Laserfiche WebLink
FILLED CELLS <br />(SEE PLAN) <br />GONG. OR PAVER <br />DRIVEHAY---, <br />I6"x8" THIGKEN <br />EDGE W/ (2) #5 <br />GONT. <br />8" GMU BLOCK <br />vr-nr<^UI_ <br />@ CORNER <br />F 7 <br />GARAGE WALL <br />BEYOND <br />GARAGE SLAB <br />(SEE PLAN) <br />THICKENED EDGE @ GARAGE DOOR DETA I L <br />SCALE: NTS <br />(1) #5 VERT. FROM FT6.- <br />TO BOND BEAM. LAP N/ <br />FOUNDATION DOWEL <br />MIN. 30" 6ROUT CELL <br />SOLID <br />z <br />a� O . GRADE <br />IN <br />8" WIDE GONT. <br />GONG. GURB <br />— 1 1) #5 DOWEL H/ 6" HOOK AT <br />ALL VERT. WALL REINF. <br />(5EE PLANS FOR LOCATION) <br />=III —III —III— _ l i <br />GLEAN COMPACTED <br />FILL o 015% I'-p" MONOLITHIG FOUNDATION <br />STANDARD DENSITY MIN W/ (2) #5 GONT. ON CHAIRS <br />WHERE 2ND STORY NALL <br />OGGUR5 DIRECTLY ABOVE THE <br />8 GMU HALL 5HOHN, FT6. SHALL <br />BE 1'-4" HIDE W (2) #5 5AR5 <br />GRGE CURB DETAIL <br />SCALE: NTS <br />8" GMU BLOCK ' R4.1 FI-FOIL OR EQUAL <br />OVER %" FURR STRIPS <br />-PER BUILDER <br />(1) #5 VERT. FROM FT6. TO <br />BOND BEAM. LAP w/ HOUSE SLAB <br />FOUNDATION DOWEL MIN. (5EE PLAN) <br />30" GROUT CELL SOLID <br />z d d <br />I_I I I=1 <br />0 6RADE ° III III III—III=11 I. <br />m =III=III= cx III —III—III—III—' ATIomORGH/LANAI SLAB <br />IL a 1=1 11=1 11-111- (SEE PLAN) <br />=11 I— `' 111—I 11=111- <br />It ° 1=111- e <br />-= — III-- 1) #5 DOWEL W/ 6" HOOK AT GRADE <br />ALL VERT. WALL REINF. <br />l—III=1 1=1—I �I 1- (5EE PLANS FOR LOCATION) <br />i t-1 I I III —III —I 11= <br />GLEAN COMPACTED=1=1 I' _—I 1=1 I —III —III —III —I 1=' <br />FILL o q5% MONOLITHIC FOUNDATION 8 x8 THICKENED li 11i i <br />STANDARD DENSITY I -O W(2) #5 GONT. ON GHAIRS SLAB W(1) #5 GONT. <br />MIN. <br />WHERE 2ND STORY WALL <br />OGGUR5 DIRECTLY ABOVE THE <br />8" GMU WALL 5HOHN, FTC. SHAH <br />BE I'-4" WIDE w/ (2) #5 BAR5 <br />SOOTING SECTION W/ BLOCK DETAIL THICKENED EDGE DETAIL <br />2 SCALE: NT5 SCALE: NTS <br />8" GMU BLOCK R4.1 FI-FOIL OR EQUAL <br />BEYOND OVER 3/4" FURR STRIPS <br />EXTERIOR DOOR -PER BUILDER <br />MTL. THRESHOLD HOUSE SLAB <br />SET IN SEALANT (SEE PLAN) <br />PAVERS <br />(5EE PLANS) <br />a d ° dr77 <br />III II1=1II II1= <br />_ 1=1 1=1—I I_I �' <br />=III —I 1= cx —III III—I_I <br />'—III—I � III —I I a I I —III —III —I I I- <br />I- <br />I I m III I I d I I III —III- <br />II 11— II1-1II= <br />1 'III 1=11 _—MONOLITHIG <br />III — �_ i' FOUNDATION H/ (2) #5 <br />GLEAN COMPACTED FILL o q5% STANDARD I1 -O„ GONT. ON CHAIRS <br />DENSITY AND TERMITE MIN. <br />TREATED <br />WHERE 2ND 5TORY NALL <br />OGGUR5 DIRECTLY ABOVE THE <br />6" GMU HALL 5HOHN, FT6. SHALL <br />BE 1'-4" HIDE W (2) #5 BAR5 <br />ENTRY DOOR DETr�IL <br />6 SGAL.E: NTS <br />8" GMU BLOCK <br />(1) #5 VERT. FROM FT6. TO <br />BOND BEAM. LAP N/ <br />FOUNDATION DOWEL MIN. <br />30 GROUT CELL 50LID <br />PORGH/PATIO/LANAI <br />SLAB OR PAVERS <br />(5EE PLAN) <br />II°Id <br />EXP JOINT �r v <br />m <br />R4.1 FI-FOIL OR EQUAL <br />OVER %" FURR STRIPS <br />-PER BUILDER <br />HOUSE 5LAB <br />(SEE PLAN) <br />a <br />°d ` °r1__1 <br />= <br />1) #5 DOWEL W/ 6" HOOK AT <br />III —III= ALL VERT. WALL REINF. <br />(5EE PLANS FOR LOCATION) <br />GLEAN COMPACTED -� „III —III—III .I 1 <br />11 1- I1= <br />FILL o q5% MONOLITHIG FOUNDATION <br />STANDARD DENSITY I _0:� H/ (2) #5 GONT. ON <br />MIN. CHAIRS <br />WHERE 2ND STORY WALL <br />OGGUR5 DIRECTLY ABOVE THE <br />8" GMU WALL 5HOHN, FT6. SHALL <br />BE 1'-4" WIDE W (2) #5 BARS <br />EXTERIOR WALL @ PORCH/PATIO/LANAI DETAIL <br />SCALE: NT5 <br />Y2" GYP, BD, EA. 51DE <br />OF 2x4'5 o 16" O.G. <br />Y2" J-13OLT5 6" FROM EA. <br />v END OF WALL AND <br />SPACE o 32" O.G. <br />2" (6" MIN. EMBED) <br />w 5TUD PLATE TIES PER <br />} PT BOT. PLAN o STUD TOP 4 <br />PLT. BOT. <br />fill <br />m <br />o d ad a <br />— d _ • d <br />(2) #5'S GONT. H/ <br />3" MIN. CLEAR <br />UPLIFT CONNECTORS SUCH AS STUD PLATE TIES, HURRICANE CLIPS, AND <br />ANCHOR BOLTS ARE NOT REQUIRED ON WALLS NOT 506JEGT TO A <br />CALCULATED NET UPLIFT FORGE. WALL HHIGH REQUIRE SUCH HARDWARE <br />HILL BE 5PEGIFIGALLY NOTED ON PLAN. <br />GARAGE 5TEF DOWN DETAIL <br />SCALE: NTS <br />8" GMU BLOCK R4.1 FI-FOIL OR EQUAL <br />OVER %" FURR STRIPS <br />-PER BUILDER <br />(1) #5 VERT. FROM FT6. TO <br />BOND BEAM. LAP W HOUSE SLAB <br />FOUNDATION DOWEL MIN. (5EE PLAN) <br />30" GROUT CELL SOLID <br />Z d d <br />o II <br />RADE III I=1I =1 I II <br />—I I_I—III—I <br />m = <br />a° <br />seal: DEC 21 2020 <br />• NO 77 24 <br />• n <br />STATE <br />O <br />© copyn'(�1 <br />�o r�i�erit��, Inc., ;•u.,. <br />�z <br />JLU <br />w <br />w <br />z_ <br />o <br />C-0 <br />M <br />z <br />w <br />J <br />N <br />Z= <br />a <br />WCE <br />C� <br />'_tz <br />5 j <br />=a <br />Q. <br />o <br />.J <br />p <br />-2Ike <br />o� <br />y <br />LY <br />o <br />m <br />N <br />cc <br />C) <br />M CL <br />M&K project number: <br />068-2001 1 <br />project mgr: <br />J S B <br />drawn by: <br />MJT <br />issue date: 1 2- `[ 6-20 <br />REVISIONS: <br />date: initial: <br />I III II I III- � <br />PVC CHASE SLEEVE TO BE <br />- III=1 1=III=1 TWIGE THE DIAMETER OF q) <br />c� II —III —III---= = II1=11 •,., <br />-' '' i lI III III —III —III I =, 111- PROTECTED PIPE � � � <br />I I=1 I I III —III —I 11= <br />GLEAN COMPACTED aSTANDARD <br />MIN.FILL o 015% MONOLITHIG FOUNDATION DENSITY i _H/ (2) #5 GONT. ON CHAIRS <br />O <br />WHERE 2ND 5TORY WALL <br />OCGUR5 DIRECTLY ABOVE THE O <br />8" GMU WALL 5HOHN, FT6. SHALL <br />BE 1'-4" HIDE W (2) #5 BAR5 <br />(:DA�S DETAIL <br />Q <br />(n 0 <br />8" GMU BLOCK <br />BEYOND R4.1 FI-FOIL OR EQUAL LL <br />EXTERIOR DOOR OVER 3/4" FURR STRIPS <br />�, <br />MTL. THRESHOLD -PER BUILDER �+-.I UJ <br />SET IN SEALANT HOUSE SLAB T T T Z <br />(SEE PLAN) I _ <br />PORGH/PATIO/LANAI L-� 0 <br />SLAB OR PAVERS (],, <br />(SEE PLANS) <br />PER MANUF. III —I —III— O < '=1 I I=1 1 1= d 1=1 I I a III—I_I I —III —III_ ►� <br />=1 m III d 1=1 1=1 LU ,� < <br />UJ <br />III —III —III III—_ MONOLITHIG <br />GLEAN COMPACTED III = �= GONT. TION W/ ON CHAIRS (2) #5 <br />FILL o q5% STANDARD I -011 O (� <br />DENSITY AND TERMITE MIN. <br />TREATED O 0 Z <br />HHERE 2NO STORY HALL LL <br />JTOGCUR5 DIRECTLY ABOVE THE �..I <br />8" GMU HALL 5HOHN, FT6. SHALL <br />BE 1'-4" HIDE N/ (2) #5 BAR5 <br />sheet: <br />EXTERIOR OUT5W1 NG 4 56D POURED S LL5 DETAIL <br />SCALE: NTS <br />SDm 1 <br />