Laserfiche WebLink
RIGHT ELEVATION <br />SCALE: 1 /4"=1'-0" <br />12 <br />5 <br />12 <br />5 <br />5:12 <br />0 <br />*25 SH *25 SH <br />ROOF SHINGLES PER <br />COMMUNITY SPECS. (TYP.) <br />5:12 <br />0 <br />ROOF SHINGLES PER <br />COMMUNITY SPECS. (TYP.) <br />12 <br />5 <br />12 <br />5 <br />FIN. 1 ST FLOOR <br />PANT AND FINISH SCHEDULE I KEY <br />PAINT COLOR SCHEME <br />SURFACE TEXTURE / FINISH KEY <br />TEXTURE <br />BODY COLOR <br />FINISH <br />SAND <br />TRIM COLOR <br />FINISH <br />NOTE: WRAP THE SAND FINISH TRIM BAND (WHERE SHOWN <br />AROUND WINDOWS & DOORS) INTO THE JAMB, HEAD & SILL <br />OF THE WINDOW & DOORS. PAINT THE BAND, JAMB, HEAD & <br />SILL THE TRIM COLOR. <br />STUCCO AND PORTLAND CEMENT PLASTER SHALL <br />BE INSTALLED PER THE CURRENT ASTM C926 & C1063 <br />REQUIREMENTS & PROVISIONS OF THE FLORIDA BUILDING CODE <br />STUCCO SHALL NOT BE LESS THAN 3 COATS WHEN APPLIED <br />OVER METAL OR WIRE LATH AND SHALL NOT BE <br />LESS THAN 2 COATS WHEN APPLIED OVER MASONRY <br />CONTROL JOINTS IN 3-COAT STUCCO SHALL BE USED TO <br />DELINEATE STUCCO AREAS NOT GREATER THAN 144 SQ. FT. OR <br />AT A MAXIMUM DISTANCE OF 18' BETWEEN JOINTS <br />PER ASTM C1063 (CURRENT EDITION) <br />WEEP SCREED SHALL BE INSTALLED AT ALL <br />STUCCO TRANSITIONS BETWEEN WOOD AND MASONRY <br />AS REQUIRED BY ASTM C1063 (CURRENT EDITION) <br />LEFT ELEVATION DEC 2 1 2020 <br />SCALE:1/4"=1'-0° <br />`� y CENS;;�JiC'�, <br />• NO 77824 <br />° e* <br />�33 ' STArr <br />TE OF '4 <br />0 � 9 �r <br />.� C <br />a' O c� <br />Q <br />0 <br />0 <br />z <br />0 <br />0 <br />00-i <br />CL <br />to <br />w <br />w <br />wi <br />w <br />W <br />10� <br />w <br />cn � <br />Q <br />U) <br />w <br />CL <br />_O <br />lz <br />c <br />W <br />z <br />Z <br />08 <br />usG <br />�Z <br />aaaaa <br />COMMUNITY: <br />LINKS @ CALUSA SPRINGS <br />PLAN # 6120 <br />RELEASED:12/10/20 <br />SHEET <br />A292 <br />I;: Y 1&. 4 <br />