />• BUILDER TO VERIFY GORRO51ON-RE515TANGE COMPATIBILITY OF <br />HARDWARE 4 FA5TENERS IN CONTACT w/ PRESERVATIVE -TREATED <br />WOOD. CONTACT LUMBER 4 HARDWARE 5UPPLIER5 TO GOORD. <br />• GONGRETE PE515N BA5ED ON AGI 318. GONGRETE SHALL ATTAIN <br />THE FOLLOWING MINIMUM GOMPRE-551VE 5TRENGTH5 IN 28 DAYS, <br />U.N.O.: <br />f'c = 2,500 P51:....... FOOTING5 <br />2,500 psi:....... 5LAB5 ON SRADE (INTERIOR 4 EXTERIOR) <br />fy = 60,000 psi ...... REBAR <br />• ALL CONCRETE EXP05ED TO THE WEATHER 5HALL NOT HAVE LE55 <br />THAN 5% OR MORE THAN 7% AIR ENTRAINMENT. <br />• ALL FOOTINGS SHALL BEAR AT LEAST 12" BELOW FIN15H GRADE. <br />• FOOTINGS AND 5LA55 ON GRADE SHALL BEAR ON VIRGIN 501L OR <br />q5% COMPACTED FILL. <br />• MINIMUM LAP 5PLIGE5 ON ALL REINFORCEMENT 5HALL BE 48 BAR <br />DIA. <br />• HOOK5 5HALL BE PROVIDED AT 015GONTIN0005 END OF REINF. <br />• GROUT 5HALL BE A5TM G416 F'c=3000 P51 W/ MAX %" ASSRESATE <br />• CONCRETE MASONRY UNITS 5HALL BE A5TM G90 WITH A MINIMUM <br />GOMPRE551VE 5TREN5TH OF Ig00 P51 (F'M = 1500 P51). ALL <br />MORTAR 5HALL BE A5TM C270, TYPE 5. GMU DESIGN BA5ED ON <br />AGI 530/530.1 <br />•ElREINFORCED GMU GORE5 (A5 INDIGATED ON PLAN) 5HALL <br />BE REINFORCED W/ (1) #5 BAR VERTICAL. BAR 5HALL <br />EXTEND INTO BOND BEAM AT TOP WALL AND 5HALL <br />ALIGN WITH FOOTING DOWEL BELOW. PROVIDE MIN 30" <br />LAP 5PLIGE WITH FOOTING DOWEL. <br />• 6ROUT SOLID ALL REINFORCED GMU GELL5 AND BOND BEAM5 <br />• ALL BOND BEAM5 ARE TO BE 8" GONT. FULL LENGTH OF WALL W/ <br />(1) #5 BAR GONT. (TYP. ® EXT. PERIMETER) <br />• PROVIDE (1) #5 BAR GROUTED 5OLID ON EACH 510E OF ALL <br />MASONRY OPENIN65 AND AT ALL WALL GORNER5. <br />• VERTICAL REINFORGEMENT 5HALL BE HELD IN PLACE AT THE TOP <br />AND BOTTOM, 5HALL BE LOGATED IN THE GENTER OF THE MASONRY <br />CELL, AND 5HALL BE LOGATED AT A MAXIMUM OF 6-0" O.G. IN <br />EXTERIOR WALL5. (A5 5HOWN ON PLAN5) <br />• ROUGH OPENINC75 ARE GALLED OUT ON PLAN - <br />BUILDER TO VERIFY. <br />• PROVIDE GONTROL JOINTS AT ALL IN51DE GORNER5 OF 5LAB <br />E06E5, AND OTHER LOGATION5 WHERE 5LA13 GRAGK5 ARE LIKELY <br />TO DEVELOP. EXACT LOGATION5 PER BUILDER. <br />• 5AW GUT OR TOOLED JOINT DEPTH 5HALL BE Y4 OF THE DEPTH <br />OF THE 5LA13 (I" FOR A 4" 5LAB) <br />• JOINT5 5HALL BE LOCATED a 12-0" O.G. (REGOMMENDED) OR <br />15-0" O.G. (MAXIMUM) <br />• JOINT GRID PATTERN 5HALL BE A5 GL05E TO 5WARE-5 A5 <br />P0551BLE (I:I RATIO), WITH A MAXIMUM OF 1:1.5 RATIO <br />CONNECTION SPECIFICATIONS (TYP. U.N.O.) <br />DE5GRIPTION OF BLDS. ELEMENT <br />3"x0.131" NAIL5 <br />3"xW20" NAIL5 <br />J015T TO 5OL.E PLATE <br />(3) TOENAIL5 <br />(3) TOENAIL5* <br />SOLE PLATE TO J015T/BLK'6. <br />(3) NAIL5 o 4" O.G. <br />(3) NAIL5 ® 4" o.c. <br />5TUD TO 50LE PLATE <br />2 TOENAIL5 <br />(3) TOENAIL5* <br />TOP OR 50LE PLATE TO 5TUD <br />2 NAIL5 <br />3 NAIL5 <br />RIM TO TOP PLATE <br />TOENAILS A 8" o.c. <br />TOENAILS 0 b" o.0 <br />BLK'S. BTWN. J015T5 TO TOP PL. <br />(3) TOENAIL5 <br />(3) TOENAIL5# <br />DOUBLE 5TUD <br />NAIL5 o 24" o.c. <br />NAIL5 o 1611 O.C. <br />DOUBLE TOP PLATE <br />NAIL5 0 24" o.c. <br />NAIL5 0 16" o.c. <br />DOUBLE TOP PLATE LAP 5PLIGE <br />q NAIL5 IN LAPPED AREA <br />II NAIL5 IN LAPPED AREA <br />TOP PLATE LAP o GORNER5 4 <br />INTER5ECTI% WALLS <br />(2) NAIL5 <br />(2) NAIL5 <br />* 2Y2"x0.113 15 AN ACCEPTABLE ALTERNATIVE TO A 3"4.120", 5AME 5PAGIN6 OR NUMBER OF <br />NAIL 5. (ONLY ACCEPTABLE WHERE * ARE 5HOWN) <br />TH15 MODEL HAS BEEN DE516NED IN <br />AGGORDANGE WITH THE 7th EDITION (2020) <br />FLORIDA BU I LD I N6 GODE (5EGTION 1(90q) <br />LATERAL DE516N REQUIREMENTS FOR THE <br />FOLLOWING WIND SPEED EXPOSURE ONLY: <br />140 MPH - EXP. B <br />WIND I MPORTANGE FACTOR = 1.0 <br />INTERNAL PRESSURE GOEFF I G I ENT = <br />ENGLOSED, +/- 0.15 <br />ANY WIND 5PEED/EXPOSURE NOT LISTED HERE <br />REQUIRES FORMAL EVALUATION I APPROVAL <br />FROM M+K 5TRUGTURAL EN61 NEERI N6. <br />EXTERIOR 4 SHEAR WALL <br />SHEATH I NIS SPECIFICATIONS <br />INDIGATE5 LOCATION AND EXTENT OF <br />5HEARWALL WHIGH REQUIRE5 5HEATHING AND/ OR <br />FASTENING 5PEGIFIGATION5 BEYOND THAT OF <br />5TNDRD GON5TRUGTION <br />5YM130L <br />SHEAR PANEL 5PEG. <br />15/52" PLYWOOD OR 05B FA5TENED W/ <br />PI <br />2y2"xO.131" NAILS ® 6" o.G. ALON6 PANEL <br />EDH5 AND 12" o.G. IN THE PANEL FIELD. <br />15/32" PLYWOOD OR 05E3 FASTENED W/ <br />P3 <br />21/2"x0.131" NAIL5 @ 3" o.G. ALONG PANEL <br />ED6E5 AND 12" o.c. IN THE PANEL FIELD. <br />5TANDARD EXTERIOR WALL 5HEATHINS REQUIREMENTS: <br />SHEATHE ALL EXTERIOR WOOD FRAMED WALL5 W/ 15/32" <br />PLYWOOD OR 05B FA5TENED W/ 2,�"x0.131" NAIL5 ® b" O.G. AT <br />ALL PANEL ED6E5 AND ® 12" O.G. AT GENTER. (U.N.O. ON PLAN5) <br />I. ALL PANEL E06E5 5HALL OCCUR OVER FRAMING OR 2X <br />BLOCKING 5HALL BE PROVIDED TO SUPPORT PANEL EDGE <br />AND FA5TENIN6 <br />2. ALL 5TRUGTURAL PANELS ARE TO BE DIRECTLY APPLIED TO <br />STUD FRAMING ® Ib"o.c. MAX. U.N.O. ON PLAN. <br />3. ALL 5HEARWALL5 5HALL HAVE DOUBLE TOP PLATE5 <br />FASTENED TOGETHER W/ %"x0.131" NAIL5 ® I6"o.c. U5E (8) <br />%"x0.131" NAIL5 ® EA. LAP 5PLIGE. (TYP. U.N.0) <br />4. LATERAL ANALY515 A55UME5 ALL INTERIOR 5HEARWALL5 <br />AND EXTERIOR WALL5 ARE GONTINUOU5 SHEATHED ABOVE <br />AND BELOW OPENIN55. <br />5. 5EE ARCHITECTURAL DRAWINGS FOR ADD'L WALL <br />CON5TRUGTION REQUIREMENT5. <br />b. ALL EXTERIOR WALL5 ARE GON5IDERED 5HEARWALL5. <br />7. WHERE PANEL5 ARE APPLIED TO BOTH FAGE5 OF WALL, <br />PANEL JOINTS 5HALL BE OFFSET TO FALL ON DIFFERENT <br />FRAMING MEMBERS. <br />8. A MAXIMUM OF TWO 1'-4" WIDE X 2'-0" TALL OPENIN55 ARE <br />PERMITTED TO BE GUT INTO INTERIOR 5HEARWALL5 50 <br />LONG A5 THEY ARE FRAMED OUT TO PROVIDE THE <br />5HEATHIN6 EDGE NAILING REQUIRED AND OGGUR 16" MINIMUM <br />FROM THE EN05 OF THE 5HEARWALL. <br />q. ALL 5HEATHIN6 PANEL5 TO MEET U.5. PRODUCT 5TANDARD <br />P51 OR P52, OR APA PRP-108 WITH 33(6 SPAN RATING (MAX) <br />10. NOTE: IF FIRE -RATED DETAILS ARE REQUIRED BY THE <br />ARCHITECTURAL PLAN5. THE 5HEATHING U5ED IN THE -FIRE <br />RATED A55EMBLIE5 5HALL BE NOMINAL 1%7," THIGK, APA <br />RATED 5HEATHINS 5 EXP05URE 1 055 OR PLYWOOD PER <br />U.5. PRODUCT STAND RD P51 OR P52, OR APA PRP-108 IN <br />ACCORDANCE WITH THE UL DE516N5 5PEGIFIED. <br />Window 4 Door Allowable Wind Pre55ure5 <br />140 MPH Wind Zone EX o5ure B <br />OPENING 51ZE <br />INTERIOR ZONES <br />END ZONE5m <br />8' Garage Door <br />+18.5 P5F/-20A P5F <br />+18.5 P5F/-20.q P5F <br />16Garage Door <br />+11.1 P5F/-Iq.7 P5F <br />+11.1 P5F/-Iq.7 P5F <br />10 5017T. <br />+21.2 P5F/-22.q P5F <br />+21.4 P5F/-28.3 P5F <br />20 5QFT. <br />+20.2 P5F/-22.0 P5F <br />+20.2 P5F/-26.4 P5F <br />50 5QFT. <br />+Iq.0 P5F/-20.8 P5F <br />+Iq-0 P5F/-23A P5F <br />100 5QFT. <br />+18.0 P5F/-Iq.B P5F <br />+18.0 P5F/-22.0 P5F <br />500 SOFT. <br />1 +15.8 P5F/-17.6 P5F <br />+15.8 P5F/-17.6 P5F <br />IDEnd Zone is defined as the smaller of 10% of least horiz. dim. or 40% <br />of mean roof height. <br />NOTE: Pressures charted here are allowable pressures and have <br />been reduced per A5GE 7-16 section 2.4.1 from ultimate pressures. <br />Divide allowable pressures dove by a factor of 0.6 to obtain ultimate <br />pressures. <br />ROOF FRAMING <br />• 5EE ROOF TRU55 UPLIFT CONNECTOR 56HEDULE FOR ALL ROOF <br />TRU55 CONNEGTORS. <br />• ROOF 5HEATHING SHALL BE 7/I6" MIN. 05B/PLYWOOD 5HEATHINS 24,(e, <br />EXPOSURE I. FASTEN 5HEATHING TO ROOF MEMBERS W/ 2 3/8"&113" <br />RING SHANK NAILS (R5R5-01 OR EQUIV) 0 6" O.G. AT PANEL E06E5 4 <br />® 6" O.G. IN FIELD. FASTEN SHEATHING TO GABLE END 4 DRAG <br />TRU55E5 W/ RING 5HANK NAILS A 3" O.G. (U.N.0). PROVIDE BLOCKING <br />ALONG PANEL ED6E5 AT FIRST 2 TRU55 BAY5 FROM GABLE END. <br />PROVIDE "H" 5TYLE GLIP5 ALONG UNSUPPORTED EDGES. <br />• ROOF SHEATHING FOR MAIN ROOF TRU55E5 5HALL EXTEND <br />GONTINUOU5LY UNDER ALL OVERFRAMINS. <br />• TRU55 ALL VALLEY 5ET5. FA5TEN EACH TO TRU55 BELOW W/ <br />51MP50N VTGR GLIP5 0 24" O.G. <br />• ALL METAL HAN66ER5 SHALL BE 5PEGIFIED BY THE TRU55 <br />MANUFACTURER, UWE55 OTHERWI5E NOTED. <br />• ERECT AND INSTALL ROOF TRU55E5 PER WTGA 4 TPI'S BG51 I <br />GUIDE TO GOOD PRAGTIGE FOR HANDLING, IN5TALLIN6 4 BRACING <br />OF METAL PLATE GONNEGTED WOOD TRU55E5." <br />• ROOF TRU55 5HOP DW55. 5HALL BE SUBMITTED TO ARCH 4 ENS. <br />FOR REVIEW AND APPROVAL PRIOR TO FABRICATION OR DELIVERY. <br />• 5UPPORT PORCH 4 5HORT SPAN ROOF TRU55E5 W/ 2x4 LEDSER <br />FASTENED TO FRAMINS W/(2) 3"x0.131" NAIL5 o 16" O.G. <br />UPL I FT CONNECTORS <br />BEARING CONDITION <br />CONNECTOR <br />LENGTTRUC0H <br />< 15' <br />51MP50N H2.5T <br />51NSLE ROOF TRU55 BEARING ON <br />> 15' <br />51MP50N HIOA <br />WOOD STUD WALL/WOOD BEAM <br />ROOF GIRDER TRU55 BEARING ON <br />ALL <br />51MP50N HT520 <br />WOOD STUD WALL/WOOD BEAM <br />51N6LE ROOF TRU55 OR PORCH <br />ALL <br />51MP50N HETAI6 <br />BEAM BEARING ON GMU WALL <br />ROOF G.T., FLU51­1 BEAM OR <br />ALL <br />(2) 51MP50N HETAI6 <br />FLUSH S.T. BRS. ON GMU WALL <br />ALL BEARING POINTS OF EAGH ROOF TRU55 5HALL BE CONNECTED <br />WITH CONNECTOR A5 L15TED ABOVE. <br />IT 15 THE RESPONSIBILITY OF THE ENGINEER OF RECORD TO DE516N <br />THE UPLIFT GONNEGTOR5 PER 5EGTION 2.2 OF AN51/TPI-2014 <br />"NATIONAL DE516N 5TANDARD5 FOR METAL PLATE CONNECTED WOOD <br />TRU55 GON5TRUCTION". M4K HA5 ENGINEERED ALL ROOF TRU55 UPLIFT <br />GONNEGTOR5 IN AGGORDANGE WITH THE REQUIREMENT5 OF A5CE-7-16. <br />ALL UPLIFT GONNEGTOR5 AND LOAD5 PER THI5 DRAWING 5HALL <br />5UPER5EDE THE TRU55 MANUFACTURER'S UPLIFT CONNECTOR <br />5PEGIFIGATION5 AND LOAD5 5HOWN ON THE SHOP GARD5. <br />LEGEND <br />• ® INTERIOR BEARING WALL <br />• _ _ _ BEARING WALL ABOVE <br />• BEAM / HEADER <br />• LOCATION AND EXTENT OF 5HEARWALL <br />I: :I EXTENT OF OVERFRAM1% <br />L _ _ _ J <br />*____ _ __---_INDIGATE5 1/8"A" 5AW GUT CONTROL JOINT <br />INDIGATE5 LOCATION OF REINFORCED GMU GORE <br />UJ (5EE NOTE5) <br />J L METAL HANGER <br />INDIGATE5 P05T ABOVE. PROVIDE 50LID <br />BLOCKING UNDER P05T OR JAMB ABOVE. <br />6ENERAL STRUCTURAL NOTES <br />• DE516N 15 BA5ED ON 7th EDITION (2020) FLORIDA BUILDING CODE. <br />• WOOD FRAME ENGINEERING 15 BA5ED ON N05, "NATIONAL DE516N <br />5PEGIFIGATION FOR WOOD GON5TRUGTION" - LATEST EDITION. <br />• DESIGN LOA05: <br />ROOF LIVE = 20 P5F <br />DEAD = 7 P5F T.G., 10 P5F B.G. <br />LOAD DURATION FACTOR = 1.25 <br />FLOOR LIVE = 40 P5F (INCLUDING 5TAIR5 4 DEGK5) <br />= 30 P5F ® SLEEPING AREAS <br />= 50 P5F ® GARAGE <br />= 200 # POINT LOAD ® SUAR05/HANDRAIL5 <br />= 50 P5F ® GUARD IN -FILL GOMPONENT5 <br />DEAD = 10 P5F (20 P5F TOTAL ® TILE) <br />WIND ULTIMATE WIND 5PEED 4 EXP05URE A5 L15TED <br />R15K GATE60RY II <br />6ENERAL FRAM I N6 <br />• EXTERIOR WOOD STUD BEARING WALL5 SHALL BE 2x 5PF#2 OR <br />5YP#2 o 16" O.G., OR BETTER (TYP. U.N.O. ON PLANS). <br />• INTERIOR WOOD 5TUD BEARING WALL5 SHALL BE 2x 5PF OR 5YP <br />STUD' GRADE LUMBER 0 I6" O.G., OR BETTER (TYP. U.N.O. ON PLANS). <br />• ALL INTERIOR 5HEARWALL5 SHALL BE GON5TRUGTED WITH 2x <br />STUD' GRADE MEMBERS 5PAGED A 16" O.G. (MAX.). <br />• ALL NON -BEARING INTERIOR STUD WALL5 SHALL BE GON5TRUGTED <br />WITH 2x 'STUD' GRADE MEMBERS 5PAGED o 24" O.G. (MAX). <br />• ALL HEADER5 SHALL BE 5UPPORTED BY (1)2x JACK 5TUD 4 (1)2x <br />KING 5TUD, MINIMUM. <br />- THE NUMBER OF 5TUD5 5PECIFIED AT A SUPPORT INDIGATE5 THE <br />NUMBER OF JAGK STUDS REQUIRED, U.N.O.. <br />• ALL HEADER5, BEAMS 4 OTHER STRUCTURAL MEMBERS 5HALL BE <br />5PRUGE-PINE-FIR #2 (5PF) OR SOUTHERN PINE #2 (5YP) LUMBER, OR <br />BETTER (KILN -DRIED). <br />• FACE NAIL MULTI -PLY 2x BEAM5 4 HEADER5 W/ 3-ROW5 OF 3"x0.131" <br />NAIL5 A 12" O.G. 5TA66ERED. APPLY NAILING FROM BOTH FAGE5 <br />3-PLY OR MORE GONDITION5. UTILIZE 2 ROWS OF NAIL5 FOR 2xb 4 <br />2x8 MEMBER5. <br />• FAGE NAIL BUILT UP 2x P05T5 IN 3'W.131" NAIL5 o 16" O.G. <br />5TAS6ERED. APPLY NAILING FROM BOTH FAGE5 o 3-PLY OR <br />MORE GONDITION5. <br />• REFER TO CONNECTION 5PEGIFIGATION5 TABLE FOR ALL <br />GONNEGTION5 (TYP. U.N.O. ON PLAN5). <br />• 5HEATH ALL WOOD FRAMED EXTERIOR WALL5 W/ 7/I6" 055 <br />FASTENED W/ 2Y2'x0.131" NAIL5 ® 6" O.G. ® ED6E5 4 12" O.G. <br />CENTER FIELD. PROVIDE HORIZONTAL 2x BLOGKINS AT ALL <br />UNSUPPORTED PANEL E06E5. TYPIGAL U.N.O. ON THE PLAN5. <br />• PROVIDE SOLID BLOGKINS IN FLOOR 5Y5TEM UNDER ALL P05T5 <br />GONTINUOU5 TO FOUNDATION/BEARING. <br />• ENGINEERED LUMBER TO MEET OR EXCEED THE FOLLOWING: <br />• L5L - Fb=2325 psi; Fv=310 psi; E=1.55x10"b psi <br />• LVL - Fb=2600 psi; Fv=285 psi; E=2.Ox10A0 psi <br />. FOR 2 4 3 PLY BEAM5 OF EQUAL WIDTH, FASTEN PLIES TOGETHER <br />WITH 3 ROW5 OF 3"x0.131" NAIL5 A 8" O/G OR 2 ROW5 Y4"x51'2" <br />51MP50N 505 5GREW5 (OR 5142" TRL65LOK 5GREW5) A 1611 0/6. U5E <br />A MINIMUM OF 3 ROW5 FOR BEAM DEPTHS OF 14" OR GREATER. <br />APPLY FA5TENIN6 AT BOTH FAGE5 FOR 3-PLY CONDITION. LOCATE <br />TOP 4 BOTTOM NAIL5/5GREW5 2" FROM EDGE. SOLID 3 Y2" OR 5 Y4" <br />BEAM5 ARE ACCEPTABLE. U5E 2 ROW5 OF NAIL5 FOR 2x6 4 2x8 <br />MEMBERS. <br />• FOR 4 PLY BEAM5 OF EQUAL WIDTH, FASTEN PLIES TOGETHER <br />WITH 3 ROWS OFY4"xb" 51MP50N 505 SGREW5 (OR 6 3/4" TRU55LOK <br />5GREW5) o 16" O/G. U5E A MINIMUM OF 4 ROWS FOR BEAM DEPTH5 <br />OF 14" OR GREATER. APPLY FA5TENIN6 AT BOTH FAGE5 (ONE 51DE <br />ONLY FOR TRU55LOK 56REW5). LOCATE TOP AND BOTTOM 5GREW5 <br />2" FROM EDGE. A 50LID 7" BEAM 15 ACCEPTABLE. <br />• ALL INTERIOR WALL 5TUD5 IN CONTACT W/ GMU WALL5 5HALL BE <br />PRESERVATIVE TREATED AND FA5TENED W/Y4" DIA. X 4" LONG <br />TAPGON5 0 24" O.G. <br />FLOOR FRAMING <br />• I-J015T5/TRU55E5 5HALL BE DE5I6NED BY MANUR TO MEET OR <br />EXCEED L/480 LIVE LOAD DEFLEGTION CRITERIA. <br />• ALL METAL HAN6ER5 5HALL BE 5PECIFIED BY I -JOIST /TRUSS <br />MANUFACTURER, UNLE55 OTHERN15E NOTED. <br />• I-JOI5T/TRU55 SHOP DW65. 5HALL BE 5UBMITTED TO ARCH. 4 EN6. <br />FOR REVIEW AND APPROVAL PRIOR TO FABRICATION OR DELIVERY. <br />• FLOOR SHEATHING 5HALL BE 23/32" CONFORMING TO P52-04, <br />24" O.G., EXP05URE I, TONGUE AND GROOVE E06E5, FASTEN <br />5HEATHING TO FRAMING MEMBERS W/ GLUE AND 3"x0.131" NAIL5 <br />6" O.G. AT PANEL E06E5 4 12" O.G. AT INTERMEDIATE 5UPPORT5. <br />TYPICAL STAIR GON51RUGTION NOTES <br />• (3) 51NSLE PLY 2x12 5TRIN6ER5 FASTENED TO HEADER AT TOP OR <br />LANDING, WHERE APPLICABLE, AND 2x6 P.T. PLATE AT BOTTOM W/ <br />(1) 51MP5ON A55 GLIP AT EAGH 5TRI%ER. <br />• FASTEN 2xb P.T. PLATE TO CONCRETE 5LAB W/ (3) %6" DIA. x 3 Y2" <br />LONG TAPGONS. <br />• FASTEN END 5TRIN6ER5 TO ADJACENT WALL5 W/ (2) 3"&131" NAIL5 <br />AT EACH 5TUD, WHERE APPLICABLE. <br />• PROVIDE %" FLOOR DECKING ON R15ER5 AND I" FLOOR DECKING <br />ON TREADS. <br />• 5EE STAIR FRAMING 5EGTION FOR MORE INFO. <br />seal: DEC 21 2020 <br />NO 7 824 <br />- k <br />� do :• STATE OF <br />V. <br />© copyng6� • ERA KILIP O. • • `. <br />�aa <br />no0 <br />z <br />JW <br />w <br />w <br />z <br />N <br />$ <br />Lo <br />z <br />C" <br />r- <br />w <br />--10 <br />a <br />LZ <br />N <br />rr <br />Z=� <br />� <br />U <br />It = <br />� n <br />c <br />W <br />ZT a <br />°O E <br />Jz <br />Q <br />M <br />W <br />o <br />� <br />W <br />S y <br />m _ <br />8 N <br />i� �. <br />C5 a <br />M&K project number: <br />068-2001 1 <br />project mgr: .J S B <br />drawn by: MJT <br />issue date: 12.15-20 <br />■ date: initial: ■ <br />Q <br />M.'" <br />a <br />Cz <br />a <br />0 <br />a <br />o <br />� <br />w <br />'L <br />0 <br />Z <br />p <br />� <br />0 <br />Q <br />� <br />Z <br />� <br />U <br />0 <br />Q' <br />(0 <br />(� <br />to <br />LO <br />C� <br />J J <br />sheet: <br />SM0.0 <br />