Laserfiche WebLink
GENERAL NOTES & SPECIFICATIONS <br />1 l i 1 P l 019 <br />i II II <br />L___J L___J L___ I <br />ARCHITECTURAL <br />SCALES 1/8' = 1'-0' <br />FLOOR PLAN <br />aD <br />ALUMINUM GUTTER <br />CANOPY BELOW TYP. <br />L---J L__.J <br />DIVISION ONE - GENERAL REQUIREMENTS <br />SUMMARY OF THE WORK <br />1. THE WORK INCLUDES ALL NEW CONSTRUCTION AS INDICATED IN THE DRAWINGS AND <br />SPECIFICATIONS. <br />2. THE PERFORMANCE OF ALL CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE <br />FEDERAL, STATE, COUNTY, AND CITY CODES, RULES AND REGULATIONS. <br />3. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL ITEMS NECESSARY FOR A <br />COMPLETE, FIRST-CLASS INSTALLATION OR THAT ARE ESSENTIAL FOR PROPER <br />OPERATION OF THE WORK INDICATED. <br />DIVISION FOUR - MA, OONNR�Y <br />SPLIT -FACED MASONRY <br />1. COLOR AND TEXTURE SHALL BE AS SELECTED BY OWNER FROM MANUFACTURER'S FULL <br />LINE FOR EACH SPECIFIED FACE, <br />2. PROVIDE SPECIAL SHAPES WHERE REQUIRED FOR LINTELS, JAMBS, CORNERS, SASH, <br />CONTROL JOINTS, HEADERS, BONDING, AND OTHER SPECIAL CONDITIONS. <br />3. USE MASONRY DETERGENT CLEANERS IN ACCORDANCE WITH MANUFACTURER'S <br />DIRECTIONS. DO NOT USE STEEL WOOL OR OTHER ABRASIVES, OR ANY PRODUCT <br />CONTAINING UNBUFFERED HYDROCHLORIC ACID OR OTHER ACIDS, <br />DIVISION SEVEN - THERMAL AND MOISTURE PROTECTION <br />MEMBRANE ROOFING <br />1. PR❑VIDE AN INSTALLED ROOFING MEMBRANE AND BASE FLASHING SYSTEM THAT DOES <br />NOT PERMIT THE PASSAGE OF WATER, AND WILL WITHSTAND THE DESIGN PRESSURES <br />CALCULATED IN ACCORDANCE WITH THE MOST CURRENT REVISION OF ASCE 7, <br />2. PROVIDE MANUFACTURER'S STANDARD GUARANTEE WITH SINGLE SOURCE COVERAGE, <br />METAL COPING <br />1. PR❑VIDE COPING/FLASHING SYSTEM WHICH MEETS THE CRITERIA RECOMMENDED BY <br />FACTORY MUTUAL RESEARCH CORPORATION'S (FMRC) REQUIREMENTS. <br />2. PROVIDE COPING/FLASHING SYSTEM TO MEET UPLIFT RATING REQUIRED FOR THE WALL <br />THICKNESS INDICATED. <br />3. PROVIDE COPING/FLASHING WITH KYNAR 500 / HYLAR 5000 FINISH FROM <br />MANUFACTURER'S STANDARD COIL-C❑ATED COLORS, <br />DIVISION EIGHT - DOORS AND WINDOWS <br />DOOR AND FRAMES <br />1. PROVIDE DOORS AND FRAMES AS INDICATED ON THE DRAWINGS. <br />2. DOORS AND FRAMES SHALL CONFORM TO THE REQUIREMENTS OF ANSI A250.8 <br />3. FIRE RATED DOORS AND FRAMES ARE INDICATED ON DOOR SCHEDULE AND SHALL BE <br />LABELED BY UL OR WH. <br />2. PROVIDE BUILDER'S HARDWARE FOR THE DOORS AND OPERATIONS INDICATED ON THE <br />DRAWINGS AND REQUIRED BY CODE, FURNISH OWNER 2 KEYS FOR EACH LOCK, <br />3. DOOR MANUFACTURER TO PROVIDE COMPLIANCE INFORMATION FOR FBC WIND LOAD <br />REQUIREMENTS AS NEEDED, <br />WINDOWS AND STOREFRONTS <br />1. PROVIDE OPERABLE AND FIXED WINDOWS AND STOREFRONTS AS SHOWN ON THE <br />DRAWINGS. <br />2. WINDOW/STOREFRONT MANUFACTURER TO PROVIDE COMPLIANCE INFORMATION FOR FBC <br />WIND LOAD REQUIREMENTS AS NEEDED, <br />DIVISION NINE - FINISHES <br />CEMENT PLASTER (STUCCO) <br />1. APPLY PORTLAND CEMENT PLASTER (STUCCO) TO ANSI STANDARDS A42.2 AND A42.3, <br />2. LATHING AND FURRING TO COMPLY WITH ASTM-C8411 <br />PAINTING <br />1. PAINT ALL EXPOSED SURFACES UNLESS OTHERWISE INDICATED, <br />2. INTERIOR PAINT SCHEDULE <br />CONCRETE, STUCCO AND MASONRYi 1 COAT WATERPROOFING MASONRY PAINT <br />1 COAT ELASTOMERIC WATERPROOF COATING <br />EXTERIOR ALUMINUM, 1 COAT ZINC CHROMATE PRIMER <br />2 COATS FLAT ALKYD ENAMEL <br />EXTERIOR WOOD TRIM, 1 COAT EXTERIOR PRIMER UNDERCOAT <br />2 COATS EXTERIOR ACRYLIC EMULSION <br />TILE <br />1. PR❑VIDE GLAZED CERAMIC WALL TILE THAT COMPLIES WITH ANSI A1371 <br />2. INSTALL TILE AND GROUT IN ACCORDANCE WITH APPLICABLE REQUIREMENTS OF ANSI <br />A108.1 THROUGH A108.13, <br />DIVISION TEN - SPECIALTIES <br />CANVAS AND ALUMINUM AWNINGS <br />1. CANVAS SHALL BE 100% EXTERIOR GRADE ACRYLIC FIBER <br />2. FRAMING SHALL BE V SQUARE .125 ASTM B 221 ALUMINUM TUBING, WELDING TO AWS <br />STANDARDS WITH WELDS GROUND SMOOTH. <br />METAL DOWNSPOUT. <br />GRADE. <br />SEAL PENETRATION OF <br />CAP ON ALL SIDES OF <br />DOWNSPOUT, <br />EXTEND DOWNSPOUT <br />6' MINIMUM BELOW <br />CAP PENETRATION. <br />PVC PIPING - REFER <br />TO CIVIL DWGS, FOR <br />PIPE SIZES AND <br />CONNECTION TO <br />DRAINAGE SYSTEM, <br />r2_ <br />ROOF PLAN DOWNSPOUT 3 BOOT DETAIL <br />A- 2 SCALES 1/8' = i'-0' a D A- 2 SCALEN,T,S, <br />Afto <br />0 <br />�+ <br />Vi <br />as <br />N <br />C <br />> <br />J <br />co <br />c <br />`° <br />c <br />� <br />FL <br />> <br />o <br />� <br />m <br />N <br />L <br />::r <br />Q <br />o <br />a <br />n <br />.I <br />J <br />0 <br />o� <br />U� <br />a <br />> <br />o <br />ON <br />N <br />C <br />z <br />d <br />c <br />a> <br />J <br />cc <br />0 <br />LL <br />U <br />C <br />o <br />J <br />rn <br />LL <br />ad <br />U_ <br />C <br />M <br />0 <br />S <br />s <br />N <br />iY <br />UL UL <br />_J <br />J <br />CN <br />z <br />U <br />J <br />- <br />�Ji <br />Z <br />c(i <br />(n <br />m <br />J <br />0 <br />U <br />= <br />D Q <br />mom= <br />UJ <br />z <br />N <br />M <br />coo <br />a <br />N <br />Revisions: <br />8/28/07 - OWNER <br />2 REQUESTED <br />CHANGES <br />9/24/07 - OWNER <br />3 REQUESTED <br />CHANGES <br />w <br />0 <br />OU) <br />o <br />Q <br />L.L <br />Q <br />o <br />J <br />_Jr <br />CL <br />Z <br />� <br />0 � y' <br />0 <br />�0 <br />Co <br />W <br />H <br />0 <br />= <br />Z N <br />UQ <br />Q <br />Project Number <br />06082a <br />Date <br />03-19-07 <br />Sheet Number <br />A-2 <br />